Page 1 of 23 Prioritization Working Group December 12, 2006 Logistics Time: 11:15 AM – 12:00 PM (EST) Place: 1095 Avenue of the Americas, NYC Floor: 12 Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle Agenda I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new T4 Change Requests – see page 5. Deferred – None. New Type 5 – page 7. New Type 4 – page 11. III) Status update on existing Change Requests - page 17. Note: PWG Meeting Rules are available in the CMP Agreement Section VI Prioritization Working Group Meeting.

Upload: others

Post on 01-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Prioritization Working Group · Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle Agenda I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new

Page 1 of 23

Prioritization Working Group December 12, 2006 Logistics

Time: 11:15 AM – 12:00 PM (EST) Place: 1095 Avenue of the Americas, NYC Floor: 12 Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle

Agenda

I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new T4 Change Requests – see page 5.

• Deferred – None. • New Type 5 – page 7. • New Type 4 – page 11.

III) Status update on existing Change Requests - page 17. Note: PWG Meeting Rules are available in the CMP Agreement Section VI Prioritization Working Group Meeting.

Page 2: Prioritization Working Group · Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle Agenda I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new

Page 2 of 23

Agenda Item I

Review Prior Month Activity Summary

November 14, 2006 Meeting Participants: The participants included Accenture, AT&T Local, AT&T Texas/California, CGI, Comcast, Covad, DSCI, Electric Lightwave, Eschelon, HTC, Integra, Level 3, Mountain Communications, Neustar, Ntelos, Penn Telecom, QTel, Sprint, Synchronoss Technology, Time Warner, Trinsic, US LEC, XO Communications.

Change Request Summary Deferred CRs N/A

Type 5 Rated C06-1767 Increase the number of templates that can be saved using LSI

Type 4 Rated N/A

Withdrawn N/A

Page 3: Prioritization Working Group · Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle Agenda I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new

Page 3 of 23

Rating Breakdown Type 5

Rating Type 5 - East

Type 5 - West

Type 5 – East/West

Type 5Total

5.0 8 9 3 20 4.0 – 4.9 27 14 12 53 3.0 – 3.9 2 2 1 4 2.0 – 2.9 0 0 0 0 1.0 – 1.9 0 0 0 0 Not Rated 0 2 0 2 Total Rated 38 27 17 80 Not Scheduled 4 7 1 12 Pending Requirements 29 19 12 59 Pending Scheduling 3 1 1 5 Withdrawn 0 0 0 0 Candidate/Committed 1 0 2 3 Total 37 27 16 80 East West Not Rated/Re-Rated 0 0 Cancelled/Withdrawn in 2006 8 14 Implemented/Completed in 2006 6 5 Cancelled/Withdrawn in 2005 12 10 Implemented/Completed in 2005 6 9 Cancelled/Withdrawn in 2004 13 10 Implemented/Completed in 2004 20 21 Cancelled/Withdrawn in 2003 7 10 Implemented/Completed in 2003 14 5 Cancelled/Withdrawn in 2002 19 8 Implemented/Completed in 2002 27 4 Total 132 96

Page 4: Prioritization Working Group · Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle Agenda I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new

Page 4 of 23

Scheduling and Implementation History of CLEC Rated Type 4/5 Change Requests by Release Release Date Type 4

Targeted/ Committed

Type 5 Targeted/ Committed

Type 4 Implemented

Type 5 Implemented

2002 Releases W – 12 E - 6

W – 4 E - 7

W – 12 E - 10

W – 14 E - 22

2003 Releases W – 16 E - 8

W – 5 E - 17

W – 12 E - 7

W – 5 E -13

2004 Releases W – 18 E - 15

W – 21 E - 19

W – 19 E - 14

W – 21 E - 20

2005 Releases W – 15 E - 14

W – 9 E - 6

W – 15 E - 16

W – 10 E - 6

February 13, 2006 February 19, 2006

W – 2 E – 5

W – 4 E – 1

W – 2 E – 5

W – 4 E – 1

April 16, 2006 W – 1 W – 0 W – 1 W – 0 June 12, 2006 June 18, 2006

W – 0 E – 4

W – 0 E – 3

W – 0 E – 4

W – 0 E – 3

October 8, 2006 October 15, 2006

W –1 E – 2

W –1 E – 2

W –1 E – 2

W –1 E – 2

February 12, 2007 February 18, 2007

W – 3 E - 2

W – 2 E - 3

Page 5: Prioritization Working Group · Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle Agenda I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new

