Schedule 1 - Pricing Scenario #1
SCHEDULE 1 PRICING SCENARIO #1
Exterior Lighting Retrofit at PDX Maintenance Facility
Description The lighting retrofit is being performed to reduce electricity usage. The lighting project consists of the replacement of existing sodium lamps with Light Emitting Diode (LED) lamps. See Pricing Scenario #1 Drawings and Details for detailed information about the existing lighting fixtures and the proposed LED replacement lamps. Instructions Supplier must provide all personal services classifications, billing rates, materials and equipment costs, for Pricing Scenario #1 below. Classifications and billing rates shall be consistent with the rates provided in Section 3.2.2.4 e of the RFP. Do not include labor costs associated with trade services or the construction installation portion of the Pricing Scenario. Cost Worksheet Pricing is provided for evaluation purposes only and shall not be construed as Supplier’s complete offer.
1. Personal Services Cost Worksheet Please provide a list of all personal services classifications required to execute an Energy Savings Performing Contract, including the billing rate and estimated number of hours.
Position Classification Billing Rate Total Estimated Project Hours Total Cost
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
Total Personal Services Costs $
Schedule 1 - Pricing Scenario #1
2. Materials and Equipment Cost Worksheet
Supplier shall provide pricing for all replacement materials and equipment as identified below. Pricing shall be consistent with manufacturer price lists and/or catalogs provided in Section 3.2.2.4 d of the RFP.
Description Quantity List Price % Discount off List Price
US Communities Price
SL4D-2 1 $ $ SL13 37 $ $ SL13A 2 $ $ SL13A-2 1 $ $ SL13A-3 3 $ $ SL13A-4 2 $ $ SL14 2 $ $ SL15 16 $ $ SL16 4 $ $ SL18 9 $ $ SL19 2 $ $ SL22 1 $ $
Total Materials and Equipment Cost: $
Total Cost (Personal Services and Materials/Equipment) for Pricing Scenario #1 $
79007700
8185
8155
10105
75357505
7525 7515
6700-6730
6620-6650
7013-7021
7028-7040
7002-7014
6904-6918
6807
6705
6720-6756
7545
6903-6915
5900
5517
NE CA SCA DES PA RKWA Y
NE C
AS
CA
DE
S P
AR
KW
AY
10245
1014510135
10041
9739
97211
1020510001 10103
102
9967
9959
10
9301
9901
9963
9941
9377
9715
9109
9401
9971
9955
PORT OF PORTLANDPORTLAND, OREGON
APPV'DNO. CK'DREVISIONSBYDATE APPV'DNO. CK'DBYDATE REVISIONSDESIGN NUMBER PROJECT NUMBER
/9:21:39 AM JOHN.PAASCHs:\2016 projects\16052 pop ltg retrofit (jci)\dwgs\phase 2\16052-e01.100.dwg6/29/2017
01/
4"1/
2"1"
2"C
AN
YO
U S
EE
TH
E A
IRP
LAN
ES
? T
HE
AD
JAC
EN
T S
AM
PLE
S S
HO
W T
HR
EE
DIF
FER
EN
T LE
VELS
OF
SH
AD
ING
.S
ETT
ING
S F
OR
VIE
WIN
G A
ND
PR
INTI
NG
DR
AW
ING
CO
NTE
NT
AR
E O
PTI
MIZ
ED
WH
EN
ALL
TH
RE
E P
LAN
ES
AR
EVI
SIB
LE.
THIS
GU
IDA
NC
E IS
PR
OVI
DE
D F
OR
RE
FER
EN
CE
ON
LY.
GR
AP
HIC
SC
ALE
- FO
R R
EFE
RE
NC
E O
NLY
PRINTED:
light
gray
dark
gray
blac
k
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17".
CHECKED BY
DATE
DESIGNED BY
DRAWN BY
SUBMITTED BY DRAWING NO.TYPE
SCALE
DISC. SHT. NO.SHEET NO.
