presentation virtualizing oracle unlocked enterprise wide benefits

21
© Amor Group 2012 Virtualizing Oracle Unlocked Enterprise Wide Benefits Dr Alastair Rennie Principal IT Management Consultant MBCS CITP CENG May 2012

Upload: solarisyourep

Post on 21-Mar-2017

110 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Presentation   virtualizing oracle unlocked enterprise wide benefits

© Amor Group 2012

Virtualizing Oracle Unlocked

Enterprise Wide Benefits

Dr Alastair Rennie

Principal IT Management Consultant

MBCS CITP CENG

May 2012

Page 2: Presentation   virtualizing oracle unlocked enterprise wide benefits

© Amor Group 2012 2

Introduction

• There’s Water (Flooding) in Scotland

• Where SEPA Started

• Criticality of Service Delivery

• Virtualisation

• Slowly but Surely we changed

• Business Change and DR Requirements

• First Design

• Second Design

• Final Design

• Where to now?

Page 3: Presentation   virtualizing oracle unlocked enterprise wide benefits

© Amor Group 2012 3

There’s water in Scotland, and a whole lot

more

• SEPA

– helps regulate and protect the environment: Water, Air, Land, Noise

– Provides flood warning and flood warning dissemination service

– provides environmental information www.environment.scotland.gov.uk www.sepa.org.uk

– provides advice and guidance on environmental management

– educates

• Formed from 65 bodies in 1996

• Centralised systems over 5 years

• Expanded from 600 to 1300 staff

• Turnover increased £34m to £85m

• Developed complex licensing processes and systems

• Implemented complex science and monitoring systems

Page 4: Presentation   virtualizing oracle unlocked enterprise wide benefits

© Amor Group 2012 4

We started small, but

• In 2000, we had:

– 10 servers

– 800 desktops

– stand-alone laboratory equipment

– manually polling river monitoring systems

– no flood warning or management services

• By 2010, we had:

– 140 servers

– 1600 desktops

– fully integrated laboratory equipment

– automatically managing monitoring stations

– sophisticated flood monitoring and prediction systems

– active flood warning services

– flood warning dissemination services

– Server and application growth continuing

0

20

40

60

80

100

120

140

160

180

2000 2002 2004 2006 2008 2010 2012

servers

Applications

Page 5: Presentation   virtualizing oracle unlocked enterprise wide benefits

© Amor Group 2012 5

Changes to the Criticality of the service?

• Increased business critical services

• Category 1 responder under the Civil Contingencies Act

• Flooding life risk notification services

• SEPA awake 24x7

Page 6: Presentation   virtualizing oracle unlocked enterprise wide benefits

© Amor Group 2012 6

Virtualisation – Utopia for SEPA • How many engineers does it take to change a light bulb

(ok manage a server farm)?

– 1:100?

– 1:300?

– 1:1000?

– 1:10,000?

– All of the above?

– At least 2!

• How much power to make the light bulb work?

– Less, I hope, and less to throw away

• How much space does the light bulb need?

– Not much, I hope

• We were looking for reduced space, power & management

0

20

40

60

80

100

120

2000 2005 2010

cooling

power

space

Page 7: Presentation   virtualizing oracle unlocked enterprise wide benefits

© Amor Group 2012 7

ca’ canny but ca’ awa

• In 2007, Built a test virtualisation suite on two spare HP DL 380’s

using VMWare ESXi (free!!!) for the team to play with. Success!!!

• In 2008 we “acquired” an HP MSA1000 storage arrays and couple

of HP DL580s

• Installed VMWare ESX Enterprise – we needed management of

the virtual servers now

• Started building virtual machines in earnest

• By 2010, out of 140 production servers, 40 had been virtualised

• Delivering improved resilience and disaster recovery

Page 8: Presentation   virtualizing oracle unlocked enterprise wide benefits

© Amor Group 2012 8

Disaster Recovery and Resilience

Shared storage

Primary Site

Dynamic Management

Replication Process

Resilient Site

Dynamic Management

Shared storage

Manual

Transfer

1 Gb Fibre x 2

Page 9: Presentation   virtualizing oracle unlocked enterprise wide benefits

© Amor Group 2012 9

Recovery Time Objectives

Business/Infrastructure Unit

ALA

RM

NE

TW

OR

K D

RIV

ES

EM

AIL

AR

C

Procurement Facilities and Estates 2 2 2

HR 2 2 2

EPI 2 1

Finance

Environmental Science - Hydrology 4 1 1

SCC 1 3 1

Environmental Science - Non-Hydrology 3

Environmental & Organisational Strategy 3 1

National Administration 1 1

1 = within 2 hrs

2 = within 4 hrs

3 = within 24 hrs

4 = within 48 hrs

5 = within 1 week

Recovery Point Objective

Business/Infrastructure Unit

ALA

RM

NE

TW

OR

K D

RIV

ES

EM

AIL

AR

C

Procurement Facilities and Estates 4 2 4

HR 2

EPI 1 1

Finance

Environmental Science - Hydrology 4 1 1

SCC 1 3 1

Environmental Science - Non-Hydrology

Environmental & Organisational Strategy 3 3

National Administration 1 1

1 = no loss of data

2 = up to 4 hrs

3 = up to 24 hrs

4 = up to 48 hrs

5 = up to 1 week

• External review determined required RTO & RPO

• Present solutions were not able to meet these

• Some were unattainable

• Realism was applied: RPO of 2 hours and RTO of 24 hours agreed

with business operations

All change for continuity, next stop disaster

Page 10: Presentation   virtualizing oracle unlocked enterprise wide benefits

© Amor Group 2012 10

How? Design, design, design to succeed!

