![Page 1: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/1.jpg)
Preparing Your County for Electric Vehicles
NACo Green Government 2011 Fall Webinar Series
September 15th
NACo is pleased to present this webinar in cooperation with Johnson Controls and the Department of Energy.
![Page 2: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/2.jpg)
NACo Staff Contacts:
Stephanie OsbornDeputy Director, County Services(202) [email protected]
Cindy WasserProgram Assistant(202) [email protected]
![Page 3: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/3.jpg)
Sept 15 Preparing Your County for Electric Vehicles
Oct 13 Green Purchasing 2.0: No Compromising onCost & Performance
Dec 1 The Future of Financing County Energy Projects
NACo Fall Green Government Webinar Series
![Page 4: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/4.jpg)
Housekeeping Items:
If you are having technical difficulties, please send us a message via the chat box on your right. Our organizer will reply to you privately and help resolve the issue.
The chat box is on the right side of the webinar window. The box will collapse so that you can better view the presentation. To unhide the box, click the arrows on the top of the panel.
![Page 5: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/5.jpg)
This webinar will be recorded and made available online to NACo members to view later or review.
Within the next few days you will receive an email notice with the link to the recording with your webinar evaluation survey.
Thank you in advance for completing the webinar evaluation survey. Your feedback is important to us.
![Page 6: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/6.jpg)
Agenda
2:00 Welcome and Introductions
2:05 Infrastructure Necessary for a Robust EV SystemRussell Garcia, Johnson Controls, Inc.
2:15 County Case Study: Sonoma CountyAmy Bolten, Sonoma County, California Water Agency
2:30 Overview of ToolsMike Simpson, National Renewable Energy Laboratory
2:45 Q&A
![Page 7: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/7.jpg)
Question and Answer Session Instructions
Type your question into the chat window, and the moderator will read the question on your behalf.
![Page 8: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/8.jpg)
Thank you for participating in NACo’s webinar.
For more information about NACo membership, contact
Andrew Goldschmidt at [email protected]
Ilene Manster at [email protected]
![Page 9: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/9.jpg)
Thank you for attending today’s webinar. Next in NACo’s Green Government Webinar Series:
Green Purchasing 2.0: No Compromising on Cost & PerformanceOctober 13, 2011
To learn more about upcoming NACo webinars, please visit www.naco.org/webinars
![Page 10: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/10.jpg)
Pg 1Pg 1
#1 Government need: cut budgets yet develop economy for jobs#1 Budget item outside of salaries: energy plus always increasing
[email protected] 916-257-6863 [email protected] 239-287-6960
![Page 11: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/11.jpg)
Pg 2Pg 2
2
EV city truck fleets integrated with your grid / Smart Grid:
![Page 12: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/12.jpg)
Pg 3Pg 3
3
EV city truck fleets integrated with your grid / Smart Grid:
![Page 13: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/13.jpg)
Pg 4Pg 4
4
EV city truck fleets integrated with your grid / Smart Grid:
![Page 14: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/14.jpg)
Pg 5Pg 5
5
Electric vehicles have completely sealed cooling systems that do not require refilling, replacement or flushing
•Electric vehicles require no oil changes or tune-ups
•There are no belts to wear out or break and no spark plugs or injectors to clean or adjust
•There is no exhaust system to replace and no liquid fuel system to freeze or clog
![Page 15: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/15.jpg)
Pg 6Pg 6
6
Houston’s City Hall EV charging station garage & Ford Transit Connect
![Page 16: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/16.jpg)
Pg 7Pg 7
7
Lighting, water, HVAC, renewable energy, building upgrades, wireless, Controls/EV’s
Energy Performance Contract with Savings Guarantee
Detailed audit Sophisticated analysis tools used to gather data and develop
customized solution
Improvements such as:
Project Discussion to Identify Goals:
Project commitment
Preliminary audit/Site visit
Electric Vehicle Stations
Lower Water Use
Reduce Emissions
Reduce Ops Budget
Lower Utility Use
Reduce Waste
Meet Project Goals
![Page 17: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/17.jpg)
Pg 8Pg 8
How do you pay for your energy budget cuts, Electric Vehicles, EV Charging Stations, retrofits & upgrades: Energy Savings
![Page 18: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/18.jpg)
Pg 9Pg 9
9
Your ideal next steps
Meet• City stakeholder leads meeting: fleet, management,
procurement with Johnson Controls to determine needs
Survey• Survey departments for EV truck needs, identify funding
& process procurement
Show• Showcase success, demonstrate savings & integrate with
grid
![Page 20: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/20.jpg)
Sonoma County Local Government Electric Vehicle Partnership
![Page 21: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/21.jpg)
Sonoma County Local Government Electric Vehicle Partnership
– born in 2008!
County of SonomaSonoma County Water AgencyNorthern Sonoma County Air Pollution Control DistrictRegional Climate Protection AuthorityOpen Space District
Cities:Santa Rosa SebastopolPetaluma WindsorRohnert Park HealdsburgCotati CloverdaleSonoma
![Page 22: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/22.jpg)
Local Government EV Vehicles and Infrastructure Workgroup
• Transform public fleets• Build local EV infrastructure
EV Fleet National Demonstration Project – Bay Area Partnership
•Collaborate and Implement Regional EV Initiatives
Statewide EV Workgroup•Promote and align state wide efforts
EV Partnership Components
![Page 23: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/23.jpg)
EV Vehicles and Infrastructure Workgroup Goals
Facilitate Regional Efforts in infrastructure build-out
Demonstrate EV Viability for the general public
Transform Public Fleets through conversion to hybrid and EVs
![Page 24: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/24.jpg)
Transform Public Fleets – Get them out on the road for people to see!
County of Sonoma/Sonoma County Water Agency:• