presented by : ameer riad khalaf supervisor: miss.rawan al- hadad

20
presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad

Upload: karyn-bowman

Post on 01-Jan-2016

24 views

Category:

Documents


0 download

DESCRIPTION

presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad. presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad. Rotterdam market hall. The continents : 1) Introduction . 2) General description. 3) foundation. 4)structure description . 6) What’s new. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: presented  by : Ameer Riad Khalaf Supervisor: Miss.Rawan  Al- Hadad

presented by :Ameer Riad Khalaf

Supervisor:Miss.Rawan Al-Hadad

presented by :Ameer Riad Khalaf

Supervisor:Miss.Rawan Al-Hadad

Page 2: presented  by : Ameer Riad Khalaf Supervisor: Miss.Rawan  Al- Hadad

Rotterdam market hall

Page 3: presented  by : Ameer Riad Khalaf Supervisor: Miss.Rawan  Al- Hadad

The continents:1) Introduction.2) General description. 3) foundation. 4)structure description.6) What’s new.

Page 4: presented  by : Ameer Riad Khalaf Supervisor: Miss.Rawan  Al- Hadad

Introduction:

The city: Rotterdam

The designer :MVRDV

The developer:DHV B.V

Page 5: presented  by : Ameer Riad Khalaf Supervisor: Miss.Rawan  Al- Hadad

2) General description:40*70*117256 Million $

100.000 m2

Page 6: presented  by : Ameer Riad Khalaf Supervisor: Miss.Rawan  Al- Hadad

more Than 200 apartments

Page 7: presented  by : Ameer Riad Khalaf Supervisor: Miss.Rawan  Al- Hadad

(LCD )screen

Page 8: presented  by : Ameer Riad Khalaf Supervisor: Miss.Rawan  Al- Hadad

The balconies.

Page 9: presented  by : Ameer Riad Khalaf Supervisor: Miss.Rawan  Al- Hadad

Soil formation

Approximately 70 m

Page 10: presented  by : Ameer Riad Khalaf Supervisor: Miss.Rawan  Al- Hadad

• Pile driving • 27 m for the pressure

piles {560 mm diameter}• 29 m for the tension piles

{710 mm diameter}

•pressure force reach 3000 KN - 4000 KN

•tension force 750 KN

Page 11: presented  by : Ameer Riad Khalaf Supervisor: Miss.Rawan  Al- Hadad

prevent groundwater to enter the excavation

Page 12: presented  by : Ameer Riad Khalaf Supervisor: Miss.Rawan  Al- Hadad

CASTING THE BOTTOM OF EXCAVATION

1.35

Page 13: presented  by : Ameer Riad Khalaf Supervisor: Miss.Rawan  Al- Hadad

DURING PUMPING THE WATER OUT

Page 14: presented  by : Ameer Riad Khalaf Supervisor: Miss.Rawan  Al- Hadad
Page 15: presented  by : Ameer Riad Khalaf Supervisor: Miss.Rawan  Al- Hadad
Page 16: presented  by : Ameer Riad Khalaf Supervisor: Miss.Rawan  Al- Hadad

Structure description

Page 17: presented  by : Ameer Riad Khalaf Supervisor: Miss.Rawan  Al- Hadad

natural resistance

to wind loads• Walls thickness 25cm

• Slabs thickness 27 cm35 m/s

2.5 KN/M2

Page 18: presented  by : Ameer Riad Khalaf Supervisor: Miss.Rawan  Al- Hadad

prestressed hollow concrete

Page 19: presented  by : Ameer Riad Khalaf Supervisor: Miss.Rawan  Al- Hadad

Glass facades

Area of 45 by 35 supported by cables 28 mm in diameter.

Page 20: presented  by : Ameer Riad Khalaf Supervisor: Miss.Rawan  Al- Hadad

What is new?• 1) the arch• 2) deepest excavation.• 3) LCD screen • 4) suspended glass.