Schedule 1 - Pricing Scenario #1 SCHEDULE 1 PRICING SCENARIO #1 Exterior Lighting Retrofit at PDX Maintenance Facility Description The lighting retrofit is being performed to reduce electricity usage. The lighting project consists of the replacement of existing sodium lamps with Light Emitting Diode (LED) lamps. See Pricing Scenario #1 Drawings and Details for detailed information about the existing lighting fixtures and the proposed LED replacement lamps. Instructions Supplier must provide all personal services classifications, billing rates, materials and equipment costs, for Pricing Scenario #1 below. Classifications and billing rates shall be consistent with the rates provided in Section 3.2.2.4 e of the RFP. Do not include labor costs associated with trade services or the construction installation portion of the Pricing Scenario. Cost Worksheet Pricing is provided for evaluation purposes only and shall not be construed as Supplier’s complete offer. 1. Personal Services Cost Worksheet Please provide a list of all personal services classifications required to execute an Energy Savings Performing Contract, including the billing rate and estimated number of hours. Position Classification Billing Rate Total Estimated Project Hours Total Cost $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Total Personal Services Costs $

Upload: others

Post on 14-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PRICING SCENARIO #1 Exterior Lighting Retrofit at PDX ... · pdx maintenance annex work area 1 site plan - overall cd misc 2016-500 9 100 m. henning j. paasch d. steinkanp april 2016

Schedule 1 - Pricing Scenario #1

SCHEDULE 1 PRICING SCENARIO #1

Exterior Lighting Retrofit at PDX Maintenance Facility

Description The lighting retrofit is being performed to reduce electricity usage. The lighting project consists of the replacement of existing sodium lamps with Light Emitting Diode (LED) lamps. See Pricing Scenario #1 Drawings and Details for detailed information about the existing lighting fixtures and the proposed LED replacement lamps. Instructions Supplier must provide all personal services classifications, billing rates, materials and equipment costs, for Pricing Scenario #1 below. Classifications and billing rates shall be consistent with the rates provided in Section 3.2.2.4 e of the RFP. Do not include labor costs associated with trade services or the construction installation portion of the Pricing Scenario. Cost Worksheet Pricing is provided for evaluation purposes only and shall not be construed as Supplier’s complete offer.

1. Personal Services Cost Worksheet Please provide a list of all personal services classifications required to execute an Energy Savings Performing Contract, including the billing rate and estimated number of hours.

Position Classification Billing Rate Total Estimated Project Hours Total Cost

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Total Personal Services Costs $

Page 2: PRICING SCENARIO #1 Exterior Lighting Retrofit at PDX ... · pdx maintenance annex work area 1 site plan - overall cd misc 2016-500 9 100 m. henning j. paasch d. steinkanp april 2016

Schedule 1 - Pricing Scenario #1

2. Materials and Equipment Cost Worksheet

Supplier shall provide pricing for all replacement materials and equipment as identified below. Pricing shall be consistent with manufacturer price lists and/or catalogs provided in Section 3.2.2.4 d of the RFP.

Description Quantity List Price % Discount off List Price

US Communities Price

SL4D-2 1 $ $ SL13 37 $ $ SL13A 2 $ $ SL13A-2 1 $ $ SL13A-3 3 $ $ SL13A-4 2 $ $ SL14 2 $ $ SL15 16 $ $ SL16 4 $ $ SL18 9 $ $ SL19 2 $ $ SL22 1 $ $

Total Materials and Equipment Cost: $

Total Cost (Personal Services and Materials/Equipment) for Pricing Scenario #1 $

Page 3: PRICING SCENARIO #1 Exterior Lighting Retrofit at PDX ... · pdx maintenance annex work area 1 site plan - overall cd misc 2016-500 9 100 m. henning j. paasch d. steinkanp april 2016

79007700

8185

8155

10105

75357505

7525 7515

6700-6730

6620-6650

7013-7021

7028-7040

7002-7014

6904-6918

6807

6705

6720-6756

7545

6903-6915

5900

5517

NE CA SCA DES PA RKWA Y

NE C

AS

CA

DE

S P

AR

KW

AY

10245

1014510135

10041

9739

97211

1020510001 10103

102

9967

9959

10

9301

9901

9963

9941

9377

9715

9109

9401

9971

9955

PORT OF PORTLANDPORTLAND, OREGON

APPV'DNO. CK'DREVISIONSBYDATE APPV'DNO. CK'DBYDATE REVISIONSDESIGN NUMBER PROJECT NUMBER

/9:21:39 AM JOHN.PAASCHs:\2016 projects\16052 pop ltg retrofit (jci)\dwgs\phase 2\16052-e01.100.dwg6/29/2017

01/

4"1/

2"1"

2"C

AN

YO

U S

EE

TH

E A

IRP

LAN

ES

? T

HE

AD

JAC

EN

T S

AM

PLE

S S

HO

W T

HR

EE

DIF

FER

EN

T LE

VELS

OF

SH

AD

ING

.S

ETT

ING

S F

OR

VIE

WIN

G A

ND

PR

INTI

NG

DR

AW

ING

CO

NTE

NT

AR

E O

PTI

MIZ

ED

WH

EN

ALL

TH

RE

E P

LAN

ES

AR

EVI

SIB

LE.

