presentation on prospect of non destructive testing and condition monitoring application in...
TRANSCRIPT
Prospect of Non DestructiveTesting and Condition
Monitoring Application inBangladesh
Ferdous KabirMarketing Manager
(ASNT NDT Level-II UT, RT, PT and ISO Level-II MT)
Saj Engineering & Trading Company
ESTABLISHED : 1998
TYPE OF BUSINESS
IMPORT
TRADING (Tendering………)
ENGINEERING SERVICE
TYPE OF BUSINESS
IMPORT
TRADING (Tendering………)
ENGINEERING SERVICE
Industrial Support We Cover
NDT Service
Condition Monitoring (Vibration
Monitoring and Dynamic
Balancing, IR Thermal Analysis,
Lube Oil Analysis)
NDT Service
Condition Monitoring (Vibration
Monitoring and Dynamic
Balancing, IR Thermal Analysis,
Lube Oil Analysis)
LUBE OIL TESTING SERVICE
1. Oxidation, 2. Nitration, 3. Sulfation, 4. Incorrectlubricant, 5. Anti-Wear additives, 6. Soot, 7. Glycol,8. Water Content, 9.TAN, 10. TBN, 11. Viscosity
Advanced Phased Array UltrasonicApplication at Present in BangladeshAdvanced Phased Array UltrasonicApplication at Present in Bangladesh
What is the Difference in Medical Ultrasonogramand Phased Array Ultrasonic Test?
Nothing Special, Both are Phased Array Ultrasonic Test
Medical Industrial
Phased Array Probe Configuration
• Essentially, a phased-array probe is a longconventional probe
cut into many small elements, which areindividually excited.
23
• Essentially, a phased-array probe is a longconventional probe
cut into many small elements, which areindividually excited.
Phased Array Probe Configuration• It is like having many small conventional UT probes
integrated inside a single probe.
…
128 elements !
Weld Overlay System
Full weld overlaysystem that enables tovisualize the relativeposition of indications inrelation to the weldgeometry. EasilyConfigure the WeldGeometry in theequipment. Such astype of weld joint, weldpreparation angle, bevelheight, bevel width, rootgap, root face,thickness of thespecimen etc.
Full weld overlaysystem that enables tovisualize the relativeposition of indications inrelation to the weldgeometry. EasilyConfigure the WeldGeometry in theequipment. Such astype of weld joint, weldpreparation angle, bevelheight, bevel width, rootgap, root face,thickness of thespecimen etc.
Defect Sizing
Image sizing cursors available for X2 – X1 and/or Y2 – Y1 indication sizing•Defect can be accurately sized•X-direction i.e. defect length Y-direction i.e. defect depth
Phased Array C-Scan:Report with completeinformation
Immediate reportfrom the equipmentcan be transferablethrough pen drive.
Phased Array Ultrasonic Test Application
Cement Mill Shell Welding Power Plant Gas Pipe Weld
Gas Field Pipe Line Weld Power Plant Boiler Tube
Ghorashal Power PlantUnit -2
Clint: Technoprome Export,Russia
Ghorashal Power PlantUnit -2
Clint: Technoprome Export,Russia
Project Completed by AUT East West Pipeline Project , Chine
(4,167 km) (www.chinaoilweb.com)
Nord Stream Project (Russia toGermany (1,212 km) sea base of Balticsea
Blue Stream Project (1,213), sea base ofBlack sea
East West Pipeline Project , Chine(4,167 km) (www.chinaoilweb.com)
Nord Stream Project (Russia toGermany (1,212 km) sea base of Balticsea
Blue Stream Project (1,213), sea base ofBlack sea
PAUT vs. RT Advantages
1. Many functional advantages from switching fromRT to PAUT.
2. No radiation3. No licensing4. No chemical wastes5. Less subjective data interpretation6. Minimizes data storage problems7. Minimizes materials handling issues8. Minimizes production disruptions9. Better detection of planar defects10.Can size in vertical plane for ECA11.Lower reject rates12.Fast and cost effective
1. Many functional advantages from switching fromRT to PAUT.
2. No radiation3. No licensing4. No chemical wastes5. Less subjective data interpretation6. Minimizes data storage problems7. Minimizes materials handling issues8. Minimizes production disruptions9. Better detection of planar defects10.Can size in vertical plane for ECA11.Lower reject rates12.Fast and cost effective
Our Completed 70 NDT Service Projects
01. 110MW Power Plant (PDB)
02. Ashugong Power Plant (Unit-2)
03. Rawjan Power Plant
04. Sylhet 150MW Power Plant
05. Katakhale Power Plant
06. Siddirgonj Power Plant…….
07. Ghorasal ST (Gas) : Unit - 2……….
08. Renata Pharmaceuticals Ltd (Mirpur)
01. 110MW Power Plant (PDB)
02. Ashugong Power Plant (Unit-2)
03. Rawjan Power Plant
04. Sylhet 150MW Power Plant
05. Katakhale Power Plant
06. Siddirgonj Power Plant…….
07. Ghorasal ST (Gas) : Unit - 2……….
08. Renata Pharmaceuticals Ltd (Mirpur)
09.Renata Pharmaceuticals Ltd(Rajandropur)
10. Army Aviation
11. Karnaphuli Steel Mill
12. Modern Erection
13. ACME Pharmaceuticals
14. SK+F Pharmaceuticals
15. HP Chemicals
16.Samuda Chemical
17. Sarker Steel …………………………………
09.Renata Pharmaceuticals Ltd(Rajandropur)
10. Army Aviation
11. Karnaphuli Steel Mill
12. Modern Erection
13. ACME Pharmaceuticals
14. SK+F Pharmaceuticals
15. HP Chemicals
16.Samuda Chemical
17. Sarker Steel …………………………………
SAJ Upcoming Services
i. Ultrasonic PredictiveMaintenance
ii. Laser Alignment
iii. XRF Service
i. Ultrasonic PredictiveMaintenance
ii. Laser Alignment
iii. XRF Service