Page 5 of 23

Agenda Item II

Deferred and New Type 4/5 Change Requests

Change Request Summary

Deferred N/A

Type 5 C06-2205 Modify the SAR response to return TNs individually

Type 4 C06-0599 Modify SUP Field Usage to Reduce Manual Intervention C06-0793 “No List” Edit Modification

Withdrawn N/A

Page 6: Prioritization Working Group · Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle Agenda I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new

Page 6 of 23

1. Deferred Change Requests. n/a

Page 7: Prioritization Working Group · Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle Agenda I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new

Page 7 of 23

2. Type 5 Change Requests. CR#/

Type Description of CR CLEC Ratings Status/Comments

C06-2205

Type 5

W

Title: Modify the SAR response to return TNs individually.

Description: Modify the SAR response to not send TNs in a range when the range is not specified on the resale or port service specific forms. Process: Order Jurisdiction: VZ West Systems: WISE/EDI Primary Area: Wholesale Advantage, Resale Documentation: Order Business Rules LSOG Version: 9 Initiator: Gloria Velez, AT&T

Overall = AT&T C/T = AT&T L = ATX = CGI = Comcast = Covad = DSCI = Electric Lightwave = Eschelon = HTC = Integra Telecom = Level 3 = Mountain Com = Ntelos = One Comm = Penn Telecom= QTel = Sprint = Time Warner = Trinsic = Unity Com = US LEC = XO =

STATUS: Pending Requirements .

Page 8: Prioritization Working Group · Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle Agenda I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new

Page 8 of 23

Initiator Gloria Velez

Telephone Number 973-360-1834

E-mail [email protected]

Initiator Company AT&T

Date request sent to Change Control

11/9/06

Identify the States that are affected by this change

West

Identify the products that are affected by this change

Resale, Wholesale Advantage

Identify the processes that are affected by this change

Order

Identify the transactions that are affected by this change

SAR

Identify the interfaces that are affected by this change

Identify the LSOG versions that are affected by this change

Describe the Change

Describe the functionality that you would like to enhance

Note: Describe what your Change Request is. Do not specify how to implement it.

Modify the SAR response to not send TNs in a range when the range is not specified on the resale or port service specific forms

Provide an example that justifies the change

Include attachments if available

SAR examples that contain a range in the TNS field but no range was sent on LSR or LSC. ZXSND3590014AA TNS = 760 530 9904 and 9905 ZXTAM3615036AA TNS = 813 866 4905 and 4906 ZXSAC3576542AA- has 2 separate ranges; only 1 was depicted on the SAR. No range depicted on LSC or Jeopardy.

Change Request Number: C06-2205 Title: T5 Modify the SAR response to return TNs individually.

Page 9: Prioritization Working Group · Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle Agenda I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new

Page 9 of 23

TNS = 559 834 9317 559 834 9318 559 834 9319 559 834 9174 – range on SAR 559 834 9175 ZXLOS3615735AA TNS = 209 825 9451 and 9452 ZXFRIDAYGTE2 Ver 05 – 10 line new order with 2 ranges. TNS = 909 463 3913 – 3914 909 463 7051 – 7052 ZXLOS3703519BB – 8 line UNE-P change order 2 lines were in a range 5624260371 5624266623 5624909462 5624909760 5625954957 5625957414 – SAR range 5625957415 5629888607 ZXLOS3715902AA – 1 line UNE-P change order to add a new line to an existing account. Received on the SAR all the lines against the account rather than just the 1 new TN. NO DL sent. ALI code for all TNS was ‘blank with the hyphen’.

