presentation of investment potential of astana

26
“Investment potential of Astana city” Administration of the Special Economic Zone “Astana – new city”

Upload: alzhan-nurtaza

Post on 23-Jun-2015

251 views

Category:

Business


0 download

DESCRIPTION

Presentation of investment potential of Astana

TRANSCRIPT

Page 1: Presentation of investment potential of Astana

“Investment potential of Astana city”

Administration of the Special Economic Zone

“Astana – new city”

Page 2: Presentation of investment potential of Astana

Republic of Kazakhstan

Since Kazakhstan has acquired independence, the main focus was to work on the creation of a favorable investment climate and with the

positive dynamics of growth. Kazakhstan ranks first among the countries of Central Asia and one of the leaders of CIS countries to provide the

most favorable conditions for investment activities.

Page 3: Presentation of investment potential of Astana

Doing business 2014

Indicator Rank

property registration 18

Obtaining a building permit 145

Simplification of procedures for the payment of

taxes13

Protecting Investors 22

Starting a Business 47

closing a business 48

Country Ease of Doing

Business Rank

Singapore 1

USA 4

Switzerland 29

UAE 23

Kazakhstan 77

Czech Republic 75

China 96

Russia 95

Ukraine 112

Page 4: Presentation of investment potential of Astana

Why Astana? (Big Five)

1. Favorable investment climate in the country

2. Customs union with Russia and Belarus

3. The dynamic growth of the city's economy

4. The special economic zone "Astana-New City“

5. Service support for investors

Page 5: Presentation of investment potential of Astana

Indicators of Astana

2005 2007 2010 2013 2014

529574

697

808841

Gross regional product (GRP) of the capital has grown by24 times since 2000 (21,3 billion US dollars).

GRP in per capita – by 14,5 times ($26,8 thousand per person).

Since 2008 trade participation in GRP has grown from 20% to 25,6%

Investments in fixed assets in 2013 amounted to 3.6 billion US dollars.

Average monthly income in 2014 amounted to 940 dollars

thousand people

Page 6: Presentation of investment potential of Astana

SamaraUfa

Yekaterinburg Omsk

Novosibirsk

Astana

Chelyabinsk

Astana is the gateway to the customs union

Ability to serve cities with population over 1 million people from Astana

The total volume of GDP- 2.7 trillion USD Total population - 170 MM people

Page 7: Presentation of investment potential of Astana

Worldwide investors in Astana

Page 8: Presentation of investment potential of Astana

Priority areas for investors

• Industrial production

• Business in construction

• Field of PPP

• High technology sector

Page 9: Presentation of investment potential of Astana

State Program of Forced Industrial-Innovative Development of Kazakhstan

Investor 2020

Business Road Map 2020

Productivity 2020

Export 2020

LEGISLATION ABOUT THE CONCESSIONS

Investment preferences :

Exemption from customs duties

Tax breaks for 10 years

LAW OF THE REPUBLIC OF KAZAKHSTAN ON INVESTMENTS

industrial benefits

Government land grants

long-term contract

Government concession liabilities are not subject to sequestration

Providing the land for the term of the concession on the terms of land use

The possibility of government support measures and sources of reimbursement to the concessionaire by the state (charge for the availability) Recourse to international arbitration

Page 10: Presentation of investment potential of Astana

Special economic zone “Astana – new city”

Total area: 7634, 71 ha.

SEZ “Astana – new city”

Industrial park №1

Industrial park №2

Area: 6603, 51 ha.

Area: 598, 1 ha. Area: 433, 1 ha.

Page 11: Presentation of investment potential of Astana

Preferences in the territory of the new business and administrative center

Tax and customs obligationson the territory of Republic of

Kazakhstan On the territory of SEZ

Corporate income tax 20%

0Property Tax 1,5%

Land tax from 0,12 USD per Sq.m.

The fee for use of the land from 0,16 USD per Sq.m.

Refund of excess value added tax on goods

12%

Customs duties and VAT on imports 5-20%

Page 12: Presentation of investment potential of Astana

Preferential treatment of the Industrial ParkPriority activities Privilege Rate

1) production of other nonmetallic mineral products;2) production of machinery and equipment;3) production of household electric appliances;4) production of rubber and plastic products;5) chemical industry; 6) metallurgic industry; 7) production of electric equipment, including

electric lighting equipment;8) production of glass components for lighting

equipment;9) food production;10) production of wood mass and cellulose, paper and

carton;11) production of furniture;12) production of vehicles, trailers and semitrailers;13) production of railroad locomotives and rolling

stock;14) production of avian- and spacecraft;15) production of basic pharmaceutical products and

equipment;16) production of electronic parts.

Exemption from customs collection at import of goods, materials and equipment, used in the process of construction

0%

Decrease of calculated corporate income tax for 100% 0%

Application of 0 rate at average annual cost of taxation objects at calculation of property tax

0%

Application of 0% index to correspondent rates at calculation of land tax 0%

Index 0 to correspondent rates at calculation of cost for land usage in term, stated in contract of temporary payable land usage (rent) but no more than 10 years from the date of provision of land plots to the right of temporary payable land use (rent ) *

0%

Page 13: Presentation of investment potential of Astana

13

Industrial park project

49 projects worth $ 1.18 billion. USD

17 under construction

19 running 6, at the design stage

7 at the stage of registration of land

6

8

23

35

8

3

5

6engineeringmetallurgicalchemicalelectricspharmaceuticslogisticsBuilding Industryfoodmanufacture of furnitureother

According to the degree of readiness

by industry

Page 14: Presentation of investment potential of Astana

Successfully implemented projects at the Industrial Park

General Electric (USA)Production of diesel locomotivesInvestment in the project: 117mln. USDNumber of employees: 1 045

ALSTOM (France)Production of electric locomotivesInvestment in the project: 61 million USDNumber of employees: 65

“Eurocopter Kazakhstan Engineering” helicopter production, on the basis of the Framework Agreement between “NK Kazakhstan Engineering” JSC and EUROCOPTER (France / Germany), as of October 27, 2010.

