presentation on the world bank/gef hungary nutrient reduction project (zeidler)
DESCRIPTION
Presentation prepared for the Regional Conference on Integrated Nutrient Pollution Management in the Danube - Black Sea Basin October23-35 2007, Ankara by Ulrich ZeidlerTRANSCRIPT
World Bank/GEFHUNGARY Nutrient Reduction Project
Presentation prepared for the Presentation prepared for the
Regional Conference onRegional Conference on
Integrated Nutrient Pollution Management Integrated Nutrient Pollution Management in the Danube - Black Sea Basinin the Danube - Black Sea Basin
October23-35 2007, AnkaraOctober23-35 2007, Ankara
by Ulrich Zeidlerby Ulrich Zeidler
Project Objectives
Reduce Budapest’s discharge of nutrients into the Reduce Budapest’s discharge of nutrients into the Danube River, and consequently into the Black Sea Danube River, and consequently into the Black Sea
Enhance the nutrient trapping capacity of GemencEnhance the nutrient trapping capacity of Gemenc and Beda-Karapancsa areas of Duna-Drava National and Beda-Karapancsa areas of Duna-Drava National Park (component B) Park (component B)
Serve as a model for similar nutrient reduction Serve as a model for similar nutrient reduction initiatives in Hungary and other Danube Basin initiatives in Hungary and other Danube Basin countries countries
Project Objectives
Reduce Budapest’s discharge of nutrients into the Reduce Budapest’s discharge of nutrients into the Danube River, and consequently into the Black Sea Danube River, and consequently into the Black Sea
Enhance the nutrient trapping capacity of GemencEnhance the nutrient trapping capacity of Gemenc and Beda-Karapancsa areas of Duna-Drava National and Beda-Karapancsa areas of Duna-Drava National Park (component B) Park (component B)
Serve as a model for similar nutrient reduction Serve as a model for similar nutrient reduction initiatives in Hungary and other Danube Basin initiatives in Hungary and other Danube Basin countries countries
Activities under component B
Hydrological Improvement of the FloodplainHydrological Improvement of the Floodplain
MonitoringMonitoring
Protected Areas Management Protected Areas Management
Project Area
GemencGemenc
Beda KarapancsaBeda Karapancsa
Floodplain FloodplainDanubeDike Dike
Principles of Interventions
Expected Outcomes
Improved hydrological communication betweenImproved hydrological communication between Danube and oxbows Danube and oxbows
Recovery/stabilization of critical wetland habitatsRecovery/stabilization of critical wetland habitats
Improved connectivity within the FloodplainImproved connectivity within the Floodplain
Documentation of nutrient reduction impact Documentation of nutrient reduction impact (monitoring system) (monitoring system)
Thank you Thank you for your attention for your attention
and for protecting usand for protecting us!!!!