PRIMAVERA TRAINING MANUAL
Step by Step Guide to Primavera Project Planner - Ver.5
www.allaboutconstruction.blogspot.com
Primavera Training Manual
Contents
.................................................................................................................................... 3
allaboutconstruction.blogspot.com 2
Primavera Training Manual
Figures
Figure :1 Getting Started
Figure :2 Login Page
Figure :3 Home Window
Figure :4 to Open EPS window
Figure: 5 Setting-Up EPS (Enterprise Project Structure)
Figure :6 EPS with different Nodes
Figure: 7 Setting Up OBS (Organizational Break down Structure)
Figure: 8 OBS with different Nodes at different levels
Figure: 9 Creating a New Project
Figure: 10 Defining Project Code & Project Name
Figure: 11 Creating a Calendar
Figure: 12 customizing the calendar
Figure: 13 Defining Working hours in Different days of the week
Figure: 14 Assigning Default Calendar to the Project
Figure: 15 Creating WBS (Work Breakdown Structure)
Figure: 16 Adding Activities at Different Levels of WBS
Figure: 17 Customizing the Timescale
Figure: 18 Defining Predecessors & Successors for different Activities
Figure: 19 Scheduling the Project
Figure: 20 Project view after scheduling the Project
Figure: 21 Creating different Resources
Figure: 22 Creating User defined Units of Measure
Figure: 23 Assigning Costs and availability of different Resources
Figure: 24 Assigning resources to Activities
Figure: 25 Creating Resource Curves
Figure: 26 Modifying Resource Curves
Figure: 27 Assigning Resource Curves to assigned resources
Figure: 28 Assigning & Saving Baselines
Figure: 29 Updating Individual Activities separately
Figure: 30 List of Default reports
allaboutconstruction.blogspot.com 3
Primavera Training Manual
1. Getting Started
Click on START PRIMAVERA PROJECT MANAGEMENT
Figure :1 Getting Started
Following Screen Appears:-
Figure :2 Login Page
allaboutconstruction.blogspot.com 4
Primavera Training Manual
Please enter Login Name and Password as provided to you. Please note that these fields are case sensitive.
Following screen appears after logging in. Alternatively, this screen can also be seen by clicking VIEWHOME
Figure :3 Home Window
allaboutconstruction.blogspot.com 5
Primavera Training Manual
2. Creating a New Project
2.1. Setting up EPS (Enterprise Project Structure)
Before creating any project, create EPS (Enterprise Project Structure). An EPS once created can be used for creating any new project in future. EPS enables you to group projects under different nodes as desired by the management. On the Standard toolbar click on ENTERPRISE Enterprise Project Structure
Figure :4 to Open EPS window
allaboutconstruction.blogspot.com 6
Primavera Training Manual
Click on ADD.
Figure: 5 Setting-Up EPS (Enterprise Project Structure)
Set-up new EPS as shown at different levels using arrow buttons in the EPS window.
Figure :6 EPS with different Nodes
allaboutconstruction.blogspot.com 7
Primavera Training Manual
2.2. Setting Up OBS (Organizational Breakdown Structure)
After EPS; OBS (Organizational Breakdown Structure) has to be Set-up.On the Standard toolbar click on ENTERPRISE OBS
Figure: 7 Setting Up OBS (Organizational Break down Structure)
Set-up new OBS as shown at different levels using arrow buttons in the OBS window.
allaboutconstruction.blogspot.com 8
Primavera Training Manual
Figure: 8 OBS with different Nodes at different levels
allaboutconstruction.blogspot.com 9
Primavera Training Manual
2.3. Creating and Defining New Project
Now the New Project can be created. Click on FILENEWThe following screen is seen.
Figure: 9 Creating a New Project
Select the appropriate level of EPS to which the new project will be assigned.
Click NEXT
Give the details of the New Project.
• Project Code • Project Name• Responsible Manager (OBS Level)• Rate Type
allaboutconstruction.blogspot.com 10
Primavera Training Manual
Figure: 10 Defining Project Code & Project Name
Click FINISH button The New Project Is Created.
allaboutconstruction.blogspot.com 11
Primavera Training Manual
3. Creating Global / Project Calendar
To specify the working time during the course of the Project a calendar, which gives the details of the working hours during a work week, holidays etc.Select ENTERPRISE CALENDARS
Figure: 11 Creating a Calendar
Click ADD which prompts you to select a global inbuilt calendar to copy from and allows you to make changes as required.
Eg : Select Standard 5 Day Workweek calendar and give the name “Test Calendar” Click “MODIFY” to incorporate changes as per the Project Requirement. Check in the box provided.
allaboutconstruction.blogspot.com 12
Primavera Training Manual
Figure: 12 customizing the calendar
Click on “Workweek” Command button to change the number of working hours on each day of the week.
Figure: 13 Defining Working hours in Different days of the week
Click OK to complete the process.
allaboutconstruction.blogspot.com 13
Primavera Training Manual
To assign the created calendar (Test Calendar) to the project select it in the Defaults tab of Project Details Pane of the Project.This automatically assigns this calendar to all the Activities of the Project, though each activity can be assigned with a different calendar as required.
Figure: 14 Assigning Default Calendar to the Project
allaboutconstruction.blogspot.com 14
Primavera Training Manual
4. Creating WBS (Work Breakdown Structure)
Now, the project is ready for creating WBS (Work Breakdown Structure) and adding activities. WBS levels should be created to allow the rolling up of Duration, Cost etc of all the activities to the respective WBS levels.
