presentation on alaska ppt · analysis of ppt barry pulliam dr. tony finizza suite 1170 1215 k...
TRANSCRIPT
![Page 1: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/1.jpg)
1
5th Floor601 W 5th Street
Los Angeles, California 90071213 624 9600
PRESENTATION ONALASKA PPT
to Senate Resources CommitteeMarch 13, 2006
Analysis of PPT
Barry Pulliam
Dr. Tony Finizza
Suite 11701215 K Street
Sacramento, California 95814916 449 2860
Suite 2825Three Allen Center
333 Clay StreetHouston, Texas 77002
713 228 2700
Suite 230106 E 6th Street
Austin, Texas 78701512 476 3711
![Page 2: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/2.jpg)
2
Econ One Research, Inc.
An economic research and consulting firm with offices in California (Los Angeles andSacramento) and Texas (Houston and Austin)
We provide consulting services in various industries, including petroleum and natural gas,regulated utilities, electricity, telecommunications, and computer software
We have worked for:
Federal government agencies, including the Department of Justice, the FederalTrade Commission, the Department of the Interior, and the President’s Councilof Economic Advisors
A number of foreign countries and international agencies, including the WorldBank, Mexico, Nigeria, Turkey, and Tanzania on matters related to economicdevelopment and privatization of state-owned utilities
A number of companies in the petroleum and natural gas industries, including BP,Occidental Petroleum, ANR Pipeline, Koch Gateway Pipeline, Sempra Energy, KNEnergy Corp., Lyondell-CITGO Refining, Total Petrochemicals U.S.A., PanhandleEastern Corp., and ONEOK, Inc.
A number of state governments on energy-related matters, including the Statesof Alaska, California, Hawaii, Louisiana, New Mexico, New York, and Texas
![Page 3: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/3.jpg)
3
Barry Pulliam
Senior Economist with Econ One Research, Inc.
Masters Degree in Economics from the Claremont Graduate School, with 17 years ofexperience consulting in the petroleum and natural gas industries
Has consulted with or served as an economic expert for the State of Alaska on a numberof occasions, including:
Several severance tax matters involving the valuation of crude oil
Recent arbitration between State and ExxonMobil involving crude oil royalties
Operation of the TAPS Quality Bank in proceedings before the FERC and Alaska PUC
Consulted with the States of California, New Mexico, Texas, and Louisiana on economicissues related to the petroleum industry
Consulted with federal government agencies, including the Department of the Interior and theFederal Trade Commission
Co-author of two recent studies prepared for the Alaska Department of Natural Resourcesrelated to natural gas markets and royalty valuation issues
Merger and antitrust investigations
![Page 4: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/4.jpg)
4
Dr. Anthony Finizza
Economist working in conjunction with Econ One Research, Inc.
Ph.D. in Economics and Finance from the University of Chicago with over 30 years ofexperience working in the petroleum industry
Chief Economist for ARCO from 1975 to 1998
At ARCO, Dr. Finizza was in charge of petroleum price forecasting for the company’s LongRange Planning Process and conducted scenario-planning exercises with senior managementresponsible for investment decisions
Consulted with the California Energy Commission, the State of Hawaii, and the InternationalHydrogen Infrastructure Group (a consortium of private companies and the U.S. Departmentof Energy) on energy-related matters
Currently teaches forecasting and modeling at the University of California, Irvine
Published articles in Business Economics, The Journal of Corporate Renewal, and TheInternational Journal of Forecasting
Former President of the International Association for Energy Economics
Senior Fellow with the U.S. Association for Energy Economics
![Page 5: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/5.jpg)
5
Oil Price Issues
![Page 6: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/6.jpg)
6
Conclusions/Observations Regarding Oil Price Forecasts
• Producers are using $40 as a planning base case with $30 as a stress price case. Majors may be using a slightly lower price range than independents, but are moving their views up.– This range may actually be lower than their best estimate, but is
consistent with their “prudent” planning approach– This range is consistent with recent observed oil asset purchases
• This range is consistent with publicly available forecasts although the recent EIA AEO 2006 is above this range. (~$54)
• What really matters is what forecasts are the “risk takers” using?
• Forecasters have been humbled (and will continue to be humbled) by their forecasts
![Page 7: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/7.jpg)
7
Oil Price Outlook • Factors Suggesting Continued Higher Prices (short-term)
– Strong oil demand, especially in China and rest of Asia– Growing Gap Between Global Demand and Global Non-OPEC
Supply• Non-OPEC oil supply cannot keep up with growing world demand
permitting increase in OPEC’s market power
• Factors Opposing Higher Oil Prices (long-term)– Conventional oil faces threat from alternative sources of liquids
when prices are high• Tar Sands: economic at ~$20-30 oil• Coal Liquids: economic above $30/bbl• Shale Oil: economic above $45-50/bbl
– Penetration of Alternative Transportation Vehicles• Oil’s key position in the transportation market will be eroded by Hybrid
vehicles, Grid-Connected Hybrid vehicles, Fuel Cell Vehicles– A $10/bbl difference in oil prices is an $73B additional consumer
costs per year
![Page 8: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/8.jpg)
8
Oil Price Forecasts
• EIA’s Annual Energy Outlook (AEO) – January 2006– Forecast of oil prices (through 2030, converted to WTI by Econ
One)– Include Alternative scenarios, probabilistic forecasts developed by
Econ One
• International Energy Agency (Paris) – 2005
• Reuters Poll of 18 Oil Analysts for WTI in 2010 (March 2006)
• NYMEX Futures market– WTI oil contract traded since early 1980s
![Page 9: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/9.jpg)
9
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
($20
04 P
er B
arre
l)
EIA AEO 2006 WTI Crude Oil Price Forecast
Source: AEO 2006 for Base Case; Econ One for Probabilistic Variance.
Base CaseP20P80
$
Oil Price Outlook – EIA Annual Energy Outlook 2006
![Page 10: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/10.jpg)
10
Alternative Oil Price Forecasts –Reuters Poll (March 10, 2006)
Source: Commodities Weekly, Deutsche Bank, 10 March 2006
Price Forecast for WTI in 2010
Reuters Poll of 18 Oil Analysts
Analyst Number
Median Mean
![Page 11: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/11.jpg)
11
IEA (2005) Oil Price Forecasts
![Page 12: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/12.jpg)
12
WTI Prices: History and Market Forecast
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
Jan-
83
Jan-
84
Jan-
85
Jan-
86
Jan-
87
Jan-
88
Jan-
89
Jan-
90
Jan-
91
Jan-
92
Jan-
93
Jan-
94
Jan-
95
Jan-
96
Jan-
97
Jan-
98
Jan-
99
Jan-
00
Jan-
01
Jan-
02
Jan-
03
Jan-
04
Jan-
05
Jan-
06
Jan-
07
Jan-
08
Jan-
09
Jan-
10
Jan-
11
Jan-
12
WTI Spot
NYMEX 3/06
NYMEX 3/05
NYMEX 3/04
NYMEX 3/03
(Dol
lars
Per
Bar
rel)
WTI Spot With Selected NYMEX Strips
Source: NYMEX.
