Problems and issues encountered on river restoration projects – a consultants view. Sally German, Senior Fluvial Geomorphologist, Arup. Appreciation of the need for detailed information. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Problems and issues encountered on river restoration projects – a consultants view](https://reader036.vdocuments.us/reader036/viewer/2022062304/5681423e550346895dae605b/html5/thumbnails/1.jpg)
Sally German, Senior Fluvial Geomorphologist, Arup
Problems and issues encountered on river restoration projects – a consultants view
![Page 2: Problems and issues encountered on river restoration projects – a consultants view](https://reader036.vdocuments.us/reader036/viewer/2022062304/5681423e550346895dae605b/html5/thumbnails/2.jpg)
2
Appreciation of the need for detailed information
The level of detailed information needed to develop a comprehensive design is often under estimated by the client – esp in the early stages of the project - therefore little budget to undertake geomorphological surveys/investigations to provide robust case for design parameters
![Page 3: Problems and issues encountered on river restoration projects – a consultants view](https://reader036.vdocuments.us/reader036/viewer/2022062304/5681423e550346895dae605b/html5/thumbnails/3.jpg)
3
Translation of concept to construction drawing
Difficult to present complex and diverse features in a ‘proper’ engineering drawing (and contractors not experienced in undertaking this type of work) – often results in the need for a high level of specialised on-site supervision
![Page 4: Problems and issues encountered on river restoration projects – a consultants view](https://reader036.vdocuments.us/reader036/viewer/2022062304/5681423e550346895dae605b/html5/thumbnails/4.jpg)
4
Engineering design issues
Disparities between designing features geomorphological vs engineering
Bed material – scour calcs to cope with 1in200yr flows vs ‘typical bed material’ or sediment size determined using sed transport rates
Bank slopes – natural slopes vs geotechnical stability Structures in the channel – appropriate size vs
engineering robustness (i.e. ability to withstand extreme conditions to ensure life of feature and reduce risk to flooding d/s if dislodged)
![Page 5: Problems and issues encountered on river restoration projects – a consultants view](https://reader036.vdocuments.us/reader036/viewer/2022062304/5681423e550346895dae605b/html5/thumbnails/5.jpg)
5
Acceptance of natural processes occurring
Sediment accumulation and erosion – acceptance (by client) that these processes may occur
![Page 6: Problems and issues encountered on river restoration projects – a consultants view](https://reader036.vdocuments.us/reader036/viewer/2022062304/5681423e550346895dae605b/html5/thumbnails/6.jpg)
6
Constraints on design
Issues relating to physical constraints – laterally due to development on the bank or the presence of a structure – design needed to manage this if risk considered high
![Page 7: Problems and issues encountered on river restoration projects – a consultants view](https://reader036.vdocuments.us/reader036/viewer/2022062304/5681423e550346895dae605b/html5/thumbnails/7.jpg)
7
Contractors – in the ground
Getting contractors to be more ‘natural’ with excavations – i.e not getting everything flat/level
Getting contractors to understand the importance of relative levels of the long profile – not just the cross-section – are v important – hard bed needs to be right
![Page 8: Problems and issues encountered on river restoration projects – a consultants view](https://reader036.vdocuments.us/reader036/viewer/2022062304/5681423e550346895dae605b/html5/thumbnails/8.jpg)
8
Tregaron - before
![Page 9: Problems and issues encountered on river restoration projects – a consultants view](https://reader036.vdocuments.us/reader036/viewer/2022062304/5681423e550346895dae605b/html5/thumbnails/9.jpg)
9
Tregaron - during
![Page 10: Problems and issues encountered on river restoration projects – a consultants view](https://reader036.vdocuments.us/reader036/viewer/2022062304/5681423e550346895dae605b/html5/thumbnails/10.jpg)
10
Tregaron - after
![Page 11: Problems and issues encountered on river restoration projects – a consultants view](https://reader036.vdocuments.us/reader036/viewer/2022062304/5681423e550346895dae605b/html5/thumbnails/11.jpg)
11
Beam Parklands - before
![Page 12: Problems and issues encountered on river restoration projects – a consultants view](https://reader036.vdocuments.us/reader036/viewer/2022062304/5681423e550346895dae605b/html5/thumbnails/12.jpg)
12
Beam Parkland - during
![Page 13: Problems and issues encountered on river restoration projects – a consultants view](https://reader036.vdocuments.us/reader036/viewer/2022062304/5681423e550346895dae605b/html5/thumbnails/13.jpg)
13
Beam Parkland - after