presentation to jefferson township public schools for feasibility study
DESCRIPTION
Presentation to Jefferson Township Public Schools for Feasibility Study. Agenda. Background Findings Recommendation Options Timelines. Background. Over 3,600 Students 8 Facilities Jefferson Twp HS Jefferson Twp MS White Rock ES Stanlick ES Milton Pre-K Cozy Lake ES - PowerPoint PPT PresentationTRANSCRIPT
Feasibility Study7 July 2009
Presentation to
Jefferson Township Public Schoolsfor
Feasibility Study
Feasibility Study7 July 2009
• Background
• Findings
• Recommendation Options
• Timelines
Agenda
Feasibility Study7 July 2009
• Over 3,600 Students
• 8 Facilities
• Jefferson Twp HS
• Jefferson Twp MS
• White Rock ES
• Stanlick ES
•Milton Pre-K
• Cozy Lake ES
•Briggs ES
•Drummond K
• Serving Lake Hopatcong, Lake Shawnee,
Oak Ridge and Milton communities
Background
Feasibility Study7 July 2009
Option 1:• Board Offices move to Drummond School• Central Storage moves to new location to be determined• Kindergarten remains at Drummond School
Pros:• Low Costs – Does not require Referendum• Short Timeframe• Least Disruptive – All students remain in current locations
Cons:• Does not accommodate Central Storage• Does not accommodate existing day care center• Does not address any educational needs• Does not accommodate full day Kindergarten
Feasibility Study7 July 2009
Option 1: Drummond School
Feasibility Study7 July 2009
Option 2:• Board Offices move to Drummond School• Central Storage moves Drummond School• Kindergarten moves to Briggs School
Pros:• Board Offices and Central Storage are accommodated• Can accommodate existing day care center• Low Costs – Does not require Referendum• Short Timeframe• Administrative costs are reduced from two to one school
Cons:• Students are relocated• Does not address any educational needs• Does not accommodate full day Kindergarten
Feasibility Study7 July 2009
Option 2: Drummond School
Feasibility Study7 July 2009
Option 2: Briggs School
Feasibility Study7 July 2009
Option 3:• Board Offices move to Drummond School• Central Storage moves Drummond School• Kindergarten moves to Briggs School• Expand Briggs to accommodate full day Kindergarten• Expand Milton to accommodate full day Kindergarten• Expand Cozy Lake to accommodate multi-purpose functions
Pros:• Board Offices and Central Storage are accommodated• Administrative costs are reduced from two to one school• Addresses all educational needs• Accommodates full day Kindergarten
Cons:• Students are relocated• Higher costs - Requires Referendum• Requires longer timeframe
Feasibility Study7 July 2009
Option 3: Drummond School
Feasibility Study7 July 2009
Option 3a: Briggs School
Feasibility Study7 July 2009
Option 3b: Briggs School
Feasibility Study7 July 2009
Option 3: Milton School
Feasibility Study7 July 2009
Option 3: Cozy Lake School
Feasibility Study7 July 2009
Timelines
Option 1:• Reconfigure Drummond School Summer 2010• Relocate Board Offices to Drummond Summer 2011• Vacate leased space Fall 2011
Option 2:• Reconfigure Drummond School Summer 2010• Relocate Kindergarten to Briggs School Summer 2011• Relocate Board Offices to Drummond Summer 2011• Vacate leased space Fall 2011
Feasibility Study7 July 2009
Timelines
Option 3:• Reconfigure Drummond School Summer 2010• Start Referendum Planning Fall 2009• Submit Schematic Plans to NJDOE Spring 2010• Referendum December 2010 • Relocate Kindergarten to Briggs School Summer 2011• Relocate Board Offices to Drummond Summer 2011• Start Construction on Additions Summer 2011• Vacate leased space Fall 2011• Complete Construction on Additions Summer 2012