Prioritization Working Group December 12, 2006 Logistics
Time: 11:15 AM – 12:00 PM (EST) Place: 1095 Avenue of the Americas, NYC Floor: 12 Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle
Agenda
I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new T4 Change Requests – see page 5.
• Deferred – None. • New Type 5 – page 7. • New Type 4 – page 11.
III) Status update on existing Change Requests - page 17. Note: PWG Meeting Rules are available in the CMP Agreement Section VI Prioritization Working Group Meeting.
Page 2 of 23
Agenda Item I
Review Prior Month Activity Summary
November 14, 2006 Meeting Participants: The participants included Accenture, AT&T Local, AT&T Texas/California, CGI, Comcast, Covad, DSCI, Electric Lightwave, Eschelon, HTC, Integra, Level 3, Mountain Communications, Neustar, Ntelos, Penn Telecom, QTel, Sprint, Synchronoss Technology, Time Warner, Trinsic, US LEC, XO Communications.
Change Request Summary Deferred CRs N/A
Type 5 Rated C06-1767 Increase the number of templates that can be saved using LSI
Type 4 Rated N/A
Withdrawn N/A
Page 3 of 23
Rating Breakdown Type 5
Rating Type 5 - East
Type 5 - West
Type 5 – East/West
Type 5Total
5.0 8 9 3 20 4.0 – 4.9 27 14 12 53 3.0 – 3.9 2 2 1 4 2.0 – 2.9 0 0 0 0 1.0 – 1.9 0 0 0 0 Not Rated 0 2 0 2 Total Rated 38 27 17 80 Not Scheduled 4 7 1 12 Pending Requirements 29 19 12 59 Pending Scheduling 3 1 1 5 Withdrawn 0 0 0 0 Candidate/Committed 1 0 2 3 Total 37 27 16 80 East West Not Rated/Re-Rated 0 0 Cancelled/Withdrawn in 2006 8 14 Implemented/Completed in 2006 6 5 Cancelled/Withdrawn in 2005 12 10 Implemented/Completed in 2005 6 9 Cancelled/Withdrawn in 2004 13 10 Implemented/Completed in 2004 20 21 Cancelled/Withdrawn in 2003 7 10 Implemented/Completed in 2003 14 5 Cancelled/Withdrawn in 2002 19 8 Implemented/Completed in 2002 27 4 Total 132 96
Page 4 of 23
Scheduling and Implementation History of CLEC Rated Type 4/5 Change Requests by Release Release Date Type 4
Targeted/ Committed
Type 5 Targeted/ Committed
Type 4 Implemented
Type 5 Implemented
2002 Releases W – 12 E - 6
W – 4 E - 7
W – 12 E - 10
W – 14 E - 22
2003 Releases W – 16 E - 8
W – 5 E - 17
W – 12 E - 7
W – 5 E -13
2004 Releases W – 18 E - 15
W – 21 E - 19
W – 19 E - 14
W – 21 E - 20
2005 Releases W – 15 E - 14
W – 9 E - 6
W – 15 E - 16
W – 10 E - 6
February 13, 2006 February 19, 2006
W – 2 E – 5
W – 4 E – 1
W – 2 E – 5
W – 4 E – 1
April 16, 2006 W – 1 W – 0 W – 1 W – 0 June 12, 2006 June 18, 2006
W – 0 E – 4
W – 0 E – 3
W – 0 E – 4
W – 0 E – 3
October 8, 2006 October 15, 2006
W –1 E – 2
W –1 E – 2
W –1 E – 2
W –1 E – 2
February 12, 2007 February 18, 2007
W – 3 E - 2
W – 2 E - 3
Page 5 of 23
Agenda Item II
Deferred and New Type 4/5 Change Requests
Change Request Summary
Deferred N/A
Type 5 C06-2205 Modify the SAR response to return TNs individually
Type 4 C06-0599 Modify SUP Field Usage to Reduce Manual Intervention C06-0793 “No List” Edit Modification
Withdrawn N/A
Page 6 of 23
1. Deferred Change Requests. n/a
Page 7 of 23
2. Type 5 Change Requests. CR#/
Type Description of CR CLEC Ratings Status/Comments
C06-2205
Type 5
W
Title: Modify the SAR response to return TNs individually.
