Priority Defects for Go-Live - Detailed Report
Delta between 12-Mar-18 and 11-Apr-18
Last Updated: 12 Apr 2018
I-SEM: Market Trial
1
What’s Included?
This presentation details the changes between the 11-Apr-18 release schedule information and the schedule information that was presented on 12-Mar-18. For each defect it shows the progression over time, detailing what the schedule was on 12-Mar-18 and the schedule now as at 11-Apr-18.
# Slide Topic Content Description
2 What’s Included? Describes what’s included in the presentation.
3 Release Schedule as at 12-Mar-18
Summary Schedule By Vendor Release Date, Market Trial Release Date, and Audience as presented on 12-Mar-18.
4 Release Schedule as at 11-Apr-18
Summary Schedule By Vendor Release Date, Market Trial Release Date, and Audience as presented on 11-Apr-18.
5 Release Schedule Delta Shows how defects have moved between release schedules between 12-Mar-18 and 11-Apr-18
6-10 Details for Period: 03-Apr-18
Current schedule information for defects that were scheduled for the “03-Apr-18 Release" on the 12-Mar-18
11-12 Defect Details for Period: 22-Apr-18
Current schedule information for defects that were scheduled for the “22-Apr-18 Release" on the 12-Mar-18
13-15 Defect Details for Period: Release Pending
Current schedule information for defects that were “Release Pending" on the 12-Mar-18
16-18 Defect Details for Period: In EirGrid Testing
Current schedule information for defects that were “In EirGrid Testing" on the 12-Mar-18
2
Release Schedule of Priority Defects for Go-Live:
Summary as at 12-Mar-18
ABB to EirGrid Release Date
Planned 03-Apr
Planned 22-Apr
Release Pending
In EirGrid Test Total
(Planned / Pending / In Test)
Expected Release Date To Market
Trial 11-Apr 30-Apr - 19-Mar -
Market Participant Facing Defects
21 4 15 10 50
Internal Defects
31 14 22 17 84
Total Defects 52 18 37 27 134
3
Explanation of Headings
Planned 03-Apr The total number of open defects remaining to be released to EirGrid on 03 April 2018.
Planned 22-Apr The total number of open defects remaining to be released to EirGrid on 22 Apr 2018.
Release Pending The total number of defects for which a release date has not yet been agreed between EirGrid and the vendors (continuing under discussion)
In EirGrid Test The total number of defects that have been received by EirGrid and are currently undergoing test, prior to release into the Market Trial environment.
Total The sum of the Planned, Release Pending, and In EirGrid Test values.
Release Schedule of Priority Defects for Go-Live:
Summary as at 11-Apr-18
ABB to EirGrid Release Date
Planned 03-Apr
Planned 22-Apr
Release Pending
In EirGrid Test
Total (Planned / Pending
/ In Test)
Expected Release Date To Market Trial
11-Apr 30-Apr - Before 11-Apr
-
Market Participant Facing Defects
18 9 6 6 39
Internal Defects
36 17 14 6 73
Total Defects 54 26 20 12 112
4
ABB to EirGrid Release Date
Planned 03-Apr
Planned 22-Apr
Release Pending
In EirGrid Test
Test Closed (Pending Market Trial deployment)
Total
Expected Release Date To Market
Trial
Before or on
30-Apr 30-Apr -
Before or on
30-Apr
Before or on
30-Apr -
Market Participant Facing Defects
2 10 0 2 2 16
Internal Defects
3 28 1 6 3 41
Total Defects 5 38 1 8 5 57
Explanation of Headings
Planned 03-Apr The total number of open defects remaining to be released to EirGrid on 03 April 2018
Planned 22-Apr The total number of open defects remaining to be released to EirGrid on 22 Apr 2018
Release Pending The total number of defects for which a release date has not yet been agreed between EirGrid and the vendors (continuing under discussion)
In EirGrid Test The total number of defects that have been received by EirGrid and are currently undergoing test, prior to release into the Market Trial environment
Test Closed The total number of defects that have been received by EirGrid and which have completed test and are pending deployment to the Market Trial environment
