present status of the project€¦ · 1 present status of the project total 84 stations are...
TRANSCRIPT
1
Present Status of the Project
Total 84 stations are streaming data in real time
26 stations are installed at blocks / tehsils / districts and
networked using SWAN Uttarakhand.
58 stations have been installed inside BSNL towers and
are connected using VPNoBB
Algorithm for real time processing of the data for
earthquake early warning has been tested.
Simulation for performance of the software successfully
completed using previously recorded data of Taiwan.
Regression model tested for Japanese, Taiwan and
Indian data set.
2
Estimated Lead Time
1. Dehradun - 20 seconds
2. Haridwar - 22 seconds
3. Roorkee - 31 seconds
4. Muzaffarnagar - 44 seconds
5. Meerut - 57 seconds
6. Delhi - 76 seconds
3
Status : Region Identification
Main Central Thrust
Main Boundary Thrust
4
Status: Current Installation for EEW System for Northern India
Possible source of future earthquake
Instrumented Area
Central Server
5
Total
Delhi 146,960 4.30% 3,101,055 91.70% 3,379,956
Total 146,960 3,101,055 3,379,956
Uttar Pradesh
High Risk Percentage Moderate Risk Percentage
Baghpat 8,967 3.5 242,415 95.6 253,469
Bijnor 103,464 15.3 545,325 80.6 676,443
Bulandshahar 55,485 8.3 596,709 89.0 670,224
Gautam Budh Nagar (NOIDA)16,505 5.8 257,296 90.4 284,519
Ghaziabad 38,463 5.3 663,712 91.8 722,691
Meerut 37,933 6.0 575,197 91.3 629,693
Muzzaffarnagar 62,274 8.6 648,804 89.4 725,764
Saharanpur 119,297 18.2 510,279 77.9 654,889
Total 442,388 4,039,737 4,617,692
Uttarakhand
High Risk Percentage Moderate Risk Percentage
Dehradun 81,880 24.4 234,502 69.8 336,012
Haridwar 42,110 12.6 274,763 82.5 333,008
Total 123,990 509,265 669,020
Haryana
High Risk Percentage Moderate Risk Percentage
Yamuna Nagar 24,052 9.3 220,851 85.1 259,609
Kurukshetra 10,456 5 189,954 91.3 208,099
Karnal 13,435 4.3 291,624 93.1 313,344
Panipat 8,863 3.8 217,408 93.1 233,547
Sonipat 5,681 1.8 311,050 96.6 321,869
Rohtak 7,535 3.1 227,507 94.9 239,806
Gurgaon 100,205 26.2 269,018 70.3 382,839
Faridabad 53,782 10.6 437,813 86.4 506,539
Total 224,009 2,165,225 2,465,652
Based on Vulnerability Atlas of India (First Revision) 2008 by BMTPC
No. of Houses at High
Risk
No. of Houses at Moderate
Risk
DistrictNo. of Houses No. of Houses
Total
DistrictNo. of Houses No. of Houses
Total
DistrictNo. of Houses No. of Houses
Total
High
Risk
Moderate
Risk
No. of houses
that can gain
benefit with
current network
9 Lacs 98 Lacs
*The report was based on 2001 census.
Status: Possible population that can gain benefit
6
Developed EEW dissemination system Using internet and using radio signal
Developed microprocessor based devices for server end and for siren end
Security against hacking ensured by using dynamically coded messages
Checking of health of dissemination system and reporting
Sirens have been fitted in the campus
Prepared Training material Video
Posters
Pamphlets
Mobile phone Apps is ready for distribution
Developed software for shake map
Developed website of EEW system (www.easni.com)
Strong ground motion data of different earthquakes recorded
by sensors uploaded in the website
7
Status: Pictures of siren installation
8
Status: Pictures of siren installation
9
Status : Training Modules
10
Status : Shake Map
11
Recorded Events
S.No. Date Earthquake Magnitude No. of Records Location
1 12/05/2015 Nepal Earthquake 7.3 5 Outside
2 18/07/2015 Chamoli 4.3 4 Inside
3 29/11/2015 Chamoli 4 14 Inside
4 26/10/2015 Hindukush 7.5 31 Outside
5 26/12/2015 Hindukush 6.5 30 Outside
6 25/09/2016 Uttarkashi 3.7 9 Inside
7 23/11/2016 Dehradun 3.4 8 Inside
8 01/12/2016 Indo-Nepal Border 5.2 20 Outside
9 13/12/2016 Dehradun 3.9 8 Inside
10 13/12/2016 Uttarakashi 3.4 6 Inside
11 19/12/2016 Uttarakashi 3.4 5 Inside
12 26/12/2016 Dehradun 3.5 4 Inside
13 10/01/2017 Chamoli 3.2 6 Inside
14 23/01/2017 Uttarkashi 3.5 6 Inside
15 03/02/2017 Chamoli 3.6 8 Inside
16 06/02/2017 Rudraprayag 3.6 8 Inside
17 11/02/2017 Rudraprayag 3.2 5 Inside