Description: Modify the SAR response to not send TNs in a range when the range is not specified on the resale or port service specific forms. Process: Order Jurisdiction: VZ West Systems: WISE/EDI Primary Area: Wholesale Advantage, Resale Documentation: Order Business Rules LSOG Version: 9 Initiator: Gloria Velez, AT&T
Overall = AT&T C/T = AT&T L = ATX = CGI = Comcast = Covad = DSCI = Electric Lightwave = Eschelon = HTC = Integra Telecom = Level 3 = Mountain Com = Ntelos = One Comm = Penn Telecom= QTel = Sprint = Time Warner = Trinsic = Unity Com = US LEC = XO =
STATUS: Pending Requirements .
Page 8 of 23
Initiator Gloria Velez
Telephone Number 973-360-1834
E-mail [email protected]
Initiator Company AT&T
Date request sent to Change Control
11/9/06
Identify the States that are affected by this change
West
Identify the products that are affected by this change
Resale, Wholesale Advantage
Identify the processes that are affected by this change
Order
Identify the transactions that are affected by this change
SAR
Identify the interfaces that are affected by this change
Identify the LSOG versions that are affected by this change
Describe the Change
Describe the functionality that you would like to enhance
Note: Describe what your Change Request is. Do not specify how to implement it.
Modify the SAR response to not send TNs in a range when the range is not specified on the resale or port service specific forms
Provide an example that justifies the change
Include attachments if available
SAR examples that contain a range in the TNS field but no range was sent on LSR or LSC. ZXSND3590014AA TNS = 760 530 9904 and 9905 ZXTAM3615036AA TNS = 813 866 4905 and 4906 ZXSAC3576542AA- has 2 separate ranges; only 1 was depicted on the SAR. No range depicted on LSC or Jeopardy.
Change Request Number: C06-2205 Title: T5 Modify the SAR response to return TNs individually.
Page 9 of 23
TNS = 559 834 9317 559 834 9318 559 834 9319 559 834 9174 – range on SAR 559 834 9175 ZXLOS3615735AA TNS = 209 825 9451 and 9452 ZXFRIDAYGTE2 Ver 05 – 10 line new order with 2 ranges. TNS = 909 463 3913 – 3914 909 463 7051 – 7052 ZXLOS3703519BB – 8 line UNE-P change order 2 lines were in a range 5624260371 5624266623 5624909462 5624909760 5625954957 5625957414 – SAR range 5625957415 5629888607 ZXLOS3715902AA – 1 line UNE-P change order to add a new line to an existing account. Received on the SAR all the lines against the account rather than just the 1 new TN. NO DL sent. ALI code for all TNS was ‘blank with the hyphen’.
How will your company benefit from completing the Change Request?
Reduce manual intervention as SAR drops for manual handling.
Describe the proposed solution to the change
How do you propose the Change Request can be implemented?
When data such as ALI is common for a TN range and a TN range was not specified on the LSR, create a separate instance for each TN. This will align to how the LSC and jeopardies are returned. The CR should be incorporated into the previous SAR CR Gloria Velez submitted.
What is the expected output resulting from the proposed solution?
Improve flow through
Interface Usability To be completed by Verizon
Benefit to CLECs To be completed by Verizon
Productivity Impact To be completed by Verizon
Page 10 of 23
Cost/Time Explanation To be completed by Verizon
LSOG Conformity To be completed by Verizon
Remarks To be completed by Verizon
Refer Questions to:
Page 11 of 23
3. Type 4 Change Requests. CR#/
Type Description of CR CLEC Ratings Status/Comments
C06-0599
398783
Type 4
W
Title: Modify SUP Field Usage to Reduce Manual Intervention
Description: The purpose of this initiative is to prohibit the use of the SUP field if the current date is the same date as the confirmed due date or if the current date is after the confirmed due date on the confirmation (LR).
Also, the SUP field will no longer be valid if a confirmation has not been received on a previous version of the LSR. Note: Loop with LNP and LNP are excluded from this change. Process: Order Jurisdiction: VZ West Systems: WISE/EDI Primary Area: Wholesale Advantage, Resale, UNE Documentation: Order Business Rules LSOG Version: 9 Initiator: Doug Tomlinson, Verizon
Overall = AT&T C/T = AT&T L = ATX = CGI = Comcast = Covad = DSCI = Electric Lightwave = Eschelon = HTC = Integra Telecom = Level 3 = Mountain Com = Ntelos = One Comm = Penn Telecom= QTel = Sprint = Time Warner = Trinsic = Unity Com = US LEC = XO =
STATUS: Pending Requirements .
