preview of the electric transmission constraint study

11
1 Preview of the Preview of the Electric Electric Transmission Transmission Constraint Constraint Study Study Division of Market Division of Market Development Development Before the Commission Before the Commission September 26, 2001 September 26, 2001

Upload: zoltan

Post on 09-Jan-2016

12 views

Category:

Documents


0 download

DESCRIPTION

Preview of the Electric Transmission Constraint Study. Division of Market Development Before the Commission September 26, 2001. Thanh Luong (Team Lead) Kumar Agarwal Cynthia Pointer Meesha Bond Raymond Montini. Ron Rattey Camilla Ng Dean Wight William Meroney (Advisor). - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Preview of the Electric Transmission Constraint Study

11

Preview of thePreview of theElectric Electric

Transmission Transmission Constraint StudyConstraint Study

Division of Market Division of Market DevelopmentDevelopment

Before the CommissionBefore the Commission

September 26, 2001September 26, 2001

Page 2: Preview of the Electric Transmission Constraint Study

22

Members of the TeamMembers of the Team• Thanh Luong (Team

Lead)• Kumar Agarwal• Cynthia Pointer• Meesha Bond• Raymond Montini

• Ron Rattey• Camilla Ng• Dean Wight• William Meroney

(Advisor)

Page 3: Preview of the Electric Transmission Constraint Study

33

ProductProduct

• A Western Infrastructure AssessmentA Western Infrastructure Assessment– Review of supply (generation), demand, market activity and transmissionReview of supply (generation), demand, market activity and transmission

Estimated Completion: To Be DeterminedEstimated Completion: To Be Determined

• A similar assessment of Eastern infrastructure is plannedA similar assessment of Eastern infrastructure is planned Estimated Completion: To Be DeterminedEstimated Completion: To Be Determined

Related ProductsRelated Products

•Transmission Constraint StudyTransmission Constraint StudyEstimated Completion: Estimated Completion: Nov. 07, 2001Nov. 07, 2001

Page 4: Preview of the Electric Transmission Constraint Study

44

Why Constraints MatterWhy Constraints Matter• Constraints and the resulting Constraints and the resulting

congestion pose two problems for congestion pose two problems for Customers:Customers:

-Threatens reliability.Threatens reliability.

- Increases the costs of Increases the costs of power.power.

Page 5: Preview of the Electric Transmission Constraint Study

55

has been the traditional criteria for relieving constraints, but . . .

Why Constraints MatterWhy Constraints Matter

Page 6: Preview of the Electric Transmission Constraint Study

66

Why Constraints MatterWhy Constraints Matter

• Constraints increase the cost of power where supply can not move to where it is needed.

Page 7: Preview of the Electric Transmission Constraint Study

77

Examples of ConstraintsExamples of Constraints

• Path 15 in Central CAPath 15 in Central CA

• Central East Interface in NYCentral East Interface in NY

Page 8: Preview of the Electric Transmission Constraint Study

Path 15Path 15 in Central CA in Central CA

Page 9: Preview of the Electric Transmission Constraint Study

Central East Central East Interface in NYInterface in NY

Page 10: Preview of the Electric Transmission Constraint Study

1010

Estimated Cost of ConstraintsEstimated Cost of Constraints

• Path 15 in Central CA:Path 15 in Central CA:- Congestion during Dec. 2000 Congestion during Dec. 2000

$73 million$73 million in additional cost to Customers in additional cost to Customers

• Central East Interface in NY:Central East Interface in NY:- Congestion during Aug. 2001 Congestion during Aug. 2001

$19 million$19 million in additional cost to Customers in additional cost to Customers

Page 11: Preview of the Electric Transmission Constraint Study

1111

In Review . . .In Review . . .

• A Western Infrastructure AssessmentA Western Infrastructure Assessment– Review of supply (generation), demand, market activity and transmissionReview of supply (generation), demand, market activity and transmission

Estimated Completion: To Be DeterminedEstimated Completion: To Be Determined

• A similar assessment of Eastern infrastructure is plannedA similar assessment of Eastern infrastructure is planned Estimated Completion: To Be DeterminedEstimated Completion: To Be Determined

•Transmission Constraint StudyTransmission Constraint StudyEstimated Completion: Estimated Completion: Nov. 07, 2001Nov. 07, 2001