Prestressed Steel Structures in P j t f th 2008 B ijiProjects of the 2008 Beijing
Olympic Games
Liu Hang, Li ChenguangBeijing Building Construction Research Institute
P. R. ChinaApril 2008
1
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 1 of 44
Introduction
Prestressing Technology is widely used in different kinds of steel structures.As a long span structure, prestressed steel structures often seem more flexible, especially in , p ythe construction process, which results in difficulties to establish the prestress. Beam string structure, the suspen-dome structureBeam string structure, the suspen dome structure and cable-net structure are commonly used in China.Applications in the Chinese National Sports HallApplications in the Chinese National Sports Hall, the Badminton Gymnasia for the 2008 Olympic Games and the Century Lotus stadium in Foshan City Guangdong province are introduced
2
City, Guangdong province are introduced.
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 2 of 44
Prestressed Steel Structures
PrestressedPrestressed steel structures
Prestressed cables
Steel structuresstructures Steel structures
(truss, grid, shell, etc.)
3
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 3 of 44
Advantagesg
Interactional behaviors of prestressed cables pimprove redundant degree.High tensile strength of cables.Inverted camber caused by prestress.Tension members be precompressed before l d dloaded. The mechanical behaviors of the structure are improvedimproved.
4
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 4 of 44
Beam String Structure
5
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 5 of 44
Beam String Structure (one-way) g ( y)
6
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 6 of 44
Applications in the 2008 Olympic Gamespp y p
The National Sports Hall.
The Table Tennis Gymnasia.
Tsingdao Sailing Center.
The Training Gymnasia for theOlympics.
7
y p
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 7 of 44
National Sports Hallp
8Two-way beam string structure (114×144.5m)
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 8 of 44
Structure Drawingg
9Span 114m×144.5m
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 9 of 44
Sectional Drawingsg
L i di l di iLongitudinal direction
10Transverse direction
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 10 of 44
Accumulative Sliding Constructiong
11Play the Movie
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 11 of 44
Composition of Prestressed CablesComposition of Prestressed CablesComposition of Prestressed CablesComposition of Prestressed CablesWhite or colored White or colored polythene coatpolythene coat
Galvanized steel Galvanized steel wires with diameterwires with diameterwires with diameter wires with diameter of 5mm or 7mmof 5mm or 7mm
Black polythene liningBlack polythene lining
12
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 12 of 44
Cross section of a cableCross section of a cableCross section of a cableCross section of a cable
13
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 13 of 44
A h S f h C blA h S f h C blAnchorage System of the CableAnchorage System of the Cable
Cold cast Cold cast CableCableanchorageanchorage Adjust sleeveAdjust sleeve Fixed endFixed end
14
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 14 of 44
Model Test of the National Sports Hallp
A 1/10 scale model was designed andA 1/10 scale model was designed and constructed.Different tensioning processes of the g pprestressing tendons are tested and verified.The model was tested under twice of the design vertical load.
15
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 15 of 44
Li D i f th M d lLine Drawing of the Model
16
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 16 of 44
Transverse Direction of the Model
17
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 17 of 44
Longitudinal Direction of the Modelg
18
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 18 of 44
Plan of Cables
19
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 19 of 44
Model under Construction
20
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 20 of 44
Model under Vertical Load
21
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 21 of 44
Inverted Camber
10
12
er(m
m) Axi s 13
Axi s 14Axi s 15
6
8
an C
ambe Axi s 16
2
4
Mid
-sp
00 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7
Tension Process
22
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 22 of 44
Internal Forces of the Cables
2500
3000
(kgf
)
Axi s 9Axi s 10Axi s 11Axi s 12 1600
1800
2000
kgf)
1000
1500
2000
rnal
For
ce o
f Cab
le(
Axi s 13Axi s 14Axi s 15
600
800
1000
1200
1400
rnal
For
ce o
f Cab
le(k
Axi s E
0
500
0 5 10 15 20 25Tension Process
Inte
r
0
200
400
600
0 5 10 15 20 25Tension Process
Inte
r Axi s FAxi s GAxi s H
Transverse direction Longitudinal directionTension Process Tension Process
23
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 23 of 44
Suspen-Dome
24
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 24 of 44
Applications in the 2008 Olympic Gamespp y p
The Badminton GymnasiaThe Badminton Gymnasia
25Circular plan, Diameter=93m
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 25 of 44
Introduction
Total building area: 24 383m2Total building area: 24,383m .7,508 seats.Suspen-dome is used as the roofSuspen-dome is used as the roof structure, with a diameter of 93m.
