presented by: purdianta, st.,mt - esa unggul...

36
Presented by: Purdianta, ST.,MT

Upload: trinhduong

Post on 04-Mar-2018

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

Presented by: Purdianta, ST.,MT

Page 2: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

Introduction

• Modern organizations are considered highly complex networks of business units

• Each business unit realizes a part of the organization’s business process

• Complexity of business tasks requires computing power

• A common approach: tackle the business process objectives each unit accomplishes with an IT platform

• A common problem: a different IT platform for each unit

Page 3: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

Definition ERP is complete enterprise wide business software solution.

The ERP system consists of software support modules, such

as: marketing and sales, fields service, product design and

development, production and inventory control,

procurement, distribution, industrial facilities management,

process desig and development, manufacturing, quality,

human resources, finance and accounting, and

information services.

“ Travis Andereg-2002”

Page 4: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

Definition ERP system are computer based system designed to

process an organization’s transactions and facilitate integrated and real time planning, production, and

customer response. In particular ERPsystems will be

assumed to have certain characteristics.

“ Daniel O’Leary 2004”

Page 5: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

Definition ERPs integrate (ot attempt to integrate) all data and

processes of an organization into a single unified system. A typical ERP system will use multiple

component of computer software and hardware to achieve the integration. A key ingredient of most ERP

system is the use of a single, unified database to

store data for the various system modules.

“ Wikipedia”

Page 6: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

ERP Process

Page 7: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

ERP Evolution

Page 8: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

Resource Planning in Enterprises Material Requirements Planning

• Bill of material, inventory data, master production schedule

• calculates material requirements and schedules MRP

ERP

MRP II Manufacturing Resource Planning

• based on MRP

•computerised method for simultaneous planning the use of

all resources in a company, including financials,

manufacturing, and distribution management

Enterprise Resource Planning

• extension of the manufacturing resources planning

• automate and integrate business and production management

processes in a real-time environment

• closely associated with the use of client/server technology for

greater flexibility in operation and modelling of the enterprise

Page 9: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

Closed Loop MRP

Page 10: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

individual

mechanical

engineering

special

projects make-

to-order

assemble-

to-order

assemble

according

to catalog

make-

to-stock

production

by lot-size repetitive

manu-

facturing

process

manu-

facturing

continuous

manu-

facturing

P

R

O

D

U

C

T

C

O

M

P

L

E

X

I

T

Y

P R O D UC T S T A B I L I T Y

Manufacturing Scope

Page 11: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

Overview

CIM

CAD/CAE

CAP

CAM

PPC

CAQ

Interfaces

Data bases

Engineering

data bases

Enterprise modeling

Communication

Knowledge-based systems

CA

M

CA

P

CA

D

pro

duction

pla

nnin

g

pro

duction c

ontr

ol

Calculation

Selling

Capacity planning

Scheduling

Progressing

Job

Stock management/

quantity planning

Cost accounting

Dispatch

Factory data capture/

order monitoring

Development

construction

Scheduling

NC-programming

Quality management CA

Q

Parts manufacture

Production logistics

Assembly

Maintenance

pro

duct-

oriente

d p

rocess c

hain

ord

er-

oriente

d p

rocess c

hain

Integrated

PPIC System

Communication-

systems

Data bases

Knowledge-based

systems

Interfaces

Enterprise modelling

CIM-CONCEPTS

Engineering data bases

Page 12: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

Generic Framework Enterprise Functionality

Page 13: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

Generic Framework Enterprise Functionality

Page 14: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

Generic Framework Enterprise Functionality

Page 15: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

ERP System

A number of significant merits obtained from the ERP system employment:

Increase in both quality and quantity of information exchanged

A common user interface able to allow business users to perform a

variety of business tasks without retraining

Integration – e.g. Time manager perform organizational

management tasks and vice versa

Transparency – e.g. Employees could be served by more than one

end points

Page 16: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

Modules of ERP

ERP would be balancing the resources of an enterprise like manpower,

machines, materials, methods, money and marketing to stay competitive

in a globalized economy.

The various modules of ERP include :

engineering data control

(bill of materials, process plan and work centre data);

sales, purchase and inventory

(sales and distribution, inventory and purchase);

material requirement planning (MRP);

resource flow management

(production scheduling, finance and human resources management);

works documentation (work order, shop order release, material issue

release and route cards for parts and assemblies);

shop floor control and management;

and others like costing, maintenance management, logistics

management and MIS.

Page 17: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

General Model of ERP System

Source : Business Process Management Journal, Vol. 6 No.5, 2000.

Page 18: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

Infrastructure for ERP

Almost all ERP vendors provide tools to determine

the kind of computer infrastructure required, called

sizing tools such as CPU, memory, disk and other

configurations required for a given number of active

users.

The client/server architecture became very popular

and several enterprises consider it a de facto

standard.

Network either at the local area network (LAN) or at

wide area network (WAN).

