Renewable Energy Applications in the Built
Environment – Our Practice in Hong Kong
COBRA 2006
Yang Hong-Xing
Renewable Energy Research Group
Department of Building Services Engineering
The Hong Kong Polytechnic University
2007-10-8 2
Main Topics
1. Concept of BIPV applications
2. Development of photovoltaic applications
in the world
3. Building-integrated photovoltaic (BIPV)
applications in Hong Kong
4. Other renewable energy applications in the
built environment in Hong Kong
5. Conclusions
2
2007-10-8 3
Energy Consumption in Buildings
in Hong Kong
Item Annual (kWh/m²) %
Air-
conditioning
123.9 57.0
Lighting 50.0 23.0
Small power 22.4 10.3
Others 21.1 9.7
Total 217.4 100
- 50-55% of the total demand is consumed in buildings
- For each building:
2007-10-8 4
How to reduce Carbon emissions?
Reduction of Carbon Emissions
Saving on Energy
Consumption
Renewable Energy
Applications
3
2007-10-8 5
PV module is a real building element like standard glass panes and can be integrated into building facade or roof structure.
Photovoltaic element for building-integration as curtain wall
BIPV Applications:
Modular BIPV claddings
2007-10-8 6
� Renewable energy resource
� Replacement of building claddings
� Power generation where needed
� No power transmission
� No land use
� Power generation for peak power supply
� Reduction of carbon emission from fossil fuel energy consumption
BIPV Applications:
Benefits
4
2007-10-8 7
BIPV Applications:
System mounting structure types
Summarized from 400 PV projects listed in the IEA-PVPS database
Slope roof
2007-10-8 8
Good practice for BIPV design
Design criteria for good-quality PV projects:
�Natural integration of the PV system;
�The PV system is architecturally pleasing, within the
context of the building;
�Good composition of colors and materials;
�The PV system matches the context of the building;
�The system, and its integration, are well engineered;
�The application of PV has led to innovative designs.
5
2007-10-8 9
World PV Module Shipment
Development of photovoltaic applications
2007-10-8 10
PV module and cell prices
Development of photovoltaic applications
6
2007-10-8 11
Application of PV modules
Cumulative installed grid-connected and off grid PV power
(From IEA-PVPS Annual report 2005)
2007-10-8 12
The cumulative installed PV
power capacity (kW)
The grid-connected distributed system may
be on or integrated into the customer’s
premises, on public and commercial
buildings, or simply in the built
environment on motorway sound barriers
etc. So the installed capacity of this system
approximately equals to that of BIPV.
7
2007-10-8 13
BIPV development in leading countries:
- Germany
Policy & Programme:
� Government authority: Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU)
� Renewable Energy Sources Act (EEG)
� “100 000 Rooftops Solar Electricity Programme”
� "Way Paving Programme Photovoltaic 2005”
� Other programme supported by some of the Federal States
2007-10-8 14
BIPV in Germany
Achievements:
Status of 100,000 roofs solar power programme in Germany
� The accumulative total
installed PV power reached
794MW at the end of 2004.
� In 2004 alone, the annual
rate of growth is 137 %.
� Germany now leads the
way at 10 W per capita.
8
2007-10-8 15
BIPV in Japan
National programmes:
� Original Sunshine Project: focus on the
integrating PV on to the roofs of residential
buildings.
� Residential PV System Dissemination
Programme(1994)
� Field test project (1993)
� New Sunshine Programme
2007-10-8 16
BIPV in Japan
Achievements:
� Residential PV systems were installed to 162 525
houses, total 595,1 MW, from FY1994 to FY2003.
� In FY2004, 54,475 houses equipped with PV
systems totaling 200.1 MW.
9
2007-10-8 17
BIPV in USA
Programme:
� The million solar roofs program.
� The California "buy down" program:
� The California "PV Pioneer" phrase 2 program:
offering subsidized photovoltaic systems to its
customers.
� The Los Angeles Department of Water and Power
(LADWP) PV program.
2007-10-8 18
BIPV in USA
Achievements:
� Installations in the United States increased from 63 MW in
2003 to 86 MW in 2004.
� The installed cost of grid connected PV systems from
$4.50 per AC Watt installed to $3.50 per watt.
LONG-TERM GOALS FOR PV LEVELISED COST OF ENERGY (LCOE) AND INSTALLED SYSTEM PRICE (from US DOE Solar Energy Technologies Program)
10
2007-10-8 19
BIPV in Netherlands
Stimulate programme:
� The PV learning programme: cultivating the acceptance of general public, basic PV cell and modular R&D
� The PV tender PV-GO programme: creation of a market for grid connected and stand alone PV system.
� The PV Covenant: general commitment of different government department, property developers, PV industry and research institute.
� The new EOS (Energy Research Subsidy) programme (2004)
2007-10-8 20
BIPV in Netherlands
Achievements:
� Cost reduction: PV modules deceased from 17
Euro/Wp in 1991 to 4.5 Euro/Wp in 2004.
� The installed PV capacity reached 19.8 MW in 2003.
� Although PV market in the Netherlands is modest, the fundamental Research of PV materials are very active.
11
2007-10-8 21
BIPV in Hong Kong, China
Achievements:
� BIPV application started from 1999 and now there is 1 MWp installed on roofs.
� There is no national programme so far, but the new energty policy is being developed.
� Private companies are interested in the application.
2007-10-8 22
The BIPV project on the Shaw Amenities
Renewable Energy Research Group (RERG)
500
700
900
1100
1300
1500
0 10 20 30 40 50 60 70 80 90
Tilted Angle (degree)
Yeraly Solar Radiation (kWh/y)
0 -90
-45 45
90
Total solar radiation on tilted PV panel
12
2007-10-8 23
4kWp BIPV in the 4kWp BIPV in the 4kWp BIPV in the 4kWp BIPV in the KadoorieKadoorieKadoorieKadoorie FarmFarmFarmFarm
Specifications:
Power rate: 4 kWp
PV module area: 40m²
DC voltage: 110V
AC voltage: 220V
Load: Lighting
and A/C
2007-10-8 24
The BIPV systems in the Science Park:
•roof integration,
•sun-shaded type and façade integration
The BIPV projects in the Science Park
13
2007-10-8 25
Other BIPV project in Hong Kong
� No 1 Peking Road
� Ma Wan Primary School
2007-10-8 26
The BIPV project at Penny Bay:
14
2007-10-8 27
EMSD Headquarters BIPV project
� EMSD Headquarters at Kowloon Bay (350 kW)
2007-10-8 28
The PV system and wind turbines
The Ma Wan Theme Park
16
2007-10-8 31
Hong Kong’s first large commercial wind
turbine at Lamma Island
Height: 71m
Power: 800kW
Wind speed: 3-25m/s
Annual energy: 1GWh
Investment: HK$15m
2007-10-8 32
Proposed Local RE Targets
� 1% annual electricity demand of 1999 in
year 2012 (355 GWh/year)
� 2% annual electricity demand of 1999 in
year 2017 (710 GWh/year)
� 3% annual electricity demand of 1999 in
year 2022 (1,065 GWh/year)
17
2007-10-8 33
Conclusions
� Building-integrated photovoltaic technology for electrical power generation has been well developed these years
� Financial incentives from government are key factors for further dissemination of BIPV systems
� The cost of BIPV system needs to be further reduced
� More educational and demonstration projects are needed.