princess cruise ship shore power project – 2001 juneau, alaska · electrical energy sales in...

47
AEL&P Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska Corry V. Hildenbrand Project Manager V. P. Energy Resource Development Alaska Electric Light & Power Co.

Upload: others

Post on 21-Jun-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&P

Princess Cruise ShipShore Power Project – 2001

Juneau, Alaska

Corry V. HildenbrandProject Manager

V. P. Energy Resource DevelopmentAlaska Electric Light & Power Co.

Page 2: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

Princess Cruises Shore Princess Cruises Shore Power Facility Juneau, AlaskaPower Facility Juneau, Alaska

AEL&P

Page 3: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11
Page 4: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&P

Shore Power Details

• Substation• Steam Boiler• Transformer• Electrical Cables• Festooning System• Operations• Questions

Page 5: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&P

Substation Civil WorkSubstation Civil Work

Page 6: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&P

Substation Substation ConstructionConstruction

Page 7: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&P

Setting TransformerSetting Transformer

Page 8: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

Excavation of cable TrenchExcavation of cable TrenchAEL&P

Page 9: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&P

Boring Under RoadBoring Under Road

Page 10: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&P

HV Cable Pull VaultHV Cable Pull Vault

Page 11: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&P

Conduit InstallationConduit Installation

Page 12: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&P

Substation 6.6 & 11 KV Breakers

Page 13: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&P

Power Transformer & Circuit Switcher

Page 14: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&P

Transformer Transformer CommissioningCommissioning • Oil Filtration

• Meggar• Power factor• TTR Testing

AEL&P

Page 15: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&P

7 MW Electric Boiler7 MW Electric Boiler

Page 16: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&P

Electrical Electrical Boiler BuildingBoiler Building

Page 17: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&PAEL&P

Transformer Design CriteriaTransformer Design Criteria.

High Voltage: W1 Primary

• Rated Power– 25 MVA at 2nd forced air cooling stage

• Rated Primary Voltage– 67,000 V Delta 350KV BIL

• Taps- plus/minus 5% range from nominal- 2.5% incremental steps

• 55 degree C rise / 65 degree rise with forced air cooling• 30 C average/ 40 C maximum ambient as per ANSI standard• 7% impedance with plus/minus ANSI standard• Copper Conductor• Oil filled with Type I oil as per ANSI standard• 65 DB(A) Guaranteed Sound Level• 100 Feet Maximum Altitude

Page 18: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&PAEL&P

Transformer Design CriteriaTransformer Design CriteriaLow Voltage Side: W2 Secondary (Electric Boiler & Winter

AELP Distribution Feeder)• Rated Power

– 8.75 MVA at 2nd forced air (FA) cooling stage– 12 MVA at 2nd FA cooling stage when W3 is not loaded

• Rated Voltage– 12.47 KV Wye connected with neutral bushing

• Copper conductor

Low Voltage Side: W3 Secondary (Ship Hotel Load)• Rated Power

– 16.25 MVA at 2nd FA cooling stage• Rated Voltage

– 11 KV with a full power rated 6.6 KV Tap; Wye connected with a neutral grounding resistor

Page 19: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&PAEL&P

Transformer Design Criteria

Included In The Transformer Package

• H.V. metering pre-wired on the transformer• Potential Transformers mounted on the transformer• Current Transformers• Relaying package pre-wired on the transformer

Page 20: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&PAEL&P

ProtectionProtection

• GE-745 Transformer Management Relay• S&C series 2010 circuit switcher• ABB Type R Vacuum Circuit Breakers (2000A, 1200A)• ABB DPU-2000 Relays• Cooper Type VWE Reclosure and Form5 Controller• AFL oil stop valve & oil containment system• ALCAD 125VDC Control Power System

Page 21: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

Power CablePower CableSubstation to Dock Disconnect

AEL&P

Substation to Dock Disconnect• Okonite 15kV EPR Cable

– 750 MCM– (3) parallel runs per phase

• A Copper Conductor• B Semiconducting• C Insulation• D Insulation • E Shield-Copper Tape • F Jacket

www.okonite.com

Page 22: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

15kv 250 MCM Cu Conductor

CPE Jacket

EPR Insulation

AMERICABLE (mining cable)

