TRANSCRIPT
![Page 1: Presenting Northwind Frank Coenen For InControl SA CEO Northwind NV](https://reader036.vdocuments.us/reader036/viewer/2022081723/56649e295503460f94b16fa5/html5/thumbnails/1.jpg)
Presenting Northwind
Frank CoenenFor InControl SA
CEO Northwind NV
![Page 2: Presenting Northwind Frank Coenen For InControl SA CEO Northwind NV](https://reader036.vdocuments.us/reader036/viewer/2022081723/56649e295503460f94b16fa5/html5/thumbnails/2.jpg)
2
Northwind project
• Concession granted: 15 May 2006
• Fully permitted– Permit for construction and exploitation– Export Cable Permit– Land cable
• Declaration of public use• Flemish road permit• Federal road permit• Building permit
• Area: 14,5 km²• Water depth: 16 to 29 m• Distance from shore: 37 km
![Page 3: Presenting Northwind Frank Coenen For InControl SA CEO Northwind NV](https://reader036.vdocuments.us/reader036/viewer/2022081723/56649e295503460f94b16fa5/html5/thumbnails/3.jpg)
3
216 MW
• 72 Vestas turbines V112 3 MW
• Yearly production estimated: 0,875 Terrawatthours= 875 million kilowatthours
Meaning:
• 1% of the yearly electricity consumption in Belgium in 2011.
• Green energy for 230.000 households each year.*
• Reduce CO2 emission by 245.000 tons each year.**
* cfr VREG** cfr Eurostat
Northwind project
![Page 4: Presenting Northwind Frank Coenen For InControl SA CEO Northwind NV](https://reader036.vdocuments.us/reader036/viewer/2022081723/56649e295503460f94b16fa5/html5/thumbnails/4.jpg)
4
General information
• Turbine model: Vestas V112 – 3.0 MW• Rotor diameter: 112 m
• Foundation type: Monopiles
• Export cable: 220 kV• Length export cable: 43 km
• Construction will start: spring 2013
![Page 5: Presenting Northwind Frank Coenen For InControl SA CEO Northwind NV](https://reader036.vdocuments.us/reader036/viewer/2022081723/56649e295503460f94b16fa5/html5/thumbnails/5.jpg)
5
Shareholders
Parkwind
![Page 6: Presenting Northwind Frank Coenen For InControl SA CEO Northwind NV](https://reader036.vdocuments.us/reader036/viewer/2022081723/56649e295503460f94b16fa5/html5/thumbnails/6.jpg)
6
1. Monopile
2. Transition piece
3. Windturbine
1
2
3
4
5
6
4. Inter array cables
5. OHVS (transformation station)
6. Export cable
Connection to transmission grid
Offshore windfarm
![Page 7: Presenting Northwind Frank Coenen For InControl SA CEO Northwind NV](https://reader036.vdocuments.us/reader036/viewer/2022081723/56649e295503460f94b16fa5/html5/thumbnails/7.jpg)
7
Project management
EPCI - Engineering Procurement Construction Installatie
Supply monopiles
Supply Transition pieces
Supply & termination inter-array cables
Installation hammer
Detailed design
Supply foundation installation vessel
ContractorsWE Power
![Page 8: Presenting Northwind Frank Coenen For InControl SA CEO Northwind NV](https://reader036.vdocuments.us/reader036/viewer/2022081723/56649e295503460f94b16fa5/html5/thumbnails/8.jpg)
8
Installation export cable & dredging:
Supply and termination land cable:
WTG installation vessel:
Supply and termination export cable:
Contractors
![Page 9: Presenting Northwind Frank Coenen For InControl SA CEO Northwind NV](https://reader036.vdocuments.us/reader036/viewer/2022081723/56649e295503460f94b16fa5/html5/thumbnails/9.jpg)
9
WTG:
Supply & installation Offshore High Voltage Station:
HV equipment: CG Power systems
Foundation design certification:
Power purchase agreement:
Contractors
![Page 10: Presenting Northwind Frank Coenen For InControl SA CEO Northwind NV](https://reader036.vdocuments.us/reader036/viewer/2022081723/56649e295503460f94b16fa5/html5/thumbnails/10.jpg)
10
Financial & legal
• BnP Parisbas Fortis
• Mott Macdonald
• Green giraffe
• Loyens & Loeff
• White & Case
• Contrast
• JLT
• Freshfields
• KPMG
Insurance
• Profin• Marsh Belgium• Codan Forsikring A/S• AXA Versicherung AG• AXIS Specialty Europe Ltd.• HDI-Gerling Verzekeringen N.V
Partners
![Page 11: Presenting Northwind Frank Coenen For InControl SA CEO Northwind NV](https://reader036.vdocuments.us/reader036/viewer/2022081723/56649e295503460f94b16fa5/html5/thumbnails/11.jpg)
11
Belgian content: 50%
•Deme-GeoSea
• Jan De Nul
• CG Power systems Belgium
• GI Windforce
•Vanden Bergh/Heijmans
Belgian content
Other than procurement• WE-Power• Aspiravi Offshore• Electrabel• Loyens Loeff Lawyers• White & Case Lawyers Brussels & London• Contrast Lawyers• Marsh Belgium • KPMG Tax advice
•Freshfields Lawyers Brussels• BNPParibasFortis • Belfius Bank• ING Bank• IMDC• Tractebel-Technum• ONDD-Delcredere.
![Page 12: Presenting Northwind Frank Coenen For InControl SA CEO Northwind NV](https://reader036.vdocuments.us/reader036/viewer/2022081723/56649e295503460f94b16fa5/html5/thumbnails/12.jpg)
12
TeamPartners
• InControl SA• WE Power• ABS• Aspiravi offshore• Chevalyse• Ensol• EPCM• IMDC• Noren quality consulting• Offshore wind power consulting• Polymira• Qualsurv• SGS• Technum Tractebel• Verenigde fiducaires• Wind Support Limited
![Page 13: Presenting Northwind Frank Coenen For InControl SA CEO Northwind NV](https://reader036.vdocuments.us/reader036/viewer/2022081723/56649e295503460f94b16fa5/html5/thumbnails/13.jpg)
13
Belgian support
• FOD economy
• Federal authorities
• MUMM
• Flemish authorities
• Elia
• CREG
• DG Leefmilieu
& Northwind team