THIS

GU

IDA

NC

E IS

PR

OVI

DE

D F

OR

RE

FER

EN

CE

ON

LY.

GR

AP

HIC

SC

ALE

- FO

R R

EFE

RE

NC

E O

NLY

PRINTED:

light

gray

dark

gray

blac

k

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17".

CHECKED BY

DATE

DESIGNED BY

DRAWN BY

SUBMITTED BY DRAWING NO.TYPE

SCALE

DISC. SHT. NO.SHEET NO.

PRELIMINARYNOT FOR

CONSTRUCTION

MISCELLANEOUS PORT FACILITIES

ENERGY EFFICIENCY UPGRADES PERFORMANCE SERVICESPDX MAINTENANCE ANNEX WORK AREA 1

SITE PLAN - OVERALL

CD MISC 2016-500 9 100

M. HENNING

J. PAASCH

D. STEINKANP

APRIL 2016

2013D045 700149PROJECT ENGINEER E01.100MIA YANGN.T.S.

N

E01.101

AS-NEGOTIATED06/26/171 MTH

SCHEDULE 1PRICING SCENARIO #1 DRAWINGS AND DETAILS

murphn
Typewritten Text
murphn
Typewritten Text
murphn
Typewritten Text
murphn
Typewritten Text
murphn
Typewritten Text
murphn
Typewritten Text
murphn
Typewritten Text
murphn
Typewritten Text
murphn
Typewritten Text
Page 4: PRICING SCENARIO #1 Exterior Lighting Retrofit at PDX ... · pdx maintenance annex work area 1 site plan - overall cd misc 2016-500 9 100 m. henning j. paasch d. steinkanp april 2016

PORT OF PORTLANDPORTLAND, OREGON

APPV'DNO. CK'DREVISIONSBYDATE APPV'DNO. CK'DBYDATE REVISIONSDESIGN NUMBER PROJECT NUMBER

/9:21:45 AM JOHN.PAASCHs:\2016 projects\16052 pop ltg retrofit (jci)\dwgs\phase 2\16052-e01.101.dwg6/29/2017

01/

4"1/

2"1"

2"C

AN

YO

U S

EE

TH

E A

IRP

LAN

ES

? T

HE

AD

JAC

EN

T S

AM

PLE

S S

HO

W T

HR

EE

DIF

FER

EN

T LE

VELS

OF

SH

AD

ING

.S

ETT

ING

S F

OR

VIE

WIN

G A

ND

PR

INTI

NG

DR

AW

ING

CO

NTE

NT

AR

E O

PTI

MIZ

ED

WH

EN

ALL

TH

RE

E P

LAN

ES

AR

EVI

SIB

LE.

THIS

GU

IDA

NC

E IS

PR

OVI

DE

D F

OR

RE

FER

EN

CE

ON

LY.

GR

AP

HIC

SC

ALE

- FO

R R

EFE

RE

NC

E O

NLY

PRINTED:

light

gray

dark

gray

blac

k

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17".

CHECKED BY

DATE

DESIGNED BY

DRAWN BY

SUBMITTED BY DRAWING NO.TYPE

SCALE

DISC. SHT. NO.SHEET NO.

PRELIMINARYNOT FOR

CONSTRUCTION

MISCELLANEOUS PORT FACILITIES

ENERGY EFFICIENCY UPGRADES PERFORMANCE SERVICESPDX MAINTENANCE FACILITY - WORK AREA 1

CD MISC 2016-500 10 100

M. HENNING

J. PAASCH

D. STEINKANP

APRIL 2016

2013D045 700149PROJECT ENGINEER E01.101MIA YANG1" = 50'

N

NOTES:1. FOR GENERAL NOTES, ABBREVIATIONS AND SYMBOLS

LEGEND SEE SHEET GI0.010.

2. CONTRACTOR TO REMOVE EXISTING FIXTURES ANDMOUNTING HARDWARE. REPLACE WITH NEW FIXTURESAND MOUNTING COMPONENTS FOUND IN THELUMINAIRE SCHEDULE.

