PRESENTATION BY THE DEPARTMENT OF LABOUR TO THE SELECT COMMITTEE ON LABOUR AND PUBLIC ENTERPRISES. Annual Report 2011/12. 31 OCTOBER 2012. TABLE OF CONTENTS. MANDATE MEDIUM TERM STRATEGIC FRAMEWORK (MTSF) AND SERVICE DELIVERY OUTCOMES ALIGNED TO THE DOL STRATEGIC OBJECTIVES - PowerPoint PPT PresentationTRANSCRIPT
PRESENTATION BY THE DEPARTMENT OF LABOUR TO THE SELECT COMMITTEE ON
LABOUR AND PUBLIC ENTERPRISES
31 OCTOBER 2012
Annual Report 2011/12
1
TABLE OF CONTENTS
2
1. MANDATE
2. MEDIUM TERM STRATEGIC FRAMEWORK (MTSF) AND SERVICE DELIVERY OUTCOMES ALIGNED TO THE DOL STRATEGIC OBJECTIVES
3. KEY ASPECTS OF THE DOL STRATEGIC PLAN 2011/12, TARGETS AND PERFORMANCE
4. BUDGET ALLOCATIONS AND UTILISATION INCLUDING AUDIT FINDINGS
5. SHELTERED EMPLOYMENT FACTORIES
6. MANAGEMENT ACTION TO RESPOND TO AUDIT MATTERS
7. HUMAN RESOURCES
3
1. Mandate
VisionThe Department of Labour will strive for a labour market which is conducive to investment, economic growth, employment creation and Decent Work.
Mission
Regulate the South African labour market for a sustainable economy through:•Appropriate legislation and regulations•Inspection, compliance monitoring and enforcement•Protection of human rights•Provision of Employment Services•Promoting equity•Social and income protection•Social dialogue.
2. MTSF and Service Delivery Outcome 2. MTSF and Service Delivery Outcome aligned to the Department of Labour’s strategic objectives aligned to the Department of Labour’s strategic objectives
4
In this report, the Department reflects on its contribution to year three of the Medium-Term Strategic Framework (MTSF) 2009-2014 with a focus on the following Government service delivery outcomes:
Outcome 4: Decent employment through inclusive economic growth, and two other outcomes;
Outcome 11. Create a better South Africa and contribute to a better and safer Africa and World; and Outcome 12: An efficient, effective and development orientated public service and an empowered and inclusive citizenship.
2. MTSF and Service Delivery Outcome 2. MTSF and Service Delivery Outcome aligned to the Department of Labour’s strategic objectives - aligned to the Department of Labour’s strategic objectives -
continuescontinues
5
SERVICE DELIVERY OUTCOMES AND OUTPUTSSERVICE DELIVERY OUTCOMES AND OUTPUTS DoL STRATEGIC OBJECTIVESDoL STRATEGIC OBJECTIVES
4: Decent employment through inclusive economic growth Outputs: 4.1 Making our growth more labour absorbing4.2. Reducing youth unemployment4.3. Raising our international competitiveness4.4. Analysing the cost structure of the South African economy4.5. Reviewing support for small business4.6. Expanding our Public Works Programme
1: Contribution to employment creation 2: Promote equity in the labour market 3: Protecting vulnerable workers 5: Strengthening social protection 6: Promoting sound labour relations 7: Monitoring the impact of legislation
11: Creating a better South Africa and contributing to a better and safer Africa in a better world.
4: Strengthening multilateral and bilateral relations
12: An efficient, effective and developmentorientated public service and anempowered and inclusive citizenship Output: 12.1 Service delivery quality and access
8: Strengthening the institutional capacity of the Department
2. MTSF and Service Delivery Outcome 2. MTSF and Service Delivery Outcome aligned to the Department of Labour’s strategic objectives - aligned to the Department of Labour’s strategic objectives -
continuescontinues
6
• To achieve these objectives, the Department, in the 2011/12 financial year focused on the following strategic programmes
• Labour law amendments. • Rebuilding the Public Employment Services. • Implementation of Decent Work Country Programme.• Strengthening of Department of Labour inspectorate.• Reduce inequality and discrimination in the labour market
through effective compliance monitoring and enforcement of the Employment Equity Act.
• Improved access to income protection services (CF and UIF) including reintegration of workers into the labour market.