• Specification created with expert help

• Solutions received

• Options appraised and tenders assessed

• To deliver DR, we were initially looking at only critical services

~60% service fail over

• Meanwhile, virtualisation needed to continue

– 40 business services to be virtualised

– 30 systems services to be retained as physical

– 12 Tb of data, 4 Tb of which is user files from other sites

– main virtualisation issues:

• Oracle database

• Citrix application delivery

Page 11: Presentation   virtualizing oracle unlocked enterprise wide benefits

© Amor Group 2012 11

From Detailed Analysis of Designs

• The options were a hybrid of virtual and physical technologies

• Not integrated and not fit for purpose

– Too complex, not a robust solution

– Too expensive to implement

– Too expensive to run, savings consumed

– Needed more people to manage

– Needed more network resources

Virtual to virtual

Physical to Physical

Physical to Physical

File to File

Virtual

Servers

Physical

Servers

Storage

File

Storage

Page 12: Presentation   virtualizing oracle unlocked enterprise wide benefits

© Amor Group 2012 12

Back to the Drawing Board

• Test Oracle virtualisation – core business systems

• Test Citrix – science system, quality system

• Re-design for an integrated fully virtualised solution

• Plan 100% virtual for business applications

• Plan for 90% virtual for systems – retain physical DC

• vSphere Site Recovery Manager to automate fail over

Virtual to virtual

Virtual to Virtual

File to File

Virtual

Servers

Enterprise

Storage

File

Storage

Physical

Servers

Mirrored

Page 13: Presentation   virtualizing oracle unlocked enterprise wide benefits

© Amor Group 2012 13

Should we virtualise Oracle, because ……

• Oracle was identified as the single biggest risk to full virtualisation

– No certification from Oracle support

– Business perceived it as a risk through unknowns:

• Critical systems

• Performance

• Availability

• Support

• Licensing

• Confidence

Major business lack of confidence

Page 14: Presentation   virtualizing oracle unlocked enterprise wide benefits

© Amor Group 2012 14

Oracle goes forth and has multiplied

• Solutions:

– Find other organisations using virtualised Oracle

• Pressure on Oracle to certify support

– Agreed licensing with Oracle support

– Discuss with SEPA business user groups, agree test plans

– Demonstrate performance with automated load testing

– Review architecture & design for supportability and availability

• Blade architecture with redundancy

• Disk arrays with redundancy

• vMotion for availability and performance

• Test, test, test ……..

Page 15: Presentation   virtualizing oracle unlocked enterprise wide benefits

© Amor Group 2012 15

Technical challenges in design

• Oracle – needs fast disks

– Had to replace standard SATA raid 6 with SAS raid 10

• Citrix – needs plenty of resources and management

– Lower server density, resource management servers are physical

• Synchronisation – fast, low latency communications

– Dedicated high speed link with acceleration

• Volume of storage – needed 30Tb

– Original calculations on VM size were low, final calculations gave a 50%

increase

Page 16: Presentation   virtualizing oracle unlocked enterprise wide benefits

© Amor Group 2012 16

This is where we arrived at

• Fully managed DR & Resilience service with vSphere

• Fully virtualised applications

• Fully virtualised storage

• Full backup of VMs

• Full backup of data

Page 17: Presentation   virtualizing oracle unlocked enterprise wide benefits

© Amor Group 2012 17

What else did we get?

• Increased scope of failover and recovery

• Improved RTO & RPO

• Additional secondary backup, tertiary DR

Page 18: Presentation   virtualizing oracle unlocked enterprise wide benefits

© Amor Group 2012 18

Here’s what we got out of this

• Costs

– Reduced implementation budget by c£180,000 in £500,000

– Reduced annual revenue by c£80,000 in £260,000

• Space

– Reduced space by 5 cabinets (x2 for DR solution)

• Power

– Reduced power by c20kW x 2

• Reduced Support

– Reduced server engineers by 1FTE

• SLA – SRM has helped deliver

– RTO target was 24 hours, achieve ~2 hours

– RPO target was 2 hours, achieve ~5 minutes

– Improved resilience and downtime of existing service

• Achieving better than 99.98 availability (<2 hours pa unplanned outage)

Page 19: Presentation   virtualizing oracle unlocked enterprise wide benefits

© Amor Group 2012 19

What did we get right?

• Reduced Power & Space

• Reduced Management

• Correct Virtualisation technology

• Correct storage technology

• Design, design, design

• Test, test, test

What was challenging?

• Storage management – speed and capacity

• Original design not bold enough

• Storage Integration and sizing

• Data flow to distant site

• No fail back

Page 20: Presentation   virtualizing oracle unlocked enterprise wide benefits

© Amor Group 2012 20

And where to now?

• Full DR testing is required

– No simple return from DR activation on most platforms

– Cannot be achieved easily with vSphere 4

• vSphere 5 is the answer

– Automated failover and failback

– Improved storage management and replication

– Improved management of environment