Total The sum of the Planned, Release Pending, In EirGrid Test, and Test Closed values
1
2-M
ar B
ase
Cas
e
Now (11-Apr)
Planned 03-Apr
Planned 22-Apr
Release Pending
In EirGrid Test
Test Closed
Closed Total
11-Apr Total
Planned 03-Apr
1 5 5 3 38 52
Planned 22-Apr
1 8 1 8 18
Release Pending
1 16 1 19 37
In EirGrid Test
2 2 23 27
Closed
Total 12-Mar 134
New 2 9 16 27
Total Defects 5 38 1 8 5 104 161 161
Schedule of Priority Defects for Go-Live: Delta
5
As at 12-Mar-18 “Defects scheduled
for 03-Apr Release”
Market Participant Facing
ID Severity Category Description Schedule as at 11-Apr-18
5003 Moderate CSB This defect will be closed – these have been covered by other defects. Updated several CSB reports for alignment with ABB design and ITS Planned 22-Apr-18
5002 Moderate CSB REPT_067 Settlement Calendar Now Closed
5001 Moderate CSB REPT_065 Tolerance for Over Generation, Tolerance for Under Generation – missing fields Now Closed
4965 Moderate Reports REPT_032 displaying incorrect time horizon data Now Closed
4945 Moderate MPI Incorrect count of successful and unsuccessful records in processing statistic in XML submission Now Closed
4939 Moderate MPI When update the DOB under: MPI will not allow you to select a date prior to 1999 Now Closed
4931 Major Imbalance Pricing
QBOA- Correct issue with RT Availability and FPN feeds into QBOA calculation. Operator data prep workaround available and in use to prevent defect from negatively impacting QBOA calculation. Now Closed
4927 Moderate Reports REPT_013 Commercial Offer Data Accepted – resolve incorrect time horizon display Now Closed
4774 Moderate CSB REPT_045 Settlement Document – correct calculation and display of data for short-pay condition Now Closed
4757 Moderate CSB REPT_045 Settlement Document – correct handling of CCBDUE and CCBDUC in settlement re-allocation Now Closed
4468 Moderate CSB CSB-TP06-SETT04 –Market Operator Cost not calculated and included in Sett Rpts Planned 22-Apr-18
4447 Moderate CSB REPT_057/058 Energy Market Information Publication Indicative/Initial – incorrect assignment of DIFF Charges to CMU (type CAU) Planned 03-Apr-18
4415 Major QBOA QBOA-3.12.2.1 TP6_042 – Calculate QBOANF for Non-Firm Decremental Quantities Now Closed
4382 Moderate QBOA QBOA Correct error with DQ calculation for non-dispatchable, priority dispatch units Test Closed 6
ID Severity Category Description Schedule as at 11-Apr-18
4374 Moderate Reports XML and HTML report count mismatch for some MP reports Now Closed
4344 Major QBOA QBOA-3.7.2.11 TP6_008 – SYNC / PSYN Test Closed
4324 Moderate CSB REPT_067 Settlement Calendar (retest and validation) Now Closed
4273 Major QBOA QBOA-3.8.2.3 TP6_013 – COD Change / PCOD Now Closed
4251 Major QBOA QBOA-3.7.2.1 TP6_003 – Imbalance Settlement Period Boundary / PISP In EirGrid Test
4250 Major QBOA QBOA-3.7.2.1 TP6_003 – Imbalance Settlement Period Boundary / PISP In EirGrid Test
4032 Moderate QBOA QBOA-3.1.2.2 TP1_001 – Multiple MWOF Instruction Now Closed
7
As at 12-Mar-18 “Defects scheduled
for 03-Apr Release”
Market Participant Facing
ID Severity Category Description Schedule as at 11-Apr-18
5005 Moderate CSB Correct endpoint for INT 15_81 Now Closed
4966 Major Scheduling & Dispatch Correct incorrect assignment for IC status at run start Now Closed
4957 Moderate Imbalance Pricing PIMB re-run validation Now Closed
4937 Major Interfaces Resolves issue with INT_91 handling (Ex ante volumes into settlement), cross-border nominations not imported into CSB Test Closed
4928 Major Interfaces Resolves issue with INT_91 handling (Ex Ante volumes into settlement), AU asset type Now Closed
4918 Moderate CSB Clear temp tables Now Closed
4899 Major Scheduling & Dispatch Correct operating mode assignment for assets with SYNC instruction Now Closed
4879 Major Imbalance Pricing Validate inclusion of IC units in FPN test Now Closed