How will your company benefit from completing the Change Request?

Reduce manual intervention as SAR drops for manual handling.

Describe the proposed solution to the change

How do you propose the Change Request can be implemented?

When data such as ALI is common for a TN range and a TN range was not specified on the LSR, create a separate instance for each TN. This will align to how the LSC and jeopardies are returned. The CR should be incorporated into the previous SAR CR Gloria Velez submitted.

What is the expected output resulting from the proposed solution?

Improve flow through

Interface Usability To be completed by Verizon

Benefit to CLECs To be completed by Verizon

Productivity Impact To be completed by Verizon

Page 10: Prioritization Working Group · Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle Agenda I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new

Page 10 of 23

Cost/Time Explanation To be completed by Verizon

LSOG Conformity To be completed by Verizon

Remarks To be completed by Verizon

Refer Questions to:

Page 11: Prioritization Working Group · Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle Agenda I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new

Page 11 of 23

3. Type 4 Change Requests. CR#/

Type Description of CR CLEC Ratings Status/Comments

C06-0599

398783

Type 4

W

Title: Modify SUP Field Usage to Reduce Manual Intervention

Description: The purpose of this initiative is to prohibit the use of the SUP field if the current date is the same date as the confirmed due date or if the current date is after the confirmed due date on the confirmation (LR).

Also, the SUP field will no longer be valid if a confirmation has not been received on a previous version of the LSR. Note: Loop with LNP and LNP are excluded from this change. Process: Order Jurisdiction: VZ West Systems: WISE/EDI Primary Area: Wholesale Advantage, Resale, UNE Documentation: Order Business Rules LSOG Version: 9 Initiator: Doug Tomlinson, Verizon

Overall = AT&T C/T = AT&T L = ATX = CGI = Comcast = Covad = DSCI = Electric Lightwave = Eschelon = HTC = Integra Telecom = Level 3 = Mountain Com = Ntelos = One Comm = Penn Telecom= QTel = Sprint = Time Warner = Trinsic = Unity Com = US LEC = XO =

STATUS: Pending Requirements .

Page 12: Prioritization Working Group · Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle Agenda I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new

Page 12 of 23

Initiator Verizon

E-mail [email protected]

Date request sent to Change Control

12/12/2006

Identify the States that are affected by this change

VZ West

Identify the products that are affected by this change

Wholesale Advantage, Resale, UNE

Identify the processes that are affected by this change

The process affected by this change is sending a supplemental LSR.

Identify the transactions that are affected by this change

Identify the interfaces that are affected by this change

WISE and EDI

Identify the LSOG versions that are affected by this change

LSOG 9

Describe the Change

Describe the functionality that you would like to enhance

Note: Describe what your Change Request is. Do not specify how to implement it.

The purpose of this initiative is to prohibit the use of the SUP field if the current date is the same date as the confirmed due date or if the current date is after the confirmed due date on the confirmation (LR).

The SUP field will no longer be valid if a confirmation has not been received on a previous version of the LSR. Loop with LNP and LNP are excluded from this change.

Provide an example that justifies the change

Include attachments if available

A LSR is sent in on the due date of the pending order. Automation processes the LSR and updates the order with the new changes from the LSR; however the field work was completed prior to the order updates and signed off. This creates an out of sync condition without any notification of the condition.

How will your company benefit from completing the Change Request?

Change Request Number: C06-0599 Title: Modify SUP Field Usage to Reduce Manual Intervention

Page 13: Prioritization Working Group · Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle Agenda I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new

Page 13 of 23

Describe the proposed solution to the change

How do you propose the Change Request can be implemented?

What is the expected output resulting from the proposed solution?