Page 12 of 23
Initiator Verizon
E-mail [email protected]
Date request sent to Change Control
12/12/2006
Identify the States that are affected by this change
VZ West
Identify the products that are affected by this change
Wholesale Advantage, Resale, UNE
Identify the processes that are affected by this change
The process affected by this change is sending a supplemental LSR.
Identify the transactions that are affected by this change
Identify the interfaces that are affected by this change
WISE and EDI
Identify the LSOG versions that are affected by this change
LSOG 9
Describe the Change
Describe the functionality that you would like to enhance
Note: Describe what your Change Request is. Do not specify how to implement it.
The purpose of this initiative is to prohibit the use of the SUP field if the current date is the same date as the confirmed due date or if the current date is after the confirmed due date on the confirmation (LR).
The SUP field will no longer be valid if a confirmation has not been received on a previous version of the LSR. Loop with LNP and LNP are excluded from this change.
Provide an example that justifies the change
Include attachments if available
A LSR is sent in on the due date of the pending order. Automation processes the LSR and updates the order with the new changes from the LSR; however the field work was completed prior to the order updates and signed off. This creates an out of sync condition without any notification of the condition.
How will your company benefit from completing the Change Request?
Change Request Number: C06-0599 Title: Modify SUP Field Usage to Reduce Manual Intervention
Page 13 of 23
Describe the proposed solution to the change
How do you propose the Change Request can be implemented?
What is the expected output resulting from the proposed solution?
Interface Usability To be completed by Verizon
Benefit to CLECs To be completed by Verizon
Productivity Impact To be completed by Verizon
Cost/Time Explanation To be completed by Verizon
LSOG Conformity To be completed by Verizon
Remarks To be completed by Verizon
Refer Questions to:
Page 14 of 23
CR#/ Type
Description of CR CLEC Ratings Status/Comments
C06-0793
398783
Type 4
W
Title: “No List” Edit Modification Description: The purpose of this initiative is to prohibit the use of the ELT field if the existing account being converted, changed or moved has a “No List” listing status. The DL form will be required with the LSR package. In addition, the value of Z (No change to listing) in the LACT field is prohibited if the existing account being converted, changed or moved has a “No List” listing status. Process: Order Jurisdiction: VZ West Systems: WISE/EDI Primary Area: Wholesale Advantage, Resale Documentation: Order Business Rules LSOG Version: 9 Initiator: Doug Tomlinson, Verizon
Overall = AT&T C/T = AT&T L = ATX = CGI = Comcast = Covad = DSCI = Electric Lightwave = Eschelon = HTC = Integra Telecom = Level 3 = Mountain Com = Ntelos = One Comm = Penn Telecom= QTel = Sprint = Time Warner = Trinsic = Unity Com = US LEC = XO =
STATUS: Pending Requirements .
Page 15 of 23
Initiator Verizon
E-mail [email protected]
Date request sent to Change Control
12/12/2006
Identify the States that are affected by this change
VZ West
Identify the products that are affected by this change
Wholesale Advantage, Resale
Identify the processes that are affected by this change
Accounts being migrated converted that have a current “No List” status will require a DL form to process the request.
Identify the transactions that are affected by this change
Identify the interfaces that are affected by this change
WISE and EDI
Identify the LSOG versions that are affected by this change
LSOG 9
Describe the Change
Describe the functionality that you would like to enhance
Note: Describe what your Change Request is. Do not specify how to implement it.
When submitting a LSR, the use of the ELT and LACT fields to “Retain Listing As Is” will be prohibited if the existing account being converted, changed or moved has a “No List” listing status. The DL form will be required with the LSR package.
Provide an example that justifies the change
Include attachments if available
A reqtyp EB, ACT V, ELT A LSR is sent in requesting to convert the account. The existing account being converted has a listing status of No List. Currently the ELT = A would convert the listing as is keeping the No List status, however resale accounts are not allowed to have a No List status per the tariff.
How will your company benefit from completing the Change Request?
All converted accounts will have the correct Listing Status.
