Page 1: Prezentacja programu PowerPoint - CEEC 2019START OF CONSTRUCTION WORKS ON THE POLISH SIDE 2022 COMMISSIONING GAS INTERCONNECTION POLAND-SLOVAKIA INAUGURATION OF THE CONSTRUCTION OF

NEW DYNAMICS IN THE NATURAL GAS SECTOR IN EUROPE

Sławomir Sieradzki

Director of Gas Market Development Division

GAZ-SYSTEM S.A.

Page 2: Prezentacja programu PowerPoint - CEEC 2019START OF CONSTRUCTION WORKS ON THE POLISH SIDE 2022 COMMISSIONING GAS INTERCONNECTION POLAND-SLOVAKIA INAUGURATION OF THE CONSTRUCTION OF

AIR QUALITY IN CEE REGION

Air quality in Poland and the CEE region

► Concentrations of air pollutant emissions

above the EU limit values

► Air pollution resulting from burning high

emission and low-quality fuels,

especially in the winter period

► Significant negative impact on the

health and economy.

► Mitigation of air pollution with a wider

use of natural gas in households, the

heating and the power generation

sectors

► Natural gas as an affordable, time- and

cost efficient solution

Page 3: Prezentacja programu PowerPoint - CEEC 2019START OF CONSTRUCTION WORKS ON THE POLISH SIDE 2022 COMMISSIONING GAS INTERCONNECTION POLAND-SLOVAKIA INAUGURATION OF THE CONSTRUCTION OF

ELECTRICITY AND HEAT GENERATION IN EUROPE

CEE

► Coal and lignite as the primary sources in the

electricity and heat generation.

► 57% of electricity produced from solid fuels in CEE.

Limited but increasing role of RES (14%) and natural

gas (9%).

► Solid fuels generate 63% of the heat in CEE. Natural

gas with a share of 26%.

North-West Europe

► Completely different outlook in North-West Europe:

► Marginal role of solid fuels, zero-emission sources

(RES, nuclear) are well-developed and supported

by low emission natural gas.

NWE: BE, DK, FR, IE, NL, LU, SE. CEE: CZ, HU, PL, SK.

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

CEE

NWE

Electricity generation

Solid fossil fuels Natural gas Renewables Nuclear Other

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

CEE

NWE

Heat generation

Solid fossil fuels Natural gas Renewables Nuclear Other

Page 4: Prezentacja programu PowerPoint - CEEC 2019START OF CONSTRUCTION WORKS ON THE POLISH SIDE 2022 COMMISSIONING GAS INTERCONNECTION POLAND-SLOVAKIA INAUGURATION OF THE CONSTRUCTION OF

NATURAL GAS: SOLUTION FOR LOW CARBON ENERGY MIX

Carbon dioxide emissions from natural

gas are about 40-45% per cent lower

than coal as a result of higher

performance and efficiency of gas-

powered facilities.

Increasing costs of carbon emissionallowances in EU - as a result of relatively

high costs of energy, coal dependent

regions may loose their competitiveness.

Natural gas, due to its low emission

coefficients compared to solid fuels,

should be considered as a fuel that can

contribute to a significant reduction of

greenhouse gas emissions

94,72

104,12

56,1

0 20 40 60 80 100 120

Hard coal

Lignite

Natural gas

EMISSIONS OF CARBON DIOXIDEKG/GJ

(KG/GJ)

Data: KOBIZE

Page 5: Prezentacja programu PowerPoint - CEEC 2019START OF CONSTRUCTION WORKS ON THE POLISH SIDE 2022 COMMISSIONING GAS INTERCONNECTION POLAND-SLOVAKIA INAUGURATION OF THE CONSTRUCTION OF

5

POLAND AS THE BIGGEST AND GROWING REGIONAL MARKET

► Positive outlook for gas demand in Poland in

recent years

► Significant increase in demand since 2015

(25% increase)

► Poland plans gas-based power and heat

generation development to be one of the

driving forces of the Polish energy

transformation.

1414,5

14,9 14,9

14,1

16,3

17,617,2

12

13

14

15

16

17

18

19

20

2011 2012 2013 2014 2015 2016 2017 2018

bcm

/y

25% increase

Source: GAZ-SYSTEM S.A.