$
![Page 13: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/13.jpg)
13
Producer View of Future Oil Prices• Producers have been “burned” by forecasts of high oil prices in the
past• Producers will test their projects against a price path that is below their
“Most Likely” view– They use the “official price view” as a speed limit to signal caution– By “high-grading,” they will have a suite of projects resilient to price risk– Their price view lags the current market price by as much as 5-7 years as
prices rise, and by 2 years as prices fall. – Current view might be: $35-40/barrel– Producers will also “stress” test their projects at $30/barrel
• The consequences of error are not symmetrical– If a producer underestimates the future path of prices, they will not
undertake high risk projects and their returns will skyrocket (the current situation relative to a few years ago)
– If a producer overestimates the future path of prices, they will be scorned by Wall Street and investors (their position in the late 1990s)
– They will “miss” opportunities, but these misses will not be fully “penalized” by the market
![Page 14: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/14.jpg)
14
Imputed Oil Company Price Views
• Marubeni acquisition (2/23/06) of Pioneer GOM assets: ~ $40
• Norsk Hydro acquisition (9/19/05) of Spinnaker Exploration: ~$35
• Statoil acquisition (4/28/05) of EnCana’s Deepwater GOM: ~ $30
![Page 15: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/15.jpg)
15
Some Examples of Humbling Oil Price Forecasting
• Energy Administration Administration (US DOE)
• A Private Oil Company
• Polls of “experts” – Society of Petroleum Evaluation Engineers
![Page 16: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/16.jpg)
16
EIA’s Annual Price Outlooks
0
10
20
30
40
50
60
70
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
(Nom
inal
Dol
lars
Per
Bar
rel)
* There is no report titled Annual Energy Outlook 1988 due to a change in the naming convention of the AEOs.Source: EIA.
$
EIA’s Annual Energy OutlookForecast Evaluation
AEO 2001AEO 2004
ActualAEO 1986AEO 1989*AEO 1992AEO 1995AEO 1998
Year of AEO
![Page 17: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/17.jpg)
17
Outlooks From An Oil Company
5
15
25
35
45
55
65
75
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
Nom
inal
Dol
lars
per
Bar
rel
1999 LRP
1993 LRP
1991 LRP
1987 LRP
1985 LRP
1989 LRP
1997 LRP1995 LRP
Actual
* Forecasts made in middle of previous year
![Page 18: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/18.jpg)
18
SPEE Annual Delphi Poll
Source: Society of Petroleum Evaluation Engineers (SPEE)
![Page 19: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/19.jpg)
19
Historical Crude Oil PricesWorld Crude Oil Prices
0
10
20
30
40
50
60
70
80
90
100
1900
1905
1910
1915
1920
1925
1930
1935
1940
1945
1950
1955
1960
1965
1970
1975
1980
1985
1990
1995
2000
2005
$/ba
rrel
Real $
Nominal $
![Page 20: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/20.jpg)
20
Investment Decision-Making by Oil and Gas Companies
![Page 21: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/21.jpg)
21
Financial CriteriaNet Present Value (NPV)
• Present value of future cash flows including capital investment
• A project with a positive NPV is a candidate for acceptance
![Page 22: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/22.jpg)
22
Financial CriteriaInternal Rate of Return (IRR)
• The discount rate at which the NPV of a project equals zero.
• All projects with an IRR greater than the risk-adjusted cost of capital should be accepted when there are no capital budget restraints. Choose higher IRR projects when there are capital budget restraints. Although the “market” would fund projects with IRR above cost of capital, project can be postponed.
• IRR of 12-15% currently indicates threshold rate of return without significant risk factors.
![Page 23: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/23.jpg)
23
Financial CriteriaCash (Undiscounted)
• Not used as key investment metric• Often used to view size of project in presentations to sovereign governments• Antithetical to discounted cash flow analysis
– Suffers from failure to reward cash early– E.g. Cash flows below are equivalent, but not in discounted terms
0
1
2
3
4
5
6
7
8
9
10
2014
2016
2018
2020
2022
2024
2026
2028
2030
2032
2034
2036
2038
2040
2042
Cash EarlyCash Later
Undiscounted Project Cash Flows
$ B
illio
ns
$ 14.3 B$40 BCash Late
$ 21.8 B$40 BCash Early
NPV (10%)Total Cash
![Page 24: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/24.jpg)
24
Economics of New Fields
![Page 25: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/25.jpg)
25
Prudhoe Bay Discovery Well - 1967
![Page 26: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/26.jpg)
26
Conclusions/Observations Regarding Exploration Impacts
• Without ANWR opening, expectation of large oil discoveries are unlikely, due to the Field Size Distribution of remaining economic reserves
• At low prices, 25/20 helps explorer more than 20/20
• Incentives are required at low prices (say, $73 M, although alternative approaches could work as well)
• At low prices, 20/20 and 25/20 preferred over SQ, in order to incent exploration
• Under either a 20/20 or 25/20 program, remaining reserves are economic, except for low prices (<$30?)
