presentation on fois & cois
DESCRIPTION
PRESENTATION ON FOIS & COIS. BLOCK DIAGRAM OF FOIS SYSTEM. P. C. FIBRE TERMIATION BOX. I/O BOX. OFC. FIBRE DISTRIBUTION FRAME BOX. PATCH PANEL. ADD & DROP MUX. SWITCH. DATA CARD. ROUTER. G 703 MODEM. V 35 - PowerPoint PPT PresentationTRANSCRIPT
FIBRETERMIATION BOX
ADD & DROP MUX
V 35 MODEM
G 703 MODEM
DATA CARD
ROUTER
SWITCH
P. C.
OFC
FIBRE DISTRIBUTION FRAME BOX
PATCH PANEL
BLOCK DIAGRAM OF FOIS SYSTEM
I/O BOX
FOIS PHASE – I FOIS PHASE – I TOTAL NO. OF LOCATION IN TOTAL NO. OF LOCATION IN
EAST COAST RAILWAY EAST COAST RAILWAY 1515 COMMISSIONED COMMISSIONED 1515
WAT DIVISION WAT DIVISION 88 KUR DIVISION KUR DIVISION 55 SBP DIVISION SBP DIVISION 11 H.Q. H.Q. 11
FOIS PHASE -IIFOIS PHASE -II TOTAL NO. OF LOCATIONS IN ECoR TOTAL NO. OF LOCATIONS IN ECoR
3838
WAT DIVISION WAT DIVISION 1818
SBP DIVISION SBP DIVISION 77
KUR DIVISION KUR DIVISION 13 13
FOIS PHASE –IIFOIS PHASE –II
TOTAL NO. OF LOCATIONS IN ECoR TOTAL NO. OF LOCATIONS IN ECoR 3838
VSAT LOCATIONS VSAT LOCATIONS 1717
RAILWAY O.F.C. RAILWAY O.F.C. 1717
LAN EXTENDERS LAN EXTENDERS 4 4
TOTAL LOCATIONS TOTAL LOCATIONS 3838
COMMISSIONED ON O.F.C. COMMISSIONED ON O.F.C. 1313 COMMISSIONED ON LAN EXTENDER COMMISSIONED ON LAN EXTENDER 33 COMMISSIONED ON VSAT COMMISSIONED ON VSAT 0 0
TOTAL COMMISSIONED TOTAL COMMISSIONED 16 16
MATERIALS REQUIRED FOR OFCMATERIALS REQUIRED FOR OFC
1.1. 3 LOCATIONS: 3 LOCATIONS: ROUTERSROUTERS
2.2. 1 LOCATION : 1 LOCATION : DATA CARDDATA CARD
MATERIALS REQUIRED FOR LAN MATERIALS REQUIRED FOR LAN EXTENDEREXTENDER
1.1. 1 LOCATION : 1 LOCATION : U.G.CABLEU.G.CABLE
PROGRESS OF COIS WORKSPROGRESS OF COIS WORKS
TENDERS IN DIVISION TENDERS IN DIVISION TO BE FLOATEDTO BE FLOATED TOTAL LOCATIONS TOTAL LOCATIONS 66 SITE READY SITE READY 44 S&T WORK DONE S&T WORK DONE 44 S&T MATERIAL S&T MATERIAL
REQUIRED REQUIRED ROUTERS, ROUTERS,
U.G. CABLEU.G. CABLE
VSAT LOCATIONSVSAT LOCATIONS TO BE TO BE COMMISSIONEDCOMMISSIONED
TOTAL IN E.Co.R.TOTAL IN E.Co.R. 2121 WAT DIV WAT DIV 1313 KUR DIV KUR DIV 88 SBP DIV SBP DIV 0 0
REQUIREMENTS REQUIREMENTS ROUTER (4 PORTS) ROUTER (4 PORTS) 11 No.11 No. ROUTER (12 PORTS) ROUTER (12 PORTS) 3 No.3 No. ROUTER (24 PORTS) ROUTER (24 PORTS) 5 No.5 No. MODEMS (64 KB/S) MODEMS (64 KB/S) 24 Pairs24 Pairs
ROUTERS (4 PORTS) LOCATIONSROUTERS (4 PORTS) LOCATIONS
PSA,PSA, MSMD, KSNG, BBS, CTC, MSMD, KSNG, BBS, CTC, DNM,JJKR,DNKL,SKND,PUI.DNM,JJKR,DNKL,SKND,PUI.
ROUTERS(12 PORTS) ROUTERS(12 PORTS) R,CSPR,BHCR,CSPR,BHC ROUTERS(24 PORTS) ROUTERS(24 PORTS)
KUR,WAT,RGDA,TIG,SBPKUR,WAT,RGDA,TIG,SBP