It is expected that in the next 10 years perspective the demand for natural gas in Poland may

increase by more than 50%. In terms of transition from coal to lower emitting sources

gas could be a major driver to meet the market demand as well as climate and

environmental requirements.

Page 6: Prezentacja programu PowerPoint - CEEC 2019START OF CONSTRUCTION WORKS ON THE POLISH SIDE 2022 COMMISSIONING GAS INTERCONNECTION POLAND-SLOVAKIA INAUGURATION OF THE CONSTRUCTION OF

PLANNED EXPANSION OF

INFRASTRUCTURE

FSRU IN PORT OF GDAŃSK (2025)

Ongoing design phase

Capacity (I stage): 4,5 bcm/y

PL-CZ INTERCONNECTION

Design phase completed in Poland

Project under evaluation, ongoing incremental process

PL-UA INTERCONNECTION

Design phase completed in Poland

Project under evaluation

PROVIDING NEW POSSIBILITIES TO THE CEE/BALTIC REGION

BALTIC PIPE (2022)

Ongoing design phase, construction works as of 2020

3 bcm/y towards DK

10 bcm/y towards PL

LNG TERMINAL (2023)

Ongoing tendering for the construction works

Capacity upgrade: 7,5 bcm/y

PL-SK INTERCONNECTION (2022)

Under construction

4.7 bcm/y towards SK

5.7 bcm/y towards PL

PL-LT INTERCONNECTION (2021)

Ongoing tendering for the construction works

2.4 bcm/y towards LT

1.9 bcm/y towards PL

Page 7: Prezentacja programu PowerPoint - CEEC 2019START OF CONSTRUCTION WORKS ON THE POLISH SIDE 2022 COMMISSIONING GAS INTERCONNECTION POLAND-SLOVAKIA INAUGURATION OF THE CONSTRUCTION OF

GAS INTERCONNECTION POLAND-SLOVAKIA

An essential part of the North-South gas corridor

(NSI East Gas), which is intended to integrate gas

systems of Central and Eastern European countries.

New gas sources for CEE: LNG and Norway (Baltic

Pipe)

Recognized as a Project of Common Interest

Member states: Poland, Slovakia

Project partners: GAZ-SYSTEM (PL), EUSTREAM (SK)

Status: FID, ongoing construction works

Capacity: PL-> SK: 5.7 bcm/y SK-> PL: 4.7 bcm/y

Page 8: Prezentacja programu PowerPoint - CEEC 2019START OF CONSTRUCTION WORKS ON THE POLISH SIDE 2022 COMMISSIONING GAS INTERCONNECTION POLAND-SLOVAKIA INAUGURATION OF THE CONSTRUCTION OF

START OF ENGINEERING • INVESTMENT DECISION

• OBTAINING THE BUILDING PERMIT

• START OF CONSTRUCTION

WORKS ON THE SLOVAK SIDE

2014 2015 2017 2018

CROSS BORDER COST ALLOCATION DECISION

OBTAINING:

• ENVIRONMENTAL DECISION,

• LOCATION DECISION

2019

START OF CONSTRUCTION WORKS ON THE POLISH SIDE

2022

COMMISSIONING

GAS INTERCONNECTION POLAND-SLOVAKIA

Page 9: Prezentacja programu PowerPoint - CEEC 2019START OF CONSTRUCTION WORKS ON THE POLISH SIDE 2022 COMMISSIONING GAS INTERCONNECTION POLAND-SLOVAKIA INAUGURATION OF THE CONSTRUCTION OF

INAUGURATION OF THE CONSTRUCTION OF THE POLISH PART OF THE POLAND -

SLOVAKIA GAS INTERCONNECTION

06.09.2019

Page 10: Prezentacja programu PowerPoint - CEEC 2019START OF CONSTRUCTION WORKS ON THE POLISH SIDE 2022 COMMISSIONING GAS INTERCONNECTION POLAND-SLOVAKIA INAUGURATION OF THE CONSTRUCTION OF

EMISSION REDUCTIONSECURITY OF SUPPLIES CLEAN AIRENERGY EFFICIENCY

NATURAL GAS INFRASTRUCTURE CONTRIBUTING TO EU OBJECTIVES

Available

infrastructure to

achieve EU climate

targets

Targeted gas

investments to complete a

competitive

market

Guaranteeing

secure and

affordable energy

supplies

Energy

transformation

in region.

Natural gas in

power & heating

generation