presentation to australian iron ore and steel summit...

63
Why Why Investing in Australian Iron Ore Investing in Australian Iron Ore Exploration? Exploration? Hope Downs and Beyond Hope Downs and Beyond Presentation to Australian Iron Ore and Steel Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October 2002 by Tad Watroba - Director, Hancock Prospecting Pty Ltd Hancock Prospecting Pty Ltd

Upload: others

Post on 20-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

WhyWhy Investing in Australian Iron Ore Investing in Australian Iron Ore Exploration?Exploration?

Hope Downs and BeyondHope Downs and Beyond

Presentation to Australian Iron Ore and Steel Summit 2002

Parkroyal Darling Harbour, Sydney30 - 31 October 2002

by Tad Watroba - Director, Hancock Prospecting Pty LtdHancock Prospecting Pty Ltd

Page 2: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

•• Why not?Why not?• • Success of Rio Success of Rio TintoTinto, BHPB, Robe River and others, BHPB, Robe River and others• Benefits to Western Australia and to the nation• Benefits to Western Australia and to the nation• How has it happened• How has it happened• Hard road to Hope Downs• Hard road to Hope Downs

Hancock Prospecting Pty Ltd

Why Investing in Iron Ore Exploration?

Page 3: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

•• Development of towns, ports, railways, roads etcDevelopment of towns, ports, railways, roads etc• • Royalties and taxesRoyalties and taxes

Hancock Prospecting Pty Ltd

Benefits to Western Australia and to the nationto Western Australia and to the nation

Western Australian Iron Ore Royalty Receipts

Year 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001

A$ M 145 151 158 139 153 154 182 235 205 233 286

• Australian Balance of Payment• Australian Balance of Payment

• Jobs, jobs, jobs• Jobs, jobs, jobs

Page 4: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Pioneering Family of the North West:•Pastoralists since 1860’s•Mineral exploration since early 1930’s

Lang Hancock ‘father’ of the Pilbaradiscovers vast quantities of iron ore in 1950’s, 1960’s & 1970’s Hancock Prospecting earns mining royaltiesContinued exploration for iron ore and Hancock is the only other holder of significant iron ore reserves in the Central Pilbara outside Rio Tintoand BHPB

Hancock Prospecting Pty Ltd

Hancock Group Hancock Group -- SummarySummary

Page 5: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

June 10 1909 Langley George Hancock born in Perth to George and Lillian HancockAugust 4 1947 Langley George Hancock and Hope Margaret Nicholas married

November 22 1952 Discovery flight with wife, Hope Hancock, whilst flying from their Nunyerry mine to Perth1953 Returning to discovery area, landing in spinifex and collecting samples for more than 50 miles and sending to Perth for analysis. After analysis, realisation he had found an iron ore zone of possible world significance

Hancock Prospecting Pty Ltd

Hancock Group Hancock Group -- HistoryHistory

Page 6: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Flying ProspectorFlying Prospector

Hancock Prospecting Pty Ltd

Page 7: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

1955 Established family company, Hancock Prospecting Pty Ltd (HPPL), now run by his daughter Gina Rinehart

1953 – 1960 Lobbied for lifting of Iron Ore export embargo by Federal Government.

• Continued exploration• Established committee for North West development with pastoralist friends Frank Thompson and Bill Leslie and proposed and lobbied for tax incentives, with the provision that monies be reinvested in the North West

1960 Export embargo on Iron Ore lifted

Hancock Prospecting Pty Ltd

Hancock Group Hancock Group -- HistoryHistory

Page 8: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

1960 – 1961 Lobbied for lifting of State embargo on pegging for Iron Ore.Together with partner E.A Wright of WPPL, endeavoured to interest Steel Mills and mining houses to invest in Hancock’s Pilbara discoveries

1961 State embargo on pegging of Iron Ore lifted

1961 Pegging of Iron Ore areas discovered by Lang Hancock with team on ground headed by cousin Bill NewmanHosted the visit of Val Duncan, Chairman of Rio Tinto, London, and other Senior Executives

Hancock Prospecting Pty Ltd

Hancock Group Hancock Group -- HistoryHistory

Page 9: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

1961 – 1962 Together with E.A Wright, negotiated agreements with Rio Tinto for the purpose of furthering development of Hancock’s discoveriesHosted the visit of Tom Price of Kaiser Steel, USA, which brought in the involvement of Kaiser Steel into what became the new company, “Hamersley Iron”Increased exploration efforts with Dr Bruno Campana of Rio Tinto Australia, and mapping of the entire Hamersley Iron ProvinceIdentified and named “Campana’s Horizon” (also known as “Bruno’s Band”)