Branches/Programmes within the Department of Labour
Programme 1: Administration (ADMIN)
Programme 2: Inspections and Enforcement Services (IES)
Programme 3: Public Employment Services (PES)
Programme 4: Labour Policy and Industrial Relations (LP and IR)
7
3. Key Aspects of the DoL Strategic Plan 2011/12, Targets and Performance
8
OUTCOME 12: AN EFFICIENT, EFFECTIVE, AND DEVELOPMENT ORIENTED PUBLIC SERVICE AND AN EMPOWERED AND INCLUSIVE CITIZENSHIPStrategic Objective 8: Strengthening the institutional capacity of the Department
KEY PERFORMANCE KEY PERFORMANCE
INDICATORSINDICATORSANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
1. % of customer complaints attended to within 14 days of Receipt
90% within 14 days
98% (5 434 out of 5 517) were resolved within timeline
2. Percentage of women, youth and people with disability (PwD) employed in line with the EE Plan
34% women employed in Senior Management Service (SMS), 43% youth and 3% people with disability (PwD) employed in the Department
38.5% (32 out of 83 employees at Senior Management Service level) women are employed in Senior Management Service (SMS) as at 31 March 2012
40% (2 830 out of 7 057 filled posts) youth employed in the Department as at 31 March 2012
2.6% (184 out of 7 057 filled posts) of the employees in the Department are people with disabilities as at 31 March 2012.
3. Percentage of vacancy rate reduced with a specified period of time
Vacancy rate reduced to below 8% by 31 March 2012
The vacancy rate in the Department has been reduced to 7.28% (554 out of 7 611 posts) as on 31 March 2012.
3. Key Aspects of the DoL Strategic Plan 2011/12, Targets and Performance - continues
9
OUTCOME 12: AN EFFICIENT, EFFECTIVE, AND DEVELOPMENT ORIENTED PUBLIC SERVICE AND AN EMPOWERED AND INCLUSIVE CITIZENSHIP
Strategic Objective 8: Strengthening the institutional capacity of the Department
KEY PERFORMANCE KEY PERFORMANCE
INDICATORSINDICATORSANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
4. % of misconduct cases finalised within a prescribed period of time
70% of misconductcases finalised in line with applicable prescripts by31 March 2012
79% (216 out of 271 cases) of misconduct cases were finalised in line with the applicable prescripts as on 31 March 2012.
5. Exit and services transfer plan developed and implemented
Implementation of Exit and Services Plan
The Exit and Services Transfer Plan was developed and approved.
3. Key Aspects of the DoL Strategic Plan 2011/12, Targets and Performance - continues
10
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 2: Promote Equity in the Labour Market
KEY PERFORMANCE KEY PERFORMANCE
INDICATORSINDICATORSANNUAL TARGETSANNUAL TARGETS ACHIEVEMENTSACHIEVEMENTS
1. Inspect JSE listed companies and ordinary designated employers to achieve 80% compliance with EE legislation
10 000 workplaces inspected JSE (60 ) Designated (140) Procedural (9 800)
A total of 10 223 workplaces were inspected;•65 JSE listed companies inspected• 218 Designated employers inspected • 9 940 companies were inspected procedurally Refer to page 39 of the Annual Report for Provincial breakdown.
3. Key Aspects of the DoL Strategic Plan 2011/12, Targets and Performance - continues
11
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 3: Protecting vulnerable workers
KEY PERFORMANCE KEY PERFORMANCE
INDICATORSINDICATORSANNUAL TARGETSANNUAL TARGETS ACHIEVEMENTSACHIEVEMENTS
1. Inspect 130 000 workplaces to achieve 80% compliance rate
130 000 inspections with 80% compliance rate
172 300 routine inspections were conducted and 74% (123 181) compliance achieved
The Limpopo figure of 14 890 (target) was omitted in the Annual Report.
3. Key Aspects of the DoL Strategic Plan 2011/12, Targets and Performance - continues
12
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 3: Protecting vulnerable workers
KEY PERFORMANCE KEY PERFORMANCE
INDICATORSINDICATORSANNUAL TARGETSANNUAL TARGETS ACHIEVEMENTSACHIEVEMENTS
2. Conduct blitz inspections in targeted sectors
Conduct 15 000 blitz inspections in the targeted sectors
21 394 blitz inspections conducted
Refer to page 40 and 41 of the Annual Report for Provincial and Sector breakdown
3. Key Aspects of the DoL Strategic Plan 2011/12, Targets and Performance - continues
13
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 3: Protecting vulnerable workers
KEY PERFORMANCE KEY PERFORMANCE
INDICATORSINDICATORSANNUAL TARGETSANNUAL TARGETS ACHIEVEMENTSACHIEVEMENTS
3. Settle at least 70% of received labour related complaints within 14 days at Registration Services
Settle 70% of received complaints within 14 days
135 807 labour related complaints were received and 110 610 (74%) settled within 14 days
3. Key Aspects of the DoL Strategic Plan 2011/12, Targets and Performance - continues
14
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
Strategic Objective 5: Strengthening Social Protection
KEY PERFORMANCE KEY PERFORMANCE
INDICATORSINDICATORSANNUAL ANNUAL
TARGETSTARGETSACHIEVEMENTSACHIEVEMENTS
1. Reduce incidents in the following high risk sectors by conducting audits, do blitzes and hold 1 seminar per year:- Iron and Steel,- Construction,- Chemical and- Agriculture/forestry)
Establish a baseline byconducing at least:• 20 audits persector• Blitz per sector• 1 seminar per year
722 inspections conducted in the Iron and Steel Sector, 1003 Inspections conducted in the Construction Sector, 144 inspections conducted in the Chemical Sector and 1338 inspections conducted in Agriculture and Forestry Sector
Refer to pages 43 and 44 of the Annual Report
2. Conduct inspections in the identified industries exposing workers to silica dust
200 workplaces inspected in order to reduce exposure by at least 2%
213 workplaces were inspected
The inspections conducted were the first. Follow-up inspections will continue to determine the level of reduction to exposure.
