PRESENTATION OUTLINE Explains today’s Indonesia economic condition in which many international observers called Indonesia is one of the promising global investment country. Informs some facts and current status of infrastructure services, that corresponds mainly to the tasks of the Ministry of Public Works. Describes some discussions on reforms in infrastructure policies as ways to attract private investors Discussing and identifying the profile of 2011 – 2014 potential infrastructure projects to be financed by the next preferential buyer’s export credit from the China Government or Public – Private Partnership (PPP) Projects financed by Chinese investors. 1

Upload: junius

Post on 10-Feb-2016

38 views

Category:

Documents


0 download

DESCRIPTION

PRESENTATION OUTLINE. Explains today’s Indonesia economic condition in which many international observers called Indonesia is one of the promising global investment country. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: PRESENTATION OUTLINE

PRESENTATION OUTLINE

• Explains today’s Indonesia economic condition in which many international observers called Indonesia is one of the promising global investment country.

• Informs some facts and current status of infrastructure services, that corresponds mainly to the tasks of the Ministry of Public Works.

• Describes some discussions on reforms in infrastructure policies as ways to attract private investors

• Discussing and identifying the profile of 2011 – 2014 potential infrastructure projects to be financed by the next preferential buyer’s export credit from the China Government or Public – Private Partnership (PPP) Projects financed by Chinese investors.

1

Page 2: PRESENTATION OUTLINE

INDONESIA’S PROMISING ECONOMIC GROWTH AFTER GLOBAL FINANCIAL CRISIS

Source : Bappenas

4,5%

Indonesia has the best economic growth (around 4.5%) in the world after China and India on the global financial crisis.

2

Page 3: PRESENTATION OUTLINE

HIGH CONTROLLED INFLATION RATE AND HIGH ECONOMIC GROWTH

The inflation rate in the same year can be controlled at the level of 2.78% which is the lowest inflation rate in the last ten years. With this low level of inflation, the purchasing power of the people of Indonesia can be maintained

Economic growth is projected to grow in a sustainable manner at the rate of 7% in 2014

Sumber: Badan Pusat Statistik (BPS)

2,78%

Inflation Rate (IHK)

3

Page 4: PRESENTATION OUTLINE

THE IMPORTANCE OF CHINA’S BUSINESSINVESTMENT ROLE

• The capacity of government financing can only meet 17% of the total estimated investment requirement of U.S. $ 200 billion per year

• Actual investment from China to Indonesia is very significant: rank-13

• Hope for the value of Chinese investment in Indonesia will continue to increase in the future

NO COUNTRY PROJECT VALUE (US $) %

1 Singapore 189 4,341.0 40,12 Netherlands 32 1,198.7 11,13 Japan 124 678.9 6,34 South Korea 186 624.6 5,85 United Kingdom 61 567.7 5,46 Seychelles 4 322.2 3,07 US of America 27 171.5 1,68 Mauritius 6 159.5 1,59 Switzerland 11 132.1 1,2

10 Malaysia 75 129.3 1,211 Germany 18 103.9 1,012 Australia 26 79.7 0,713 People's Republic of

China 37 66.5 0,614 Thailand 4 51.4 0,515 Italy 11 41.1 0,416 Taiwan 36 31.7 0,317 France 12 29.0 0,318 India 31 26.2 0,219 Hong Kong 18 21.0 0,220 Arab Emirat 3 15.5 0,1

Sumber : Badan Koordinasi Penanaman Modal (BKPM)

Ranking of Foreign Direct Investment Realization by Country, 1 JANUARY - 31 DECEMBER 2009

4

Page 5: PRESENTATION OUTLINE

5

NEGARAPERINGKAT GCI

2010-2011 2009-2010

Switzerland 1 1

Swedia 2 4

Singapura 3 3

Amerika Serikat 4 2

Jerman 5 7

Malaysia 26 24

Brunei Darussalam 28 32

Thailand 38 36

Indonesia 44 54

Vietnam 59 75

Filipina 85 87

Kamboja 109 110

INDONESIA’S RANK IN THE GLOBAL COMPETITIVENESS INDEX 2009 – 2010 AND 2010 – 2011

Sumber : World Economic Forum, 2010

Page 6: PRESENTATION OUTLINE

Although in the last five years, infrastructure condition in Indonesia has improved, but there are still a lot of infrastructure projects need to be accomplished along with the rapid population growth and economic development activities.

