Session 2 – The Prince 2 Components: Plans; Controls and Stages
Overview
P2 Organization P2 Plans P2 Controls P2 Stages
Overview
P2 Organization P2 Plans P2 Controls P2 Stages
Plans
In P2 the Gant alone is not regarded as a plan
P2 is more comprehensive
Plans
Plans
ThreePlanningLevels
Plans
TOP DOWN – HELPS IDENTIFY SUB PROJECTS
Plans
Plans
Increased level of detail
LevelTime
Plans
WHAT
HOW
NB
Plans
•Exception Plan•Same level of detail•Motivation of why deviation
Overview
P2 Organization P2 Plans P2 Controls P2 Stages
Controls
• Management by exception• But within tolerance levels• Delegated by Board to project
manager• Tolerance assigned at:
•Project level•Stage level• Work package (product level)
Controls
Project Board
Controls
Overview
P2 Organization P2 Plans P2 Controls P2 Stages
Stages
• Management :• Specific time span• Separated by Board
decisions• Sequential• Don’t overlap
• Technical:• Lead to product• Can overlap• Interface with
management stages NB!
Stages
• Management :• Specific time span• Separated by Board
decisions• Sequential• Don’t overlap
• Technical:• Lead to product• Can overlap• Interface with
management stages NB!