Prov.Target Actual
Deviance
GP 200 213 13NATIONAL 200 213 13
3. Key Aspects of the Department of Labour’s Strategic Plan 2011/12 - Targets and Performance
15
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
Strategic Objective 1: Contribution to employment creation
KEY KEY
PERFORMANCE PERFORMANCE
INDICATORSINDICATORS
ANNUAL ANNUAL
TARGETSTARGETSACHIEVEMENTSACHIEVEMENTS
1. Number of registered job-seekers on the Employment Services for South Africa system per year
600 000 reportingjob-seekers registered on the System
Work-seekers registered : 553 883
Prov. Target Actual Deviance
EC 90000 36227 53773
FS 66000 39474 26526
GP 120000 146865 +26865
KZN 78000 104718 +26718
LP 54000 61002 +7002
MP 60000 46317 13683
NC 36000 23323 12677
NW 48000 21081 26919
WC 48000 74876 +26876
NATIONAL 600 000 553 883 46117
3. Key Aspects of the Department of Labour’s Strategic Plan 2011/12 - Targets and Performance
16
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
Strategic Objective 1: Contribution to employment creation
KEY KEY
PERFORMANCE PERFORMANCE
INDICATORSINDICATORS
ANNUAL ANNUAL
TARGETSTARGETSACHIEVEMENTSACHIEVEMENTS
2. Number of job-seekers Registered on the system assessed and profiled
50% job-seekers registering on the system are assessed and profiled within 60 days of Registration
222 956 (40%) of the 553 883 job seekers registered on the system were assessed and profiled
Prov. Target Actual Deviance
EC 18114 18149 +35
FS 19737 17222 2515
GP 73432 44884 28548
KZN 52359 51542 817
LP 30501 13922 16579
MP 23158 38093 +14935
NC 11662 4154 7508
NW 10541 16373 +5832
WC 37438 18617 18821
NATIONAL 276942 222956 53986
3. Key Aspects of the Department of Labour’s Strategic Plan 2011/12 - Targets and Performance
17
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 1: Contribution to employment creation
KEY KEY
PERFORMANCE PERFORMANCE
INDICATORSINDICATORS
ANNUAL ANNUAL
TARGETSTARGETSACHIEVEMENTSACHIEVEMENTS
3. Number of job-seekers placed/referred to opportunities
450 000 job-seekers placed/referred to opportunities
96 505 referred/placed into opportunities
NB: Other work-seekers were provided with counselling & employment enhancement and other DoL services
3. Key Aspects of the DoL Strategic Plan 2011/12, Targets and Performance - continues
18
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
Strategic Objective 1: Contribution to employment creation
KEY PERFORMANCE KEY PERFORMANCE
INDICATORSINDICATORSANNUAL ANNUAL
TARGETSTARGETSACHIEVEMENTSACHIEVEMENTS
4. Number of employers registering vacancies on ESSA
2 000 2 475 companies registered vacancies
Prov. Target Actual DevianceEC 300 361 +61FS 220 260 +40GP 400 578 +178KZN 260 274 +14LP 180 212 +32MP 200 152 48NC 120 227 +107NW 160 187 +27WC 160 224 +64
NATIONAL 2000 2475 +475
3. Key Aspects of the DoL Strategic Plan 2011/12, Targets and Performance - continues
19
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
Strategic Objective 1: Contribution to employment creation
KEY PERFORMANCE KEY PERFORMANCE
INDICATORSINDICATORSANNUAL ANNUAL
TARGETSTARGETSACHIEVEMENTSACHIEVEMENTS
5. Number of private employment agencies registered
1500 1 162 PEAs were registered
Prov. Target Actual DevianceEC 224 132 92FS 160 57 103
GP 300 491 +191KZN 196 211 +5LP 136 76 60MP 152 69 83
NC 92 32 60NW 120 30 90WC 120 64 56NATIONAL 1500 1162 338
3. Key Aspects of the DoL Strategic Plan 2011/12, Targets and Performance - continues
20
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
Strategic Objective 1: Contribution to employment creation
KEY PERFORMANCE KEY PERFORMANCE
INDICATORSINDICATORSANNUAL TARGETSANNUAL TARGETS ACHIEVEMENTSACHIEVEMENTS
6. Number of jobs saved through social plan intervention
20 000 15 165 jobs saved
7.SEF approved policy and legal framework developed
SEF legal status and business case finalized
Legal establishment provision is included in the ES Bill.National treasury approved a tender for the services provider for the 2nd Phase business case.