Change Request Number: C06-0793 Title: No List Edit Modification
Page 16 of 23
Describe the proposed solution to the change
How do you propose the Change Request can be implemented?
What is the expected output resulting from the proposed solution?
Interface Usability To be completed by Verizon
Benefit to CLECs To be completed by Verizon
Productivity Impact To be completed by Verizon
Cost/Time Explanation To be completed by Verizon
LSOG Conformity To be completed by Verizon
Remarks To be completed by Verizon
Refer Questions to:
Page 17 of 23
Agenda Item III Ranked Change Request Status Summary Rating Descriptions:
Status Description
PENDING REQUIREMENTS VZ accepted the initiative into Change Management but Verizon has yet to complete all the requirements for the initiative.
PENDING SCHEDULING Requirements are complete and final, change request is waiting for scheduled release date
SCHEDULED MONTH YEAR Change request is a candidate for a release or has been committed to a release.
NOT SCHEDULED VZ had advised CLECs that the initiative is not actively being worked.
CUF ISSUE # The initiative has been moved to the CUF.
WITHDRAWN The initiator has withdrawn the initiative.
Page 18 of 23
Type 5 Summary:
# East CR# Initiative West CR# Initiative Title Initiator Rated Status 1 East C02-
2712 376792
Standalone Digital UNE Loop Outside Moves through a Single Order Process
Covad 5 Not Scheduled
2 East C02-3217
378615
Same Day Pair Changes XO 5 Not Scheduled
3 East C03-1235
383974
Ability to Issue Record Orders via LSI and EDI
CTSI 5 Pending Requirements
4 West C03-2383
386313 Alert Notifications AT&T 5 Not Scheduled
5 East C04-0279
387071 West C04-0278
387070 Single LSR to move from UNE-P to xDSL Covad 5 Pending Requirements
6 East C04-0283
387076 West C04-0282
387074 Single LSR to migrate from Line Splitting to xDSL
Covad 5 Pending Requirements
7 West C04-0350
387272 Ability to Download Historical Customer Information from WISE
SBC 5 Not Scheduled
8 West C04-0785
387993 Notification Process for Jeopardies Eschelon 5 Not Scheduled
9 East C04-1017
388523 Allow 411 Blocking on UNE-P MetTel 5 Committed Feb 07
10 East C04-2386
391689
Provide an order mechanism to allow dark fiber move requests
SegTEL 5 Pending Requirements
11 East C05-0380
392945
Replace the Provider Notification Report with the Provider Notification Form
MetTel 5 Pending Requirements
12 East C05-0378
392944
Add the Billing Entry of Corporate Rewards feature ZCRW on an assume as is order
DSCI 5 Pending Requirements
13 East C05-2078
395377
Receipt of the CAT 11 Records on a daily basis.
Comcast 5 Pending Requirements
14
West C05-2272
395724 Allow for quicker identification of cancelled orders
Integra 5 Pending Requirements
15
West C05-2273
395725 Eliminate expiration date for Line Splitting agreements
Covad 5 Pending Requirements
16
West C05-2622
396339 Enhance the WISE Interface to pull the pre-order data into the LSR
Eschelon 5 Pending Requirements
17 West C06-0019
Expend Pre-Order View of cable pair availability
Eschelon 5 Pending Requirements
18 East C06-0734
West C06-0734
Greenfield addresses be included in the Bulk Loop Qualification Extract Database
AT&T 5 Pending Requirements
Page 19 of 23
# East CR# Initiative West CR# Initiative Title Initiator Rated Status
19 West C06-0862
Drop project requirement for Return to Native port in orders.
