presented by pedc sustainable energy subcommittee gary gump chairman april 03, 2009
DESCRIPTION
Portsmouth RI Town Wind Turbine Generator EBC RI Chapter Program RI Energy Programs – Federal Stimulus, RGGI and Renewable Energy Fund. Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009. www.portsmouthRIenergy.com. Green is Good BUT.. Building a WTG is - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009](https://reader033.vdocuments.us/reader033/viewer/2022052510/568146b5550346895db3d5e3/html5/thumbnails/1.jpg)
Portsmouth RITown Wind Turbine Generator
EBC RI Chapter ProgramRI Energy Programs – Federal Stimulus, RGGI
and Renewable Energy Fund Presented by
PEDC Sustainable Energy Subcommittee
Gary Gump ChairmanApril 03, 2009
www.portsmouthRIenergy.com
![Page 2: Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009](https://reader033.vdocuments.us/reader033/viewer/2022052510/568146b5550346895db3d5e3/html5/thumbnails/2.jpg)
Green is Good
BUT..
Building a WTG is
an Economic Decision
![Page 3: Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009](https://reader033.vdocuments.us/reader033/viewer/2022052510/568146b5550346895db3d5e3/html5/thumbnails/3.jpg)
Needs
• Wind
• Space
• Support
• and “all the other things”
![Page 4: Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009](https://reader033.vdocuments.us/reader033/viewer/2022052510/568146b5550346895db3d5e3/html5/thumbnails/4.jpg)
Wind and Space
• Sufficient Wind to Generate Power– Wind Models or Met Tower?– Capacity Factor
• Wind Doesn’t blow all the time• Typically CF is 20%-30% over a year
• Space– NIMBY– Some concerns over catastrophic failure– Ice slinging– The higher the better
• Power proportional to cube of wind speed
![Page 5: Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009](https://reader033.vdocuments.us/reader033/viewer/2022052510/568146b5550346895db3d5e3/html5/thumbnails/5.jpg)
Support• WTG is a ‘community investment’• Provide current and balanced information and address
“hot buttons”– Counter “misinformation” – Affect on wildlife– Sound– Visual affect
• Public Relations– Need initial buy in– Continual positive reinforcement
• Portsmouth did:– Web Site: updated frequently, FAQs– Mail Survey– Public Workshops– Referendum
• Create Community “Ownership”
![Page 6: Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009](https://reader033.vdocuments.us/reader033/viewer/2022052510/568146b5550346895db3d5e3/html5/thumbnails/6.jpg)
… and All the Other Things• Wind Model• Economic Model • Choosing a contractor• Warranties• Insurance• Operation and Maintenance• How to Pay for It• Revenues - Distribution• Electric Interconnect• Public Utilities Commission• Federal Energy Regulatory
Commission• Funding
• Federal/State Legislation• Liaison with State Officials• Large Equipment Access
to Site• Geology• Environment/Health/DEM• Affect on Wildlife• Historical/Archeological • FAA• Town Zoning• Permitting• Risk Management• Project Management
![Page 7: Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009](https://reader033.vdocuments.us/reader033/viewer/2022052510/568146b5550346895db3d5e3/html5/thumbnails/7.jpg)
CREBCREBApplicationApplication
Submittal Apr 06Submittal Apr 06
StateStateGrant Grant
ApprovalApprovalApr 06Apr 06
Feasibility Feasibility StudyStudy
Consultant Consultant RFP IIRFP IIFeb 06Feb 06
Feasibility Study
Jul 06 – Sep 07
Wind ProjectBond
ReferendumNov 07
Sign TurbineContractApr 08
InstallationPreparations
Apr 08 – Nov 08
TurbineCommissioning
March 09
2006 2007 2008
CREBCREBApprovedApproved Nov 06Nov 06
WorkshopWith TCFeb 07
RequestRequestBond LegislationBond Legislation
Jan 07Jan 07
RFQfor
Turbine andTurbine InstallDec 07
Report FeasibilityStudy to
TC and SCSep 07
TC/SCApproveProject?