8. Increased sales of goods from Service Products leading to more intake of people with disabilities into SEF
30% in sales leading to 500 more people with disabilities employed in SEF subject to Government departments placing 30% of their orders from SEF
Only 0.67% increase in sales was recorded. No additional people with disabilities were employed. Only 1.47% increase in sales/orders was placed by government departments
Insufficient orders placed by government departments
3. Key Aspects of the DoL Strategic Plan 2011/12, Targets and Performance - continues
21
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
Strategic Objective 1: Contribution to employment creation
KEY PERFORMANCE KEY PERFORMANCE
INDICATORSINDICATORSANNUAL TARGETSANNUAL TARGETS ACHIEVEMENTSACHIEVEMENTS
9. Number of companies assisted to facilitate constructive dialogue between social partners, managers & workers, to improve productivity
120 companies 275 companies assisted
10. Productivity month campaign conducted & best performing organizations awarded
Five productivity brochures & one electronic newsletter published during productivity month
3 brochures printed and 8 electronic newsletters published
Productivity month campaign conducted. 2 regional awards, & 1 national award function held
One national Productivity award function heldFive regional award functions held
3. Key Aspects of the DoL Strategic Plan 2011/12, Targets and Performance - continues
22
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
Strategic Objective 1: Contribution to employment creation
KEY PERFORMANCE KEY PERFORMANCE
INDICATORSINDICATORSANNUAL TARGETSANNUAL TARGETS ACHIEVEMENTSACHIEVEMENTS
11. No. of SMME managers assisted to manage matters related to intellectual property
3000 • 2 842 managers were trained
12. Research study conducted on the impact of municipal programs on SMMEs in relation to productivity and jobs created.
Research report compiled and published in 2011/12
Research report completed and four seminars conducted
13. Number of public servants / expenses approved by Compensation Fund, paid
Claims approved by the Compensation Fund Commissioner, submitted
•Outstanding claims inclusive of 1999 to September 2011, total outstanding R20.9m received from National Treasury •Additional allocation was received from National Treasury = R26m•Transferred to CF R36m from 1999 to March 2012.•Outstanding claims to paid to CF = R1.2m
3. Key Aspects of the DoL Strategic Plan 2011/12, Targets and Performance - continues
23
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 2: Promote Equity in the Labour Market
KEY PERFORMANCE KEY PERFORMANCE
INDICATORSINDICATORSANNUAL TARGETSANNUAL TARGETS ACHIEVEMENTSACHIEVEMENTS
1. Employment Equity Act (EEA) and its Regulations Amended
Amended EEA promulgated
NEDLAC negotiations on the Employment Equity Bill was postponed to commence in April 2012 due to prolonged negotiations on the LRA and BCEA Bills.
2. Code of Good Practice and Technical Assistanceguidelines on HIV and AIDS reviewed andAmended
HIV and AIDS Code and Technical assistance Guidelines amended
The Code on HIV and AIDS and the World of Work reviewed and finalised by 28 March 2012.
3. Income Differentialsassessed to determine race and genderdisparities in salaries
60 58 Income Differentials assessed to determine race and gender disparities in salaries
3. Key Aspects of the DoL Strategic Plan 2011/12, Targets and Performance - continues
24
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
Strategic Objective 3: Protecting Vulnerable Workers
KEY PERFORMANCE KEY PERFORMANCE
INDICATORSINDICATORSANNUAL TARGETSANNUAL TARGETS ACHIEVEMENTSACHIEVEMENTS
1. BCEA amended Amended BCEA promulgated
Bills were approved by Cabinet and submitted to Parliament. Information sharing sessions conducted country wide
2. Review existing sectoral determination
Publish an amended SD for: Civil Engineering, Taxi, Contract Cleaning,Domestic Workers, Farm Workers, Wholesale and Retail, Forestry
Five (5) Sectoral determinations reviewed. They are the following;
•Taxi published on 27/06/11 GG 34392•Contract Cleaning published 28/11/11 GG 34798•Domestic published on 28/11/2011 GG 34797•Farm Worker published 18/01/2012 GG 34947•Forestry worker published 18/01/2012 GG 34946
3. Key Aspects of the DoL Strategic Plan 2011/12, Targets and Performance - continues
25
OUTCOME 11: CREATE A BETTER SOUTH AND CONTRIBUTE TO A BETTER AND SAFER AFRICA AND WORLD Strategic Objective 4: Strengthening bilateral and multilateral relations
KEY PERFORMANCE KEY PERFORMANCE
INDICATORSINDICATORSANNUAL TARGETSANNUAL TARGETS ACHIEVEMENTSACHIEVEMENTS
1. Ensure compliance with ILO’s constitutional requirements in terms of Article 19 and 22 of the Constitution of the ILO.
Compile and submit reports in consultation with programmes and other departments on South Africa’s compliance in law, policy and practice.
2 Article 19 Questionnaires unratified on Social Security Convention submitted to the ILO
6 Article 22 reports on ratified Conventions were submitted to the ILO
Refer to page 62.