4871 Moderate CSB Change Holiday Export prefix Now Closed
4865 Major Scheduling & Dispatch RTD ignored certain SYNC instructions in some cases Now Closed
4864 Major Scheduling & Dispatch RTD error handling Now Closed
4838 Moderate Imbalance Pricing Inconsistent unit commitment actions with NCED in Cert Environment Now Closed
4831 Moderate CSB Update logic for CSB DA/IDT data push, exchange rate application Now Closed
4826 Moderate CSB Correct SQL error for Contact Management Now Closed 8
As at 12-Mar-18 “Defects scheduled
for 03-Apr Release”
TSO Internal
ID Severity Category Description Schedule as at 11-Apr-18
4780 Major CSB Correct issue with Event Management in CSB OUI Planned 22-Apr-18
4779 Major CSB Reconfigure event for CSB data push to settlement Now Closed
4710 Moderate Non-Functional Allow for automatic stslog process kill In EirGrid Test
4709 Major Non-Functional Update LDAP, 2FA login routine In EirGrid Test
4700 Major Non-Functional OUI intermittent failure Now Closed
4664 Moderate Scheduling & Dispatch Tab display issue in OUI Now Closed
4551 Major Interfaces Update cache clearing logic Planned 22-Apr-18
4372 Moderate Interfaces Error with INT_100 Planned 22-Apr-18
4333 Moderate Scheduling & Dispatch Correct filtering issue with Forecast data pre-scheduling Now Closed
4321 Moderate Scheduling & Dispatch Correct issue with Merit Order displays Now Closed
4171 Moderate Scheduling & Dispatch RT Frequency Data not populated with complete set of data Now Closed
4084 Major Interfaces Issue with equipment rating in NetMod after CIM import Now Closed
9
As at 12-Mar-18 “Defects scheduled
for 03-Apr Release”
TSO Internal
ID Severity Category Description Schedule as at 11-Apr-18
4076 Moderate Scheduling & Dispatch Error with SPS Now Closed
3814 Moderate Scheduling & Dispatch Errors with integration displays in OUI dashboard causing S/D errors Now not priority
3656 Moderate Interfaces Incorrect adjustment for non-conforming loads Now Closed
2133 Moderate Non-Functional Error with NFT_TP05 In EirGrid Test
2132 Moderate Non-Functional Error with NFT_TP08 Now Closed
10
As at 12-Mar-18 “Defects scheduled
for 03-Apr Release”
TSO Internal
Market Participant Facing
ID Severity Category Description Schedule as at 11-Apr-18
5011 Moderate Reports REPT_018, currently daily instead of ISP resolution Planned 22-Apr-18
5006 Moderate Reports REPT_012: The SQL not including correct field name for FUEL_USE. Now Closed
4921 Moderate MPI The MPI is inconsistently throwing an error when attempting to add a new Participant / Resource Planned 22-Apr-18
4907 Moderate Reports REPT_082 Average Outturn Availability – incorrect time horizon display Now Closed
11
As at 12-Mar-18 “Defects scheduled
for 22-Apr Release”
ID Severity Category Description Schedule as at 11-Apr-18
4969 Moderate Scheduling & Dispatch LTS ER3 missing RD Desy. Planned 22-Apr-18
4919 Major Interfaces Incorrect dates assigned to scheduling output files Now Closed
4911 Major Scheduling & Dispatch Incorrect display of N-S flow Planned 03-Apr-18
4900 Major Scheduling & Dispatch Incorrect application of operating mode across LTS/RTC sequence In EirGrid Test
4856 Major Scheduling & Dispatch
RTD & RTC not respecting Trip Instructions and RTD not respecting FAIL Instructions Now Closed
4846 Major Scheduling & Dispatch
RTD & RTC not respecting Trip Instructions and RTD not respecting FAIL Instructions Planned 22-Apr-18
4842 Major Scheduling & Dispatch Incorrect MIN OFF time calculation Planned 22-Apr-18
4840 Major Scheduling & Dispatch Improper LTS sequence termination for TCGs Now Closed
4441 Moderate Scheduling & Dispatch RTD EDIL DI not transferring to LTS for particular unit Now Closed
4412 Moderate Scheduling & Dispatch PS scheduling in forbidden zone Now Closed
4367 Major Scheduling & Dispatch RTD status message not displaying correctly Planned 22-Apr-18
4234 Major Scheduling & Dispatch Incorrectly truncating INC/DEC data Planned 22-Apr-18
3865 Major Dispatch Display issue for data in RTC Now Closed
3730 Moderate Scheduling & Dispatch Incorrect display of multiple ramp limits for ICMP in MPI Planned 22-Apr-18
12
Market Participant Facing
As at 12-Mar-18 “Defects scheduled
for 22-Apr Release”
ID Severity Category Description Schedule as at 11-Apr-18
5015 Moderate Reports REPT_081 – not delivered as specified: spliced price/quantity curve, ranked ASC by per aggregated associated quantity for each ISP. Planned 22-Apr-18
5013 Major Reports REPT_028 – currently displaying aggregate values per jurisdiction/ trading day – rather than 15-minute resolution as specified. Planned 22-Apr-18
5012 Moderate Reports REPT_023 – currently aggregated instead of ISP resolution Planned 22-Apr-18
4991 Moderate Reports REPT_017 - ParticipantName is showing as the MDP name. Should be the PT ID related to Resource. Now Closed
4990 Moderate Reports REPT_002b - Report displaying data for full Trading Day. Should only be displaying data for 3.5 hours. Now Closed
4988 Moderate Reports REPT_042 – Forecast Imbalance Report not including entire time horizon following DAGC (within day) Planned 22-Apr-18
4980 Moderate CSB REPT_045 Field names incorrectly labelled in the XML Report Now Closed
4960 Moderate CSB REPT_072 OUI process stays at 'initial' status. No Report available on the MPI Now Closed
4938 Moderate CSB REPT_071 - OUI process stays at 'initial' status. No Report available on the MPI Now Closed
4936 Moderate Reports Hourly Dispatch Instructions Report not available to download Report in MPI Now Closed
4935 Moderate Reports Report not publishing data for ‘Trade Date’ and ‘Delivery Date’ column Now Closed
4901 Moderate CSB REPT_067 Settlement Calendar, schema update – RUN_TYPE Now Closed
4475 Major Imbalance Pricing RTPIMB - Failing to run periodically Now Closed
4255 Major Imbalance Pricing
Imb. Pric. routine incorrectly flags units that do not contribute to constraints. No impact on PIMB calculation, but needs to be addressed. Planned 22-Apr-18 13
As at 12-Mar-18 “Defects Pending Release”
Market Participant Facing
ID Severity Category Description Schedule as at 11-Apr-18
4853 Moderate CSB CSB settlement re-run failing due to dependency of previous data push (MISTL_DLY_PUSH) Now Closed
4837 Moderate Imbalance Pricing EWIC is incorrectly flagged for S_PRM_ROI Now Closed
4834 Major Reports Inability to place the publication of specific reports on hold without compromising system performance or the publication of other reports. Unplanned
4799 Moderate Interfaces Adjust configuration for LPRED processes to sync with RT data feed from EMS Now Closed
4790 Moderate Scheduling & Dispatch Local constraint management issue for priority dispatch. Planned 22-Apr-18
4756 Major Scheduling & Dispatch PMPMW in DSI is not being applied to the NCED/NCUC/NCUC Input tables in all cases Now Closed
4532 Moderate Scheduling & Dispatch Advisory DI not followed if Follow PN=Y and UUT=Y Planned 22-Apr-18
4483 Moderate Scheduling & Dispatch Error in WPRED totals in some cases Planned 22-Apr-18
4360 Major Scheduling & Dispatch Incorrect display for COP - operator interface Planned 22-Apr-18
4318 Major Scheduling & Dispatch Incorrect notification time Now Closed
4306 Major Scheduling & Dispatch NCUC defaulting heat state to warm in some cases Planned 22-Apr-18
4235 Major Scheduling & Dispatch SA and NCUC functions incorrectly applying the hierarchy of Operating Mode Planned 22-Apr-18
14
As at 12-Mar-18 “Defects Pending Release”
TSO Internal
ID Severity Category Description Schedule as at 11-Apr-18
4188 Major Scheduling & Dispatch SYNC DI rule not followed in particular Initial Condition state Now Closed
4172 Moderate Scheduling & Dispatch Blending flags process in WPRED Planned 03-Apr-18
4123 Major Scheduling & Dispatch
