presentation from december 12, 2000 dinner meeting

Upload: incosewma

Post on 30-May-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    1/26

    R.C. Zittel 1

    Sim

    ulationBasedAcquisition

    AnEmerging

    Reality

    Augmented Unmanned Ground Vehicle

    (AUGV)12-week Systems Engineering Exercise

    C O N T R A C T

    C O N T R A C T

    US Govt

    Augmented Unmanned Ground Vehicle

    Simulation-Based AcquisitionAcquisition An Emerging Reality

    Simulation-Based AcquisitionAcquisition An Emerging Reality

    INCOSE Washington Metropolitan Area Chapter December 12, 2000

    Mr. Randy ZittelSystems Engineering Department

    Defense Systems Management College703-805-5267 [email protected]

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    2/26

    R.C. Zittel 2

    Sim

    ulationBasedAcquisition

    AnEmerging

    Reality

    1996 - Virtual Prototyping: A Powerhouse For Integrated Product & Process Development

    1997 - IPPD Powerhouse: Modeling & Simulation

    1998 - Simulation, IPPD & Systems Engineering:To The Next Level

    1999 - Collaborative Based SystemsSystems Engineeringor Collaborative Based AcquisitionCollaborative Based Acquisition

    2000 - INCOSE Symposium: SBA Tutorial (Jim2000 - INCOSE Symposium: SBA Tutorial (JimHollenbach & OlsenHollenbach & Olsen

    2001 - 2001 - Simulation-Based AcquisitionAcquisition - An Emerging An Emerging Reality Reality

    1996 - Virtual Prototyping: A Powerhouse For Integrated Product & Process Development

    1997 - IPPD Powerhouse: Modeling & Simulation

    1998 - Simulation, IPPD & Systems Engineering:To The Next Level

    1999 - Collaborative Based SystemsSystems Engineeringor Collaborative Based AcquisitionCollaborative Based Acquisition

    2000 - INCOSE Symposium: SBA Tutorial (Jim2000 - INCOSE Symposium: SBA Tutorial (JimHollenbach & OlsenHollenbach & Olsen

    2001 - 2001 - Simulation-Based AcquisitionAcquisition - An Emerging An Emerging Reality Reality

    The Evolving Saga . . . .The Evolving Saga . . . .

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    3/26

    Programs ExploringThe Way in SBA...

    Programs ExploringThe Way in SBA...

    Adaptive ModelingLanguage Knowledge-

    Based Engineering

    SBA Pilot &Integrated

    ModelManagement

    Process

    IntegratedSimulation

    Cycle

    SBA Pilot Program& 150 Sims & IDE

    Colocated IntegratedDigital Environment

    & Sim Interoperability

    Smart ProductModel

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    4/26

    R.C. Zittel 4

    Sim

    ulationBasedAcquisition

    AnEmerging

    Reality

    Extensive Re-use Within Phases and Across Acquisition Programs

    CG47

    DD963

    DDG51

    CG47

    DD963DDG51

    PLATSIG/

    KINE

    C2

    C OM M S D AT AFUSION

    SENS1SENS2

    SENS3

    SENS4

    DRIVERS

    ConceptEx

    ploration&Definition

    Demonstration/

    Validation

    EngineeringManufacturing&Development

    Production&

    Deployment

    Upgrade

    andReplace

    nt

    PHASE

    Functional Design

    MNS

    ORDSYSTEM

    CONCEPTS

    Top Level SystemRequirements Physical & Info

    System (HW/SW) Design

    Cost, Schedule &Program Mgmt

    1000

    100

    10

    MGMT

    JanApr Jul Oct

    ADVANCED COMBAT SYSTEMS

    ADVANCED PLATFORMS

    ADVANCED SENSORS AND WEAPONS

    REQ

    SPECLo gical St ru ct ur al / HM E

    CONCEPTUAL

    System InfoRepository

    REQSPEC

    LogicalStructural /HME

    CONCEPTUAL

    System InfoRepository

    REQSPEC

    LogicalStructural /HME

    CONCEPTUAL

    System InfoRepository

    Dist InfoRepository

    Distributed SimulationFramework

    Eng Development& Manufacturing

    Operations,Logistics& Training

    Conceptual Development

    Test & Eval

    Simulation-Based Acquisition

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    5/26

    Sim

    ulationBasedAcquisition

    AnEmerging

    Reality

    SIMULATION-BASED ACQUISITION (SBA)