3. Key Aspects of the DoL Strategic Plan 2011/12, Targets and Performance - continues
26
OUTCOME 11: CREATE A BETTER SOUTH AND CONTRIBUTE TO A BETTER AND SAFER AFRICA AND WORLD Strategic Objective 4: Strengthening bilateral and multilateral relations
KEY PERFORMANCE KEY PERFORMANCE
INDICATORSINDICATORSANNUAL TARGETSANNUAL TARGETS ACHIEVEMENTSACHIEVEMENTS
2. Develop briefing documents for: Arlac, AULSAC,ILO GB , and ILC and SADC ELS
Develop briefing documents on and South African positions on the agenda items for: Arlac, AULSAC,ILO GB and ILC,SADC ELS
•SA delegations have participated in the Annual meetings of these Multi-lateral bodies. Details of these appear in the Annual Report.
•SA successfully hosted the 12th African Regional meeting.
3. Projects in priority output areas identified, agreed on with social partners, implemented and reported on
South Africa’s Decent Work Country Programme implemented
Regular meetings of the Steering Committee and Technical Implementation Committee held to monitor implementation of projects in priority output areas as agreed
3. Review the implementation of the Memorandum of Understanding with Lesotho, Namibia, Cuba and China
MOU’s with respective countries reviewed and signed
Review of the memorandum of understanding with China has been finalised and is awaiting signature
3. Key Aspects of the DoL Strategic Plan 2011/12, Targets and Performance - continues
27
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 6: Promoting Sound Labour Relations
KEY PERFORMANCE KEY PERFORMANCE
INDICATORSINDICATORSANNUAL TARGETSANNUAL TARGETS ACHIEVEMENTSACHIEVEMENTS
1. Extend collective agreements within 90 days
18 collective agreements published within 60 days of receipt
24 collective agreements
Average turnaround time: 57 days
2. Decision to register new labour organisationstaken within 90 days
90 days 144 Average turnaround time: 104 days
3. Key Aspects of the DoL Strategic Plan 2011/12, Targets and Performance - continues
28
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 7: Monitoring the impact of legislation
KEY KEY
PERFORMANCPERFORMANC
E INDICATORSE INDICATORS
ANNUAL ANNUAL
TARGETSTARGETSACHIEVEMENTSACHIEVEMENTS
1. Annual Labour Market Review report developed and disseminated
Four (4) Annual Labour Market Review report developed and disseminated
(100%) Four annual labour market reports were produced, approved and published. These include:1.Industrial Action report 2011: It provides a trend analysis on industrial disputes in the country.2.Annual Labour Market Bulletin: It provides a general overview of key indicators regarding the performance of the SA economy, labour force and wage agreements in the financial year 2011/123.Annual Administrative Statistics report: It presents data series in the last 12 months of 2011. It considers only selected key indicators to assess progress made by each branch within the DoL4.Job Opportunity and Unemployment in the SA labour market: It examines the deficiency in the demand and supply of labour based on the analysis of vacancies and unemployment insurance data in the financial year 2011/12.
3. Key Aspects of the DoL Strategic Plan 2011/12, Targets and Performance - continues
29
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 7: Monitoring the impact of legislation
KEY PERFORMANCE KEY PERFORMANCE
INDICATORSINDICATORSANNUAL TARGETSANNUAL TARGETS ACHIEVEMENTSACHIEVEMENTS
2. The impact of the Department’s Strategic Plan on stated goals and objectives researched and reported on
Implementation of RME agenda 2 continues with the following projects.1.Evaluation of the NSDS II2.UIF noncompliance in the taxi, domestic and catering sectors3.Assessment of the registration, recruitment and selection services in ESSA
1. The following RME 2 projects were completed, submitted to the Minister and disseminated through research seminars:
Evaluation of the NDSD II, UIF Client satisfaction survey, UIF noncompliance in the taxi, domestic and
catering sectors, Assessment of registration, recruitment and
selection services in ESSA
4. Budget Allocations and Utilisation per Main 4. Budget Allocations and Utilisation per Main Division of the VoteDivision of the Vote
30
Final Actual Expenditure
Appropriation Expenditure as % of
final appropriation
R'000 R'000 R'000 R'000 R'000 R'000 %
1. ADMINISTRATION
Current payment 580 743 - 9 234 589 977 589 977 - 100.0%
Transfers and subsidies 255 - 515 770 770 - 100.0%
Payment for capital assets 117 457 - (1 844) 115 613 112 850 2 763 97.6%
Payment for financial assets - - 673 673 673 - 100.0%
698 455 - 8 578 707 033 704 270 2 763
2. INSPECTION AND ENFORCEMENT SERVICES
Current payment 389 091 (10 000) (4 014) 375 077 375 077 - 100.0%
Transfers and subsidies 199 - 384 583 583 - 100.0%
Payment for capital assets - - 89 89 89 - 100.0%
Payment for financial assets - - - - - - 0.0%
389 290 (10 000) (3 541) 375 749 375 749 -
3. PUBLIC EMPLOYMENT SERVICES
