primary needs ……

16

Upload: fredericka-nolan

Post on 01-Jan-2016

13 views

Category:

Documents


1 download

DESCRIPTION

Primary needs ……. ….. of the water framework directive. …… with regard to data. John Rune Selvik Norwegian Institute for Water Research. Need for data. What kind of data? For what purpose? When is it needed? Who need data?. Tasks in WFD. Designation of River Basin Districts - 2003 - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Primary needs ……
Page 2: Primary needs ……

Primaryneeds …….

Page 3: Primary needs ……

….. of the water framework directive

…… with regard to data

John Rune Selvik

Norwegian Institute for Water Research

Page 4: Primary needs ……

Need for data

• What kind of data?

• For what purpose?

• When is it needed?

• Who need data?

Page 5: Primary needs ……

Tasks in WFD• Designation of River Basin Districts - 2003

• Analysis of river basin characteristics - 2004

• Identification of pressures and review of the impact of human activities -2004

• Economic analysis of water use -2004

• Establish monitoring programmes -2006

• Programme of measures - 2009

• River Basin Management Plan - 2009

• Reporting and public information - cont.

Page 6: Primary needs ……

Analysis of river basin characteristics - 2004

• Location/boundaries of each water body

• Type of water body (two systems)

• Type specific reference conditions

Page 7: Primary needs ……

Identification of pressures - 2004

• Type and magnitude

• Point pollution

• Diffuse pollution

• Water abstraction and flow regulation

• Morphological alteration

• Land use pattern

Page 8: Primary needs ……

Assessment of impact

• Susceptibility to pressures

• Which water bodies will most likely fail to meet the objectives?– monitoring data– models– expert judgement

• Further characterisation for those who fails

Page 9: Primary needs ……

Economic analysis of water use - 2004

• Polluter pays principle

• Recovery of the cost of water services including environmental resource costs

Page 10: Primary needs ……

Establish monitoring programmes 2006

• Coherent and comprehensive overview of water status within each RBD

• Surveillance monitoring

• Operational monitoring

• Investigative monitoring

Page 11: Primary needs ……

Programme of measures

• At the latest by 2009

• Designed in order to achieve the objectives

• Encompass requirements in existing EC legislation plus other necessary measures

Page 12: Primary needs ……

Who need data?

EU

National

Regional/RBD

Local (municipality)

e.g. municipality cooperation

.

ScienceNGOPublic

Page 13: Primary needs ……

Who needs what?

Indicators

Aggregation levels

Detailed information

Regional

Municipality

EC

NGO

Public

Science

Education

Page 14: Primary needs ……

The Norwegian situation

• Vansjø-Hobøl -national WFD pilotstudy– 90 dataset– 20 data-holders

• Availability

• EUROHARP project: 450 types of data

Page 15: Primary needs ……

0

5

10

15

20

25

Area-

info,

maps

Popula

tion

Hydro

logy,

clim

ate

Pollut

ion

Wat

er us

e an

d m

orph

ologi

cal c

hang

es

Mon

itorin

g

Econo

my

No

. o

f d

ata

se

t

Not available

Paper

Electronic something

Quality database

Page 16: Primary needs ……

WE will propably have work to do after Cristmas also!