Interface Usability To be completed by Verizon

Benefit to CLECs To be completed by Verizon

Productivity Impact To be completed by Verizon

Cost/Time Explanation To be completed by Verizon

LSOG Conformity To be completed by Verizon

Remarks To be completed by Verizon

Refer Questions to:

Page 14: Prioritization Working Group · Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle Agenda I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new

Page 14 of 23

CR#/ Type

Description of CR CLEC Ratings Status/Comments

C06-0793

398783

Type 4

W

Title: “No List” Edit Modification Description: The purpose of this initiative is to prohibit the use of the ELT field if the existing account being converted, changed or moved has a “No List” listing status. The DL form will be required with the LSR package. In addition, the value of Z (No change to listing) in the LACT field is prohibited if the existing account being converted, changed or moved has a “No List” listing status. Process: Order Jurisdiction: VZ West Systems: WISE/EDI Primary Area: Wholesale Advantage, Resale Documentation: Order Business Rules LSOG Version: 9 Initiator: Doug Tomlinson, Verizon

Overall = AT&T C/T = AT&T L = ATX = CGI = Comcast = Covad = DSCI = Electric Lightwave = Eschelon = HTC = Integra Telecom = Level 3 = Mountain Com = Ntelos = One Comm = Penn Telecom= QTel = Sprint = Time Warner = Trinsic = Unity Com = US LEC = XO =

STATUS: Pending Requirements .

Page 15: Prioritization Working Group · Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle Agenda I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new

Page 15 of 23

Initiator Verizon

E-mail [email protected]

Date request sent to Change Control

12/12/2006

Identify the States that are affected by this change

VZ West

Identify the products that are affected by this change

Wholesale Advantage, Resale

Identify the processes that are affected by this change

Accounts being migrated converted that have a current “No List” status will require a DL form to process the request.

Identify the transactions that are affected by this change

Identify the interfaces that are affected by this change

WISE and EDI

Identify the LSOG versions that are affected by this change

LSOG 9

Describe the Change

Describe the functionality that you would like to enhance

Note: Describe what your Change Request is. Do not specify how to implement it.

When submitting a LSR, the use of the ELT and LACT fields to “Retain Listing As Is” will be prohibited if the existing account being converted, changed or moved has a “No List” listing status. The DL form will be required with the LSR package.

Provide an example that justifies the change

Include attachments if available

A reqtyp EB, ACT V, ELT A LSR is sent in requesting to convert the account. The existing account being converted has a listing status of No List. Currently the ELT = A would convert the listing as is keeping the No List status, however resale accounts are not allowed to have a No List status per the tariff.

How will your company benefit from completing the Change Request?

All converted accounts will have the correct Listing Status.

Change Request Number: C06-0793 Title: No List Edit Modification

Page 16: Prioritization Working Group · Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle Agenda I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new

Page 16 of 23

Describe the proposed solution to the change

How do you propose the Change Request can be implemented?

What is the expected output resulting from the proposed solution?

Interface Usability To be completed by Verizon

Benefit to CLECs To be completed by Verizon

Productivity Impact To be completed by Verizon

Cost/Time Explanation To be completed by Verizon

LSOG Conformity To be completed by Verizon

Remarks To be completed by Verizon

Refer Questions to:

Page 17: Prioritization Working Group · Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle Agenda I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new

Page 17 of 23

Agenda Item III Ranked Change Request Status Summary Rating Descriptions:

Status Description

PENDING REQUIREMENTS VZ accepted the initiative into Change Management but Verizon has yet to complete all the requirements for the initiative.

PENDING SCHEDULING Requirements are complete and final, change request is waiting for scheduled release date

SCHEDULED MONTH YEAR Change request is a candidate for a release or has been committed to a release.

NOT SCHEDULED VZ had advised CLECs that the initiative is not actively being worked.

CUF ISSUE # The initiative has been moved to the CUF.

WITHDRAWN The initiator has withdrawn the initiative.