Hancock Prospecting Pty Ltd

Hancock Group Hancock Group -- HistoryHistory

Page 10: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Hancock Prospecting Pty Ltd

Bruno’s BandBruno’s Band

Page 11: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

1962 Hosted the visit of Dr Muraoka and staff from Marubeni, Japan, utilising Hancock’s “Hamersley Station” as headquarters for Marubeni’s, and Hancock’s continuing exploration effortsThe exploration report of Dr Muraoka brought the Japanese Steel industry’s interest into the Pilbara

Hancock Prospecting Pty Ltd

Hancock Group Hancock Group -- HistoryHistory

Page 12: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Dr Dr Muraoka Muraoka and Lang Hancockand Lang Hancock

Hancock Prospecting Pty Ltd

Page 13: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

1963 – 1964 Arranged and hosted the visit of the world’s then richest man, Daniel K Ludwig, and interested him in presenting a cost saving proposal to the West Australian government for the building of a large central port and unified railway system to service the entire Pilbara Iron Ore region, to enhance the region’s competitiveness.

1966 Tom Price commissioned, and Port and town of Dampier established

Hancock Prospecting Pty Ltd

Hancock Group Hancock Group -- HistoryHistory

Page 14: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

1966 – 1971 Brought Hamersley Iron Executives to Paraburdoo and interested them in developing ParaburdooSought to interest Texasgulf of USA, CSR, MIM, Utah, and Consolidated Goldfields into participation in Hancock’s and Hanwright’sexploration teams

1969 Established with WPPL the Sunday newspaper “The Sunday Independent”

Hancock Prospecting Pty Ltd

Hancock Group Hancock Group -- HistoryHistory

Page 15: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

1970 - 1971 Hanwright explored with the co-operation of Mr Hancock’s brothers’ in law Jim and Bill Nicholas, and friend Don Rhodes, the West Angelas, which Mr Hancock named after E.A. Wright’s daughter, but these areas were then confiscated by the West Australian government, and later given to a competing company

1972 HPPL and WPPL established with Texas Gulf the Iron Ore (Rhodes Ridge) Agreement with the West Australian government

Hancock Prospecting Pty Ltd

Hancock Group Hancock Group -- HistoryHistory

Page 16: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Rhodes Ridge JV with Texas GolfRhodes Ridge JV with Texas Golf

Page 17: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

1972 HPPL and WPPL established with the Iron Ore (Wittenoom) Agreement with the West Australian governmentHPPL and WPPL established with MIM, Utah and Consolidated Goldfields the Iron Ore (McCameys) Agreement with the West Australian government

1973 Paraburdoo Commenced production

Hancock Prospecting Pty Ltd

Hancock Group Hancock Group -- HistoryHistory

Page 18: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

1974 Established the nationwide “National Miner” newspaper•Gained jet pilots license at age 65, and acquired first Lear Jet and utilised for overseas visits to promote Australian mineral developments, and to show executives, politicians and others the Pilbara’spotential

Hancock Prospecting Pty Ltd

Hancock Group Hancock Group -- HistoryHistory

Page 19: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

1975 Arranged and hosted the visit of close friend, and Premier Joh Bjelke-Petersen and party to the Pilbara, and promoted the establishment of a railway line across Australia linking the Pilbara’s Iron to Queensland’s coking coalAfter years of worldwide effort with Marandoo, and completing the feasibility study, received “Letter of Interest” from Nippon Steel, allowing Nippon Steel to participate up to 1/3 in the Marandoo project.