![Page 27: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/27.jpg)
27
Stylized Lifecycle of New Field
Exploration and
Appraisal Period
Economic LimitDevelopment Capital Production Phase
4 years 3 years 5-20+ years
![Page 28: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/28.jpg)
28
Comparison of Reserves – Central North Slope vs. ANWR
1%51%Amount in Fields Smaller than 64 M Barrels
43%2%Amount in Fields Over 500 M Barrels
22%0%Amount in Fields Over 1 B Barrels
10.44.0Mean Estimate of Reserves (Billions of barrels)
ANWRCentral North Slope
Undiscovered Technically Recoverable Oil Reserves
Note: Not all these reserves are economic
Source: USGS
![Page 29: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/29.jpg)
29
Size Distribution of Undiscovered Fields in Central North Slope
Technically Recoverable Reserves Central North Slope
(no ANWR)
17
8
3
1
11
4
1
24
13
5
2
21
0
5
10
15
20
25
30
50 100 150 500
Field Size (Millions of Barrels)
Num
ber o
f Acc
umul
atio
ns
P20MeanP80
![Page 30: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/30.jpg)
30
Technically Recoverable Reserves ANWR
27
19
12
9
3130
22
25
33
25
1514
0
5
10
15
20
25
30
35
50 100 150 500
Field Size (MMB)
Num
ber o
f Acc
umul
atio
ns
P20MeanP80
Size Distribution of Undiscovered Fields – ANWR
10 Billion Barrels of Technically Recoverable Oil Reserves in ANWR
![Page 31: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/31.jpg)
31
Economic Oil Reserves in Central North Slope Alaska At Alternative Prices
Economically Recoverable Reserves Central North Slope
Mean Estimate(No ANWR)
0.86
1.89
3.20
2.66
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
30 40 50 60
WTI (Real $2006 Per Barrel)
Bill
ions
of B
arre
ls
![Page 32: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/32.jpg)
32
Expected Discoveries Under Alternative PricesExpected Discoveries under Alternative WTI Prices
Central North Slope
3
12
15
21
3
5
8
11
12
4 4
1 1 1 1
0
5
10
15
20
25
$30 $40 $50 $60
WTI Price ($/barrel)
Num
ber o
f Acc
umul
atio
ns
50100150500
20 Fields
![Page 33: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/33.jpg)
33
5%500 MMB
10%150 MMB
25%100 MMB
60%50 MMB
PercentSize of Field
Likely Distribution of New Field Discoveries
![Page 34: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/34.jpg)
34
How An Explorer Will Look At The Exploration Proposition
• Calculate the Net Present Value of all outcomes, weighted by the expectation of the outcome
• EMV= NPV (a successful development project) x (Chance of hitting oil) less NPV (cash flow from undertaking exploration)
Expend Exploration Capital
Hit Oil Dry Hole
1:6 (16.7%) chance*5:6 (83.3%) chance
Develop field
Negative Cash Flow: Exploration expenditures less government credits,
allowances, tax sheltering
Positive Cash Flow (Hopefully):
Wellhead revenue less Royalty, PPT, Property Tax, Development CAPEX and OPEX, SIT, FIT, and
adjusted for government credits, allowances, tax sheltering
*The experience in Alaska from 1994-2003 is 17.9% according to Wood Mac GOGRR 2004
![Page 35: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/35.jpg)
35
Schematic of Cash Flows For This Example
Cash Flow From Exploration
100% of Time
Cash Flow From Development
and Production
16.7% of Time
![Page 36: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/36.jpg)
36
Avoiding Gambler’s Ruin• Say the chance of drilling a
successful well is 1-in-6, or .167
• An explorer will want to mitigate the risk of failure by drilling more wells. (Possibly shared.)
• The chance of failure with one well is .833 (=1-.167). The chance of failure with a 6 well program is .334 (=.833^6)
• An explorer can drill six wells with an expected number of successful wells = 1.0 .0078.00016
1.000Total
.0007
.0081
.0538
.2015
.4019
.3341
Chance Expected Value
No. of Successes
.00335
.03244
.16143
.40302
.40191
00
![Page 37: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/37.jpg)
37
Illustration of A Failed Exploration Program – 1 Well
-14.9-10.7-11.1Producer NCF NPV10
SQ25/2020/20
-19.8-14.2-14.8Total Producer
Cash Flow
-7.8-2.3-2.3-2.4
-7.4-2.2-2.2-2.3
-10.3-3.2-3.1-3.1
4321
Year
A One Well Dry Hole Program at $20 Million
![Page 38: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/38.jpg)
38
0
5
10
15
20
25
30
35
40
45
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Years From Start of Development
Mill
ion
Bar
rels
Per
Yea
r
Oil Production Profiles
500 MB Field
150 MB
50 MB
100 MB
![Page 39: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/39.jpg)
39
Economics of an 6-Well Exploration Program 50 MM Field (High Cost, Low Productivity)
Without $73 M Allowance
SQ25/2020/20Price (Real $2006)
131.8156.2139.2$ 50100.471.164.8$ 4069.0-2.10.0$ 30
State Revenues ($M) NPV10125.5110.5120.9$ 5023.141.144.9$ 40-79.2-35.7-37.0$ 30
Explorer NCF NPV10
![Page 40: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/40.jpg)
40
Economics of an 6-Well Exploration Program 50 MM Field (High Cost, Low Productivity)
With $73 M Allowance
SQ25/2020/20Price (Real $2006)
131.878.877.3$ 50100.42.910.3$ 4069.0-50.6-38.8$ 30
State Revenues ($M) NPV10125.5157.9158.8$ 5023.182.878.3$ 40-79.2-6.0-13.2$ 30
Explorer NCF NPV10
![Page 41: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/41.jpg)
41
Economics of an 6-Well Exploration ProgramWithout $73 M Allowance
SQ25/2020/20Price (Real $2006)
261.9$ 50200.6$ 40139.2$ 30
State Revenues ($M) NPV1021.1$ 5014.9$ 409.9$ 30
Explorer IRR331.6$ 50148.3$ 40-34.9$ 30
Explorer NCF NPV10
![Page 42: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/42.jpg)
42
Economics of an 6-Well Exploration ProgramWithout $73 M Allowance
SQ25/2020/20Price (Real $2006)
261.9337.5296.9$ 50200.6183.4165.7$ 40139.254.151.2$ 30
State Revenues ($M) NPV1021.122.522.8$ 5014.916.917.1$ 409.910.210.3$ 30
Explorer IRR331.6261.7284.1$ 50148.3138.9149.7$ 40-34.93.35.1$ 30
Explorer NCF NPV10
![Page 43: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/43.jpg)
43
Economics of an 6-Well Exploration ProgramWith $73 M Allowance
SQ25/2020/20Price (Real $2006)
261.9253.0232.6$ 50200.6112.3108.9$ 40139.2-2.26.2$ 30
State Revenues ($M) NPV1021.124.023.9$ 5014.918.718.5$ 409.912.011.7$ 30
Explorer IRR331.6311.0323.5$ 50148.3182.4184.5$ 40-34.937.732.6$ 30
Explorer NCF NPV10
![Page 44: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/44.jpg)
44
State Revenues (NPV10) From Example Exploration Program
State Revenues NPV 10w/ $73 M Allowance
-100
0
100
200
300
400
500
600
700
$30.00 $40.00 $50.00 $60.00 $70.00 $80.00
$ M
20/2025/20SQ
![Page 45: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/45.jpg)
45
Conclusions/Observations Regarding Exploration Impacts
• Without ANWR opening, expectation of large oil discoveries are unlikely, due to the Field Size Distribution of remaining economic reserves
• At low prices, 25/20 helps explorer more than 20/20
• Incentives are required at low prices (say, $73 M, although alternative approaches could work as well)
• At low prices, 20/20 and 25/20 preferred over SQ, in order to incent exploration
• Under either a 20/20 or 25/20 program, remaining reserves are economic, except for low prices (<$30?)