• Road infrastructure : national road network has increased from 34,629 km in 2004, became 38,570 km in 2009.

• Toll road development increasing:− In 1978 – 2010 = 741 km − Target in year 2010-2014 = 700 km

• National drinking water coverage increasing:− In 2005 = 42,5%− In 2009 = 47,71%− Target in year 2010-2015 = 68,87%

• Developing waste management

LATEST DEVELOPMENTS IN INDONESIA’S INFRASTRUCTURE (1)

6

Page 7: PRESENTATION OUTLINE

To meet these targets, Indonesia Government invite the private sector, both domestic investors and overseas to participate in building infrastructure, especially in areas that have been developed such as metropolitan cities, major cities and other areas.

Open dumping

80,6%

Con-trolled landfill. 15,5% Sanitary landfill, 2,8%

LANDFILL CONDITION IN INDONESIA

TOTAL : 378 LANDFILLSAREA : 1.886,99 Ha

7

LATEST DEVELOPMENTS IN INDONESIA’S INFRASTRUCTURE (2)

Page 8: PRESENTATION OUTLINE

OPPORTUNITY INVESTMENT ON TOLL ROAD DEVELOPMENT, WATER RESOURCES MANAGEMENT

AND SANITATION

WATER SUPPLYWASTE

MANAGEMENT

TOLL ROAD TOLL ROAD

8

Page 9: PRESENTATION OUTLINE

GOVERNMENT SUPPORT TO ENCOURAGE INVESTMENTS (1)

Water Supply Development Institutional reforms with the

establishment of the Subsidiary Agency of Water Supply System Development (BPP-SPAM)

PDAM recovery reforms in Indonesia Water supply regulations improvement

Toll Road Development Acceleration Institutional and legislation reforms and

establishment of Indonesian Toll Road Authority (BPJT)

Completion of the relevant regulations of land acquisition

Establishment of Public Service Agency (BLU) toll road

Land Capping policy implementation

9

Page 10: PRESENTATION OUTLINE

To create a conducive investment climate, the government has issued Perpres No. 13/2010, as revised from Perpres No. 67/2005, concerning cooperation between the government and business entities in providing infrastructure. Through this revision the government provides convenience and greater access to business entities to participate in infrastructure development.

Related with the risks guarantee associated a better financing, the government establishing two state-owned enterprises, namely PT. Indonesia Infrastructure Facility and the PT. Penjaminan Infrastruktur which responsible for facilitating funding or financing to ensure financial compliance or financial disclosure before the construction starts.

10

GOVERNMENT SUPPORT TO ENCOURAGE INVESTMENTS (2)

Page 11: PRESENTATION OUTLINE

Linked to land acquisition, the GOI commits to support private investors by creating some new methods. These methods are:1. Land freezing when no land transaction is allowed after toll road corridor

been decided by the government; 2. Land price is determined by independent appraisal instead of using tax

value of land; 3. Land capping in which government will bear the land cost 110% above

proposed by investor in concession agreement; 4. Revolving fund which is provided to ease investors risks in case of delay in

land acquisition.