Scheduling advising IC trade to move ICRP from forbidden zone. This is not expected behavior Planned 22-Apr-18
4096 Moderate Scheduling & Dispatch Error loading LT Forecast for WPRED Planned 22-Apr-18
3686 Moderate Interfaces CIM file import error Now Closed
2961 Moderate Scheduling & Dispatch Inconsistent display of time horizon across modules Planned 22-Apr-18
2950 Moderate Scheduling & Dispatch Advisory dispatch display issue (operator view) Planned 22-Apr-18
2912 Moderate Scheduling & Dispatch DSI incorrectly setting operating modes Planned 22-Apr-18
1627 Moderate Scheduling & Dispatch
Verify potential issue with start_time for Load Forecast across multiple scheduling runs Now Closed
1338 Moderate Scheduling & Dispatch Application of Complex Offers for RTD in absence of Simple COD Now Closed
1186 Major Scheduling & Dispatch Incorrect market operator display for Last Time to Instruct Alarm (LTS) Now Closed
15
As at 12-Mar-18 “Defects Pending Release”
TSO Internal
ID Severity Category Description Schedule as at 11-Apr-18
4933 Moderate CSB Resolves issue with REPT_043 Settlement Statement (sum values by Unit, Charge Component) in REPORT_DETAIL Now Closed
4932 Major Imbalance Pricing Resolve issue with offset timestamps between EDIL and TSO DI log Now Closed
4869 Moderate Reports Modify existing reports Rept_012, REPT_001a, REPT_001b, REPT_002a, REPT_002b as per CR 15b and aligns with currently published ITS (Volume C R7.2) Now Closed
4521 Major MPI Error querying newly added DSU via the MPI Now Closed
4430 Moderate CSB Resolves issue with REPT_045 Settlement Document Report. Preserve currency format. (0.0 – 0.00),missing vat totals in report_summary element Now Closed
4414 Major QBOA QBOA-3.11.2.5 TP6_041 – Calculate Accepted Offer Quantity Now Closed
4348 Major QBOA QBOA calculated incorrectly where DQs have overlapping FPNs Now Closed
4343 Major QBOA QBOA-3.7.2.11 TP6_008 – SYNC / PSYN Now Closed
4277 Major QBOA QBOA-3.7.2.9 TP6_007 – DESY / PDES Now Closed
4248 Major QBOA QBOA-3.7.2.1 TP6_003 – Imbalance Settlement Period Boundary / PISP Now Closed
16
As at 12-Mar-18 “Defects In EirGrid Testing”
Market Participant Facing
ID Severity Category Description Schedule as at 11-Apr-18
4978 Moderate CSB Importing FPN error Now Closed
4963 Moderate Interfaces AR_AP interface totals not matching Sttl Detail Table Now Closed
4954 Moderate CSB Internal_Use flag not properly set Now Closed
4952 Moderate CSB Ex Ante trades (particular scenarios) violating unique constraint in MMS/CSB. CSB should be updated to allow for integration of these trades. Now Closed
4951 Moderate CSB Sequencing error with push of exchange rate to internal systems Now Closed
4909 Moderate Reports Periodic event not appearing in MOI Now Closed
4835 Moderate CSB Time horizon overlapping in IC Capacity integration. Confirm timeframe, not a defect Now Closed
4816 Moderate CSB Exchange rate not pushed with each record. Should be updated, to prevent potential issue. Now Closed
4811 Moderate CSB Update query to account for latest EFF_TIME for EX_POST_AVAIL integration Test Closed
4803 Moderate CSB Update Reallocation query used in data transfer Test Closed
4773 Moderate CSB Verify AR/AP invoice totals to MS Dynamics Now Closed
4670 Moderate CSB Correct intermittent double-entry into audit table. Now Closed
17
As at 12-Mar-18 “Defects In EirGrid Testing”
Market Participant Facing
ID Severity Category Description Schedule as at 11-Apr-18
4213 Moderate CSB Re-run CSB-TP01 - MI Data 02 integration Now Closed
4201 Major Interfaces Update unit mapping tables data to resolve potential issue with multiple entries for single asset In EirGrid Test
4127 Major QBOA QBOA(3): Correct P5Min PDI In EirGrid Test
4043 Major Interfaces Correct issue with ICRP and LTS totals Now Closed
4030 Moderate Interfaces Correct mapping issue for State estimator file load Now not priority
18
As at 12-Mar-18 “Defects In EirGrid Testing”
Market Participant Facing