Hancock Prospecting Pty Ltd

Hancock Group Hancock Group -- HistoryHistory

Page 20: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Hancock Prospecting Pty Ltd

Premier Joh Bjelke-Petersen Visit

Page 21: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

1979 Wrote and released first book “Wake Up Australia” (launched on June 10 by Premier Joh Bjelke-Petersen and his daughter Gina, in his absence due to ill health) on “Wake Up Australia” jumbo jet tour of Australia’s mineral assets and potential

Hancock Prospecting Pty Ltd

Hancock Group Hancock Group -- HistoryHistory

Page 22: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

WakeWake--up Australia Flightup Australia Flight

Page 23: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Wake up Australia FlightWake up Australia Flight

Page 24: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

1987 Achieved government support for infrastructure sharing for the McCamey’s project by way of a State Agreement with BHP to allow third parties to access their railway

1989 - 1991 Achieved first tonnage to be mined at McCamey’s Monster, first Hancock’s own iron ore mine in production

1992 March 27th, passed away unexpectedly, despite strong will to live, his daughter Gina Rinehart takes over HPPL

Hancock Prospecting Pty Ltd

Hancock Group Hancock Group -- HistoryHistory

Page 25: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Hancock Prospecting Pty Ltd

The Man of IronThe Man of Iron

Page 26: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

1992 December - HPPL achieved the Iron Ore (Hope Downs) Agreement with the state Government1993 Mrs Rinehart hosted visit by Premier Mr Richard Court, and party to Pilbara1993 June 10th, a new planet, discovered by Dr Candy, named in permanent honour of Lang Hancock

1994 Marandoo commenced production

1997 Pre-feasibility study for Hope Downs finalised and bankable feasibility study commenced

Hancock Prospecting Pty Ltd

Hancock Group Hancock Group -- HistoryHistory

Page 27: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

1998 29th January announcement of participation ofIscor Limited to develop the Hope Downs Iron Ore Project with Hancock Prospecting Pty Ltd

1999 June 10th Naming of Hancock Range in the Pilbarain honour of Lang Hancock and the Hancock family, and their pioneering history in the North West region

2000 Established program with the Notre Dame University to commence the Hancock Free enterprise lectures

Hancock Prospecting Pty Ltd

Hancock Group Hancock Group -- HistoryHistory

Page 28: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Mining•Hope Downs•Joint Venture Partner in Rhodes Ridge (25%) with Rio Tinto•Objective:- to be Australia’s 3rd iron ore producer•Other Iron Ore Tenements (East Angelas, Roy Hill, MulgaDowns and others)•Coal•Ferruginous Manganese

Other Interests•Pastoral •Property

Hancock Prospecting Pty Ltd

Hancock Group Hancock Group -- Position TodayPosition Today

Page 29: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Hancock Prospecting Pty Ltd

Location MapLocation Map

Page 30: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

1971 Pacminex exploration (19 holes)

1985 Geological Mapping

1987 RC drilling programme

1988Low level aeromagnetic survey

1991100m decline Diamond drilling Preliminary metallurgy

Hancock Prospecting Pty Ltd

Hope Downs ProjectHope Downs Project

Page 31: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

1992 Initiated environmental studies30,000m of RC drilling730m diamond drillingHope South discoveryHope Downs Iron Ore Agreement Act

199360,000m RC drilling programme5 winzes sunk in Hope North & South2400m diamond drill corePermanent camp established

Hancock Prospecting Pty Ltd

Hope Downs ProjectHope Downs Project

Page 32: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

19947 winzes sunk in Hope North & SouthMetallurgical testwork commenced at AmmtecGeotechnical studies Hope North & South3D interpretation & Orebody Modelling of Hope North

1995Mine Planning for Hope North3D interpretation & Orebody Modelling of Hope SouthFurther metallurgical testwork CISIRI, British Steel

Hancock Prospecting Pty Ltd

Hope Downs ProjectHope Downs Project

Page 33: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

1996Mine Planning for Hope SouthCSIRO and MPL metallurgical testworkMarketing Documentation

1997MarketingExploration of Hope 2 and 3Continuation of Pre-feasibility StudyDiscussions with Potential Partners

Hancock Prospecting Pty Ltd

Hope Downs ProjectHope Downs Project

Page 34: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Hancock Prospecting Pty Ltd

Hancock andHancock and IscorIscor Agreement for Hope DownsAgreement for Hope Downs

Page 35: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Tenements 100% owned by Hancock GroupTotal Delineated resource for Hope Downs 1, 2, 3 and EastAngelas (Not part of the agreement with Kumba) exceed 1,200 MtExtensive pre-feasibility work by Hancock had proceeded for over 6 years (total spent exceeds $25 M)Drilling, geology, mine planning, metallurgy, engineering, environmental, native title and heritage studiesHope Downs 1 comprises two deposits - North & South with scheduled recoverable reserves over 400 Mt