![Page 46: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/46.jpg)
46
Effective Severance Tax Rates Over Time
0.0%
2.0%
4.0%
6.0%
8.0%
10.0%
12.0%
14.0%
16.0%19
77
1979
1981
1983
1985
1987
1989
1991
1993
1995
1997
1999
2001
2003
2005
2007
2009
2011
2013
2015
2017
2019
2021
2023
2025
2027
2029
(Effe
ctiv
e Ta
x Ra
te P
erce
nt)
Historical Projected Status Quo
1977-2005Average:
12.0%
FY 2007-2016Average:
6.3%
FY 2007-2030Average:
4.9%
Source: Historical: Alaska Department of Revenue.
![Page 47: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/47.jpg)
47
Effective Tax Rates and Wellhead Prices Over Time(All North Slope Fields)
0.0%
2.5%
5.0%
7.5%
10.0%
12.5%
15.0%
17.5%
20.0%
1977 1979 1981 1983 1985 1987 1989 1991 1993 1995 1997 1999 2001 2003 2005
(Effe
ctiv
e Ta
x R
ate
Perc
ent)
0
5
10
15
20
25
30
35
40
45
50
(Wel
lhea
d Do
llars
Per
Bar
rel)
$Effective Tax Rate
Wellhead Price
1970s:11.53%$7.85
1980s:13.21%$14.52
1990s:13.15%$12.48
2000s:8.54%$27.02
Source: Alaska Department of Revenue.
![Page 48: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/48.jpg)
48
Effective Tax Rates and Wellhead Prices Over Time(Prudhoe Bay Field)
0.0%
2.5%
5.0%
7.5%
10.0%
12.5%
15.0%
17.5%
20.0%
1977 1979 1981 1983 1985 1987 1989 1991 1993 1995 1997 1999 2001 2003 2005
(Effe
ctiv
e Ta
x R
ate
Perc
ent)
0
10
20
30
40
50
60
(Wel
lhea
d Do
llars
Per
Bar
rel)
$
1970s:11.46%$7.85
1980s:13.59%$15.07
1990s:14.72%$12.85
2000s:13.18%$27.27
Source: Alaska Department of Revenue.
Effective Tax Rate
Wellhead Price
![Page 49: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/49.jpg)
49
Effective Tax Rates and Wellhead Prices Over Time(Kuparuk Field)
0.0%
2.5%
5.0%
7.5%
10.0%
12.5%
15.0%
17.5%
20.0%
1977 1979 1981 1983 1985 1987 1989 1991 1993 1995 1997 1999 2001 2003 2005
(Effe
ctiv
e Ta
x R
ate
Perc
ent)
0
10
20
30
40
50
60
(Wel
lhea
d Do
llars
Per
Bar
rel)
$
1970s:n/an/a
1980s:9.42%
$11.01
1990s:12.33%$11.69
2000s:3.52%$20.81
Source: Alaska Department of Revenue.
Effective Tax Rate
Wellhead Price
![Page 50: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/50.jpg)
50
Effective Tax Rates and Wellhead Prices Over Time(Alpine Field)
0.0%
2.5%
5.0%
7.5%
10.0%
12.5%
15.0%
17.5%
20.0%
1977 1979 1981 1983 1985 1987 1989 1991 1993 1995 1997 1999 2001 2003 2005
(Effe
ctiv
e Ta
x R
ate
Perc
ent)
0
10
20
30
40
50
60
(Wel
lhea
d Do
llars
Per
Bar
rel)
$
1970s:n/an/a
1980s:n/an/a
1990s:n/an/a
2000s:10.51%$29.33
Source: Alaska Department of Revenue.
Effective Tax Rate
Wellhead Price
![Page 51: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/51.jpg)
51
Projected North Slope Crude Oil* Production(FY 2007-2030)
Prudhoe Bay312,219
Prudhoe Bay285,044 Prudhoe Bay
231,630
PB Sats.63,489
Kuparuk114,006 Kup. Sats.
64,323
Alpine84,341 Alpine
64,236
Others196,052 Others
223,156
Others181,122
PB Sats.43,844
PB Sats.60,862
Kuparuk103,134
Kuparuk83,474
Kup. Sats.87,029
Kup. Sats.77,866
Alpine35,887
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
5-Year Average (FY 2007-2011) 10-Year Average (FY 2007-2016) 24-Year Average (FY 2007-2030)
(Bar
rels
Per
Day
)
Source: Alaska Department of Revenue.* Includes NGLs.
823,461 bpd = 3.0 Billion Bbls.
640,280 bpd = 5.6 Billion Bbls.
27.1%
7.8%
12.5%
34.6%
28.3%
10.0%
13.0%
36.2%
22.6%
9.2%
7.5%
36.8%
847,973 bpd = 1.5 Billion Bbls.
13.4%
9.9%
7.4%
10.6%
6.8%
5.6%
![Page 52: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/52.jpg)
52
Change in Projected Taxes Under a 20/20 TaxDOR Forecast Production (FY 2007-2030)*
0
200
400
600
800
1,00020
07
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
(Rea
l 200
6 M
illio
n D
olla
rs)
12.6%12.4%PPT Effective Tax Rate (Percent)
4.9%6.3%SQ Effective Tax Rate (Percent)
$749$747Annual Average Difference from SQ ($Million)
$17,971$7,471Total Difference from SQ ($Million)
$29,255$15,272Total PPT Tax ($Million)
FY 2007-2030FY 2007-2016
$Price: EIA Base Forecast; WTI = $54.70 Real Average
* Calculated from July 2006; includes 6-year transition and $73 Million exemption; volumes per DOR Fall 2005 Forecast with Oooguruk projection.
![Page 53: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/53.jpg)
53
Change in Projected Taxes Under a 20/20 TaxDOR Forecast Production (FY 2007-2030)*
0
200
400
600
800
1,00020
07
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
(Rea
l 200
6 M
illio
n D
olla
rs)
8.8%
15.2%
n/a
$476
$1,127
1H 2006
12.6%12.4%PPT Effective Tax Rate (Percent)
4.9%6.3%SQ Effective Tax Rate (Percent)
$749$747Annual Average Difference from SQ ($Million)
$17,971$7,471Total Difference from SQ ($Million)
$29,255$15,272Total PPT Tax ($Million)
FY 2007-2030FY 2007-2016
$Price: EIA Base Forecast; WTI = $54.70 Real Average
* Calculated from July 2006; includes 6-year transition and $73 Million exemption; volumes per DOR Fall 2005 Forecast with Oooguruk projection.
![Page 54: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/54.jpg)
54
Change in Projected Taxes Under a 20/20 TaxDOR Forecast Production (FY 2007-2030)*
0
200
400
600
800
1,00020
07
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
(Rea
l 200
6 M
illio
n D
olla
rs)
8.8%
15.2%
n/a
$476
$1,127
1H 2006
12.6%12.4%PPT Effective Tax Rate (Percent)
4.9%6.3%SQ Effective Tax Rate (Percent)
$749$747Annual Average Difference from SQ ($Million)
$17,971$7,471Total Difference from SQ ($Million)
$29,255$15,272Total PPT Tax ($Million)
FY 2007-2030FY 2007-2016
$Price: EIA Base Forecast; WTI = $54.70 Real Average
Alternative TransitionCredit
Transition Credit+
* Calculated from July 2006; includes 6-year transition and $73 Million exemption; volumes per DOR Fall 2005 Forecast with Oooguruk projection.
