présentation powerpoint - office of the united nations … · ppt file · web view2014-11-11 ·...

6
Page 1 Compteurs à pré-paiement « Gcin’amanzi » : Soweto water « Gcin’amanzi » : Soweto water supply project supply project Combining the implementation of the Combining the implementation of the right to water with efficient water use right to water with efficient water use through prepayment through prepayment

Upload: vodien

Post on 13-Sep-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Présentation PowerPoint - Office of the United Nations … · PPT file · Web view2014-11-11 · Title: Présentation PowerPoint Author: FORNAGE Last modified by: ROTBARDTA Created

Page 1Compteurs à pré-paiement

« Gcin’amanzi » : Soweto water « Gcin’amanzi » : Soweto water supply projectsupply project

Combining the implementation of the Combining the implementation of the right to water with efficient water use right to water with efficient water use

through prepaymentthrough prepayment

Page 2: Présentation PowerPoint - Office of the United Nations … · PPT file · Web view2014-11-11 · Title: Présentation PowerPoint Author: FORNAGE Last modified by: ROTBARDTA Created

Page 2Compteurs à pré-paiement

« Gcin’amanzi » : Soweto water supply project« Gcin’amanzi » : Soweto water supply project Situation before project (2005):

162 000 households/ 1 M. persons 90% of connections billed on a lump sum basis (20

m3/month vs 61 m3/mois consumption), wastagewastage, deteriorated networks, very high losses and UFWhigh losses and UFW (>80%)

Revenue collection : 25% , non payment was a political act under apartheid

Regional water stresswater stress: high marginal cost of water « Gcin’amanzi » (conservation de l’eau) :

Free installation of prepayment water meters, application of Free Basic Water SupplyFree Basic Water Supply, Subsidized tariffs, cancellation of customer debts, renewal of public and private networks

Main risks : i) social acceptance (good), ii) legality

Page 3: Présentation PowerPoint - Office of the United Nations … · PPT file · Web view2014-11-11 · Title: Présentation PowerPoint Author: FORNAGE Last modified by: ROTBARDTA Created

Page 3Compteurs à pré-paiement

Lesira-Teq Metering - OverviewLesira-Teq Metering - Overview

=> Jobourg Water was comforted by a judgment of Constitutional Court but this lead to :

Evolution JW strategy and technology : from prepayment to intelligent water meters

Customer has option of Prepayment, Post paid, Flat rate, or Conventional modes

Customer can change between modes after completing relevant application

Changing between modes (once authorised) is done at vending point using User Tag and Hand Held Vending Unit (HHVU)

Free Basic Water (FBW) and Emergency Water (EW) can be available in all modes

Meter can be locked at any time

Page 4: Présentation PowerPoint - Office of the United Nations … · PPT file · Web view2014-11-11 · Title: Présentation PowerPoint Author: FORNAGE Last modified by: ROTBARDTA Created

Page 4Compteurs à pré-paiement

1. Prepayment mode1. Prepayment mode

Customer buys credit in advance from vending point When credit is finished,When credit is finished, meter goes to restricted flow of

40l/h. More credit must be purchased Customer receives Free Basic WaterFree Basic Water (FBW) of 9 000 litres

once per month or 300 liters per day (50 l. per person per day)

Emergency WaterEmergency Water (EW) is available up to four times per year (1 000 litres per occasion) but only when there is no credit and FBW is finished

Page 5: Présentation PowerPoint - Office of the United Nations … · PPT file · Web view2014-11-11 · Title: Présentation PowerPoint Author: FORNAGE Last modified by: ROTBARDTA Created

Page 5Compteurs à pré-paiement

2. “Post paid” mode2. “Post paid” mode

When FBW is finished, water will continue

The user/client chooses his assigned negative credit limit in user/client chooses his assigned negative credit limit in litres or Rand valuelitres or Rand value.

This amount can be consumed over a number of months

The meter shows the “Debt” water total in volume and in RandThe meter shows the “Debt” water total in volume and in Rand

Full flow will be maintained until the negative credit limit is reached.

Then the meter will turn into a restricted flow mode of 40l/hThen the meter will turn into a restricted flow mode of 40l/h (optional)

Customer receives Free Basic WaterFree Basic Water (FBW) of 9 000 litres once per month or 300 litres per day and Emergency waterEmergency water

Page 6: Présentation PowerPoint - Office of the United Nations … · PPT file · Web view2014-11-11 · Title: Présentation PowerPoint Author: FORNAGE Last modified by: ROTBARDTA Created

Page 6Compteurs à pré-paiement

Lesira-Teq Metering - OverviewLesira-Teq Metering - Overview