Current payment 196 168 - (4 137) 192 031 192 031 - 100.0%
Transfers and subsidies 128 391 10 000 292 138 683 138 158 525 99.6%
Payment for capital assets 250 - 1 755 2 005 2 005 - 100.0%
Payment for financial assets - - - - - - 0.0%
324 809 10 000 (2 090) 332 719 332 194 525
4. LABOUR POLICY AND INDUSTRIAL RELATIONS
Current payment 107 050 (4 095) (2 966) 99 989 93 427 6 562 93.4%
Transfers and subsidies 497 422 4 095 19 501 536 501 441 95 100.0%
Payment for capital assets 357 - - 357 41 316 11.5%
Payment for financial assets - - - - - - 0.0%
604 829 - (2 947) 601 882 594 909 6 973
Subtotal 2 017 383 - - 2 017 383 2 007 122 10 261 99.5%
Appropriation per programme
Vote 18- LABOURAppropriation Statement
for the year ended 31 March 2012
2011/12
Adjusted Appropriation
Shifting of Funds
Virement Variance
4. Budget Allocations and Utilisation per Main 4. Budget Allocations and Utilisation per Main Division of the VoteDivision of the Vote
31
AdjustedAppropriation
Shifting of Funds
Virement Final
Appropriation Actual
Expenditure Variance
Expenditure as % of final
appropriation R'000 R'000 R'000 R'000 R'000 R'000 %
Current payments
Compensation of employees 786 312 (11 195) (16 625) 758 492 757 883 609 99.9%
Goods and services 486 740 (2 900) 14 712 498 552 492 599 5 953 98.8%
Interest and rent on land - - 30 30 30 - 100.0%
Transfers & subsidies
Provinces & municipalities 12 - 39 51 51 - 100.0% Departmental agencies & accounts 542 184 - - 542 184 542 183 1 100.0% Foreign governments & international organisations 10 211 4 095 - 14 306 14 211 95 99.3%
Non-profit institutions 73 258 10 000 - 83 258 82 734 524 99.4%
Households 602 - 1 171 1 773 1 773 - 100.0%
Payment for capital assets
Buildings & other fixed structures 3 996 - 575 4 571 4 571 - 100.0%
Machinery & equipment 114 068 - (575) 113 493 110 414 3 079 97.3%
Payment for financial assets - - 673 673 673 - 100.0%
Total 2 017 383 - - 2 017 383 2 007 122 10 261 99.5%
2011/12 Appropriation per Economic classification
4. AUDIT FINDINGS – 2011/12
32
Qualification - None
Emphasis of Matter - None
Other Findings: Predetermined Objectives:
• Performance targets not specific (25% of PES priorities)
• Performance targets not specific (28% of IES)
• Performance indicators not well defined (33% of IES)
Procurement and contract management:Goods and services of a transaction value above R500 000 were procured without inviting competitive bids The Accounting Officer did not report the deviation from normal procurement processes to National Treasury and the Auditor General.Employees of the Department performed remunerative work outside their employment without written permission from the relevant authority.
4. AUDIT FINDINGS – 2011/12
33
Human resource management :Funded vacant posts were not filled within 12 months and vacant positions in the department were not advertised within six months.
Expenditure Management:Contractual obligations and money owed by the department were not settled within 30 days.
5. SEF
34
SHELTERED EMPLOYMENT
FACTORIES (SEF)
5.1 Background History of The SEF
• The Sheltered Employment Factories (SEF) were established more than 65 years ago to provide employment opportunities for those handicapped people who were unable to hold down employment in the open labour market due to the nature of their afflictions. There are more than 2.5 million handicapped people in South Africa of whom some 10% to 15% probably require an environment such as the Sheltered Employment Factories provide. Currently around 97% of the workers in our factories fit this profile. This is not merely a haven for the unemployed, but for those who cannot compete – often the emotionally / psychologically challenged.
• The Department of Labour inherited the SEF from the previous Government and has in the recent past taken a bold step of embarking on a turnaround strategy, that is aimed at converting the SEF into entities that:
- have a clear and definable legal status
- operate as efficient entities
- serve to advance government’s national agenda on active participation in the economy of the country by people with disabilities.
35
5.1 Background History of SEF - continues
• The SEF now has 12 factories across South Africa operating in 7 of the 9 provinces,
with only Mpumalanga and Limpopo without a facility. Factories are located in
Bloemfontein, Cape Town, Durban, East London, Johannesburg, Kimberly,
Pietermaritzburg, Port Elizabeth, Potchefstroom and Pretoria. Collectively they
employ some 1 100 disabled people supported by 120 administration, management
and technical staff. With current premises – land, buildings and equipment - there is
the potential to provide meaningful work opportunities for more than 3 000
handicapped people. In time it is envisaged that these numbers will increase
significantly as an awareness of the SEF and its purpose is created in South Africa
and the potential market for products is addressed.