26
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 26 of 44
The Roof Structure
27
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 27 of 44
Cables and tension rods
Grid Dome StructureStrut
28Ring CableRadial Tension Rod
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 28 of 44
Prestressing Forces of the Ring Cablesg g
Prestressing forces are established throughPrestressing forces are established through tensioning ring cables, which includes 3 stages.
Stage Tension force / Controlled force
1st ring cable
Force/kN
2nd ring cable
Force/kN
3rd ring cable
Force/kN
4th ring cable
Force/kN
5th ring cable
Force/kN
1 70% 1693 860 534 249 118
2 90% 2177 1106 687 320 152
3 110% 2661 1351 839 391 185
29
3 110% 2661 1351 839 391 185
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 29 of 44
Inverted camber
80
60
70
80实 测 值
理 论 值
40
50
60
值 m
m
20
30
起拱
值
0
10
30
1 2 3 4 5 6 7 8 9 10 11
起 拱 值 测 点 编 号
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 30 of 44
Cable-net structure
31
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 31 of 44
The Century Lotus Stadium of Foshan City, G d P iGuangdong Province
32
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 32 of 44
Introduction
Total building area: 123,125m2.g ,36,000 seats. Circular Plan, diameter=310m.Double-layer cable net structure is used as roof structure.PVC membrane is covered on the roof unfoldedPVC membrane is covered on the roof,unfolded area is:72,482m2.The cable net structure is composed of a internal ring cable, 40 radial upper cables, 40 radial lower cables and many hanger cables, total weight about 600t.
33
600t.
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 33 of 44
34
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 34 of 44
Structure of Main Cables
35
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 35 of 44
Construction Process
Place the ring cable at the middle of thePlace the ring cable at the middle of the ground.Using 40 temporary strands to lift the ring g p y gcable to an altitude higher than the design altitude.Install the upper radial cables.Uninstall the temporary strands.Install the lower radial cables.Install the hanger cables and the membrane.
36
g
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 36 of 44
Internal Forces of the Temporary Strandsp y
500
600
MP
a)
300
400
500
mp
Stra
nds(
M
100
200
Stre
ss o
f Tem Group 1
Group 2Group 3Group 4
00 1 2 3 4 5 6 7 8 9 10
Construction Process
S
Group 5
37
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 37 of 44
Internal Forces of the Upper Radial Cablespp
350
400
e(M
Pa)
200
250
300
rRad
ial C
able
Group 1
50
100
150
ess
of U
pper
Group 1
Group 2
Group 3
Group 4
G 5
0
50
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22Construction Process
Stre Group 5
38
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 38 of 44
Internal Forces of the Lower Radial Cables
250
300
e(M
pa)
150
200
250
r Rad
ial C
able
Group1
50
100
ress
of L
ower
Group1
Group2
Group3
Group4
Group5
010 11 12 13 14 15 16 17 18 19 20 21 22
Construction Process
Str Group5
39
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 39 of 44
Internal Force of the Ring Cableg
300
350
400
200
250
300
ss(
MP
a )
Group1
50
100
150
Stre
s Group1
Group2
Group3
Group4
Group50
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Construction Process
Group5
40
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 40 of 44
Vertical Displacement of the Ring Cablep g
2. 5
3
m)
1. 5
2
plac
emen
t(m
0
0. 5
1
Dis
p
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Construction Process
41
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 41 of 44
Temporary Strands Lifting the Ring Cablep y g g
42
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 42 of 44
The Stadium During Constructiong
43
2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG
(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 43 of 44