At Lower Cost Dr. Yves El Mallat

Upload: dr-yves-yazid-el-mallat

Post on 13-Aug-2015

22 views

Category:

Documents


0 download

TRANSCRIPT

Page 2: Presentation Nairobi shrinked
Page 3: Presentation Nairobi shrinked
Page 4: Presentation Nairobi shrinked
Page 5: Presentation Nairobi shrinked

Particular Wage Rate/Day

US$

Productivity

MT.W.S/Lab/Day Labor Cost US$/MT/Day

Refinery A 16 5 3.2

Refinery B 18 7 2.6

0.6 US$

Page 6: Presentation Nairobi shrinked
Page 7: Presentation Nairobi shrinked
Page 8: Presentation Nairobi shrinked
Page 10: Presentation Nairobi shrinked
Page 11: Presentation Nairobi shrinked
Page 12: Presentation Nairobi shrinked
Page 13: Presentation Nairobi shrinked
Page 14: Presentation Nairobi shrinked
Page 15: Presentation Nairobi shrinked
Page 16: Presentation Nairobi shrinked
Page 17: Presentation Nairobi shrinked
Page 18: Presentation Nairobi shrinked
Page 19: Presentation Nairobi shrinked
Page 20: Presentation Nairobi shrinked

The major cost component in any sugar refinery resides

in the raw sugar purchase cost, which could exceed 88 % (Raw sugar melted) of the white sugar produced at Ex-factory cost.

Page 21: Presentation Nairobi shrinked

Particulars %

Raw Sugar Melted 88.3%

Labor Cost 3.4%

Energy (Khuff Gas) 2.9%

Packing Cost 2.4%

Chemicals Cost 1.3%

Factory Overheads 1.25%

Repair & Maintenance 0.3%

Other Utilities 0.15%

White Sugar Ex-Factory Cost 100%

97%

Page 22: Presentation Nairobi shrinked

0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00% 70.00% 80.00% 90.00% 100.00%

Raw Sugar Melted

Labor Cost

Energy (Khuff Gas)

Packing Cost

Chemicals Cost

Factory Overheads

Repair & Maintenance

Other Utilities

White Sugar Refining Cost Components

Page 23: Presentation Nairobi shrinked

Raw sugar hedging is when a company

offsets risks arising out of fluctuations in raw

sugar prices.

Page 24: Presentation Nairobi shrinked
Page 25: Presentation Nairobi shrinked

Industrial Engineering joins

people, machines and the

organization to achieve

greater productivity.

Page 26: Presentation Nairobi shrinked
Page 27: Presentation Nairobi shrinked
Page 28: Presentation Nairobi shrinked
Page 29: Presentation Nairobi shrinked
Page 30: Presentation Nairobi shrinked

Advanced Technology

Gasketed Plate

Heat Exchangers

Page 31: Presentation Nairobi shrinked
Page 32: Presentation Nairobi shrinked
Page 33: Presentation Nairobi shrinked
Page 34: Presentation Nairobi shrinked

Installation of state-of-the-art sugar packaging equipment comes with

accompanying promise of faster speed coupled with reduced labor, giveaway,

and packaging material waste.

All other packaging cost components are manageable by the means of supply

price negotiations and wastage control.

Page 35: Presentation Nairobi shrinked
Page 36: Presentation Nairobi shrinked
Page 37: Presentation Nairobi shrinked
Page 38: Presentation Nairobi shrinked
Page 39: Presentation Nairobi shrinked

39

Page 40: Presentation Nairobi shrinked

40 Countries with a low productivity increase are

among the poorest of the planet.