36
5.2 Business Case
• The Business Case is aimed at developing a turnaround strategy that will help the Sheltered Employment Factories to transform into legal entities that sustain themselves and increase employment opportunities for people with disabilities who cannot secure employment in the open labour market due to the nature of their afflictions.
Progress to date
• The Employment Services Bill currently referred to parliament, makes reference of SEF’s legal framework in Chapter 6 and deals with the establishment of the SEF as Protected Employment Enterprise (PEE).
• Three reports have been produced by the appointed service provider and adopted by the Department, the reports are namely;
Situational Analysis
• Which looks at the current situation at the SEF and the environment in which the factories operate.
37
5.2 Business Case - continues
SEF Options Models
• This presents an range of options that the SEF has to consider in order to transform itself into viable entities; and
Implementation Plan
• This is a detailed plan on the implementation of the agreed option(s) with time frames and milestones over the MTEF period.
• A detailed SEF budget bid was prepared and submitted to the National Treasury for consideration based on the Implementation plan recommendations.
38
5.3 Employment Equity
39
• SEF’s financial situation has led to a decrease in the number of people with disabilities employed by SEF from 3 000 to 926 and consequently SEF’ s ability to change the profile of their employees to be representative of South African society.
• SEF employs (1 063: 2008) 926 people with disabilities which constitutes 0.04% of the total South African population of people with disabilities
• SEF employees (67%: 2008) 60% White compared to the general population of people with disabilities which is 82% African
• SEF employees are (82%: 2008) 72% male compared to the general population of people with disabilities which is 52% Female
5.3 Employment Equity - continues
40
• SEF race and gender profile exhibits racial and gender disparities. Reductions in work and the moratorium on recruitment SEF has impacted on the opportunity to redress these inequities. However, the change in statistics from 2008 demonstrates commitment to redressing equity balances.
• Management profile is 50% White, 29% African, 18% Coloured and 3% Asian of which 47% is male and 43% is female.
• Factory worker’s profile is of 62% White, 15% African, 22% Coloured and 1% Asian of which 76% is male and 26% female.
• The overall SEF profile is 60% White, 22% Coloured, 17% African and 1% Asian of which 72% is male and 28% is female.
• The SEF age profile exhibits an aging population with very little feed (6%) into the new generation and many employees (39%) older than 50 years..
5.4 Production Facility
Province Factory Products Specialisation(i) Gauteng Pretoria
SpringfieldRand
In total the factories have the manufacturing capability that produces different product types in the following fields:- furniture (wooden and metal for offices, schools and domestic use)- textiles (garments, bed linen, protective clothing, hospital and surgical garb - with printed or embroidered logos)- metal work (shaped and welded construction)- leather work- canvas work- book binding (beautifully crafted leather binding with gold lettering)- screen printing (printing onto promotional products e.g. T-shirts, logos, caps, linen, flags, bunting, banners).
(i) Western Cape NdabeniEpping
(i) KwaZulu Natal PietermaritzburgDurban
(i) Eastern Cape East LondonPort Elizabeth
(i) Northern Cape Kimberley(i) Free State Bloemfontein(i) North West Potchefstroom
41
The SEF is complemented by these factories across the landscape of the country as follows:
5.5 Key Aspects of the SEF Strategic Plan 2011/12, Targets and Performance
42
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 1: Contribute to employment creation
KEY PERFORMANCE KEY PERFORMANCE
INDICATORSINDICATORSANNUAL TARGETSANNUAL TARGETS ACHIEVEMENTSACHIEVEMENTS
1. Approved policy and legal framework for SEF.
Draft Report of the SEF 2nd Phase Business Case available.
Service providers for the 2nd and final phase of the business case were evaluated in March 2012 and appointment will be done in April 2012. It is envisioned that the 2nd phase of the business case will be finalised by July 2012. The SEF legal status is incorporated in the Employment Services currently at NEDLAC.
-Delays in the procurement of the service provider by National Treasury Technical Assistance (TAU).-Protracted negotiations on the ES Bill at NEDLAC
2. Number of people with disability/ex-combatants and Compensation Fund beneficiaries assisted with skills for employment in SEF.
Research and define (Position Paper) the SEF Centre by end of March 2012.
Position paper not finalised due to its dependence on the business case outcomes.
- Insufficient capacity in SEF
5.5 Key Aspects of the SEF Strategic Plan 2011/12, Targets and Performance - continues
43
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 2: Manage factories to be visible and sustainable enterprises
KEY PERFORMANCE KEY PERFORMANCE
INDICATORSINDICATORSANNUAL TARGETSANNUAL TARGETS ACHIEVEMENTSACHIEVEMENTS
1. Percentage increase in rand value of sales.
15% increase in sales comparison to 2010/11 financial year.
0.74% increase in sales compared to prior financial year:2011/12 sales – R 50 280 0452010/11 sales – R 49 910 548
-Limited working capital to procure sufficient materials to service large orders.
2. Percentage reduction in production and delivery lead-time.
Establish production schedule/turnaround baseline/Action Plan.