Hancock Prospecting Pty Ltd

Hope Downs Project Status after Signing withHope Downs Project Status after Signing with IscorIscor

Page 36: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Hope Downs Feasibility Study PeriodHope Downs Feasibility Study PeriodIn 1998, the Hancock Group and the Iscor Group began a bankable feasibility study of the potential development of the Hope 1 iron ore depositHope Downs Management Services (HDMS) was formed to manage the bankable feasibility study (BFS)The original Project concept was to:• Produce 15 Mt/a of discrete Marra Mamba lump and fines from Hope

1, and• Deliver the ore “on ship” using shared rail and port infrastructure

In late 2000, the Project concept was revised to:• Produce 25 Mt/a of discrete Marra Mamba lump and fines from Hope

1, and• Deliver the ore “on ship” using independent rail and port

infrastructureThe FS technical report was completed in July 2002

Hancock Prospecting Pty Ltd

Page 37: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Geological ProgramGeological Program

100,000 metres drilling during pre-feasibility

32,000 metres drilled in feasibility study

13 exploration shafts sunk (1000 m)

Representative samples - 1997 and 1999

Revised Resource model - September 1999

Hancock Prospecting Pty Ltd

Page 38: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Geology Geology Most iron ore deposits of economic value in the Pilbara were derived by enrichment of either the Brockman Iron Formation or the Marra Mamba Iron FormationIron ore from the Marra Mamba Iron Formation will be mined at Hope 1 Hope 1 is made up of 2 orebodies• Hope North• Hope South

Figure 3.5 Diagrammatic cross section of Hope 1

WittenoomDolomite

Marra Mamba

Iron Formation ore

ore

detritusdetritus

HopeSouth

HopeNorth

E

W

Hancock Prospecting Pty Ltd

Page 39: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Geology Geology At Hope 1, the mineralised zone contains three ore-types:

Figure 3.9 Schematic diagram showing the locationof different ore-types at Hope 1

Hydrated ore-type

2. Hydrated ore-type, <10%, generally LGDetrital ore-type

3. Detrital ore-type, <10%, generally LG

1. Bedded ore-types, ~80%, mainly HG

Bedded ore-types

• Main minerals are goethite and hematite• Ore-type characteristics are the same at Hope

North and Hope South

Hancock Prospecting Pty Ltd

Page 40: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

GeologyGeology

Initially, most of Hope 1 had been drilled on a 200 m × 50 m gridInfill drilling (on a 100 m × 50 m grid) was carried out during the BFS to:• Confirm the structural

interpretation• Confirm the accuracy of

drilling data• Increase confidence in the

Mineral ResourceDrilling summary (total)• 1552 holes• 134 172 m (16% diamond

drilling) Drill rigs operating at Hope 1

Hancock Prospecting Pty Ltd

Page 41: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

GeologyGeologyMineral Resource estimate - Hope 1

Derived from geological cross sections based on drillingConsistent with the Australian Code for Reporting Mineral Resources and Ore Reserves (Mineral Resource tonnage estimate is inclusive of Ore Reserve tonnage estimate)Cut-off grade = 58%Fe ; Average in-situ density = 2.8 t/m³

61.8

3.0

1.6

0.06

% dry basis

Fe

SiO2

Al2O3

P

0.1

6.7

Mn

LOI

Mineral Resource490 Mt, in situ#

Measured; 195 Mt

Indicated; 270 Mt

Inferred; 25 Mt

# dry, to the nearest 5 Mt

Increasing level ofgeological knowledge

and confidence

Hancock Prospecting Pty Ltd

Page 42: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Sample evaluationSample evaluation

Bulk sampling (drum sample) programs:• A decline (mainly hydrated ore-type)• 12 winzes (vertical shafts), maximum

depth 81 m• 8 winzes in Hope North• 4 winzes in Hope South

Winze and decline locations at Hope 1

6000 N

10000 N

12000 E

Hope NorthHope North

Hope SouthHope South

∀1

2

3 456

78

9

10

11

12

Decline

6000 N

10000 N

12000 E

Hope NorthHope North

Hope SouthHope South

∀1

2

3 456

78

9

10

11

12

Decline

12

3 456

78

9

10

11

12

Decline

• A bulk marketing sample was prepared from winze material in 1999

– Represented the first ~110 Mt of ore to be mined– Lump ore was conditioned

• Material recovered from the winzes was also used for evaluation of ore processing characteristics

