Construction of Bridges
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 2/74
Materials suitable for the Construction of
Long-span Bridges
1. Stone – in arch masonry
2. Steel – in girder or box-section constructed in steel
plates and standard sections
3. Steel – truss constructed of standard sections
4. Reinforced Concrete – in arch or spanned forms5. Tensioned RC – in various forms
6. Precast – mainly in box-section girder
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 3/74
Common Bridge Forms
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 4/74
Simple Supported – span effective from 10m to 60mActual example – Route 3
Interchange at Au Tau, Yuen Long
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 5/74
Continuous Span – from 10m to 100m
Actual example – construction of a span of continual section
of elevated highway bridge at Route 3, Kwai Chung
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 6/74
Balanced Cantilever – span from 25m to 200m
Actual example – balanced cantilever bridge series
forming the approach to the Ting Kau Bridge
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 7/74
Balanced cantilever bridge
for viaduct of West Rail at
Au Tau Interchange
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 8/74
Balanced Cantilever Suspended Span – span from 50m to 300m
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 9/74
Steel Truss – 50m to 100m
Actual example –
5-span steel truss
bridge in western
part of Pearl River,
Guangzhou
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 10/74
Steel Arch (framed or trussed) – from 150m to 500m
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 11/74
Sydney Harbour Bridge
and its approach
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 12/74
Close up view of the
bridge trusses
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 13/74
Close up of the bridge at
the tower support
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 14/74
Cable suspension – from 400m to 1500m
The 1377m
span Tsing
Ma Bridge
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 15/74
Concrete Arch (ribbed or unribbed) – from 50m to 300m
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 16/74
Steel Arch – from
100m to 500m
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 17/74
The actual example – LuPoa Bridge, Shanghai (550m main span)
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 18/74
Cable stayed (multi-spanned) – from 50 to 500m per span
The 3-span cable-stayed Ting Kau Bridge
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 19/74
Cable stayed span – from 200m to 800m
Actual example – the connecting bridge from
Macau Mainland to the Island of Taipa in Macau
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 20/74
Example of box-sectioned
steel girder bridge
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 21/74
Structural Elements for Typical Bridges
1. Foundation –for bridge towers, portal frames or piers
2. Bridge Tower – the vertical supporting structure for cablesuspension or cable-stayed bridges
3. Pier – the vertical supporting structure for usual spanned bridges
4. Portal frame – cross beam between piers to support the deck
5. Bridge deck – the horizontal part of a bridge that support pedestrian or traffic activities
6. Bridge anchor – required only for suspension bridges tocounter resist the pull from the suspension cable
7. Suspension cable – for suspension and cable-stayed bridges
for the hanging, support or counter-balancing of the bridgedeck
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 22/74
The foundation of
the bridge tower of
Ting Kau Bridgeon Tsing Yi side
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 23/74
The foundation for the
Bridge Tower of Tsing MaBridge on the Tsing Yi side
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 24/74
Forming the foundation for piers of elevated highway bridges
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 25/74
Pier supports for an
elevated roadway
A portal frame serving
also as a transfer beam
in the Route 3/AirportRailway at Kwai Chung
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 26/74
Falsework for theconstruction a
portal frame
id f i id d hi id
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 27/74
Bridge tower for Tsing Ma Bridge and Kap Shiu Mun Bridge
Tsing Ma Tower
B id f S B id
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 28/74
Bridge tower for Stonecutter Bridge
Bridge tower & side span/approach bridge of Stonecutter Bridge
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 29/74
Bridge tower & side span/approach bridge of Stonecutter Bridge
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 30/74
The forming of the cable
anchor of Tsing Ma
Bridge on Ma Wan side
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 31/74
The forming of the cable
anchor of Tsing Ma
Bridge on Tsing Yi side
Forming the deck of the
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 32/74
Forming the deck of the
approach section of Tsing
Ma Bridge on Ma Wan sideusing erection and hoisting
approach
Forming the deck of
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 33/74
Forming the deck of
the approach section
of Tsing Ma Bridgeon Tsing Yi side
C l ti th d k f
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 34/74
Completing the deck of
Tsing Ma Bridge (abutting
section at Tsing Yi side) by erecting of the steel
truss at spot
Hoisting and erecting
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 35/74
Hoisting and erecting
of the modulated
bridge deck for theTsing Ma Bridge
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 36/74
Forming the bridge deck of
Ting Kau Bridge usingmodulated steel girder frames
L i h d k f h l
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 37/74
Laying the precast deck of the steel
girder frame
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 38/74
Other methods to form the deck of bridges
1. Balanced cantilever method
2. Construct in-situ
3. Construct using precast beam
4. Construct using precast girder section and erected by a
launching machine (viaduct)5. Construct using incremental launching method
(the photos of project cases as shown in the following pages are for
reference only in order to help students to understand more
about bridge construction)
Forming the deck of
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 39/74
Forming the deck of
the Ting Kau Bridge
approach section usinga special balanced-
cantilever traveling
formwork system
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 40/74
The Ting Kau Bridge
approach section
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 41/74
Construction of a sectionof elevated railway track
in the KCR Ma On Shan
Line using in-situ method