PRELIMINARYNOT FOR
CONSTRUCTION
MISCELLANEOUS PORT FACILITIES
ENERGY EFFICIENCY UPGRADES PERFORMANCE SERVICESPDX MAINTENANCE ANNEX WORK AREA 1
SITE PLAN - OVERALL
CD MISC 2016-500 9 100
M. HENNING
J. PAASCH
D. STEINKANP
APRIL 2016
2013D045 700149PROJECT ENGINEER E01.100MIA YANGN.T.S.
N
E01.101
AS-NEGOTIATED06/26/171 MTH
SCHEDULE 1PRICING SCENARIO #1 DRAWINGS AND DETAILS
PORT OF PORTLANDPORTLAND, OREGON
APPV'DNO. CK'DREVISIONSBYDATE APPV'DNO. CK'DBYDATE REVISIONSDESIGN NUMBER PROJECT NUMBER
/9:21:45 AM JOHN.PAASCHs:\2016 projects\16052 pop ltg retrofit (jci)\dwgs\phase 2\16052-e01.101.dwg6/29/2017
01/
4"1/
2"1"
2"C
AN
YO
U S
EE
TH
E A
IRP
LAN
ES
? T
HE
AD
JAC
EN
T S
AM
PLE
S S
HO
W T
HR
EE
DIF
FER
EN
T LE
VELS
OF
SH
AD
ING
.S
ETT
ING
S F
OR
VIE
WIN
G A
ND
PR
INTI
NG
DR
AW
ING
CO
NTE
NT
AR
E O
PTI
MIZ
ED
WH
EN
ALL
TH
RE
E P
LAN
ES
AR
EVI
SIB
LE.
THIS
GU
IDA
NC
E IS
PR
OVI
DE
D F
OR
RE
FER
EN
CE
ON
LY.
GR
AP
HIC
SC
ALE
- FO
R R
EFE
RE
NC
E O
NLY
PRINTED:
light
gray
dark
gray
blac
k
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17".
CHECKED BY
DATE
DESIGNED BY
DRAWN BY
SUBMITTED BY DRAWING NO.TYPE
SCALE
DISC. SHT. NO.SHEET NO.
PRELIMINARYNOT FOR
CONSTRUCTION
MISCELLANEOUS PORT FACILITIES
ENERGY EFFICIENCY UPGRADES PERFORMANCE SERVICESPDX MAINTENANCE FACILITY - WORK AREA 1
CD MISC 2016-500 10 100
M. HENNING
J. PAASCH
D. STEINKANP
APRIL 2016
2013D045 700149PROJECT ENGINEER E01.101MIA YANG1" = 50'
N
NOTES:1. FOR GENERAL NOTES, ABBREVIATIONS AND SYMBOLS
LEGEND SEE SHEET GI0.010.
2. CONTRACTOR TO REMOVE EXISTING FIXTURES ANDMOUNTING HARDWARE. REPLACE WITH NEW FIXTURESAND MOUNTING COMPONENTS FOUND IN THELUMINAIRE SCHEDULE.
SCALE: IN FEET
0' 25' 50' 100' 150'
SL4D-2
SL164T-3
SL164T-3
SL134P-7
SL134P-7
SL134P-7
SL134P-7
SL134B-21
SL134B-21
SL134B-21SL13
4B-21
SL134B-21
SL164T-3
SL164T-3
SL134EL-17
SL134EL-17SL13
4EL-17
SL134EL-17SL13
4EL-15
SL134EL-15
SL13A-44EL-19,21
SL13A-24EL-19,21
SL13A-44EL-19,21
SL13A-34EL-19,21
SL13A-34EL-19,21
SL13A-34EL-19,21
SL13A4EL-21
SL13A4EL-21
SL134EL-13SL13
4EL-13
SL134EL-13
SL184EL-13
SL184EL-13
SL184EL-13
SL184EL-13
SL154W-1
SL154W-1
SL154W-1
SL154W-1
SL154W-1
SL154W-1
SL19
SL184EL-7
SL134B-21
SL224W-1
SL134EL-17 SL13
4EL-17
SL184EL-13
SL184EL-13
SL144EL-13SL14
4EL-13
SL15
SL152HM-16
SL152HM-16
SL152HM-16
SL152HM-16
SL152HM-16
SL15SL15
AS-NEGOTIATED06/26/171 MTH
REVISED BY CC #1811/07/162 MTH
