Prestressed Steel Structures in P j t f th 2008 B iji Projects of the 2008 Beijing Olympic Games Liu Hang, Li Chenguang Beijing Building Construction Research Institute P. R. China April 2008 1 2008 PTI TECHNICAL CONFERENCE SESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 1 of 44

Upload: vodat

Post on 09-Sep-2018

217 views

Category:

Documents


4 download

TRANSCRIPT

Prestressed Steel Structures in P j t f th 2008 B ijiProjects of the 2008 Beijing

Olympic Games

Liu Hang, Li ChenguangBeijing Building Construction Research Institute

P. R. ChinaApril 2008

1

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 1 of 44

Introduction

Prestressing Technology is widely used in different kinds of steel structures.As a long span structure, prestressed steel structures often seem more flexible, especially in , p ythe construction process, which results in difficulties to establish the prestress. Beam string structure, the suspen-dome structureBeam string structure, the suspen dome structure and cable-net structure are commonly used in China.Applications in the Chinese National Sports HallApplications in the Chinese National Sports Hall, the Badminton Gymnasia for the 2008 Olympic Games and the Century Lotus stadium in Foshan City Guangdong province are introduced

2

City, Guangdong province are introduced.

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 2 of 44

Prestressed Steel Structures

PrestressedPrestressed steel structures

Prestressed cables

Steel structuresstructures Steel structures

(truss, grid, shell, etc.)

3

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 3 of 44

Advantagesg

Interactional behaviors of prestressed cables pimprove redundant degree.High tensile strength of cables.Inverted camber caused by prestress.Tension members be precompressed before l d dloaded. The mechanical behaviors of the structure are improvedimproved.

4

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 4 of 44

Beam String Structure

5

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 5 of 44

Beam String Structure (one-way) g ( y)

6

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 6 of 44

Applications in the 2008 Olympic Gamespp y p

The National Sports Hall.

The Table Tennis Gymnasia.

Tsingdao Sailing Center.

The Training Gymnasia for theOlympics.

7

y p

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 7 of 44

National Sports Hallp

8Two-way beam string structure (114×144.5m)

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 8 of 44

Structure Drawingg

9Span 114m×144.5m

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 9 of 44

Sectional Drawingsg

L i di l di iLongitudinal direction

10Transverse direction

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 10 of 44

Accumulative Sliding Constructiong

11Play the Movie

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 11 of 44

Composition of Prestressed CablesComposition of Prestressed CablesComposition of Prestressed CablesComposition of Prestressed CablesWhite or colored White or colored polythene coatpolythene coat

Galvanized steel Galvanized steel wires with diameterwires with diameterwires with diameter wires with diameter of 5mm or 7mmof 5mm or 7mm

Black polythene liningBlack polythene lining

12

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 12 of 44

Cross section of a cableCross section of a cableCross section of a cableCross section of a cable

13

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 13 of 44

A h S f h C blA h S f h C blAnchorage System of the CableAnchorage System of the Cable

Cold cast Cold cast CableCableanchorageanchorage Adjust sleeveAdjust sleeve Fixed endFixed end

14

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 14 of 44

Model Test of the National Sports Hallp

A 1/10 scale model was designed andA 1/10 scale model was designed and constructed.Different tensioning processes of the g pprestressing tendons are tested and verified.The model was tested under twice of the design vertical load.

15

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 15 of 44

Li D i f th M d lLine Drawing of the Model

16

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 16 of 44

Transverse Direction of the Model

17

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 17 of 44

Longitudinal Direction of the Modelg

18

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 18 of 44

Plan of Cables

19

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 19 of 44

Model under Construction

20

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 20 of 44

Model under Vertical Load

21

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 21 of 44

Inverted Camber

10

12

er(m

m) Axi s 13

Axi s 14Axi s 15

6

8

an C

ambe Axi s 16

2

4

Mid

-sp

00 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7

Tension Process

22

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 22 of 44

Internal Forces of the Cables

2500

3000

(kgf

)

Axi s 9Axi s 10Axi s 11Axi s 12 1600

1800

2000

kgf)

1000

1500

2000

rnal

For

ce o

f Cab

le(

Axi s 13Axi s 14Axi s 15

600

800

1000

1200

1400

rnal

For

ce o

f Cab

le(k

Axi s E

0

500

0 5 10 15 20 25Tension Process

Inte

r

0

200

400

600

0 5 10 15 20 25Tension Process

Inte

r Axi s FAxi s GAxi s H

Transverse direction Longitudinal directionTension Process Tension Process

23

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 23 of 44

Suspen-Dome

24

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 24 of 44

Applications in the 2008 Olympic Gamespp y p

The Badminton GymnasiaThe Badminton Gymnasia

25Circular plan, Diameter=93m

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 25 of 44

Introduction

Total building area: 24 383m2Total building area: 24,383m .7,508 seats.Suspen-dome is used as the roofSuspen-dome is used as the roof structure, with a diameter of 93m.