![Page 55: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/55.jpg)
55
Change in Projected Taxes Under a 20/20 TaxDOR Forecast Production (FY 2007-2030)*
* Calculated from July 2006; includes 6-year transition and $73 Million exemption; volumes per DOR Fall 2005 Forecast with Oooguruk projection.
EIA WTI Price Forecast: Fixed FY2007-2016 FY2007-2030Base Low High $40 Price Breakeven Breakeven
Average WTI Price in Real 2006 Dollars: $54.70 $35.40 $72.00 $40.00 $30.50 $28.80
FY 2007-2016
Total PPT Tax (Million 2006$) $15,272 $9,789 $21,158 $8,888 $3,925 -
Total Difference from Status Quo (Million 2006$) $7,471 $3,614 $11,688 $3,434 $0 -
Annual Average Difference from Status Quo (Million 2006$) $747 $361 $1,169 $343 $0 -
PPT Effective Tax Rate (Percent) 12.4% 10.3% 13.8% 10.2% 6.3% -
Status Quo Effective Tax Rate (Percent) 6.3% 6.5% 6.2% 6.3% 6.3% -
FY 2007-2030
Total PPT Tax (Million 2006$) $29,255 $12,765 $44,738 $16,230 - $5,293
Total Difference from Status Quo (Million 2006$) $17,971 $4,824 $30,262 $8,317 - $0
Annual Average Difference from Status Quo (Million 2006$) $749 $201 $1,261 $347 - $0
PPT Effective Tax Rate (Percent) 12.6% 8.7% 14.5% 10.0% - 5.0%
Status Quo Effective Tax Rate (Percent) 4.9% 5.4% 4.7% 4.9% - 5.0%
![Page 56: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/56.jpg)
56Change in Projected Taxes Under a 20/20 Tax withCosts Increased by 20%DOR Forecast Production (FY 2007-2030)*
* Calculated from July 2006; includes 6-year transition and $73 Million exemption; volumes per DOR Fall 2005 Forecast with Oooguruk projection.
EIA WTI Price Forecast: Fixed FY2007-2016 FY2007-2030Base Low High $40 Price Breakeven Breakeven
Average WTI Price in Real 2006 Dollars: $54.70 $35.40 $72.00 $40.00 $34.60 $32.50
FY 2007-2016
Total PPT Tax (Million 2006$) $13,803 $8,320 $19,689 $7,419 $4,579 -
Total Difference from Status Quo (Million 2006$) $6,002 $2,145 $10,219 $1,965 $0 -
Annual Average Difference from Status Quo (Million 2006$) $600 $214 $1,022 $197 $0 -
PPT Effective Tax Rate (Percent) 11.2% 8.8% 12.9% 8.5% 6.3% -
Status Quo Effective Tax Rate (Percent) 6.3% 6.5% 6.2% 6.3% 6.3% -
FY 2007-2030
Total PPT Tax (Million 2006$) $26,505 $10,070 $41,988 $13,480 - $6,159
Total Difference from Status Quo (Million 2006$) $15,221 $2,129 $27,511 $5,566 - $0
Annual Average Difference from Status Quo (Million 2006$) $634 $89 $1,146 $232 - $0
PPT Effective Tax Rate (Percent) 11.5% 6.8% 13.6% 8.3% - 4.9%
Status Quo Effective Tax Rate (Percent) 4.9% 5.4% 4.7% 4.9% - 4.9%
![Page 57: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/57.jpg)
57
Change in Projected Taxes Under a 25/20 TaxDOR Forecast Production (FY 2007-2030)*
0
200
400
600
800
1,000
1,200
1,400
1,60020
07
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
(Rea
l 200
6 M
illio
n D
olla
rs)
16.4%16.0%PPT Effective Tax Rate (Percent)
4.9%6.3%SQ Effective Tax Rate (Percent)
$1,106$1,197Annual Average Difference from SQ ($Million)
$26,555$11,968Total Difference from SQ ($Million)
$37,840$19,769Total PPT Tax ($Million)
FY 2007-2030FY 2007-2016
$Price: EIA Base Forecast; WTI = $54.70 Real Average
* Calculated from July 2006; includes 6-year transition and $73 Million exemption; volumes per DOR Fall 2005 Forecast with Oooguruk projection.
![Page 58: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/58.jpg)
58
Change in Projected Taxes Under a 25/20 TaxDOR Forecast Production (FY 2007-2030)*
0
200
400
600
800
1,000
1,200
1,400
1,60020
07
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
(Rea
l 200
6 M
illio
n D
olla
rs)
8.8%
19.4%
n/a
$782
$1,432
1H 2006
16.4%16.0%PPT Effective Tax Rate (Percent)
4.9%6.3%SQ Effective Tax Rate (Percent)
$1,106$1,197Annual Average Difference from SQ ($Million)
$26,555$11,968Total Difference from SQ ($Million)
$37,840$19,769Total PPT Tax ($Million)
FY 2007-2030FY 2007-2016
$Price: EIA Base Forecast; WTI = $54.70 Real Average
* Calculated from July 2006; includes 6-year transition and $73 Million exemption; volumes per DOR Fall 2005 Forecast with Oooguruk projection.
![Page 59: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/59.jpg)
59
Change in Projected Taxes Under a 25/20 TaxDOR Forecast Production (FY 2007-2030)*
0
200
400
600
800
1,000
1,200
1,400
1,60020
07
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
(Rea
l 200
6 M
illio
n D
olla
rs)
8.8%
19.4%
n/a
$782
$1,432
1H 2006
16.4%16.0%PPT Effective Tax Rate (Percent)
4.9%6.3%SQ Effective Tax Rate (Percent)
$1,106$1,197Annual Average Difference from SQ ($Million)
$26,555$11,968Total Difference from SQ ($Million)
$37,840$19,769Total PPT Tax ($Million)
FY 2007-2030FY 2007-2016
$Price: EIA Base Forecast; WTI = $54.70 Real Average
* Calculated from July 2006; includes 6-year transition and $73 Million exemption; volumes per DOR Fall 2005 Forecast with Oooguruk projection.
Alternative TransitionCredit
Transition Credit+
![Page 60: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/60.jpg)
60
Change in Projected Taxes Under a 25/20 TaxDOR Forecast Production (FY 2007-2030)*
* Calculated from July 2006; includes 6-year transition and $73 Million exemption; volumes per DOR Fall 2005 Forecast with Oooguruk projection.