Hancock Prospecting Pty Ltd

Page 43: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

MiningMiningOre Reserve estimate - Hope 1

Derived from the Mineral Resource estimate (Measured and Indicated categories only)Consistent with the Australian Code for Reporting Mineral Resources and Ore Reserves (Ore Reserve tonnage estimate is within the Mineral Resource tonnage estimate)Tonnage and grade estimates include dilution (<5%)

Apply mining recovery factors, schedules & blending ratios

Apply mining recovery factors, schedules & blending ratios

Ore Reserve400 Mt, saleable#

Proved; 175 Mt

Probable; 225 Mt

61.6

3.09

1.59

6.7

% dry basis

Fe

SiO2

Al2O3

LOI

Mineral Resource490 Mt, in situ#

Measured; 195 Mt

Indicated; 270 Mt

Inferred; 25 Mt

# dry, to the nearest 5 Mt

Hancock Prospecting Pty Ltd

Page 44: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

MiningMining

Conventional open pit mining operation• Horizontal 10 m benches

6000 N

10000 N

12000 E

SouthCentral

SouthEast

NorthEast1

NorthFlatTop

NorthWest

Hope NorthHope North

Hope SouthHope South

∀SouthWest

NorthEast2

∀ Hope 1

Mt Whaleback

Marandoo

∀ Hope 1

Mt Whaleback

Marandoo

6000 N

10000 N

12000 E

SouthCentral

SouthEast

NorthEast1

NorthFlatTop

NorthWest

Hope NorthHope North

Hope SouthHope South

∀SouthWest

NorthEast2

∀ Hope 1

Mt Whaleback

Marandoo

∀ Hope 1

Mt Whaleback

Marandoo

Definition of pit areas for mine planning

Mine planning – pit design and operations• Hope North is:

– divided into 4 pits for scheduling– ~6000 m long and 500 m wide

• Hope South is:– divided into 3 pits for scheduling– ~5000 m long and up to 750 m wide

Hancock Prospecting Pty Ltd

Page 45: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

MiningMiningMine operations – equipment

Equipment selections were made to:• Ensure the required mining

selectivity• Take advantage of the latest

developments in mining technology

• Standardise the mining fleet

Mining operations – quality control concept• Target product quality will be achieved by:

– Grade control drilling– Maintaining adequate drilled and broken stocks– Mining from pits with complementary blending

grades– Using run of mine stockpiles (before primary crusher)

Table 5-11 Major mining fleet at 25 Mt/a productionEquipment Proposed size Number

Blast hole drills 251 mm diameter 4

Hydraulic excavators 30 m³ bucket 2

Front End Loaders 16 m³ bucket 2

Haul trucks 231 t 18

Komatsu 830E haul truck

Hancock Prospecting Pty Ltd

Page 46: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

PlantPlantFlowsheet and facilities

Plant design by Fluor DanielFinal design production rate = 25 Mt/a (dry)Two stage crushing and screening plant to produce separate lump (-31.5+6.3 mm) and fines (-6.3 mm) products at Hope 1Construction will proceed in 2 phases:

Phase 1: initial design production rate of 15 Mt/aPhase 2: additional production capacity of 10 Mt/a

25 Mt/aPhase 2; +10 Mt/a

overlandconveyor

HopeSouth

Schematic outline of ore processing plant

Phase 1; +15 Mt/a

lump

productscreeningmodules

fines

scalpingmodules

secondarycrushingmodules

primarycrushingmodule

HopeNorth

Hancock Prospecting Pty Ltd

Page 47: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

PlantPlantMine stockyard

The mine stockyard will be located inside the rail loopStockyard capacity will be 600 000 t (live)Each live stockpile has sufficient ore to fill 2 trains, each of 224 ore cars

Train loading and infrastructureTrain loading

• Proposed system used successfully at other Pilbara operations

• Designed to load 224 ore cars with up to 125 t per ore car in a total time of 3 hours

Infrastructure• Stand-alone services• Appropriate to a fly-in / fly out

operationOreprocessing

plant

Trainloadout

Rail loop

∀Schematic outline of mine stockpiles and train loadout

Overland conveyor(from Hope South)

Hancock Prospecting Pty Ltd

Page 48: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Feasibility Study Results Feasibility Study Results –– Mining and Ore ProcessingMining and Ore Processing