Grounding Conductor

Mining HV Cable For Ship Mining HV Cable For Ship Power ConnectionPower Connection

AEL&P

Page 23: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

Conduit Installation on DockConduit Installation on DockAEL&P

Page 24: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

Conduit Installation on DockConduit Installation on DockAEL&P

Page 25: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

Dock Disconnect/GroundingDock Disconnect/GroundingSwitch CabinetSwitch Cabinet

AEL&P

Page 26: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

HV Terminations @ HV Terminations @ Disconnect/Grounding SwitchDisconnect/Grounding Switch

AEL&P

Page 27: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&P

Gantry Gantry Festooning Festooning

Cable Cable Location Location

SystemSystem

Page 28: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&P

Festooning Festooning System System Allows for Allows for Cable Cable Adjustment Adjustment for Tidal for Tidal FluctuationsFluctuations

Page 29: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&P

Gantry Cable Festooning System Gantry Cable Festooning System

Page 30: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&P

Lowering Shore Power CablesLowering Shore Power Cables

Page 31: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&P

Connecting Shore CablesConnecting Shore Cables

Page 32: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&PEach Cruise Ship has Bulkhead Doors to Each Cruise Ship has Bulkhead Doors to Accommodate the Shore Power Cables Accommodate the Shore Power Cables and the LP Steam Lines.and the LP Steam Lines.

Page 33: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

Shipboard Shipboard Cables Cables ConnectionsConnections

AEL&P

• 4 Power Connectors (Callenberg)• 1 Neutral Connection (Callenberg)• 2 Control (Cannon Plug)• 1 SCADA (Cannon Plug)•Standardization of Cable Connections

Page 34: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&P

Shipboard Control PanelShipboard Control Panel

Page 35: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&P

Shipboard AutomationShipboard Automation• Shipboard Automatic Synchronization• Real and Reactive Load Transfer Rates• Less Than 500 KW and 500 KVARS

Separation• Ship to Shore Isolation (Fault or other

Protecive Peramiters)• No Shipboard Manual Controls• Standardization of Shipboard Programming

Page 36: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

SCADASCADASupervisory Control and Data AcquisitionSupervisory Control and Data Acquisition

AEL&P

Page 37: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

Ship to Shore SCADA & Ship to Shore SCADA & Control InterfaceControl Interface

AEL&P

• RS-485 4-wire communication link• Modbus is used for the SCADA

Communication Protocol• Modbus Register Addressing• Ship to Shore Permissives and Protection are

hard wired• Ship to Shore Standardization

Page 38: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

Thane Dispatch CenterThane Dispatch Center AEL&P

Page 39: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&P

Power Dispatcher’s RolePower Dispatcher’s Role

• Communications with Ship on Connection and Disconnection Time

• Coordination of Switching Orders • Dispatch of Lineman for Connection and

Disconnection of Ship• SCADA Control of Energization of Shore

Circuit to Ship• Coordination of Loading of Shore LP

Electric Steam Boiler

Page 40: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

Design and Construction Design and Construction Responsibility

AEL&P

Responsibility• AELP – Substation to Dock Located

Disconnect/Grounding Switch, SCADA & Control Interface to Ships

• Callenberg – Ship Board Switchgear and Interface to AELP’s Shore Power

• PN&D – Modifications of Dock for Cable Gantry Festooning System

• ABB & Siemens – Shipboard Automation

Page 41: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&P

Design & Construction TimingDesign & Construction Timing

• Notice to Proceed Give by Princess December 1, 2000

• On Line Early June 2001

Page 42: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&PIn SummaryIn Summary

Electrical Energy Sales In Juneau, Alaska to Princess

•Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11 KV and .83 to .86 PF

•Ship LP Steam Loads 4 to 6 MW @ 12.47 KV and Unity PF

•Total Annual Demand for Shore Power is 11 - 12 GWH Annually

Page 43: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11

AEL&PAEL&P

First High Voltage Shore Power Connection for Cruise ShipsJuneau, AlaskaJuneau, Alaska

Page 44: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11
Page 45: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11
Page 46: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11
Page 47: Princess Cruise Ship Shore Power Project – 2001 Juneau, Alaska · Electrical Energy Sales In Juneau, Alaska to Princess •Ship Hotel Electrical Loads 7 to 11 MW @ 6.6 KV or 11