PRESENTATION ONPRESENTATION ONINTEGRATED STATION PLAN AT SARAI
KALE KHAN ISBT
Dated – 11.09.12
Multi modal Integration at SKK ISBT
• Improved intermodal connectivity is crucial for sustainable t t d g t gtransport and passenger patronage
• Seamless transfers from one mode to anotherIt reduces spill over of passengers to the adjoining areas and • It reduces spill over of passengers to the adjoining areas and discourages informal transport activities
• Saving in capital cost• Saving in capital cost• Peak hour Station loading in 2041 projected at 45950 at Sarai
Kale Khan • Existing ISBT, Railway station and proposed DMRC and 2 RRTS
stations at ISBT Sarai Kale Khan are integrated
Passengers at Sarai Kale Khan
Daily Passengers Peak Hour Passengers
Years 2016 2021 2031 2041 2016 2021 2031 2041
RRTS Alwar 38000 44520 66395 84950 4047 4762 9553 9843
Inter State Bus 13397 15564 15960 24754 1386 1617 2217 2780Inter State Bus Terminal
13397 15564 15960 24754 1386 1617 2217 2780
Local 21219 24872 45164 51258 2311 2721 6604 6060
Railway station 3384 4084 5271 8938 350 424 732 1003
Metro station – Ph III
53370 72615 91064 105297 5871 7988 10017 11583
RRTS- Delhi Meerut
143469 169202 201368 245233 14347 16920 20137 24523
Total 234839 286337 358827 435480 24265 29670 39707 45950
Final Option –Stacked RRTSStacked RRTS stations
RAILWAY LINEDELHI – ALWAR LINE
RAILWAY LINE
NIZAMUDDIN RLY STATION
Interstate Bus Terminal City Bus Terminal
RING ROADRING ROAD
Redevelopment Plan of ISBT Sarai Kale Khan
Site Plan
Proposed Skywalk
Metro Station with Exits
P d Sk lkProposed Skywalk
METRO EXIT
INTEGRATION
CONNECTION TO RLY STN THROUGH METRO CONCOURSE
SKYWALK
CONNECTION TO RLY THROUGH FOB
Auto & NMT Parking
METRO EXIT
RRTS EXIT
CONNECTION
Meerut RRTS stn (-41m) is stacked below Alwar RRTS stn (-27m)
CONNECTION
Longitudinal Section
RRTS Al Pl tf ( 27 )
Concourse (-19m)Parking
RRTS Alwar Platform (-27m)
RRTS Meerut Platform (-41m)
UNPAID AREA
PAID AREA
PLATFORM
PARKING
Cross Section
NZM Rly Stn
RING ROAD
DMRCStation Box
RRTS Station Box
Around 1000 car parking in 2 floors
Cross Section View of RRTS station Box
PARKING
CONCOURSE LEVEL
RRTS ALWAR PLATFORM
RRTS MEERUT PLATFORMPLATFORM
Plan at Parking and Concourse Level
PARKING LVL 1 & 2
RRTS CONCOURSE - -19 M
PAID AREA
UNPAID AREA
Steps going to Platform
Steps going up
RRTS Platform Plans
RRTS ALWAR PLATFORM -27 M
RRTS MEERUT PLATFORM -41 M
Views
Platform Level View
Concourse Level ViewConcourse Level View