Ministry of Public Works launched the e-procurement system in 1999 that allows public to participate transparently in the process of procurement

11

GOVERNMENT SUPPORT TO ENCOURAGE INVESTMENTS (3)

Page 12: PRESENTATION OUTLINE

INFRASTRUCTURE DEVELOPMENT PROJECTSTO BE OFFERED TO THE CHINA GOVERNMENT (1)

Priority projects in the area of roads and bridges are:1. Toll road development of Solo - Kertosono2. Toll road development of Bawen – Solo3. Toll road development of Cisumdawu (Cileunyi – Sumedang – Dawuhan)

Potential projects in the area of roads and bridges are:4. Construction Project of Musi III Bridge 5. Construction Project of Pasir Panajam Bridge6. Construction of Arterial Road to Support Belang-Belang International Port7. Manado – Bitung Toll Road Development Project8. Pekanbaru – Kandis – Dumai Toll Road Development Project

12

Page 13: PRESENTATION OUTLINE

1. SOLO – KERTOSONO TOLL ROAD Part of the Trans Java Toll Road network. Length ± 179 km connecting Central Java and East Java Provinces. One of the Government Priorities to be operated simultaneously with the other Trans

Java Toll Road segments. Preparations such as FS (2005), PPP studies (2007) with 6 schemes,

Amdal/Environmental Impact Assessment (2008), DED (2008) had been done. Economically Feasible (EIRR ±22%), but Financially Marginal (FIRR ±14%). Government gives the support through the constructions of Colomadu – Karanganyar

(± 21 km) and Saradan – Kertosono (± 39 km) segments. Government support is included within the Blue Book worth of US$ 500 million, but

isn’t yet commited. Road construction with a length of ± 600 m was done in the year 2009 using the

National Budget with an amount of Rp 15 billion. An amount of ± Rp 53 billion was allocated in the year 2010 for the purpose of

constructing the bridges bottom structure and the approach in the west side of the bridge (± 150 m).

An amount of Rp 150 billion is allocated in 2011 to finish the bridge work. Another funding is still needed to finish the government support.

13

PRIORITY PROJECTSIN THE AREA OF ROADS AND BRIDGES (1)

Page 14: PRESENTATION OUTLINE

2. SEMARANG SOLO TOLL ROAD SECTION : BAWEN - SOLO Semarang Solo Toll Road (72.64 km) is a part of the Trans Java Toll Road It has been bound with Badan Usaha Jalan Tol (BUJT) which is PT Trans Marga Jateng. Evaluation of Penerusan Pengusahaan Jalan Tol based on the regulation within Permen PU

No. 06/PRT/M/2010 about Pedoman Evaluasi Penerusan Pengusahaan Jalan Tol has been done.

Based on results of the evaluation, for the project to be financially feasible, the Government will have to give construction support worth Rp 1.914 billion or construction as long as 32.1 km (Sta 40+541 to Sta 72+611) in the Bawen-Solo section.

Plan of the operation : - Semarang-Bawen (2012)- Bawen-Solo (2014)

Details 2010 EvaluationLand Cost Rp 927 Billion

Construction Cost (minus Government Support) Rp 3.112 Billion

Investation Cost Rp 6.212 Billion

Initial Rate Class I Rp 500/km (2011)

Government Support Rp 1.914 Billion

14

PRIORITY PROJECTSIN THE AREA OF ROADS AND BRIDGES (2)

Page 15: PRESENTATION OUTLINE

3. CILEUNYI – SUMEDANG – DAWUAN TOLL ROAD Phase 2 The Bandung City, Capital of West Java is one of the biggest emerging

metropolitan city attract and generate socio-economic activities. The Government intends to build a new international airport in Majalengka and

new port in Cirebon as main inlet/outlet for West Java and Secondari inlet/outlet of Jakarta which need high standard road access.

Accordingly GOI will develop the Cileunyi-Sumedang-Dawuan toll road along ± 58.5 km connecting Trans Java Toll Road, new airport and other cities as Bandung and Cirebon.

Project Objective: (a) Improve accessibility and capacity of road networks connecting Bandung and Cirebon and the proposed new airport and seaport; (b) Promote national and regional development in corridor-impacted areas and cities along the road in the eastern part of West Java; and (c) Increase productivity of the area and improve access to regional and international market.