EIA WTI Price Forecast: Fixed FY2007-2016 FY2007-2030Base Low High $40 Price Breakeven Breakeven
Average WTI Price in Real 2006 Dollars: $54.70 $35.40 $72.00 $40.00 $27.10 $26.10
FY 2007-2016
Total PPT Tax (Million 2006$) $19,769 $12,915 $27,126 $11,789 $3,382 -
Total Difference from Status Quo (Million 2006$) $11,968 $6,740 $17,656 $6,335 $0 -
Annual Average Difference from Status Quo (Million 2006$) $1,197 $674 $1,766 $633 $0 -
PPT Effective Tax Rate (Percent) 16.0% 13.6% 17.7% 13.6% 6.3% -
Status Quo Effective Tax Rate (Percent) 6.3% 6.5% 6.2% 6.3% 6.3% -
FY 2007-2030
Total PPT Tax (Million 2006$) $37,840 $17,226 $57,193 $21,558 - $4,671
Total Difference from Status Quo (Million 2006$) $26,555 $9,286 $42,717 $13,645 - $0
Annual Average Difference from Status Quo (Million 2006$) $1,106 $387 $1,780 $569 - $0
PPT Effective Tax Rate (Percent) 16.4% 11.7% 18.5% 13.3% - 5.0%
Status Quo Effective Tax Rate (Percent) 4.9% 5.4% 4.7% 4.9% - 5.0%
![Page 61: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/61.jpg)
61
Difference in Projected Taxes Between a 25/20 and a 20/20 TaxDOR Forecast Production (FY 2007-2030)*
0
200
400
600
80020
07
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
(Rea
l 200
6 M
illio
n D
olla
rs)
16.4%16.0%20/20 PPT Effective Tax Rate (Percent)
12.6%12.4%25/20 PPT Effective Tax Rate (Percent)
$358$450Annual Average Difference from 20/20 PPT Tax ($Million)
$8,584$4,497Total Difference from 20/20 PPT Tax ($Million)
$37,840$19,769Total 25/20 PPT Tax ($Million)
FY 2007-2030FY 2007-2016
$Price: EIA Base Forecast; WTI = $54.70 Real Average
* Calculated from July 2006; includes 6-year transition and $73 Million exemption; volumes per DOR Fall 2005 Forecast with Oooguruk projection.
![Page 62: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/62.jpg)
62
0
200
400
600
80020
07
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
(Rea
l 200
6 M
illio
n D
olla
rs)
15.2%
19.4%
n/a
$305
$1,432
1H 2006
16.4%16.0%20/20 PPT Effective Tax Rate (Percent)
12.6%12.4%25/20 PPT Effective Tax Rate (Percent)
$358$450Annual Average Difference from 20/20 PPT Tax ($Million)
$8,584$4,497Total Difference from 20/20 PPT Tax ($Million)
$37,840$19,769Total 25/20 PPT Tax ($Million)
FY 2007-2030FY 2007-2016
$Price: EIA Base Forecast; WTI = $54.70 Real Average
Difference in Projected Taxes Between a 25/20 and a 20/20 TaxDOR Forecast Production (FY 2007-2030)*
* Calculated from July 2006; includes 6-year transition and $73 Million exemption; volumes per DOR Fall 2005 Forecast with Oooguruk projection.
![Page 63: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/63.jpg)
63
* Calculated from July 2006; includes 6-year transition and $73 Million exemption; volumes per DOR Fall 2005 Forecast with Oooguruk projection.
EIA WTI Price Forecast: Fixed FY2007-2016 FY2007-2030Base Low High $40 Price Breakeven Breakeven
Average WTI Price in Real 2006 Dollars: $54.70 $35.40 $72.00 $40.00 - -
FY 2007-2016
Total 25/20 PPT Tax (Million 2006$) $19,769 $12,915 $27,126 $11,789 - -
Total Difference from 20/20 PPT Tax (Million 2006$) $4,497 $3,126 $5,969 $2,901 - -
Annual Average Difference from 20/20 PPT Tax (Million 2006$) $450 $313 $597 $290 - -
25/20 PPT Effective Tax Rate (Percent) 16.0% 13.6% 17.7% 13.6% - -
20/20 PPT Effective Tax Rate (Percent) 12.4% 10.3% 13.8% 10.2% - -
FY 2007-2030
Total 25/20 PPT Tax (Million 2006$) $37,840 $17,226 $57,193 $21,558 - -
Total Difference from 20/20 PPT Tax (Million 2006$) $8,584 $4,462 $12,455 $5,328 - -
Annual Average Difference from 20/20 PPT Tax (Million 2006$) $358 $186 $519 $222 - -
25/20 PPT Effective Tax Rate (Percent) 16.4% 11.7% 18.5% 13.3% - -
20/20 PPT Effective Tax Rate (Percent) 12.6% 8.7% 14.5% 10.0% - -
Difference in Projected Taxes Between a 25/20 and a 20/20 TaxDOR Forecast Production (FY 2007-2030)*
![Page 64: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/64.jpg)
64
* Calculated from July 2006; includes 6-year transition and $73 Million exemption; volumes per DOR Fall 2005 Forecast with Oooguruk projection.
Projected Government TakesDOR Forecast Production (FY 2007-2030)*
Total Government Take (Percent) Alaska Take (Percent)EIA WTI Price Forecast: Fixed EIA WTI Price Forecast: Fixed
Base Low High $40 Price Base Low High $40 PriceAverage WTI Price in
Real 2006 Dollars: $54.70 $35.40 $72.00 $40.00 $54.70 $35.40 $72.00 $40.00
FY 2007-2016
Status Quo 53.3% 55.0% 52.4% 55.5% 24.8% 26.9% 23.7% 27.2%
20/20 PPT 57.2% 57.6% 57.1% 58.2% 30.9% 30.9% 31.0% 31.5%
25/20 PPT 59.6% 59.9% 59.6% 60.6% 34.5% 34.5% 34.8% 35.1%
FY 2007-2030
Status Quo 51.9% 54.7% 50.8% 53.7% 23.4% 27.2% 22.0% 25.7%
20/20 PPT 56.9% 57.1% 56.9% 57.3% 31.2% 30.9% 31.3% 31.3%
25/20 PPT 59.3% 59.3% 59.3% 59.7% 34.9% 34.3% 35.2% 34.9%
![Page 65: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/65.jpg)
65
* Calculated from July 2006; $73 Million exemption; does not include transition; volumes per DOR Fall 2005 Forecast with Oooguruk projection.