SL152HM-16
SL152HM-16
2HM-162HM-16
2HM-16
2HM-16
PANEL 4EL
PANEL2HM
PANEL4P
PANEL4W
SL134EL-15
SL134EL-15
SL134EL-15
SL184EL-13SL18
4EL-13
PANEL4T
PANEL4B
4EL-19,21
PORT OF PORTLANDPORTLAND, OREGON
APPV'DNO. CK'DREVISIONSBYDATE APPV'DNO. CK'DBYDATE REVISIONSDESIGN NUMBER PROJECT NUMBER
/9:21:50 AM JOHN.PAASCHs:\2016 projects\16052 pop ltg retrofit (jci)\dwgs\phase 2\16052-e01.801.dwg6/29/2017
01/
4"1/
2"1"
2"C
AN
YO
U S
EE
TH
E A
IRP
LAN
ES
? T
HE
AD
JAC
EN
T S
AM
PLE
S S
HO
W T
HR
EE
DIF
FER
EN
T LE
VELS
OF
SH
AD
ING
.S
ETT
ING
S F
OR
VIE
WIN
G A
ND
PR
INTI
NG
DR
AW
ING
CO
NTE
NT
AR
E O
PTI
MIZ
ED
WH
EN
ALL
TH
RE
E P
LAN
ES
AR
EVI
SIB
LE.
THIS
GU
IDA
NC
E IS
PR
OVI
DE
D F
OR
RE
FER
EN
CE
ON
LY.
GR
AP
HIC
SC
ALE
- FO
R R
EFE
RE
NC
E O
NLY
PRINTED:
light
gray
dark
gray
blac
k
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17".
CHECKED BY
DATE
DESIGNED BY
DRAWN BY
SUBMITTED BY DRAWING NO.TYPE
SCALE
DISC. SHT. NO.SHEET NO.
PRELIMINARYNOT FOR
CONSTRUCTION
MISCELLANEOUS PORT FACILITIES
ENERGY EFFICIENCY UPGRADES PERFORMANCE SERVICESPDX MAINTENANCE FACILITY LIGHTING FIXTURE SCHEDULE
WORK AREA 1
CD MISC 2016-500 11 100
M. HENNING
J. PAASCH
D. STEINKANP
APRIL 2016
2013D045 700149PROJECT ENGINEER E01.801MIA YANGNONE
AS-NEGOTIATED06/26/171 MTH
Existing Technology
Pole- Mounted Cobra-head Fixture,High Pressure Sodium, 400W lamps
Pole- Mounted Shoebox Fixture,High Pressure Sodium, 250W lamp
Exterior Wall Pack Fixture, High Pressure Sodium,50W Lamp
Pole-Mounted Acorn Fixture, High Pressure Sodium,150W lamp
High bay Fixture, High Pressure Sodium, 250W lamp
Jar Fixture, Incandescent, 60W lamp
Pole- Mounted Shoebox Fixture,High Pressure Sodium, 250W lamp
Pole- Mounted Shoebox Fixture,High Pressure Sodium, 250W lamp
Pole- Mounted Shoebox Fixture,High Pressure Sodium, 250W lamp
Pole- Mounted Shoebox Fixture,High Pressure Sodium, 250W lamp
Exterior Wall Pack Fixture, High Pressure Sodium,150W Lamp
Exterior Wall Pack Fixture, High Pressure Sodium,150W Lamp
Fixture Quantity
37
2
9
4
19
2
2
3
1
2
16
1 SL4D-2 (2) COBRA HEAD ROADWAY AND AREA POLE MOUNTED LEDFIXTURE WITH PHOTOCONTROL
LED 39,932 TYPE III 356 ATB260BLEDE85 MVOLTR3 NL P7 WH PCSS
HOLOPHANE MAST ARM Pole- Mounted Cobra- head Fixture,High Pressure Sodium, 400W lamps
1 SL22RE-LAMP JELLY JAR WITH SCREW-IN LED A19
SOCKET816 27 A19 27W 27K GE SCREW IN
LAMPJar Fixture, Incandescent, 60W Lamp