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 42/74
The laying of precast
beams to form thedeck of the Route 3
elevated roadway at
Kwai Chung
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 43/74
Hoisting of the precast beamsusing a special launching gantry
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 44/74
Construction of anelevated highway bridge
using precast girder
erected by the use of alaunching machine
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 45/74
Launching gantry used to erect precast girders to
form a span of an elevated bridge (viaduct)
A bridge in the Fo Tan
R d I t
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 46/74
Road Improvement
Project making use of Incremental Launching
method to span across the
servicing KCR rail line
Alignment of servicing rail line
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 47/74
– elevated roadway constructed in the
form of viaduct
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 48/74
Route 3 – Kwai Chung Section
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 49/74
Route 3 – Country Park Section at Au Tau Interchange
Hung Hom Bypass
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 50/74
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 51/74
Tsing Yi North Coastal Roadway
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 52/74
Highway project inMa On Shan
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 53/74
Launching gantry used in the Hung Hom Bypass
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 54/74
Launching gantry used in
Route 3 at Au Tau Interchange
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 55/74
Launching gantry used
in Tsing Yi North
Coastal Roadway
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 56/74
Launching gantry used in the Ma On Shan highway project (T7)
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 57/74
Launching Gantry
used in the Route 3Kwai Chung section
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 58/74
Launching Gantry
used in the Route 8
Tsing Yi Section
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 59/74
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 60/74
Layout of the bridgeapproach/interchange
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 61/74
Front leg
Master winch
Rear leg
Slave winch
Rear
support
HangersFront
support
116m long
Main Truss
(For end span and 1st pair segment erection)(SWL = 105 T)
(SWL = 120T)
Elevation of the Launching Machine
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 62/74
A review of other highway and railway bridges
– construction of the viaduct systems
for the West Rail projects
Viaduct for railway
track of the Kowloon
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 63/74
track of the Kowloon
Canton Railway WestRail at the northwestern
part of the New
Territory, Hong Kong
Some sections of viaduct
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 64/74
spanning more than 40mat Au Tau Interchange
Forming the viaduct
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 65/74
g
for railway track using the under-
slung girder and
longitudinal beam
supported method
E i f h i d
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 66/74
Erection of the viaduct
using balanced cantilever
arrangement with
temporary anchor before
completion of a span
Precast box girders
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 67/74
used for the viaduct
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 68/74
A section of viaduct with provision for an extension to the future northern link
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 69/74
Construction of some
sections of elevated railway
track using in-situ method
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 70/74
Constructing the linking bridge between Tung Chung and Chek lap Kok
(the Airport Railway) using Incremental Launching method
Trends in the Construction of Bridges in HK
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 71/74
Construction of large and long-span bridges is of no doubt a part of the major infrastructure development for a city,
which is, again, a reflection of the economical climate and
development strategy of the area.
On the construction side, the limited land reserve in Hong
Kong does imposes stringent conditions especially where
the options and cost effectiveness of constructing a bridgeis concerned. To cope with these considerations, a few
world-class bridges over 1000m span are yet scheduled for
completion in the coming decade, in view of keeping Hong
Kong to be competitive in particular within the highly
economic-active region in the southern part of China. The
construction of these bridges is, without much choice, in the
form of either cable-stayed or suspension bridges.
The construction of other medium to short-span bridges are
becoming much popular recently as part of the highway
improvement strategy in Hong Kong.
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 72/74
p gy g g
The shortage of space for highway improvement works, the
involvement of complicated interchanging provisions, the
familiarization of bridge construction techniques in catering
various local constraints with acceptable cost, are factors that made
bridges of this type becoming popular.
Some inherited difficulties such as the requirement of large amount
of working spaces for the forming, transporting and storing of the
roomy precast elements; the operation of the launching works, or
arrangement for traffic diversion within existing busy roadway,
still makes roadwork under urban environments complicated and costly. Needless to mention working in environmental sensitive
locations such as where protection to natural habitats or rural
culture is required; or where waste, noise and dust problems are of ultimate concern.
The cost for constructing bridges are unavoidably high in
particular working within congested and complicated urban
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 73/74
particular working within congested and complicated urban
environment like Hong Kong.
As a tradition, bridges and elevated highway structures in Hong
Kong are mainly constructed in concrete. As a cost saving option,steel bridge, say, in hollow section, box-girder or any other
feasible design, may be alternative choices for highway bridges,
like those commonly used in Mainland China or Japan. Thesaving in initial cost and construction time of using such
alternatives may provide surplus capitals and expedite the
ongoing infrastructure projects, this is essential especially in theforthcoming years when the economic situation is expected to be
less favourable than before.
7/16/2019 Presentation Bridge Construction PPT
http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 74/74
The end of the presentation