ReferendumBallot
for Project
YES
NO
YES
NO
TC/SCProject
ApprovalOct 07
Portsmouth Wind Turbine Project Timeline
PEDC Sustainable Energy Subcommittee Members
Gary Gump, ChairBob HamiltonDoug SmithSteve LakeJohn PalmieriRich Talipsky
2009
2004-05 - Ideas- Ideas
- Exploratory- Exploratory- Decision to- Decision togo forwardgo forwardWith a planWith a plan
![Page 8: Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009](https://reader033.vdocuments.us/reader033/viewer/2022052510/568146b5550346895db3d5e3/html5/thumbnails/8.jpg)
98958
““Behind the Meter”Behind the Meter”
The “GridThe “Grid”
Electricity Used
Electricity Used(retail)(retail)
Electricity
Electricity SuppliedSupplied(wholesale)
(wholesale)
Turb
ine
Supp
lied
Turb
ine
Supp
lied
Elec
tricity
Elec
tricity
High & Middle School average about High & Middle School average about 950,000 kWh/yr each950,000 kWh/yr each
600 kW Turbine Production600 kW Turbine Productionabout 1,500,000 kWh/yrabout 1,500,000 kWh/yr
Power Generation and the “Grid”
(Behind-the-meter (Pre-2008 Laws))
High School
Portsmouth RI EDC June 2007
98958
98958
98958
HS Meter
OtherTownMeters
![Page 9: Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009](https://reader033.vdocuments.us/reader033/viewer/2022052510/568146b5550346895db3d5e3/html5/thumbnails/9.jpg)
98958
The “GridThe “Grid”
Turbine Turbine SuppliedSupplied
ElectricityElectricity
1.5 Mw Turbine Production1.5 Mw Turbine Productionabout 3,300,000 kWh/yrabout 3,300,000 kWh/yr
Power Generation and the “Grid”
(Per 2008 Law)
High School
Portsmouth RI EDC June 2007
98958
98958
98958
HS Meter
OtherTownMeters
98958
“Virtual”ElectricMeter
Credit for Credit for WTGWTGPowerPower
ProducedProduced
Municipal Total
+/- 4,200,000 kwH/yr
![Page 10: Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009](https://reader033.vdocuments.us/reader033/viewer/2022052510/568146b5550346895db3d5e3/html5/thumbnails/10.jpg)
March 2008March 2008
![Page 11: Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009](https://reader033.vdocuments.us/reader033/viewer/2022052510/568146b5550346895db3d5e3/html5/thumbnails/11.jpg)
April 2008April 2008
![Page 12: Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009](https://reader033.vdocuments.us/reader033/viewer/2022052510/568146b5550346895db3d5e3/html5/thumbnails/12.jpg)
May 2008May 2008
![Page 13: Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009](https://reader033.vdocuments.us/reader033/viewer/2022052510/568146b5550346895db3d5e3/html5/thumbnails/13.jpg)
August 2008August 2008
![Page 14: Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009](https://reader033.vdocuments.us/reader033/viewer/2022052510/568146b5550346895db3d5e3/html5/thumbnails/14.jpg)
August 2008August 2008
![Page 15: Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009](https://reader033.vdocuments.us/reader033/viewer/2022052510/568146b5550346895db3d5e3/html5/thumbnails/15.jpg)
August 2008August 2008
![Page 16: Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009](https://reader033.vdocuments.us/reader033/viewer/2022052510/568146b5550346895db3d5e3/html5/thumbnails/16.jpg)
August 2008August 2008
![Page 17: Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009](https://reader033.vdocuments.us/reader033/viewer/2022052510/568146b5550346895db3d5e3/html5/thumbnails/17.jpg)
January 2009January 2009
![Page 18: Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009](https://reader033.vdocuments.us/reader033/viewer/2022052510/568146b5550346895db3d5e3/html5/thumbnails/18.jpg)
January 2009January 2009
![Page 19: Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009](https://reader033.vdocuments.us/reader033/viewer/2022052510/568146b5550346895db3d5e3/html5/thumbnails/19.jpg)
January 2009January 2009
![Page 20: Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009](https://reader033.vdocuments.us/reader033/viewer/2022052510/568146b5550346895db3d5e3/html5/thumbnails/20.jpg)
February 2009February 2009
![Page 21: Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009](https://reader033.vdocuments.us/reader033/viewer/2022052510/568146b5550346895db3d5e3/html5/thumbnails/21.jpg)
February 2009February 2009
![Page 22: Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009](https://reader033.vdocuments.us/reader033/viewer/2022052510/568146b5550346895db3d5e3/html5/thumbnails/22.jpg)
March 2009March 2009
![Page 23: Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009](https://reader033.vdocuments.us/reader033/viewer/2022052510/568146b5550346895db3d5e3/html5/thumbnails/23.jpg)
Total Height (base to blade tip)------ 336 FeetTotal Height (base to blade tip)------ 336 FeetHeight Above Sea Level (to base) – 188 feetHeight Above Sea Level (to base) – 188 feetTotal Height Above Sea Level (to blade tip) – 524 FeetTotal Height Above Sea Level (to blade tip) – 524 FeetBlades –------------------------ 123 Feet, 6 Tons eachBlades –------------------------ 123 Feet, 6 Tons eachBlade Hub – Diameter ------ 15 Feet., 19 TonsBlade Hub – Diameter ------ 15 Feet., 19 TonsTower height to Hub –------ 213 Feet Tower height to Hub –------ 213 Feet 3 sections -------------------- 115 Tons total3 sections -------------------- 115 Tons totalNacelle –_____________12X15 Feet – 68 TonsNacelle –_____________12X15 Feet – 68 TonsTotal Weight –-------------------------------- 440,000 PoundsTotal Weight –-------------------------------- 440,000 Pounds
On-Line On-Line March 2009March 2009
![Page 24: Presented by PEDC Sustainable Energy Subcommittee Gary Gump Chairman April 03, 2009](https://reader033.vdocuments.us/reader033/viewer/2022052510/568146b5550346895db3d5e3/html5/thumbnails/24.jpg)
Portsmouth Municipal Wind Energy Activity
• See www.portsmouthRIenergy.com
• Questions: e-mail [email protected]