Page 18: Prioritization Working Group · Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle Agenda I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new

Page 18 of 23

Type 5 Summary:

# East CR# Initiative West CR# Initiative Title Initiator Rated Status 1 East C02-

2712 376792

Standalone Digital UNE Loop Outside Moves through a Single Order Process

Covad 5 Not Scheduled

2 East C02-3217

378615

Same Day Pair Changes XO 5 Not Scheduled

3 East C03-1235

383974

Ability to Issue Record Orders via LSI and EDI

CTSI 5 Pending Requirements

4 West C03-2383

386313 Alert Notifications AT&T 5 Not Scheduled

5 East C04-0279

387071 West C04-0278

387070 Single LSR to move from UNE-P to xDSL Covad 5 Pending Requirements

6 East C04-0283

387076 West C04-0282

387074 Single LSR to migrate from Line Splitting to xDSL

Covad 5 Pending Requirements

7 West C04-0350

387272 Ability to Download Historical Customer Information from WISE

SBC 5 Not Scheduled

8 West C04-0785

387993 Notification Process for Jeopardies Eschelon 5 Not Scheduled

9 East C04-1017

388523 Allow 411 Blocking on UNE-P MetTel 5 Committed Feb 07

10 East C04-2386

391689

Provide an order mechanism to allow dark fiber move requests

SegTEL 5 Pending Requirements

11 East C05-0380

392945

Replace the Provider Notification Report with the Provider Notification Form

MetTel 5 Pending Requirements

12 East C05-0378

392944

Add the Billing Entry of Corporate Rewards feature ZCRW on an assume as is order

DSCI 5 Pending Requirements

13 East C05-2078

395377

Receipt of the CAT 11 Records on a daily basis.

Comcast 5 Pending Requirements

14

West C05-2272

395724 Allow for quicker identification of cancelled orders

Integra 5 Pending Requirements

15

West C05-2273

395725 Eliminate expiration date for Line Splitting agreements

Covad 5 Pending Requirements

16

West C05-2622

396339 Enhance the WISE Interface to pull the pre-order data into the LSR

Eschelon 5 Pending Requirements

17 West C06-0019

Expend Pre-Order View of cable pair availability

Eschelon 5 Pending Requirements

18 East C06-0734

West C06-0734

Greenfield addresses be included in the Bulk Loop Qualification Extract Database

AT&T 5 Pending Requirements

Page 19: Prioritization Working Group · Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle Agenda I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new

Page 19 of 23

# East CR# Initiative West CR# Initiative Title Initiator Rated Status

19 West C06-0862

Drop project requirement for Return to Native port in orders.

Eschelon 5 Pending Requirements

20 West C06-1324

Ability to pull a CSI with the Circuit ID Telscape 5 Pending Requirements

21 East C03-1209

383920 West C03-1334

384305 Single LSR to Migrate Line Share to Line Split

AT&T 4.9 Not Scheduled

22 East C03-2371

386121 West C03-2364

386117 Loopshare to Loopshare Migration – P3 Covad 4.9 Pending Requirements

23 East C04-0288

387067 West C04-0287

387078 Single LSR to migrate Loop Share to xDSL

Covad 4.9 Pending Requirements

24 East C04-0999

388487

Allow use of the WSOP = V on the EU form for interfering stations

Trinsic 4.9 Pending Requirements

25 East C05-0437

393189

Create a simple system for requesting “aerial to burial” loop changes

ATX 4.9 Pending Requirements

26

West C05-2428

396125 Allow the CFA validation tool to accept the input of T1 CFAs

Integra 4.9 Pending Requirements

27 East C06-1369

389922 West C06-1369

389922 Enhance TAXI TML to allow multiple TNs or circuit IDs on one ticket

Broadview 4.9 Committed Feb 07

28 East C02-1849

372230

Jeopardy for facility Notice Transmissions Covad 4.8 Pending Requirements

29 East C04-0284

387077

Enhancement of Automated Jeopardy Covad 4.8 Pending Requirements

30 East C04-0281

387073 West C04-0280

387072 Single LSR to move from LineShare to xDSLCapable Loop

Covad 4.8 Pending Requirements

31 East C06-0517

10861 West C06-0517

10861 MOVE Service Order Process Improvement

AT&T 4.8 Pending Requirements

32 East C06-1207

399378 West C06-1207

399378 Update service address for an end user with a records order.

AT&T 4.8 Pending Requirements

33 East C03-1146

383761

CFA Assignment Verification Covad 4.7 Pending Requirements

34

West C04-0254

386964 Misdirected Calls to 611 AT&T 4.7 Not Scheduled

35 East C05-0436

393188

Bill circuits by the States they service to the correct state BAN

Broadview 4.7 Pending Requirements

36 East C05-1180

394088

Don’t allow the disconnect process prior to the connect process on related transactions