26

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 26 of 44

The Roof Structure

27

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 27 of 44

Cables and tension rods

Grid Dome StructureStrut

28Ring CableRadial Tension Rod

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 28 of 44

Prestressing Forces of the Ring Cablesg g

Prestressing forces are established throughPrestressing forces are established through tensioning ring cables, which includes 3 stages.

Stage Tension force / Controlled force

1st ring cable

Force/kN

2nd ring cable

Force/kN

3rd ring cable

Force/kN

4th ring cable

Force/kN

5th ring cable

Force/kN

1 70% 1693 860 534 249 118

2 90% 2177 1106 687 320 152

3 110% 2661 1351 839 391 185

29

3 110% 2661 1351 839 391 185

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 29 of 44

Inverted camber

80

60

70

80实 测 值

理 论 值

40

50

60

值 m

m

20

30

起拱

0

10

30

1 2 3 4 5 6 7 8 9 10 11

起 拱 值 测 点 编 号

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 30 of 44

Cable-net structure

31

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 31 of 44

The Century Lotus Stadium of Foshan City, G d P iGuangdong Province

32

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 32 of 44

Introduction

Total building area: 123,125m2.g ,36,000 seats. Circular Plan, diameter=310m.Double-layer cable net structure is used as roof structure.PVC membrane is covered on the roof unfoldedPVC membrane is covered on the roof,unfolded area is:72,482m2.The cable net structure is composed of a internal ring cable, 40 radial upper cables, 40 radial lower cables and many hanger cables, total weight about 600t.

33

600t.

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 33 of 44

34

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 34 of 44

Structure of Main Cables

35

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 35 of 44

Construction Process

Place the ring cable at the middle of thePlace the ring cable at the middle of the ground.Using 40 temporary strands to lift the ring g p y gcable to an altitude higher than the design altitude.Install the upper radial cables.Uninstall the temporary strands.Install the lower radial cables.Install the hanger cables and the membrane.

36

g

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 36 of 44

Internal Forces of the Temporary Strandsp y

500

600

MP

a)

300

400

500

mp

Stra

nds(

M

100

200

Stre

ss o

f Tem Group 1

Group 2Group 3Group 4

00 1 2 3 4 5 6 7 8 9 10

Construction Process

S

Group 5

37

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 37 of 44

Internal Forces of the Upper Radial Cablespp

350

400

e(M

Pa)

200

250

300

rRad

ial C

able

Group 1

50

100

150

ess

of U

pper

Group 1

Group 2

Group 3

Group 4

G 5

0

50

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22Construction Process

Stre Group 5

38

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 38 of 44

Internal Forces of the Lower Radial Cables

250

300

e(M

pa)

150

200

250

r Rad

ial C

able

Group1

50

100

ress

of L

ower

Group1

Group2

Group3

Group4

Group5

010 11 12 13 14 15 16 17 18 19 20 21 22

Construction Process

Str Group5

39

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 39 of 44

Internal Force of the Ring Cableg

300

350

400

200

250

300

ss(

MP

a )

Group1

50

100

150

Stre

s Group1

Group2

Group3

Group4

Group50

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Construction Process

Group5

40

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 40 of 44

Vertical Displacement of the Ring Cablep g

2. 5

3

m)

1. 5

2

plac

emen

t(m

0

0. 5

1

Dis

p

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Construction Process

41

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 41 of 44

Temporary Strands Lifting the Ring Cablep y g g

42

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 42 of 44

The Stadium During Constructiong

43

2008 PTI TECHNICAL CONFERENCESESSION 4 - PRESTRESSED STEEL STRUCTURES IN PROJECTS OF THE 2008 BEIJING OLYMPIC GAMES LIU HANG, LI CHENGUANG

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 43 of 44

Thanks!