DESCRIPTION
This is a Power Point Presentation discussing briefly about the Slab, Beam & Column of a building construction. It was presented on 6th March, 2014 as part of the Presentations of the subject: DETAILS OF CONSTRUCTION, at Ahsanullah University of Science & Technology (AUST)TRANSCRIPT
![Page 1: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/1.jpg)
PRESENTATIONON
BEAM , SLAB , COLUMN
![Page 2: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/2.jpg)
![Page 3: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/3.jpg)
Presented By : Group-05 Year : 2nd, Sem : 2nd
Name of the Group Members :
MOHAMMED NASIL AFTAD – 12-01-03-141 MD. MOHIBUL HASAN – 12-01-03-112 SAFFAT RABBY MUNAYEM – 12-01-03-106 MD. MUSABBIR AHMED – 12-01-03-156 MD. MYNUL KARIM – 12-01-03-126 MAKSUDUR RAHMAN – 12-01-03-146 BISWAJITH DEB RAHUL – 12-01-03-120 SHARMIN SIDDIKA – 12-01-03-131 AFSANA KHAN – 12-01-03-151 S.M. TOWFIQ ISLAM – 11-02-03-047
![Page 4: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/4.jpg)
![Page 5: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/5.jpg)
Column is a vertical structural member
It transmits the load from ceiling/roof slab and beam, including its self-weight to the foundation.
![Page 6: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/6.jpg)
Long
Column/
Slender
Short
Column
Intermediate
Column
![Page 7: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/7.jpg)
Horizontal member of a structure
Carries transverse loads
![Page 8: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/8.jpg)
SIMPLY SUPPORTED
BEAMOVERHANGING BEAM CANTILEVER BEAM
FIXED BEAM PROPPEDCONTINUOUS
BEAM
![Page 9: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/9.jpg)
It is a flat horizontal surface
It is supported by beam and column
It transfers load to the beam
![Page 10: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/10.jpg)
GRANAIT
MARBEL
•*ONE WAY * TWO WAY * FLAT * BEAM
*RIBBED
CONCRETE
WOODEN
![Page 11: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/11.jpg)
SLAB
BEAM
COLUMN
![Page 12: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/12.jpg)
1. U.D.C. CONSTRUCTION
TEJGAON INDUSTRIAL AREA, DHAKA
2. RANGS BABYLONIA
TEJGAON INDUSTRIAL AREA, DHAKA
3. RESIDENTIAL AREA
BASUNDHARA RESIDENTIAL AREA , DHAKA
![Page 13: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/13.jpg)
Sand
Cement
Reinforcement
![Page 14: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/14.jpg)
Vibrator
Cutter
Mixing Machine
![Page 15: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/15.jpg)
![Page 16: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/16.jpg)
A rectangular column must have at least 4 reinforcements at 4 corners
![Page 17: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/17.jpg)
Circular column should have minimum 6 reinforcements
Reinforcement should be min 1% and max 8%
![Page 18: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/18.jpg)
It is done when length of reinforcement bar is small but we need longer reinforcement
Provided in mid span
Tied with hooks
![Page 19: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/19.jpg)
Columns have closed lateral ties spaced approximately uniformly across the column
Resist shear force and bursting out effect
10mm Ø, 12mm Ø bars are used
![Page 20: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/20.jpg)
Normal spacing = S in mid span
Spacing near support joint = S/2
![Page 21: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/21.jpg)
Used to resist expansion
The hooks shall be bent to 135º
![Page 22: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/22.jpg)
Must be leak proof, smooth inside and properly aligned
Should be maintained 1.5 in clear cover
![Page 23: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/23.jpg)
Concrete is casted in two lifts
It should not be casted from more than 5 feet high to avoid concrete segregation
![Page 24: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/24.jpg)
Compaction is done by vibrator
Construction joints are provided for better bonding between new and old concrete
Formwork is removed after 3 days
![Page 25: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/25.jpg)
Provides water for hydration reaction
Increases the strength up to 2.5 times
Done for 21 days
Gunny bags are used for curing
![Page 26: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/26.jpg)
![Page 27: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/27.jpg)
STEEL FORMWORK WOODEN FORMWORK
![Page 28: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/28.jpg)
A min. of 0.2% bar is to be provided for the compression in order to take care of the deflection
Extra tops are used in the support joints
![Page 29: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/29.jpg)
Used to resist shear and diagonal tension stresses in a beam
Shall be minimum size of 8mm ∅ in case of lateral load resistance
![Page 30: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/30.jpg)
Alternate hook is provided
The hooks shall be bent to 135º
Stirrup distribution is dense near support
![Page 31: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/31.jpg)
Casting and Curing are done simultaneously for beam and slab.
Casting of lower part is done earlier
![Page 32: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/32.jpg)
Side of formwork is removed after 3 days
Bottom part is removed after 21-28 days
![Page 33: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/33.jpg)
![Page 34: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/34.jpg)
Steel Formwork Wooden Formwork
![Page 35: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/35.jpg)
BRACING
PROPS
![Page 36: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/36.jpg)
Slab reinforcement includes straight bar , cranked bar
Extra tops near the supports
![Page 37: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/37.jpg)
Mainly 1.5 " clear cover is maintained
CC blocks are used
![Page 38: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/38.jpg)
Compaction is done with Patta
![Page 39: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/39.jpg)
Curing : It is done for 21 days
Removal of Formwork: After 21 days formwork is removed
![Page 40: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/40.jpg)
![Page 41: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/41.jpg)
![Page 42: Presentation on Slab, Beam & Column](https://reader038.vdocuments.us/reader038/viewer/2022102614/559bdf781a28ab3f568b467d/html5/thumbnails/42.jpg)