    SIMULATION-BASED ACQUISITION (SBA)

    to have an Acquisition Process inwhich DoD and Industry are enabled byrobust, collaborative use of simulationtechnology that is integrated acrossacquisition phases and programs .

    Vision

    Substantially reduce the time, resources and risk associatedwith the entire acquisition process;

    Increase the quality, military worth and supportability of fielded systems, while reducing their operating andsustaining costs throughout the total life cycle ;

    Enable Integrated Product and Process Development (IPPD)across the entire acquisition life cycle .

    Goals

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    6/26

    R.C. Zittel 6

    Sim

    ulationBasedAcquisition

    AnEmerging

    Reality

    DoD Principles of Simulation-Based Acquisition

    DoD Principles of Simulation-Based Acquisition

    Advanced information technology applications.

    Comprehensive functional assessments, i.e. design, support,manufacturing, achieving reduced risk and more informed decisions

    Early optimization of system performance vs. total ownership cost.

    Total ownership cost minimization thru standards-based reuse of

    information and software. More optimal program investments enabled by system of systemsmission area assessments.

    Enduring collaborative environments with reusable, interoperable

    tools and supporting resources Automated near-real-time sharing of relevant information among allpersonnel, [ distributed product description ] thru a common technicalarchitecture; and open, commercial, data interchange standards.

    Advanced information technology applications.

    Comprehensive functional assessments, i.e. design, support,manufacturing, achieving reduced risk and more informed decisions

    Early optimization of system performance vs. total ownership cost.

    Total ownership cost minimization thru standards-based reuse of

    information and software. More optimal program investments enabled by system of systemsmission area assessments.

    Enduring collaborative environments with reusable, interoperabletools and supporting resources

    Automated near-real-time sharing of relevant information among allpersonnel, [ distributed product description ] thru a common technicalarchitecture; and open, commercial, data interchange standards.

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    7/26R.C. Zittel 7

    Sim

    ulationBasedAcquisition

    AnEmerging

    Reality

    The Advanced Program Management Courseis required by Congress for all DoD PMs

    DJJ F M A M J A S O NJJ F M A M J A S O N D JJ F M A M J A S O N D

    APMC

    CY2000 CY2001 CY2002

    APMC APMC APMC 352

    302 302

    352

    6 WKS

    8 WKSAPMCAPMC

    Management PrinciplesDod Policy Business Finance

    Software Contract Finance Earned ValueContracting Funds Mgt Logistics Manufacturing

    Systems Engineering Test & Evaluation

    The Systems Engineering Curriculum is spread across 12 weeks

    1 2 3 4 5 6 Weeks 8 9 10 11 12

    14-Week Program Management Coursescovering all elements of DoD acquisition

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    8/26R.C. Zittel 8

    Sim

    ulationBasedAcquisition

    AnEmerging

    Reality

    Systems Engineering ProcessSystems Engineering Process

    RequirementsAnalysis

    Functional Analysis/Allocation

    Synthesis

    System Analysisand Control(Balance)