ATX 4.7 Pending Requirements

37

West C05-2422

396124 Ability to return multiple iterations in CSI for the ECCKT and the NDLP

Integra 4.7 Pending Requirements

38 East C03-0057

380169 West C03-0072

380174 Line Splitting Data Migration Covad 4.6 Pending Requirements

Page 20: Prioritization Working Group · Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle Agenda I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new

Page 20 of 23

# East CR# Initiative West CR# Initiative Title Initiator Rated Status 39 East C04-

0697 387797 Retain function “Continue for Remaining”

and “Values for Remaining” in LSI redesign.

DSCI 4.6 Pending Requirements

40 East C04-1182

388803 Ability to reserve TNs for all Centrex Products

AT&T 4.6 Pending Requirements

41 East C05-0284

392918 CABS to include both the CSR and Bill in the same Mailing

Cavalier 4.6 Pending Requirements

42 East C05-1769

394972 West C05-1769

394972 Disconnect DSL capability on shared Loop where the voice is being migrated

Covad 4.6 Pending Scheduling

43 East C04-2406

391690 Shorten the port interval on simple ports Comcast 4.5 Pending Requirements

44 East C05-2076

395374 Allow creation of trouble tickets for all premises extensions/dual svc locations

Broadview 4.5 Pending Requirements

45 East C02-2290

374642 Line Station Transfer Notification Covad 4.4 Pending Scheduling

46 East C05-0797

393644 Allow a voice port without contacting the data provider when DSL is present

Comcast 4.4 Pending Scheduling

47 East C05-0575

393481 Integrate the validate collocation assignment step process

Conversant 4.4 Pending Requirements

48 West C05-1215

394090 The ability to submit bulk or batched PIC change orders

Eschelon 4.4 Pending Requirements

49 East C05-1852

394973 West C05-1852

394973 Line Split to Line Split change voice provider and keep/change data provider

MetTel 4.4 Committed Feb 07

50 East C05-1854

394975 West C05-1854

394975 Resale voice/CLEC data to Lineshare/Linesplit (change voice, keep/change data)

MetTel 4.4 Pending Requirements

51 East C05-2074

395373 Add OCN to file name on LLR Report Penn Telecom

4.4 Pending Requirements

52 East C05-2077

395376 Add Trouble Ticket Service Recovery Request and Response to the TAXI TML Interface

Broadview 4.4 Pending Requirements

53 West C05-2276

395726 Enhancements to the SCORE search function

Eschelon 4.4 Pending Requirements

54 West C06-1713

Return partial address validations parsed into respective fields

Sprint 4.2 Pending Requirements

55 West C03-2347

385953 Enhance Held Order Process Eschelon 4.3 Not Scheduled

56 East C03-2416

386317 Develop migrate Voice/Data service to/from Resale with unchanged data service on single LSR

MetTel 4.3 Pending Requirements

57 East C04-1586

389903 Remove Delay for Wholesale RCF Circuits

REMI 4.3 Pending Requirements

Page 21: Prioritization Working Group · Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle Agenda I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new