Cost estimate: US$ 205 Million

PRIORITY PROJECTSIN THE AREA OF ROADS AND BRIDGES (3)

15

Page 16: PRESENTATION OUTLINE

OTHER POTENTIAL PROJECTS IN THE AREA OF ROADS AND BRIDGES

No. Project Cost (US$) Remarks 1 Construction Project of Musi

III Bridge 55 Million To provide an efficient road network in Sumatra

Island as well as Palembang Metropolitan City and to promote its rapid socio economic and industrial area development.

2 Construction Project of Pasir Panajam Bridge

350 Million To improve accessibility from Panajam to Balikpapan it requires bridge construction to shorten travel time and to anticipate traffic congestion.

3 Construction of Arterial Road to Support Belang-Belang International Port

60 Million To build the national road network into an acceptable standard of services and provide accessibility to support regional and local economic development.

4 Manado – Bitung Toll Road Development Project

562 Million The construction of Manado – Bitung toll road length ± 35 km is designated to connect Sam Ratulangi International Airport with the planned Bitung International Port.

5 Pekanbaru – Kandis – Dumai Toll Road Development Project

845 Million Facilitate through traffic to the Dumai Port which will soon become Sumatra Island’s primary shipping gateway. Ease traffic congestion as well as to increase efficiency and shorten travel time.

16

Page 17: PRESENTATION OUTLINE

Priority projects in the areas of water resources management sector are:1. Construction of Jambo Aye Dam2. Construction of Pandan Duri Dam3. Construction of Dams in East Nusa

Tenggara (NTT), includes: Raknamo, Kolhua, and Mbay Dams

4. Construction of Lau Simeme Multipurpose Dam

5. Additional funds for Jati Gede multipurpose dam

17

INFRASTRUCTURE DEVELOPMENT PROJECTSTO BE OFFERED TO THE CHINA GOVERNMENT (2)

Page 18: PRESENTATION OUTLINE

PRIORITY PROJECTS IN THE AREA OF WATER RESOURCES MANAGEMENT (1)

18

Page 19: PRESENTATION OUTLINE

PRIORITY PROJECTS IN THE AREA OF WATER RESOURCES MANAGEMENT (2)

19

Page 20: PRESENTATION OUTLINE

INFRASTRUCTURE DEVELOPMENT PROJECTS OF PUBLIC WORKSTO BE OFFERED TO THE PRIVATE SECTORS OF CHINA (1)

Road Infrastructure Development which includes the construction of toll roads with a total funding requirement of U.S. $ 15 billion to support the construction of toll roads in Jakarta and surrounding areas (Greater Jakarta) Banten, West Java, Central Java, Yogyakarta, East Java, North Sumatra, Riau, Kepulauan Riau, West Sumatra, South Sumatra, Lampung and North Sulawesi (detailed information enclosed).

20

Page 21: PRESENTATION OUTLINE

Development of Water Supply Network Infrastructure and Sanitation and also waste management that includes the development of water supply system in 4 (four) locations with a total fundings requirements of U.S. $ 1.2 billion; and waste processing facilities in 11 (eleven) locations with with a total fundings requirements U.S. $ 41.62 million. (detailed information enclosed)

21

INFRASTRUCTURE DEVELOPMENT PROJECTS OF PUBLIC WORKSTO BE OFFERED TO THE PRIVATE SECTORS OF CHINA (2)

Page 22: PRESENTATION OUTLINE

Appresiation to China International Contractors Association (CHINCA), China Ministry of Commerce and China EXIM Bank and their staffs who have provided support and assistance in the implementation of this Forum.

Expectation that forum this is the first step in a productive and mutually beneficial relationship between the Indonesian Government, the Government of People’s Republic of China, and Chinese investors in infrastructure development in Indonesia, and can be run successfully.

CLOSING REMARKS