Projected Annual Average Taxes at Various Tax Rates and PricesDOR Forecast Production (FY 2007-2030)*
Change PerChange Per % Increase% Increase in Credit
WTI Price 20/20 21/20 22/20 23/20 24/20 25/20 in Tax Rate Rate(Million 2006 Dollars)
(1) (2) (3) (4) (5) (6) (7) (8) (9)
FY 2007-2016
$40 $888.8 $946.8 $1,004.8 $1,062.8 $1,120.9 $1,178.9 $58.0 ($13.6)
$45 $1,149.5 $1,220.6 $1,291.6 $1,362.7 $1,433.7 $1,504.8 $71.1 ($13.6)
$50 $1,410.2 $1,494.3 $1,578.4 $1,662.5 $1,746.6 $1,830.7 $84.1 ($13.6)
$55 $1,671.0 $1,768.1 $1,865.2 $1,962.4 $2,059.5 $2,156.6 $97.1 ($13.6)
$60 $1,931.7 $2,041.9 $2,152.1 $2,262.2 $2,372.4 $2,482.6 $110.2 ($13.6)
Change PerDollar Increase $52.1 $54.8 $57.4 $60.0 $62.6 $65.2
in WTI Price
FY 2007-2030
$40 $676.3 $720.7 $765.1 $809.5 $853.9 $898.3 $44.4 ($10.6)
$45 $878.9 $933.5 $988.0 $1,042.5 $1,097.1 $1,151.6 $54.5 ($10.6)
$50 $1,081.6 $1,146.3 $1,211.0 $1,275.6 $1,340.3 $1,405.0 $64.7 ($10.6)
$55 $1,284.3 $1,359.1 $1,433.9 $1,508.7 $1,583.5 $1,658.3 $74.8 ($10.6)
$60 $1,487.0 $1,571.9 $1,656.8 $1,741.8 $1,826.7 $1,911.7 $84.9 ($10.6)
Change PerDollar Increase $40.5 $42.6 $44.6 $46.6 $48.6 $50.7
in WTI Price
![Page 66: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/66.jpg)
66
Effective Severance Tax Rates Over Time
0.0%
2.0%
4.0%
6.0%
8.0%
10.0%
12.0%
14.0%
16.0%19
77
1979
1981
1983
1985
1987
1989
1991
1993
1995
1997
1999
2001
2003
2005
2007
2009
2011
2013
2015
2017
2019
2021
2023
2025
2027
2029
(Effe
ctiv
e Ta
x Ra
te P
erce
nt)
Historical Projected Status Quo
1977-2005Average:
12.0%
FY 2007-2016Average:
6.3%
FY 2007-2030Average:
4.9%
Source: Historical: Alaska Department of Revenue.
![Page 67: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/67.jpg)
67
Effective Average Tax Rates at Various Price Levels(FY 2007-2016)
0%
5%
10%
15%
20%
25%
$20 $25 $30 $35 $40 $45 $50 $55 $60 $65 $70 $75
(WTI Price in $2006)
(Effe
ctiv
e Ta
x R
ate
Perc
ent)
AverageHistorical Rate
Source: Alaska Department of Revenue.
![Page 68: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/68.jpg)
68
Effective Average Tax Rates at Various Price Levels(FY 2007-2016)
0%
5%
10%
15%
20%
25%
$20 $25 $30 $35 $40 $45 $50 $55 $60 $65 $70 $75
(WTI Price in $2006)
(Effe
ctiv
e Ta
x R
ate
Perc
ent)
AverageHistorical Rate
ProjectedStatus Quo
Source: Historical: Alaska Department of Revenue.
![Page 69: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/69.jpg)
69
Effective Average Tax Rates at Various Price Levels(FY 2007-2016)
0%
5%
10%
15%
20%
25%
$20 $25 $30 $35 $40 $45 $50 $55 $60 $65 $70 $75
(WTI Price in $2006)
(Effe
ctiv
e Ta
x R
ate
Perc
ent)
AverageHistorical Rate
ProjectedStatus Quo
20/20 Tax*
* Calculated from July 2006; includes 6-year transition and $73 Million exemption; volumes per DOR Fall 2005 Forecast with Oooguruk projection.Source: Historical: Alaska Department of Revenue.
![Page 70: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/70.jpg)
70
Effective Average Tax Rates at Various Price Levels(FY 2007-2016)
0%
5%
10%
15%
20%
25%
$20 $25 $30 $35 $40 $45 $50 $55 $60 $65 $70 $75
(WTI Price in $2006)
(Effe
ctiv
e Ta
x R
ate
Perc
ent)
AverageHistorical Rate
ProjectedStatus Quo
20/20 Tax*
25/20 Tax*
* Calculated from July 2006; includes 6-year transition and $73 Million exemption; volumes per DOR Fall 2005 Forecast with Oooguruk projection.Source: Historical: Alaska Department of Revenue.
![Page 71: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/71.jpg)
71
Example of Tax with Sliding Scale
Assumptions: 0.25% per dollar over $45/barrel WTI (threshold);$55/barrel WTI price;$47/barrel ANS wellhead price;20/20 PPT.
Sliding Scale Tax in Addition to PPT, andDeductible Against PPT
If WTI is <= Threshold price (e.g., $45): No Additional Tax
If WTI is > Threshold price: Additional Tax Equals 0.25% PerDollar Over Threshold x Gross Wellhead Value
Additional Tax = (WTI Price - Threshold) x Increment Rate x ANS Wellhead Price x (1 - PPT Tax Rate)
= ($55 - $45) x 0.25% x $47 x (1 - 20%)= 2.5% x $47 x 80%= $0.94
![Page 72: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/72.jpg)
72
Effective Average Tax Rates at Various Price Levels(FY 2007-2016)
0%
5%
10%
15%
20%
25%
$20 $25 $30 $35 $40 $45 $50 $55 $60 $65 $70 $75
(WTI Price in $2006)
(Effe
ctiv
e Ta
x R
ate
Per
cent
)
AverageHistorical Rate
ProjectedStatus Quo
20/20 Tax*
25/20 Tax*
20/20 Tax*; $45Sliding Scale; 0.25%
* Calculated from July 2006; includes 6-year transition and $73 Million exemption; volumes per DOR Fall 2005 Forecast with Ooguruk projection.Source: Historical: Alaska Department of Revenue.
![Page 73: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/73.jpg)
73
Effective Average Tax Rates at Various Price Levels(FY 2007-2016)
0%
5%
10%
15%
20%
25%
$20 $25 $30 $35 $40 $45 $50 $55 $60 $65 $70 $75
(WTI Price in $2006)
(Effe
ctiv
e Ta
x R
ate
Per
cent
)
AverageHistorical Rate
ProjectedStatus Quo
20/20 Tax*
25/20 Tax*
20/20 Tax*; $45Sliding Scale; 0.25%
20/20 Tax*; $45Sliding Scale; 0.35%
* Calculated from July 2006; includes 6-year transition and $73 Million exemption; volumes per DOR Fall 2005 Forecast with Ooguruk projection.Source: Historical: Alaska Department of Revenue.