Eschelon 5 Pending Requirements
20 West C06-1324
Ability to pull a CSI with the Circuit ID Telscape 5 Pending Requirements
21 East C03-1209
383920 West C03-1334
384305 Single LSR to Migrate Line Share to Line Split
AT&T 4.9 Not Scheduled
22 East C03-2371
386121 West C03-2364
386117 Loopshare to Loopshare Migration – P3 Covad 4.9 Pending Requirements
23 East C04-0288
387067 West C04-0287
387078 Single LSR to migrate Loop Share to xDSL
Covad 4.9 Pending Requirements
24 East C04-0999
388487
Allow use of the WSOP = V on the EU form for interfering stations
Trinsic 4.9 Pending Requirements
25 East C05-0437
393189
Create a simple system for requesting “aerial to burial” loop changes
ATX 4.9 Pending Requirements
26
West C05-2428
396125 Allow the CFA validation tool to accept the input of T1 CFAs
Integra 4.9 Pending Requirements
27 East C06-1369
389922 West C06-1369
389922 Enhance TAXI TML to allow multiple TNs or circuit IDs on one ticket
Broadview 4.9 Committed Feb 07
28 East C02-1849
372230
Jeopardy for facility Notice Transmissions Covad 4.8 Pending Requirements
29 East C04-0284
387077
Enhancement of Automated Jeopardy Covad 4.8 Pending Requirements
30 East C04-0281
387073 West C04-0280
387072 Single LSR to move from LineShare to xDSLCapable Loop
Covad 4.8 Pending Requirements
31 East C06-0517
10861 West C06-0517
10861 MOVE Service Order Process Improvement
AT&T 4.8 Pending Requirements
32 East C06-1207
399378 West C06-1207
399378 Update service address for an end user with a records order.
AT&T 4.8 Pending Requirements
33 East C03-1146
383761
CFA Assignment Verification Covad 4.7 Pending Requirements
34
West C04-0254
386964 Misdirected Calls to 611 AT&T 4.7 Not Scheduled
35 East C05-0436
393188
Bill circuits by the States they service to the correct state BAN
Broadview 4.7 Pending Requirements
36 East C05-1180
394088
Don’t allow the disconnect process prior to the connect process on related transactions
ATX 4.7 Pending Requirements
37
West C05-2422
396124 Ability to return multiple iterations in CSI for the ECCKT and the NDLP
Integra 4.7 Pending Requirements
38 East C03-0057
380169 West C03-0072
380174 Line Splitting Data Migration Covad 4.6 Pending Requirements
Page 20 of 23
# East CR# Initiative West CR# Initiative Title Initiator Rated Status 39 East C04-
0697 387797 Retain function “Continue for Remaining”
and “Values for Remaining” in LSI redesign.
DSCI 4.6 Pending Requirements
40 East C04-1182
388803 Ability to reserve TNs for all Centrex Products
AT&T 4.6 Pending Requirements
41 East C05-0284
392918 CABS to include both the CSR and Bill in the same Mailing
Cavalier 4.6 Pending Requirements
42 East C05-1769
394972 West C05-1769
394972 Disconnect DSL capability on shared Loop where the voice is being migrated
Covad 4.6 Pending Scheduling
43 East C04-2406
391690 Shorten the port interval on simple ports Comcast 4.5 Pending Requirements
44 East C05-2076
395374 Allow creation of trouble tickets for all premises extensions/dual svc locations
Broadview 4.5 Pending Requirements
45 East C02-2290
374642 Line Station Transfer Notification Covad 4.4 Pending Scheduling
46 East C05-0797
393644 Allow a voice port without contacting the data provider when DSL is present
Comcast 4.4 Pending Scheduling
47 East C05-0575
393481 Integrate the validate collocation assignment step process
Conversant 4.4 Pending Requirements
48 West C05-1215
394090 The ability to submit bulk or batched PIC change orders
Eschelon 4.4 Pending Requirements
49 East C05-1852
394973 West C05-1852
394973 Line Split to Line Split change voice provider and keep/change data provider
MetTel 4.4 Committed Feb 07
50 East C05-1854
394975 West C05-1854
394975 Resale voice/CLEC data to Lineshare/Linesplit (change voice, keep/change data)
MetTel 4.4 Pending Requirements
51 East C05-2074
395373 Add OCN to file name on LLR Report Penn Telecom
4.4 Pending Requirements
52 East C05-2077
395376 Add Trouble Ticket Service Recovery Request and Response to the TAXI TML Interface
Broadview 4.4 Pending Requirements
53 West C05-2276
395726 Enhancements to the SCORE search function