Page 21 of 23

# East CR# Initiative West CR# Initiative Title Initiator Rated Status

58 East C04-1590

389904

Change Provisioning Process for UNE-P Migration

REMI 4.3 Pending Requirements

59

West C04-1829

390710 Enhance the LSP Process for UNE-P Line Splitting

Covad 4.3 Pending Requirements

60 East C05-0051

392228

Ability to specify copper when ordering a loop

MetTel 4.3 Pending Requirements

61 East C05-1853

394974 West C05-1853

394974 Resale voice with DRL to Resale with CLEC data (change data provider)

MetTel 4.3 Pending Requirements

62

West C05-2203

395628 Improved descriptions of IOSCs in SCORE

Integra 4.3 Pending Requirements

63 East C03-0439

381932 POTS Reuse for T1 Service XO 4.2 Not Scheduled

64

West C05-2238

395629 Remove the requirement to populate the LSOG version in WISE

Eschelon 4.2 Pending Requirements

65

West C05-2241

395630 Auto populate all forms with the AN used on the LSR form

Eschelon 4.2 Pending Requirements

66 East C02-2797

376791

Directory Listing USOCs on Summary Bill AT&T 4.1 Not Scheduled

67

West C05-0322

392921 Improved enhanced reporting capabilities in WISE

SBC 4.1 Pending Requirements

68 East C05-1007

393841

Maintain DSL capability on shared loops where the TN is ported

Covad 4.1 Pending Scheduling

69 East C05-1860

394978

Allow the CLEC community to manage Assume Dial 9 Centrex services

Broadview 4.1 Pending Requirements

70 West C03-1705

384778 Reschedule VZW CLEC Production Impacting Release

AT&T 4 Pending Scheduling

71 East C04-0365

370394

CAB Formatting of 911, OSS and DUF quantity billed and unit rates

VarTec 4 Pending Requirements

72

West C05-1530

394476 Suppress SAR4 TNS/Lines that are not listed on the LSR

AT&T 4 Pending Requirements

73 East C05-2075

395374

Alter Provider Notification Reports by adding report total to a column

Penn Telecom

4 Pending Requirements

74

West C05-0321

392920 Advance search capabilities of LSRs in WISE database

SBC 3.9 Pending Requirements

75

West C06-0515

Re-instate the Billing Completion system’s notifier

AT&T 3.9 Pending Requirements

76 East C06-0207

West C06-0207

Expand the PHONE field in the Trouble Administration using TAXI TML services.

Broadview 3.8 Pending Requirements

Page 22: Prioritization Working Group · Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle Agenda I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new

Page 22 of 23

# East CR# Initiative West CR# Initiative Title Initiator Rated Status

77 East C04-2134

391190 Ability to issue a UNE P to Resale Migration as is or as is with minor changes

Broadview 3.7 Pending Requirements

78 East C06-1767

Increase the number of templates that can be saved using LSI

Qtel 3 Pending Requirements

79 West C03-1517

384425 LEX and LST fields for Directory List Posting

AT&T NR Not Scheduled

80 West C04-1271

389088 Provide Associated FIDs and FID Detail in lieu of IOSC Description

AT&T NR Not Scheduled

Page 23: Prioritization Working Group · Room: 21A/B Bridge: 800-566-2250 Chair: Stephen Cuttle Agenda I) Review Prior Meeting Summary notes – page 2 II) Review deferred, new T5, and new

Page 23 of 23

Type 4 Summary:

# Region CR# Initiative Title Rated Status 1 East C05-2219 396243 Add Showbook Functionality to the

Directory Listing Pre-order Transactions

5 Committed Feb 07

2 E/W C06-1160 398819 LSI-TA to add 7 days of access hours 4.8 Committed Feb 07

3 East C05-1551 394481 UNE Loop to Resale Migrations 4.3 Pending Scheduling

4 West C04-2480 391760 Flow Through to Process Centranet requests for Acts of N, V & T

3.8 Pending Scheduling

5 East C04-1064 388555 Modify CRS Form 3.2 Pending Scheduling

6 East C05-0150 392296 Flowthru ACT=N WithPorted in TN 3.1 Pending Scheduling

7 West C05-1910 395081 Feature Combo Errors for VZ West UNEP & Resale

3 Committed Feb 07

8 East C05-1389 394419 Flowthrough Expedite Requests 3 Pending Scheduling

9 East C05-0956 393790 Implement maximum line/PON number restrictions for PON processing

1 Pending Requirements