presentation for december 8 09 meeting
TRANSCRIPT
School District No. 46
(Sunshine Coast)A COMMUNITY ENGAGED IN THE PURSUIT OF LIFELONG
LEARNING AND EDUCATIONAL EXCELLENCE
ENGAGING THE COMMUNITY/
POSSIBLE SCHOOL CLOSURES
December 8, 2009
School District No. 46 (Sunshine Coast)
GOVERNANCE POLICY
2.8 SCHOOL CLOSURES
The Board of School Trustees of School District No. 46 (Sunshine Coast)
believes in the educational value of neighbourhood schools. The Board needs
to give continuing attention to:
2.8.1 Educational program effectiveness.
2.8.2 Factors involving student safety and building modernization needs.
2.8.3 Financial limitations of the school district.
2.8.4 Operational deficiencies.
2.8.5 Demographic changes within School District No. 46.
2.8.6 The integrity of each student’s educational program.
When school closure or consolidation is contemplated, the Board shall ensure
that adequate advance notice and opportunities for community consultation are
provided.
School Operating Capacity
September 2009 FTE
September 2009 Headcount
West Sechelt 200/181 188 201
Sechelt 294/275 66 68
Kinnikinnick 471/433 122.5 124
Davis Bay 154/135 88 93
Roberts Creek 270/251 276.5 287
Total 1389/1275 741 773
Excess Capacity 616/502
ENGAGING THE COMMUNITY MEETINGS:
September 22nd and 29th
October 8th and October 15th
COMMITTEE MEMBERS (31)
Davis Bay, Kinnikinnick, Sechelt and West Sechelt Elementary Schools
Representatives from each school:
•Administrator
•Teaching Staff
•Support Staff
•PAC Member
•Member of the Community
•Grade Six Representative
•Superintendent
•Assistant Superintendent
•Secretary-Treasurer
•SCPVPA Representative
•Principal of Receiving School
•Sunshine Coast Teachers’ Association, President
•CUPE, President
•District of Sechelt Planning Department
•Trustee
RECOMMENDATIONS FROM
“ENGAGING THE COMMUNITY” COMMITTEE
• Leave West Sechelt as is, K-7. Cap their enrollment total or
adjust the boundary so as not to create an overcrowding
situation.
• Combine the school populations of Davis Bay, Sechelt and
Kinnikinnick into one facility.
• Pursue the Neighbourhoods of Learning option as well as
recommendation two, not instead of recommendation two.
West Sechelt
Sechelt
Sechelt School Catchment Areas
Kinnikinnick
Davis Bay
Close Kinnikinnick and Davis Bay- Add to Sechelt
New Sechelt
West Sechelt
Close Sechelt & Davis Bay – Add to Kinnikinnick
West Sechelt
New
Kinnikinnick
Close Kinnikinnick Add to Sechelt (Davis Bay Open)
NewSechelt
Davis Bay
West Sechelt
25 ATTRIBUTES AS IDENTIFIED BY THE COMMITTEE
25 ATTRIBUTES continued
Estimated Annual Savings School Closures
School Closure *Davis Bay Elementary Sechelt Elementary Kinnikinnick Elem.
Base 118,500 118,500 118,500
SPED (.5) 45,000 45,000 45,000
Custodian 52,000 59,000 59,000
Admin. Assistant 46,000 46,000 53,000
Principal 59,000 59,000 72,000
Hydro Estimate (Annual) 22,000 20,000 17,000
Transportation Estimate** -15,000 -25,000 25,000
Small School Grant* -126,000
Total Savings per school $ 201,500 $ 322,500 $ 389,500
*Note: Davis Bay receives a “Small School Grant” due to its
geographical location. This would not be granted if the school
closed and is reflected in the calculation above.
**Note: If Sechelt Elementary closes and students are bussed to Kinnikinnick,
then transportation costs will increase by approximately $25,000 for Sechelt. If Davis
Bay closes, then transportation costs will increase approximately $15,000. If
Kinnikinnick closes, there is a savings of $25,000 in bussing costs as the majority of
students are currently bussed to Kinnikinnick
Note: Teacher savings are unknown as assignments depend upon class size and composition.
MAJOR MAINTENANCE PROJECTS
SECHELT ELEMENTARY
• MechanicalComplete up grade to mechanical system $850,000
• ElectricalUpgraded lighting from T-12 to T-8 $45,500Intrusion Alarms and fire alarm changed $15,000Total Electrical: $60,000
• FlooringUpgrades and repairs estimated at $25,000
• BathroomsRemodel bathrooms $50,000
• GroundsRecondition upper field. $45,000
TOTAL: $1,030,000
Maintenance Projects
KINNIKINNICK ELEMENTARY
• MechanicalComplete upgrade to roof top units $450,000
• ElectricalUpgrade lighting from T-12 to T-8 $25,000New intrusion and fire alarms $20,000New PA and intercom System $7,500 Total Electrical: $52,500
• FlooringRepair and replacement of floor coverings lifting due to moisture estimated at $150,000
• BathroomsRemodel bathrooms $15,000
• GroundsField drainage and re-contouring estimated at: $160,000
TOTAL: $827,500
MAINTENANCE PROJECTS
DAVIS BAY ELEMENTARY
• Mechanical
Re and Re Furnace, Gym air handler and hook up DDC $450,000
• Electrical
Upgrade lighting from T-12 to T-8 $45,000
New intrusion and fire alarms and fire alarms $25,000
Total Electrical: $70,000
• Flooring
Repairs and replacement: $35,000
• Bathrooms
Remodel bathrooms $25,000
Total: $580,000
Seismic Upgrade Schedule (under review)
Sechelt: Seismic Upgrade Scheduled in Capital Plan for 2012/13
Upgrade resistance to seismic loading $2,935,520
Davis Bay: Seismic Upgrade – Scheduled in Capital Plan for 2014/15
Upgrade resistance to seismic loading $624,640
West Sechelt: Seismic Upgrade – Scheduled in Capital Plan for 2014/15
Upgrade resistance to seismic loading $520,380