    P

    ROCESS

    INPUT

    PROCESS OUTPUT

    RequirementsLoop

    DesignLoopVerification

    Loop

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    9/26R.C. Zittel 9

    Sim

    ulationBasedAcquisition

    AnEmerging

    Reality

    Systems Engineering - Sunrise to SunsetSystems Engineering - Sunrise to Sunset

    REQUIREMENTSPLANNING

    DESIGNFAB

    &TEST

    EVERYTEAM

    C O N T R A C T

    C O N T R A C T

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    10/26

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    11/26R.C. Zittel 11

    Sim

    ulationBasedAcquisition

    AnEmerging

    Reality

    The Systems Engineering Curriculum is spread across 12 weeks

    REQUIREMENTS & PLANNING DESIGN FAB & TEST

    IBR

    DESIGNAUGV

    C O N T R A C T

    C O N T R A C T

    RISKPLAN

    TPMPLAN

    ITEMPERFSPEC

    SCHEDULE

    CMPLAN

    S Y S T E M S P E

    C

    PROGRAMPLAN ITR

    SFR

    SRR

    ORGANIZEI P T

    RESOURCESPLAN

    The 12-week Systems Engineering Curriculum

    1 2 3 4 5 6 Weeks 8 9 10 11 12

    Bidders

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    12/26R.C. Zittel 12

    Sim

    ulationBased

    Acquisition

    AnEmerging

    Reality

    Mine Detection

    Lost CommunicationsVehicle Recovery Assembly Obstacle Avoidance

    System Design, Lifecycle Concerns,System Design, Lifecycle Concerns,Software Design and Operational TestingSoftware Design and Operational Testing

    System Design, Lifecycle Concerns,System Design, Lifecycle Concerns,Software Design and Operational TestingSoftware Design and Operational Testing

    Object OrientedDesign Programming

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    13/26R.C. Zittel 13

    Sim

    ulationBased

    Acquisition

    AnEmerging

    Reality

    AUGV - 80 sec

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    14/26R.C. Zittel 14

    Sim

    ulationBased

    Acquisition

    AnEmerging

    Reality

    System Level Trades

    Select System LevelTrade Option

    Material Selection

    For structural pieces,

    use the drop downmenu to select thematerial.

    Changing Model Type

    Use this button tochange the type model

    CAD/CAM - LCC - Unit Cost - Virtual TestingCAD/CAM - LCC - Unit Cost - Virtual Testing

    Development Cost

    Calculate developmentcost from EV hours.

    Transmission Options

    Wheel/gear options

    Intermediate Gear

    Use the intermediategear only if there are twodifferent gear sizesattached together (such as the differential)so that they turn at thesame rate and are placed

    between the motor andwheel gears.

    Drive and Wheel Gears

    Use the drop downmenus to select gearsattached to the motor

    and drive axle.

    Performance Outputs

    Outputs

    Checking Performance

    Use this button to change performance parameters.

    Look for costdrivers andattempt to reduce.

    Drive Motor OverhaulRate

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    15/26R.C. Zittel 15

    Sim

    ulationBased

    Acquisition

    AnEmerging

    Reality

    AUGV Technical PerformanceMeasurements (TMPs)

    AUGV Technical PerformanceMeasurements (TMPs)