The Productivity SA piloted a productivity turnaround project at the Rand Factory and the project will be rolled out to other factories during 2012/13
5.5 Key Aspects of the SEF Strategic Plan 2011/12, Targets and Performance - continues
44
OUTCOME 12: AN EFFICIENT, EFFECTIVE, AND DEVELOPMENT ORIENTED PUBLIC SERVICE AND AN EMPOWERED AND INCLUSIVE CITIZENSHIPStrategic Objective 8: Strengthening the institutional capacity of the Sheltered Employment Factories
KEY PERFORMANCE KEY PERFORMANCE
INDICATORSINDICATORSANNUAL TARGETSANNUAL TARGETS ACHIEVEMENTSACHIEVEMENTS
1. Strategic risk monitored in line with the Risk Appetite Model/Framework.
Strategic risk reviews done and operational risk assessments done for all factories by end of March 2012.
Strategic and operational risk assessments completed at 10 of the 12 SEF factories are to be assessed by end of June 2012.
- Insufficient time allocated to complete all factories by end of March 2012.
2. Percentage of Youth and Women employed in SEF.
20% of Youth employed in the SEF as at end of March 2012.
30% of Women employed in the SEF by end of March 2012.
Equity profile as at 31 March 2012: 9.4% Youth employed.
28.25% Women employed.
Limited appointments made during 2011/12.
5.6 FINANCIAL MANAGEMENT OF SEF
45
2011/12 2010/11
Revenue 50,280,045 49,910,548 Cost of sales (36,352,021) (35,645,461)
Gross Profit 13,928,024 14,266,087
Other revenue 64,266,279 70,212,973 Operating expenses (89,999,434) (86,546,373)
Operating (loss) / profit (11,805,131) (2,068,313)
Investment income 694,288 13,516 Finance costs (985,936) (21,638)
Loss for the year (12,096,779) (2,076,435)
Other comprehensive income - -
TOTAL COMPREHENSIVE INCOME / (LOSS) (12,096,779) (2,076,435)
SHELTERED EMPLOYMENT FACTORIESSTATEMENT OF COMPREHENSIVE INCOME
AS AT 31 MARCH 2012
5.6 AUDIT MATTERS OF SEF
46
Qualification - None
Emphasis of Matter -Financial sustainability / going concern:•The entity is unable to operate as a going concern Material losses:•The entity disclosed material losses amounting to R1 006 852 and R130 374 due write down of inventory and criminal conduct by fraudsters, respectively.Irregular expenditure incurred:•SEF incurred irregular expenditure due to the lack of Supply Chain Management processes.
5.6 AUDIT MATTERS OF SEF
47
Compliance with laws and regulations
Procurement and contract management: •Goods and services of a transaction value above R500 000 were procured without inviting competitive bids •Consultants were appointed to render services for which there was sufficient time to recruit people to perform the work.•Employees of the entity performed remunerative work outside their employment without written permission from the relevant authority
6. MANAGEMENT ACTION TO RESPOND TO AUDIT
48
• The Department, including SEF, has developed a
Management Action Plan to address all audit
findings/queries.
• Progress reports are provided to Management Committees
and the Audit Committee.
• Follow-ups are performed during the year by Internal Audit.
7. HUMAN RESOURCES – The DoL’s Staff compliment
49
Programme No. of posts No. of posts filled Vacancy RateNumber of posts filled
additional to the establishment
Administration(Corporate Services)
391 352 10.1 0
COO
5 791 5 400 6.8 95
PES 81 42 48.2 1
LP and IR 123 111 9.8 11
IES 59 48 18.6 5
Social Insurance
UIF: 455CC : 711
UIF: 421CC : 683
7.53.9
UIF: 25CC : 418
Total *7 611 7 057 7.3 555
7. HUMAN RESOURCES – Employment status
50
7. HUMAN RESOURCES – Equity by Occupational Band
51
Occupational BandsMale (44%) Female (56%)
African Coloured Indian White African Coloured Indian White Total Top Management 5 1 0 0 3 0 0 0 9Senior Management 34 4 3 4 24 1 0 3 73Professionally qualified and experienced specialists and mid-management
294 26 20 29 291 27 6 65 758
Skilled technical and academically qualified workers, junior management, supervisors, foreman and superintendents
746 84 34 72 795 108 40 255 2134
Semi-skilled and discretionary decision making
1371 172 39 64 1724 243 42 201 4083
Unskilled and defined decision making
84 12 1 4 111 14 0 1 0
Total 2534 299 97 173 2948 393 88 525 7057
CONCLUSION
52
The Department of Labour has appreciated the tenable successes and acknowledged some of the challenges facing the organisation. And, we continue in our strides to address these challenges.
The Department received its second unqualified audit opinion consecutively. The Sheltered Employment Factories (SEF) obtained its first unqualified report in years. Issues raised by the Auditor General are being corrected and improvements in the control environment are on an on-going process.
Chairperson, the Department has significantly improved its internal efficiencies and focuses on service delivery; that is the reason for changes to the labour legislations are recommended.
Thank You…