Talgo (Spain)Production of train coaches Project investments: US$58 mln. Number of employees: 131

Page 15: Presentation of investment potential of Astana

Service support for investors

Full support of investors in pre-investment, active and

post-investment stages (“one-stop one-shop”

principle)

Service support (consultancy in preparing a feasibility study, Business - plan and others.)

Carrying out investment activities Promotion of brand Astana abroad

INVESTORS SERVICE CENTRE

Page 16: Presentation of investment potential of Astana

JSC “Astana Innovations” is the operator of the project of “SMART Astana”

SMART ASTANA - IS TO ENSURE A HIGH QUALITY OF LIFE THROUGH THE USE OF NEW TECHNOLOGIES AND COST-EFFECTIVE, ENVIRONMENTALLY FRIENDLY USE OF URBAN SYSTEMS OF LIFE, PROVIDING A PLATFORM FOR INNOVATION IN THE CAPITAL.

Our proposed development goal: a comfortable, efficient, competitive city and “smart” way of life for residents and guests of Astana, the effective management of the city

Priority areas for development within the SMART ASTANA

Education: 80% increase in the level of satisfaction of parents, students, employers, taking into account the quality of education

Healthcare: 100% - the share of health care organizations that are connected to a single network health

Ecology: 30% reduction in pollution

Tourism: 20% increase in inbound tourism

Culture: 80% - the degree of customer satisfaction with quality of services sphere of culture

Page 17: Presentation of investment potential of Astana

Astana ЕХPO – 2017 «Future – energy»

• Expected number of visitors - 5.1 MM visitors;

• Duration of the exhibition - 3 months;

• It will bring together 100 countries and about 10 international organizations;

• Holding such a big event is the new big impetus to small and medium size

businesses.

Page 18: Presentation of investment potential of Astana

Concessionary projects of Astana

WORK IS UNDERWAY TO EXPAND THE LIST OF PROJECTS IN THE SOCIAL SPHERE AND THE SPHERE OF

HOUSING AND COMMUNAL SERVICES

projects Expected investment

Construction and operation of 2-autoparkings ~ 25 MM USD per parking

Construction and operation of 2 bus stations ~ 28 MM USD per station

Construction and operation of the complex of 4 kindergartens

~ 4 MM USD per kindergarten

Construction and operation of the urban clinics ~ 6 MM USD for each clinic

Construction and operation of 3 outpatient clinics ~ 5 MM USD for one ambulance

Page 19: Presentation of investment potential of Astana

Projects by the scheme of public - private partnership in the field of transportation infrastructure of Astana city

Page 20: Presentation of investment potential of Astana

Construction and operation of two parking lots

Purpose and idea of the project: reduction of the deficit of parking spaces and improvement the quality of services to provide parking spaces in the administrative center of the capital

Applicant: Department of passenger transport and highways of Astana city

Period of concession: 2015-2045

Capacity: 472 - 568 parking spaces in each section of parking

Investments during the construction: 11,5 to 13,1 million USD for each parking lot

Estimated types and amount of state support: compensation for investment costs at ~ 100% of the cost of construction during the 12 years

Current status: All the documents have been prepared. Competition procedures are in the process.

Page 21: Presentation of investment potential of Astana

Construction and operation of two bus stations

The Purpose and Idea of the project: is to improve the quality of services on international and long-distance transportation for the population of the capital

Applicant: Department of passenger transportation and highways in Astana

Concession period: 2015-2045

Capacity: 4 500 passengers per day

Investments during the construction: from 28 million to 32,5 million USD for each bus station

Estimated types and amount of state support: compensation for investment costs at ~ 100% of the cost of construction during the 11 years

Current status: All the documents have been prepared. Competition procedures are in the process.

Page 22: Presentation of investment potential of Astana

Projects of public – private partnership in the field of education in the city of Astana

Page 23: Presentation of investment potential of Astana

Construction and operation of 4 kindergartens

The purpose and idea of the project: reduction of demand for kindergartens in the capital of Kazakhstan

Applicant: Department of Education of Astana city

Implementation Period: 2015-2035

Capacity: 240 seats in each kindergarten

Investments during the construction: ~ 16 million USD for each kindergarten

Current Status: under the development of the financial model of the project

Page 24: Presentation of investment potential of Astana

Projects of public - private partnership in the field of health service in Astana

Page 25: Presentation of investment potential of Astana

Construction and operation of ambulances and of three outpatient clinics in Astana

Purpose of Project: Development of primary health care and maintenance of the population with high-tech medical care and improvement of public health

Applicant: Department of Health Service of Astana city

Concession Period: 2015-2035

Investments during the construction – 5,4- 6,2 million USD

Estimated types and amount of state support:   - Compensation of 100% of the investment costs for the construction of the object   - reward for management of implementation

Capacity - 150 to 250 visits per shift 10 to 40 thousand population will be served.

Method of financing Med. Services will be paid by government (every month $ 4.5 per person)Current Status: under the development of the financial model of the project

Page 26: Presentation of investment potential of Astana

Republic of Kazakhstan

010000, Astana city, 13 Dostyk St.

Tel. + 7 (7172) 578 986

Tel. + 7 (7172) 578 987

E-mail: [email protected]

www.investinAstana.kz