![Page 74: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/74.jpg)
74
Effective Average Tax Rates at Various Price Levels(FY 2007-2016)
0%
5%
10%
15%
20%
25%
$20 $25 $30 $35 $40 $45 $50 $55 $60 $65 $70 $75
(WTI Price in $2006)
(Effe
ctiv
e Ta
x R
ate
Per
cent
)
AverageHistorical Rate
ProjectedStatus Quo
20/20 Tax*
25/20 Tax*
20/20 Tax*; $45Sliding Scale; 0.25%
20/20 Tax*; $40Sliding Scale; 0.25%
20/20 Tax*; $45Sliding Scale; 0.35%
* Calculated from July 2006; includes 6-year transition and $73 Million exemption; volumes per DOR Fall 2005 Forecast with Ooguruk projection.Source: Historical: Alaska Department of Revenue.
![Page 75: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/75.jpg)
75
Effective Average Tax Rates at Various Price Levels(FY 2007-2030)
0%
5%
10%
15%
20%
25%
$20 $25 $30 $35 $40 $45 $50 $55 $60 $65 $70 $75
(WTI Price in $2006)
(Effe
ctiv
e Ta
x R
ate
Per
cent
)
AverageHistorical Rate
ProjectedStatus Quo
20/20 Tax*
25/20 Tax*
20/20 Tax*; $45Sliding Scale; 0.25%
20/20 Tax*; $40Sliding Scale; 0.25%
20/20 Tax*; $45Sliding Scale; 0.35%
* Calculated from July 2006; includes 6-year transition and $73 Million exemption; volumes per DOR Fall 2005 Forecast with Ooguruk projection.Source: Historical: Alaska Department of Revenue.
![Page 76: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/76.jpg)
76
* Calculated from July 2006; includes 6-year transition and $73 Million exemption; volumes per DOR Fall 2005 Forecast with Ooguruk projection.
Projected Effective Tax Rates with Sliding Scale TaxDOR Forecast Production (FY 2007-2030)*
20/20 with Sliding Scale Tax$35 Threshold Price $40 Threshold Price
Status 0.20% 0.25% 0.30% 0.35% 0.20% 0.25% 0.30% 0.35%WTI Price Quo 20/20 Increment Increment Increment Increment Increment Increment Increment Increment($ 2006) (Percent)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
$30 4.9% 5.8% 5.8% 5.8% 5.8% 5.8% 5.8% 5.8% 5.8% 5.8%
$40 4.9% 10.0% 10.8% 11.0% 11.2% 11.4% 10.0% 10.0% 10.0% 10.0%
$50 4.9% 11.9% 14.3% 14.9% 15.5% 16.1% 13.5% 13.9% 14.3% 14.7%
$60 4.9% 13.4% 17.4% 18.4% 19.4% 20.4% 16.6% 17.4% 18.2% 19.0%
$70 4.8% 14.5% 20.1% 21.5% 22.9% 24.3% 19.3% 20.5% 21.7% 22.9%
$80 4.8% 15.2% 22.4% 24.2% 26.0% 27.8% 21.6% 23.2% 24.8% 26.4%
20/20 with Sliding Scale Tax$45 Threshold Price $50 Threshold Price
0.20% 0.25% 0.30% 0.35% 0.20% 0.25% 0.30% 0.35%WTI Price 25/20 Increment Increment Increment Increment Increment Increment Increment Increment($ 2006) (Percent)
(11) (12) (13) (14) (15) (16) (17) (18) (19)
$30 8.3% 5.8% 5.8% 5.8% 5.8% 5.8% 5.8% 5.8% 5.8%
$40 13.3% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0%
$50 15.5% 12.7% 12.9% 13.1% 13.3% 11.9% 11.9% 11.9% 11.9%
$60 17.3% 15.8% 16.4% 17.0% 17.6% 15.0% 15.4% 15.8% 16.2%
$70 18.5% 18.5% 19.5% 20.5% 21.5% 17.7% 18.5% 19.3% 20.1%
$80 19.4% 20.8% 22.2% 23.6% 25.0% 20.0% 21.2% 22.4% 23.6%
![Page 77: PRESENTATION ON ALASKA PPT · Analysis of PPT Barry Pulliam Dr. Tony Finizza Suite 1170 1215 K Street Sacramento, California 95814 916 449 2860 Suite 2825 Three Allen Center 333 Clay](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f0703de7e708231d41adf6d/html5/thumbnails/77.jpg)
77
* Calculated from July 2006; includes 6-year transition and $73 Million exemption; volumes per DOR Fall 2005 Forecast with Ooguruk projection.
Projected Government Takes with Sliding Scale TaxDOR Forecast Production (FY 2007-2030)*
20/20 with Sliding Scale Tax$35 Threshold Price $40 Threshold Price
Status 0.20% 0.25% 0.30% 0.35% 0.20% 0.25% 0.30% 0.35%WTI Price Quo 20/20 Increment Increment Increment Increment Increment Increment Increment Increment($ 2006) (Percent)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
$30 57.0% 57.7% 57.7% 57.7% 57.7% 57.7% 57.7% 57.7% 57.7% 57.7%
$40 53.7% 57.3% 57.9% 58.0% 58.2% 58.3% 57.3% 57.3% 57.3% 57.3%
$50 52.3% 56.9% 58.5% 58.9% 59.3% 59.7% 58.0% 58.2% 58.5% 58.7%
$60 51.5% 56.9% 59.4% 60.0% 60.7% 61.3% 58.9% 59.4% 59.9% 60.4%
$70 50.9% 56.9% 60.3% 61.2% 62.0% 62.9% 59.8% 60.6% 61.3% 62.0%
$80 50.6% 56.9% 61.2% 62.3% 63.4% 64.5% 60.7% 61.7% 62.7% 63.6%
20/20 with Sliding Scale Tax$45 Threshold Price $50 Threshold Price
0.20% 0.25% 0.30% 0.35% 0.20% 0.25% 0.30% 0.35%WTI Price 25/20 Increment Increment Increment Increment Increment Increment Increment Increment($ 2006) (Percent)
(11) (12) (13) (14) (15) (16) (17) (18) (19)
$30 59.7% 57.7% 57.7% 57.7% 57.7% 57.7% 57.7% 57.7% 57.7%
$40 59.7% 57.3% 57.3% 57.3% 57.3% 57.3% 57.3% 57.3% 57.3%
$50 59.3% 57.4% 57.6% 57.7% 57.8% 56.9% 56.9% 56.9% 56.9%
$60 59.3% 58.4% 58.8% 59.2% 59.5% 57.9% 58.1% 58.4% 58.7%
$70 59.3% 59.3% 59.9% 60.6% 61.2% 58.8% 59.3% 59.8% 60.3%
$80 59.4% 60.2% 61.1% 61.9% 62.8% 59.8% 60.5% 61.2% 61.9%