Petroleum Resource Integration

Preparation Stage in Bidang Perencanaan BPMIGAS

Page 2: Priprep2 xml

Orientation (Vision – Mission)

To supervise and control the PSC’s contracts’ implementation through partnership in order to ensure effectiveness and efficiency of upstream oil & gas business activities for the greatest welfare of the Nation

Be a proactive and trustworthy partner in optimizing the benefit of the upstream oil & gas industry for all stakeholders while becoming one of the nation’s engine in mobilizing different economic and industrial activities

Page 3: Priprep2 xml

Prudent Character

ProfessionalKnow what best to do

ResponsiveAware and respond to the

situation

UnityShare and incorporate each other

DecisiveAuthorize and responsible

EthicsKnow the way how to do

Nation focusedInternal resources oriented

Trustworthy Reliable to be taken into account

Knowledge and Technology

Communicative, online connectivity & direct notification

Centralized and integrated information

Analytic decision, planning & reporting

Best practice standard of procedures

In house management & administration

Accurate information, calculation, and estimation

Page 4: Priprep2 xml

SWOT BPMIGAS

STRENGTH– Orientation and Prudent Character

WEAKNESS– Standard level of technology implementation

– Offline connectivity & communication– Separated & individual application system

– Non analytic decision, planning, and reporting

– Incomprehensive SOP (PTPTK)– Outsourced management & administration

– Unreliable information calculation and estimation

OPPORTUNITY– Contractor’s advanced technology– Best practice standard in oil & gas

international community – Unexplored oil & gas resources

THREAD– National production declining

– Uncertainty of sustainable energy availability

Page 5: Priprep2 xml

Future condition phase 1 - Internal- “1st prudent realization” -

(Petroleum Resource Integration - PRI)

Advanced knowledge & technologyInternal dedicated GIS server for spatial and textual data management

Online communication and connectivityInternal system for KKKS data loader to BPMIGAS server

Centralized and integrated information systemInternal master textual database systemInternal master spatial database system

Analytic decision, planning & reportingInternal Project Portfolio Management System

Best practice business standard and procedureDesigned WP&B, AFE, POD Procedures and Tracking implementation

Designed PTPTK for Common GIS coordinate system, data structure, and symbology

In house management & administrationLocal administration portal for data, information, and knowledge database system of textual and

spatial data

Secure and reliable textual - spatial information, calculation, and estimationInternal Project Portfolio Management System

Unity

Ethics

Decisive

Trustworthy

Nation Focused

Professional

Responsive

Page 6: Priprep2 xml

How to Transfer Data?

Using text-column format– SPS, LIS, LAS, etc.

Using Excel format Using XML format

– MathML, GeoML, WitsML, etc.

Using Web Form– BCA/Mandiri/Niaga Internet Banking

Using GIS portal– WMS, USGS, Google Maps

Page 7: Priprep2 xml

XML Introduction

Page 8: Priprep2 xml

WITSML(Wellsite Information Transfer Standar Markup

Language)

Page 9: Priprep2 xml

XML Samples

XML Textual View

Table View

Form View

Page 10: Priprep2 xml

Database Terminology

Table

Query

Form

Report

*Macro

Where the data stored

Where the data calculated

Where to input data

Where the data published

To automate the process

Page 11: Priprep2 xml

App Build Procedure

Concept (The Main Idea)

Business Process

(The Procedure)

Data Structure (The Storage)

Application

(The Process)

Infrastructure (The Tools)

User

User

User / IT

IT

IT

Invention

Organization

Normalization

Programming

Configuration

Page 12: Priprep2 xml

BPMIGAS Data Group & Status

00-Basin60/86………….. 01-WK / KKS…………… 02-Komitmen…………… 03-WPNB……………….. 04-AFE………………….. 05-Study………………… 06-Survey………………. 07-EKS Drilling………… 08-P&L………………….. 09-POD…………………. 10-Field………………….

available

available

available

unsynchronized

unsynchronized

unavailable

unavailable

unavailable

to be completed

unavailable

unavailable

Page 13: Priprep2 xml

1ST PRUDENT PRI Realization

DBEP

Basin Monitor

COMMITMENT

WP&B

DOCUMENT CAPTURE ANALYSTICAL PROCESS PLANNING

Prospek LEad

AFESIE

DSSPRI

SIBEP

User Working

Panel

EKSEPT

LETTER

Pengem bangan

Lapangan

Project Progress

(DATA WAREHOUSE) (EXPERIENCES)(DATA ANALYSIS)

PORTFOLIO

K3S PERFORMANCE

GIS Data

Katalog Data EKS

RECOMENDATION

etc…… etc…… etc……

etc……

GIS

Page 14: Priprep2 xml

Future condition phase 2 - External- “2nd prudent realization” -

(Petroleum Resource Management - PRM)

Advanced knowledge & technologyBPMIGAS – KKKS connectivity with GIS to GIS communication technology

Online communication and connectivityBPMIGAS - KKKS online connectivity for data loading, capturing, query, retrieving and notification

Centralized and integrated information systemBPMIGAS Regional E&P base map of spatial textual database server synchronized with KKKS

local E&P thematic map of spatial textual database server

Analytic decision, planning & reportingCross BPMIGAS – KKKS Project Portfolio Management System

Best practice business standard and procedureImproved WP&B, AFE, POD Procedures PTPTK and Tracking

Improved GIS management (PTPTK) for BPMIGAS - KKKS

In house management & administrationCentralized administration portal for KKKS data, information, and knowledge database system of

textual and spatial data in BPMIGAS

Secure and reliable textual - spatial information, calculation, and estimationCross BPMIGAS – KKKS Project Portfolio Management System

Unity

Ethics

Decisive

Trustworthy

Nation Focused

Professional

Responsive

Page 15: Priprep2 xml

2ND PRUDENT PRI Connection

SIE

DSS

SIBEP

PORTFOLIO

K3S PERFORMANCE

CONNECTOR

OTHERSCONNECTIVITY(Inter Portal Connection)

GIS KKKSGIS BPMIGAS

Page 16: Priprep2 xml

BPMIGAS – KKKS Management in order to maintain national oil & gas production for sustainable energy supply of 1.2 MMBOPD in 2015

GIS InterfaceBPMIGAS Office

KKKS Office

• prospect ranking … !• exploration target … !• cum production rate … !• WP&B, AFE, POD…!

“..we propose drilling for the third year of contract situated

here..”

“..according to our regional base map you

shoul first d run 3D survey surrounding the location to

ensure the risk of drilling…”

Page 17: Priprep2 xml

NATIONAL GIS CONCEPT PLAN(Cloud Computing)

BPMIGAS

KKKS

KKKS

KKKS

KKKS KESEHATAN

KEHUTANAN

PERTANAHAN

PERTAMBANGAN

TRANSPORTASI

BAKOSURTANAL