Mineral Resources . . . . 490 Mt at 61.8%FeOre Reserves . . . . . . . . 400 Mt at 61.6%FeWaste : Ore ratio . . . . . 1.4 : 1.0Mining method . . . . . . . Open-cut; drill, blast, load &

haulProduction ramp-up . . 5 Mt/a steps to 25 Mt/a by Year 5Ore processing plant . . Dry, 2 stage crushing and

screeningProducts . . . . . . . . . . . .47% lump, 53% fines at mineApprovals . . . . . . . . . . .Secured

Hancock Prospecting Pty Ltd

Page 49: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Product quality projectionsProduct quality projections

Projections of physical properties have been made based on:

• Results from testworkcarried out on the composite lump and fines prepared during the BFS

• Simulation of the mine to port handling and transportation process

Table 9-5 Projected physical properties (at port) Test Typical value

Bulk density (uncom pacted, dry)

Lump, kg/m³ 1850

Fines, kg/m³ 2050

Tumble Strength ISO 3271

Tumble Index; TI, %+6.3 mm 86

Abrasion Index; AI, %-0.5 mm 8

Decrepitation ISO 8371

Decrepitation Index; DI, % -6.3 mm 5

Reduction Disintegration ISO 4696-1

LTB, % +6.3 mm 60

LTB, % -3.15 mm 22

Reducibility ISO 4695

(dR/dt)40, % /min 1.24

65% reduction time, min 50

Hancock Prospecting Pty Ltd

Page 50: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Iron Making Slag Rate Index comparisonIron Making Slag Rate Index comparison

The slag rate index of Hope 1 lump is:* ~5% lower than Brockman lump

The slag rate index of Hope 1 fines is: * ~15% lower than Hamersley and Yandi fines* ~25% lower than Mt Newman fines * ~55% lower than Mesa J fines

Hancock Prospecting Pty Ltd

Page 51: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Infrastructure Infrastructure -- RailRail

New heavy-haul railway from Hope 1 to Port HedlandDesigned as an independent operationTotal length ~370 km3 passing sidings required for a capacity of 25 Mt/aHope 1 •

km0 100

N

BHP Yandi

Mt Whaleback Jimblebar

PortHedland

Hancock Prospecting Pty Ltd

Page 52: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

RailwayRailway

Schematic long section of proposed railway

0

200

400

600

800

0 40 80 120 160 200 240 280 320 360

Distance, km

Hei

gh

t, m

RL

ChichesterRange

HancockRange

PortHedland Hope 1

Passingsiding 1

Passingsiding 2

Passingsiding 3

0

200

400

600

800

0 40 80 120 160 200 240 280 320 360

Distance, km

Hei

gh

t, m

RL

ChichesterRange

HancockRange

PortHedland Hope 1

Passingsiding 1

Passingsiding 2

Passingsiding 3

Hancock Prospecting Pty Ltd

Page 53: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

PortPort

Hope 1 ore exports through Port Hedland New ore handling & ship loading facilities designedHDMS has lease options over land on the western side of Port Hedland harbour and a new berth site at Harriet Point

Aerial view of Port Hedland harbour, looking E

N S

W

E Nelson Point berths (BHPBIO)

Finucane Island berth (BHPBIO)

Harriet Point

Hancock Prospecting Pty Ltd

Page 54: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

PortPortThe port materials handling system will be developed in 2 stages:

• Stage 1: initial capacity = 15 Mt/a• Stage 2: to increase capacity to 25

Mt/aThe system will comprise:

• Train unloading facilities (twin cell dumper)

• An in-loading circuit• ore stacking (capacity = 10 000

t/h)• stockpiling (capacity = 4.1 Mt at

Stage 2)• An out-loading circuit

• ore reclaiming (capacity = 10 000 t/h)

• lump rescreening (up to 9 screens at Stage 2)

• A fines-return circuit and bulking in circuit

• Product sampling facilities Schematic outline of port materials handling system

Stage 1; +15 Mt/a

Stage 2; +10 Mt/a

Car dumper

Total; 25 Mt/a

Lump rescreening plant

Page 55: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Feasibility Study Feasibility Study -- ConsultantsConsultants