    $7,000$8,000$9,000$10,000

    $11,000$12,000$13,000$14,000$15,000$16,000

    Milestones

    U n

    i t C o s t

    Predicted 15000 15000 12000 10000

    Actual 15000 7232 8232 8639

    Line 3 Award SFR Fnl Tst ITR

    11-Sep-00 7-Nov-00 20-Nov-00 1-Dec-00Goal

    Threshold80%

    100%

    Milestones

    M i n e

    D e

    t e c t

    i o n

    A l a r m

    5 0 % C o n

    f i d e n c e

    Predicted 0.85 0.85 0.92 0.97

    Actual 0.85 0.95 0.95 0.98

    Line 3 Award SFR Fnl Tst ITR

    11-Sep-00

    7-Nov-00 21-Nov-00 1-Dec-00

    Goal = 99%

    Threshold

    70%

    Milestones

    M i n e A v o

    i d a n c e

    5 0 % C o n

    f i d e c e

    Predicted 0.72 0.72 0.9 0.95

    Actual 0.72 0.72 0.95 0.97

    Line 3 Award SFR Fnl Tst ITR

    11-Sep-00

    7-Nov-00 21-Nov-00 1-Dec-00

    Goal = 97%

    Threshold =86% ft

    1 ft2 ft

    3 ft4 ft5 ft6 ft

    Milestones

    L o s t

    C o m

    m ' s M a n e u v e r

    D i s t a n c e

    t o T a r g e

    t

    Predicted 5 5 3 2

    Actual 5 3 2 1

    Line 3 Award SFR Fnl Tst ITR

    11-Sep-00

    7-Nov-00 24-Nov-00 1-Dec-00

    Goal

    Threshold

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    16/26

    Mine Detection & Avoidance Reference NomographMine Detection & Avoidance Reference Nomograph

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    17/26R.C. Zittel 17

    Sim

    ulationBased

    Acquisition

    AnEmerging

    Reality

    LABOR HOURS ACCOUNTABILITYLABOR HOURS ACCOUNTABILITY

    W B S D e s c r i p t i o nL a b o r E V

    C o d e1 2 3 4 C a t $ / H rT e c h B C W S B C W P A C W P B C W S B C W P A C W P B C1 0 0 0A U G V S Y S T E M ( B C W S D o l l a r s ) 1 7 0 5 5 1 7 0 5 5 1 7 1 7 1 . 2 59 4 7 5 9 4 7 5 8 1 6 7 . 53 4 8 2 3 . 7 53 6 2 3 3 . 7 56 7 51 0 0 0A U G V S Y S T E M ( B C W S h o u r s )1 8 1 . 1 4 7 . 4 5 4 7 . 4 5 4 7 . 9 2 5 2 5 2 1 . 8 9 0 . 4 9 3 . 2

    1 1 0 0 A U G V V E H I C L EE n g 4 5 0% 1 2 . 1 1 2 . 1 1 2 . 1 7 7 7 2 8 2 9 . 5 3 0 .

    1 2 0 0 P r o g ra m M a n a g e m e n tP M 3 7 5 L O E 4 . 6 4 . 6 4 . 6 1 . 7 5 1 . 7 5 1 5 . 7 5 6

    1 3 0 0 T E S T & E V A L U A T I O ND T 5 0 0 % 3 . 7 3 . 7 3 . 7 4 4 2 8 . 2 8 . 5 1 0

    1 4 0 0 T R A I N I N G P S 2 7 5 % 1 . 1 1 . 1 1 . 2 5 1 1 1 1 1 . 2 1 1 . 2 1

    1 5 0 0 D a t a D a t a 2 0 0 % 3 . 7 5 3 . 7 5 3 . 7 5 1 . 5 1 . 5 1 3 3 . 5

    1 6 0 0 M a n u f a c t u r in g & P r o d u c i b i li t yM fg 3 5 0 % 7 7 7 3 3 2 . 8 1 6 1 6 1 6

    1 7 0 0 L o g i s t i c S u p p o r t a b i l i t yP S 2 7 5 % 4 . 5 4 . 5 4 . 5 2 . 2 5 2 . 2 5 2 . 5 6 . 7 5 6 . 7 5

    1 8 0 0 S y s E n g & I n t e g r a t i o nM fg 3 5 0 % 7 . 7 7 . 7 7 . 8 3 . 5 3 . 5 4 9 . 5 9 . 7 5

    1 9 0 0 C O D a t a 2 0 0 L O E 3 3 3 . 2 1 1 0 . 5 2 2 2

    6 6 , 9$

    IL e v e T h r u I B R I B R to S F R S F R t o I T

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    18/26R.C. Zittel 18

    Sim

    ulationBased

    Acquisition

    AnEmerging

    Reality

    Spoof2 - 60 secSpoof2 - 60 sec

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    19/26R.C. Zittel 19

    Sim

    ulationBased

    Acquisition

    AnEmerging

    Reality

    The Advanced Program Management Courseis required by Congress for all DoD PMs

    DJJ F M A M J A S O NJJ F M A M J A S O N D JJ F M A M J A S O N D

    APMC

    CY 2000 CY 2001 CY 2002

    APMC APMC APMC 352

    302 302

    3528 WKS

    APMCAPMC

    Management PrinciplesDod Policy Business Finance Contract Finance

    Earned Value Contracting Funds Mgt LogisticsManufacturing Software Systems Engineering Test & Evaluation