Eschelon 4.4 Pending Requirements
54 West C06-1713
Return partial address validations parsed into respective fields
Sprint 4.2 Pending Requirements
55 West C03-2347
385953 Enhance Held Order Process Eschelon 4.3 Not Scheduled
56 East C03-2416
386317 Develop migrate Voice/Data service to/from Resale with unchanged data service on single LSR
MetTel 4.3 Pending Requirements
57 East C04-1586
389903 Remove Delay for Wholesale RCF Circuits
REMI 4.3 Pending Requirements
Page 21 of 23
# East CR# Initiative West CR# Initiative Title Initiator Rated Status
58 East C04-1590
389904
Change Provisioning Process for UNE-P Migration
REMI 4.3 Pending Requirements
59
West C04-1829
390710 Enhance the LSP Process for UNE-P Line Splitting
Covad 4.3 Pending Requirements
60 East C05-0051
392228
Ability to specify copper when ordering a loop
MetTel 4.3 Pending Requirements
61 East C05-1853
394974 West C05-1853
394974 Resale voice with DRL to Resale with CLEC data (change data provider)
MetTel 4.3 Pending Requirements
62
West C05-2203
395628 Improved descriptions of IOSCs in SCORE
Integra 4.3 Pending Requirements
63 East C03-0439
381932 POTS Reuse for T1 Service XO 4.2 Not Scheduled
64
West C05-2238
395629 Remove the requirement to populate the LSOG version in WISE
Eschelon 4.2 Pending Requirements
65
West C05-2241
395630 Auto populate all forms with the AN used on the LSR form
Eschelon 4.2 Pending Requirements
66 East C02-2797
376791
Directory Listing USOCs on Summary Bill AT&T 4.1 Not Scheduled
67
West C05-0322
392921 Improved enhanced reporting capabilities in WISE
SBC 4.1 Pending Requirements
68 East C05-1007
393841
Maintain DSL capability on shared loops where the TN is ported
Covad 4.1 Pending Scheduling
69 East C05-1860
394978
Allow the CLEC community to manage Assume Dial 9 Centrex services
Broadview 4.1 Pending Requirements
70 West C03-1705
384778 Reschedule VZW CLEC Production Impacting Release
AT&T 4 Pending Scheduling
71 East C04-0365
370394
CAB Formatting of 911, OSS and DUF quantity billed and unit rates
VarTec 4 Pending Requirements
72
West C05-1530
394476 Suppress SAR4 TNS/Lines that are not listed on the LSR
AT&T 4 Pending Requirements
73 East C05-2075
395374
Alter Provider Notification Reports by adding report total to a column
Penn Telecom
4 Pending Requirements
74
West C05-0321
392920 Advance search capabilities of LSRs in WISE database
SBC 3.9 Pending Requirements
75
West C06-0515
Re-instate the Billing Completion system’s notifier
AT&T 3.9 Pending Requirements
76 East C06-0207
West C06-0207
Expand the PHONE field in the Trouble Administration using TAXI TML services.
Broadview 3.8 Pending Requirements
Page 22 of 23
# East CR# Initiative West CR# Initiative Title Initiator Rated Status
77 East C04-2134
391190 Ability to issue a UNE P to Resale Migration as is or as is with minor changes
Broadview 3.7 Pending Requirements
78 East C06-1767
Increase the number of templates that can be saved using LSI
Qtel 3 Pending Requirements
79 West C03-1517
384425 LEX and LST fields for Directory List Posting
AT&T NR Not Scheduled
80 West C04-1271
389088 Provide Associated FIDs and FID Detail in lieu of IOSC Description
AT&T NR Not Scheduled
Page 23 of 23
Type 4 Summary:
# Region CR# Initiative Title Rated Status 1 East C05-2219 396243 Add Showbook Functionality to the
Directory Listing Pre-order Transactions
5 Committed Feb 07
2 E/W C06-1160 398819 LSI-TA to add 7 days of access hours 4.8 Committed Feb 07
3 East C05-1551 394481 UNE Loop to Resale Migrations 4.3 Pending Scheduling
4 West C04-2480 391760 Flow Through to Process Centranet requests for Acts of N, V & T
3.8 Pending Scheduling
5 East C04-1064 388555 Modify CRS Form 3.2 Pending Scheduling
6 East C05-0150 392296 Flowthru ACT=N WithPorted in TN 3.1 Pending Scheduling
7 West C05-1910 395081 Feature Combo Errors for VZ West UNEP & Resale
3 Committed Feb 07
8 East C05-1389 394419 Flowthrough Expedite Requests 3 Pending Scheduling
9 East C05-0956 393790 Implement maximum line/PON number restrictions for PON processing
1 Pending Requirements