Geological Modeling - SnowdensHydro-geology - AquaterraMine Design & Scheduling - SnowdensProcess Plant - Fluor DanielRail - HGM/ Fluor DanielMaterials Handling - Fluor DanielMarine - HGMEnvironmental - Biota

Page 56: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Iron Ore Market Outlook Iron Ore Market Outlook -- DemandDemand

Further consolidation amongst steel makersChina to rely more on imported iron oreConsumers focusing on consistent, high quality, raw materials

Iron ore imports by China(historic and forecast)

~155 Mt

020406080

100120140160180

1985 1990 1995 2000 2005 2010 2015

Year

Mt

Hancock Prospecting Pty Ltd

Page 57: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Iron Ore Market Outlook Iron Ore Market Outlook -- SupplySupply

Consolidation of iron ore supply; completed?Continued growth in seaborne iron ore tradeHigh quality lump ore supplies are limited

Seaborne iron ore trade

0

100

200

300

400

500

600

1985 1990 1995 2000 2005 2010

Year

Mt

Hancock Prospecting Pty Ltd

Page 58: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Iron Ore Market Outlook Iron Ore Market Outlook –– Hope DownsHope Downs

Strong formal support for the Project from ChinaHDMS is working to secure formal support from other markets

Proposed sales - by market

China50%

Japan25%

Other Asia10%

Europe15%

Hancock Prospecting Pty Ltd

Page 59: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Financing OptionsFinancing OptionsKumba Resources Ltd• Public listing on JSE (October 2001)

Equity Investor/sConventional Project Finance• Strong market support• Sound engineering design• Competent managers

Mining ContractorInfrastructure Outsourcing• Infrastructure Funds• Rail & Port investors

Hancock Prospecting Pty Ltd

Page 60: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Hancock Prospecting Pty Ltd

Ownership Structure: Joint Venture stageOwnership Structure: Joint Venture stage

HancockHancock KumbaKumba

Hope DownsHope DownsJoint VentureJoint Venture

EquityEquityInvestorsInvestors

Page 61: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Project Development ScheduleProject Development Schedule

Feasibility Report completed . . . . . . February 2002

Letters of Intent/sales contracts . . . . 4th Quarter 2002

Government approvals . . . . . . . . . December 2003

Construction commences . . . . . . . . January 2004

Shipments to customers commence . . 2nd Quarter 2006

Hancock Prospecting Pty Ltd

Page 62: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Why Not? Why Not? -- That WhyThat Why

Hancock Prospecting Pty Ltd

WA IRON ORE PRODUCTION AND DESTINATION - 2001

Mine Domestic Japan China Korea Taiwan Europe Other Total

HI operations - 19.0 12.6 10.3 4.4 4.0 0.6 50.9Channar - - 9.7 - - - - 9.7Newman 3.2 11.2 7.7 3.1 2.7 2.5 - 30.4Goldsworthy 2.5 3.5 0.8 - 0.5 - - 7.3BHP Yandi 1.5 14.6 3.0 8.1 2.0 1.6 - 30.8Robe River 0.4 17.2 1.0 1.4 - 7.9 0.4 28.3Koolyanbobbing 0.1 - 3.2 - - - - 3.3Cockatoo Island - - 1.2 - - - - 1.2

Total bydestination

7.7 65.5 39.2 22.9 9.6 16.0 1.0 162.0

Page 63: Presentation to Australian Iron Ore and Steel Summit 2002members.iinet.net.au/~hppl/downloads/HopeDownsBeyond.pdf · Summit 2002 Parkroyal Darling Harbour, Sydney 30 - 31 October

Why Not? Why Not? -- That WhyThat Why

Hancock Prospecting Pty Ltd

COMMITTED OR POSSIBLE NEW IRON ORE PROJECTS IN WESTERN AUSTRALIA

Mine Expected Production Destination Expected Start-up

West Angelas 20Mt/a East Asia July 2002Mining Area C 15Mt/a Korea 2003Eastern & Western Rangesand Paraburdoo

20Mt/a China 2004

Hope Downs 25Mt/a East Asia 2006Portman Expansion An extra 5Mt/a China 2006BHP Billiton’s Yandi An extra 5Mt/a short term East Asia 2003Nammuldi/Silvergrass An extra 3Mt/a short term East Asia 2007Mount Gibson 1.5Mt/a East Asia 2003Yandicoogina expansion An extra 3Mt/a East Asia 2007

TOTAL 97.5Mt/a