SCALE: IN FEET

0' 25' 50' 100' 150'

SL4D-2

SL164T-3

SL164T-3

SL134P-7

SL134P-7

SL134P-7

SL134P-7

SL134B-21

SL134B-21

SL134B-21SL13

4B-21

SL134B-21

SL164T-3

SL164T-3

SL134EL-17

SL134EL-17SL13

4EL-17

SL134EL-17SL13

4EL-15

SL134EL-15

SL13A-44EL-19,21

SL13A-24EL-19,21

SL13A-44EL-19,21

SL13A-34EL-19,21

SL13A-34EL-19,21

SL13A-34EL-19,21

SL13A4EL-21

SL13A4EL-21

SL134EL-13SL13

4EL-13

SL134EL-13

SL184EL-13

SL184EL-13

SL184EL-13

SL184EL-13

SL154W-1

SL154W-1

SL154W-1

SL154W-1

SL154W-1

SL154W-1

SL19

SL184EL-7

SL134B-21

SL224W-1

SL134EL-17 SL13

4EL-17

SL184EL-13

SL184EL-13

SL144EL-13SL14

4EL-13

SL15

SL152HM-16

SL152HM-16

SL152HM-16

SL152HM-16

SL152HM-16

SL15SL15

AS-NEGOTIATED06/26/171 MTH

REVISED BY CC #1811/07/162 MTH

SL152HM-16

SL152HM-16

2HM-162HM-16

2HM-16

2HM-16

PANEL 4EL

PANEL2HM

PANEL4P

PANEL4W

SL134EL-15

SL134EL-15

SL134EL-15

SL184EL-13SL18

4EL-13

PANEL4T

PANEL4B

4EL-19,21

Page 5: PRICING SCENARIO #1 Exterior Lighting Retrofit at PDX ... · pdx maintenance annex work area 1 site plan - overall cd misc 2016-500 9 100 m. henning j. paasch d. steinkanp april 2016

PORT OF PORTLANDPORTLAND, OREGON

APPV'DNO. CK'DREVISIONSBYDATE APPV'DNO. CK'DBYDATE REVISIONSDESIGN NUMBER PROJECT NUMBER

/9:21:50 AM JOHN.PAASCHs:\2016 projects\16052 pop ltg retrofit (jci)\dwgs\phase 2\16052-e01.801.dwg6/29/2017

01/

4"1/

2"1"

2"C

AN

YO

U S

EE

TH

E A

IRP

LAN

ES

? T

HE

AD

JAC

EN

T S

AM

PLE

S S

HO

W T

HR

EE

DIF

FER

EN

T LE

VELS

OF

SH

AD

ING

.S

ETT

ING

S F

OR

VIE

WIN

G A

ND

PR

INTI

NG

DR

AW

ING

CO

NTE

NT

AR

E O

PTI

MIZ

ED

WH

EN

ALL

TH

RE

E P

LAN

ES

AR

EVI

SIB

LE.

THIS

GU

IDA

NC

E IS

PR

OVI

DE

D F

OR

RE

FER

EN

CE

ON

LY.

GR

AP

HIC

SC

ALE

- FO

R R

EFE

RE

NC

E O

NLY

PRINTED:

light

gray

dark

gray

blac

k

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17".

CHECKED BY

DATE

DESIGNED BY

DRAWN BY

SUBMITTED BY DRAWING NO.TYPE

SCALE

DISC. SHT. NO.SHEET NO.

PRELIMINARYNOT FOR

CONSTRUCTION

MISCELLANEOUS PORT FACILITIES

ENERGY EFFICIENCY UPGRADES PERFORMANCE SERVICESPDX MAINTENANCE FACILITY LIGHTING FIXTURE SCHEDULE

WORK AREA 1

CD MISC 2016-500 11 100

M. HENNING

J. PAASCH

D. STEINKANP

APRIL 2016

2013D045 700149PROJECT ENGINEER E01.801MIA YANGNONE

AS-NEGOTIATED06/26/171 MTH

Existing Technology

Pole- Mounted Cobra-head Fixture,High Pressure Sodium, 400W lamps

Pole- Mounted Shoebox Fixture,High Pressure Sodium, 250W lamp

Exterior Wall Pack Fixture, High Pressure Sodium,50W Lamp

Pole-Mounted Acorn Fixture, High Pressure Sodium,150W lamp

High bay Fixture, High Pressure Sodium, 250W lamp

Jar Fixture, Incandescent, 60W lamp

Pole- Mounted Shoebox Fixture,High Pressure Sodium, 250W lamp

Pole- Mounted Shoebox Fixture,High Pressure Sodium, 250W lamp

Pole- Mounted Shoebox Fixture,High Pressure Sodium, 250W lamp

Pole- Mounted Shoebox Fixture,High Pressure Sodium, 250W lamp

Exterior Wall Pack Fixture, High Pressure Sodium,150W Lamp

Exterior Wall Pack Fixture, High Pressure Sodium,150W Lamp

Fixture Quantity

37

2

9

4

19

2

2

3

1

2

16

1 SL4D-2 (2) COBRA HEAD ROADWAY AND AREA POLE MOUNTED LEDFIXTURE WITH PHOTOCONTROL

LED 39,932 TYPE III 356 ATB260BLEDE85 MVOLTR3 NL P7 WH PCSS

HOLOPHANE MAST ARM Pole- Mounted Cobra- head Fixture,High Pressure Sodium, 400W lamps

1 SL22RE-LAMP JELLY JAR WITH SCREW-IN LED A19

SOCKET816 27 A19 27W 27K GE SCREW IN

LAMPJar Fixture, Incandescent, 60W Lamp