Click VIEW HOME To create WBS click on the “WBS” command button in the HOME page.
Figure: 15 Creating WBS (Work Breakdown Structure)
Set-up the WBS as shown. Please note that WBS should include all the levels except the lowest level of Activities which will be added to the respective WBS level (explained in Next Step)
allaboutconstruction.blogspot.com 15
Primavera Training Manual
5. Adding Activities
Click on the “Activities” button on the Directory bar. WBS just created appears. Activities can be added to each level of WBS by clicking “add” button on the top right corner of the screen.
Figure: 16 Adding Activities at Different Levels of WBS
allaboutconstruction.blogspot.com 16
Primavera Training Manual
6. Customizing Time Scale
Right click on the Timescale (Top Bar where the Activity bars appear). Choose “Timescale”. Following window appears:-
Figure: 17 Customizing the Timescale
Choose from the options available.
allaboutconstruction.blogspot.com 17
Primavera Training Manual
7. Predecessors and Successors
For this click on the “Show/Hide bottom Layout” on “Activity Bar”. Click on “Relationships” tab. Here both Predecessors and Successors can be added with the required lag and inter-relationships. To add a Predecessor, click on the “Assign” button. Following screen appears:-
Figure: 18 Defining Predecessors & Successors for different Activities
allaboutconstruction.blogspot.com 18
Primavera Training Manual
8. Scheduling the Project
The Project has to be scheduled on a particular date as required to schedule the activities depending on the respective assignment of predecessors and successors.
To schedule the project Click on “Tools” “Schedule” (see Fig. 19)Alternatively it can be executed using “F9”.
Figure: 19 Scheduling the Project
allaboutconstruction.blogspot.com 19
Primavera Training Manual
Refer to Fig. 20 to see the Project after scheduling.
Figure: 20 Project view after scheduling the Project
allaboutconstruction.blogspot.com 20
Primavera Training Manual
9. Resources
9.1. Creating and Assigning Resources
To create the resource list Click Enterprise Resources
Unlike other Planning Software Primavera gives the advantage of creating Resources of three different types.
• Labour• Non Labour• Material
Figure: 21 Creating different Resources
Material resources can be assigned with Units as applicable. Customized list of Units of Measure can be prepared in Admin Categories
To Create List of Units of Measure Click “Admin Admin Categories Units of Measure”
allaboutconstruction.blogspot.com 21
Primavera Training Manual
Assign suitable Units of measure to different material resources as required in the Resource details sheet.
Figure: 22 Creating User defined Units of Measure
allaboutconstruction.blogspot.com 22
Primavera Training Manual
9.2. Resource Availability and Resource Costs
To assign the costs to different resources and their availability during the course of the Project Click on the Units & Prices tab in the Resource Detail sheet. (see Fig. 23)
Figure: 23 Assigning Costs and availability of different Resources
allaboutconstruction.blogspot.com 23
Primavera Training Manual
9.3. Assigning Resources to Different Activities
To assign resources to different activities Click on the Resources tab in the Activity Details sheet and click on “+Add Resources” button to add the resources created.
Figure: 24 Assigning resources to Activities
allaboutconstruction.blogspot.com 24
Primavera Training Manual
10. Creating and Assigning Resource Curves
Resource/cost distribution curves enable you to specify how you want resource units or costs spread over the duration of an activity. Resource units and costs are distributed evenly during an activity unless you specify nonlinear distribution using curves.
10.1. Creating Resource Curves
To Create Resource curves Choose, Enterprise Resource Curve click Add (See Fig.25)Choose a Default resource Curve from which you want to copy to create a new one.
Figure: 25 Creating Resource Curves
allaboutconstruction.blogspot.com 25
Primavera Training Manual
Rename the New resource curve and click Modify to make changes as required. (See Fig.26)
Figure: 26 Modifying Resource Curves
allaboutconstruction.blogspot.com 26
Primavera Training Manual
10.2. Assigning Resource Curves
To assign resource curve to a particular resource assigned different activities, click on Resources tab in the Activity Details sheet and click on Resource Curve column.
Figure: 27 Assigning Resource Curves to assigned resources
allaboutconstruction.blogspot.com 27
Primavera Training Manual
11. Base lines
Before you update a schedule for the first time, you should create a baseline plan. A baseline is a complete copy of Original Project Plan that you can compare to the current schedule to evaluate progress.
11.1. Assigning Base lines
To assign a Baseline, Choose Project Assign Base lines and click Ok button to save the current project as a base line.
Figure: 28 Assigning & Saving Baselines
allaboutconstruction.blogspot.com 28
Primavera Training Manual
12. Updating Project Progress
Projects can be updated in two ways
• Updating Project Progress Automatically• Updating Individual activities separately
12.1. Updating Project Progress Automatically
If the activities are progressing as per the schedule, you can update the project as a whole to a particular data date.
Figure: 29 Updating Individual Activities separately
12.2. Updating Individual activities separately
To update progress of different activities separately click on the Status tab of Activity details window. Here you can enter actual start and finish dates as per the actual progress at site.
allaboutconstruction.blogspot.com 29
Primavera Training Manual
13. Reports
Different types of default reports are available.However customized reports can be generated using report wizard.
Figure: 30 List of Default reports
allaboutconstruction.blogspot.com 30