Page 19: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

An Example of Client-Server ERP System

Client Application Logic System Data

WEB

Server JVM

Servlet Engine

Security Manager

WEB

Browser

Applet

Application

EJB

Entity

Beans

Session

Beans

J

T

S

D

B

A

P

I

SAP SB

Oracle

Informix

JDBC

ODBC

Page 20: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

An Example of Networking ERP System

Work Unit A Work Unit B Work Unit C

Server

Process C Process D

Module A Module B Module C

Process A Process B

Page 21: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

SERVER User

Login Manager

Username,

Encrypted password

An Example of ERP Security System

• Authentication • Authorization • Encryption Data

Page 22: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

An Example of Authorization ERP System 1/2 Modul-Modul User Group End User

User A

User B

User C

Sales

Purchase

Finance

Planning

Group 1

Group 2

Group 3

B/T

B/T

B/T

Page 23: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

User Context Manager

Transactional Database Manager

R/W R/W R/W

Module Finance

Module Purchasing

Module

Warehousing

Module Planning

Module

Sales

An Example of Authorization ERP System 2/2

Page 24: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

WORK UNIT A

WORK UNIT C WORK UNIT D WORK UNIT B

Application Server

COMPUTER NETWORK

Workstation Workstation

Workstation

An Example Integration of ERP System 1/2

Page 25: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

Branches X Branches Y

INTEGRATION

Head Office

An Example Integration of ERP System 1/2

Page 26: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

Cost for ERP

Total Cost of Overall Implementation

Implementation Services (used to cost even more, but not any more)

Software (40% - 60%)

Added Hardware (20% - 25%)

Basically, the cost of ERP implementation varies : - SME (Small-Medium Size) US$ 50,000 – US$ 700,000 - Medium Size US$ 700,000 – US$ 3 Million - Large Size More than US$ 3 Million

Most informants, used “annual revenue”, NOT number of employees as a measure for organization size (SME, Medium, Large). Because of implementation complexity, one of the vendors interviewed said that “there is no way can give a price over the phone”.

Page 27: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

The ERP Project Structure

SC - Project sponsor (e.g.: managing director) - Other senior managers - Internal Project Manager (PM) - External PM (e.g.: vendor) Level 1: Steering Committee (SC)

PM - Internal Project Manager (PM) - External PM (e.g.: vendor) Level 2: Project Manager (PM)

- Vendor assigned consultant - Team Leader Level 3: Implementation teams

Level 4: Large projects only

Page 28: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

Suppliers Outlet

Transportation Inbound

Logistics

Manufacturing

Delivery

Warehousing

Consumer

Product

Information + Cash

General Business Process Flow (Manufacturing Based )

Page 29: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

Marketing/Sales ForecastsBasic Data

Management

Order

Acceptance

Warehouse

Packing List

Shipping

Account

Receivable

(Accounting)

Customer

Payments

Marketing/

Sales

Customer/

Sales Order

Production

BOM

Management

Production &

Material Planning

Production/

Parts Ordes

Account Payable

(Accounting)

Invoicing/

Billing

Supplier

Payments

Purchasing

Inventory

Levels/Status

Product

Costing

Inventory

Management

Cost &

Income

Accounting

COGS/

COGM

Organizational Unit Function Data

Simply Business Process Chain Diagram for Logistics (Inbound + Outbound)

Page 30: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

Cycle of analytic and synthetic determination of demand

Source: Kernler 1993

master

production

plan

orders

deadlines

secondary

requirement

primary

demand

analytical determination of demand synthetic availability calculation

quantity

calculation

date

calculation

purchase

sale latest dates earliest dates

Page 31: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

Bill Of Materials (BOM) for customer`s order

ROB-1000 customer`s

order

. . .

ROB-1000

standard BOM

interactive

configuring

and manual

changing

customer`s order BOM

customer

Industrial robot ROB-1000

maximum load

action range 1,000 mm

base

150 kg

floor assembly

Page 32: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

Jobs of Bills Of Materials (BOM)

Source: Hackstein 1989

Functions Tasks

process planning

production scheduling

disposition

store

manufacturing

and

assembly

purchasing

sale and service

accounting

routing assembly instruction

production sequence (assembly sequence) demand management allocation of components/materials availability control

reservation list of product hierarchy (-structure) summary of required components/assemblies distribution

purchase of finished parts/raw material outside supply pricing

calculation of gross selling prices lists of substitutes

preliminary costing historic costing statistics

Page 33: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

Source : McGraw-Hill/Irwin, Copyright © 2004

ERP System Among Others

Page 34: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

Conclusions 1/2

ERP Implementation allowed:

An increase in the performance achieved in terms of business

process requests served at any given time period

Better inter-departmental cooperation through the use of the same

unified IT – ERP platform by all team members

A significant decrease in the number of errors in the business

process and in the information exchange among business nodes

Page 35: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

Conclusions 2/2

ERP Implementation allowed:

A significant reduction in the workload offered to the central

coordinator node

An increase in the system’s fault tolerance in case of business nodes

failures

Easy adaptation of new business methodologies by using standard

software engineering procedures

Page 36: Presented by: Purdianta, ST.,MT - Esa Unggul Universitydigilib.esaunggul.ac.id/public/UEU-paper-6560-Pertemuan_1_ERP... · Material Requirements Planning • Bill of material,

“No product move until information move”

Quotes from Douglas M. Lambert, 2001. (Professor of Transportation & Logistics and Director of The Global Supply Chain Forum, Fisher Collage of Business, The Ohio State University)