    The Systems Engineering Curriculum is spread across 12 weeks

    1 2 3 4 5 6 Weeks 8 9 10 11 12

    DCMA DCMA

    14-Week Program Management Coursescovering all elements of DoD acquisition 6 WKS

    The Systems Engineering Development Exercise is spread across 5 days.

    1 2 3 Days 45

    Focused5-day SE Exercise

    based on the Lego MindstormExercise to educate DCMA personnel

    The 10-day Advanced Systems Engineering Course.

    Developing

    4-hour SE Exercisebased on the Lego Exerciseto educate DoD Systems Engineers

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    20/26R.C. Zittel 20

    Sim

    ulationBased

    Acquisition

    AnEmerging

    Reality

    In closing,In closing,

    Simulation-Based Acquisition is:

    the Integrated Use of Simulations and Information On an Integrated / Networked Information System

    (DoD mandates an Integrated Digital Environment)

    Enabling Integrated Product & Process Development

    Simulation-Based Acquisition is: the DoD initiative to accelerate acquisition

    DSMC is utilizing SBA to expand its SE education

    ALL DSMC courses are open to industry (formal agreementwith CODSIA)

    Any company is eligible; tuition-free!

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    21/26

    R.C. Zittel 21

    Sim

    ulationBased

    Acquisition

    AnEmerging

    Reality

    Tis the week before ChristmasTis the week before Christmas

    My apologies toMy apologies to'Twas the Night Before Christmas

    by Clement Clarke Moore

    (1779-1863)

    Tis the week before ChristmasTis the week before Christmas

    My apologies toMy apologies to'Twas the Night Before Christmas

    by Clement Clarke Moore

    (1779-1863)

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    22/26

    R.C. Zittel 22

    Sim

    ulationBased

    Acquisition

    AnEmerging

    Reality

    Merry Christmas to all

    Happy Hanukkah, too

    This presentations done, my satire too

    Merry Christmas to all

    Happy Hanukkah, too

    This presentations done, my satire too

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    23/26

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    24/26

    Http://center.dsmc.dsm.mil

    High SpeedPortals/Gate-

    ways, WebLearningModules,DSMC/DAUCourseMaterials,

    just-in-timereferences

    DiverseSources of InformationInto

    AcquisitionKnowledgeProducts

    Phase 1Operational

    Aug 00

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    25/26

    R.C. Zittel 25

    Sim

    ulationBased

    Acquisition

    AnEmerging

    Reality Questions ?

    Questions ?

  • 8/9/2019 Presentation from December 12, 2000 Dinner Meeting

    26/26

    SBA ReferencesSBA References

    Primary DoD SBA Source: Defense Modeling & Simulation OfficeSBA Special Interest Area: www.dmso.mil/sba/

    DSMC Acquisition Knowledge Management System:http://center.dsmc.dsm.mil/

    DSMC Acq Knowledge Mgt M&S Repositoryhttp://center.dsmc.dsm.mil/job_support/support_modules/acquisition_management_topics.htm

    Army M&S, SBA and SMARThttp://www.sarda.army.mil/zd/rdadomain.htm#SMART

    Navy SBA http://www.acq-ref.navy.mil/ & //navmsmo.hq.navy.mil

    Marine Corps SBA: Mr. Joseph Carr, 703-784-4469, MARCORSYSCOM

    DoD SBA POC: Col Crash Konwin, OSD/Office of Interoperability [email protected]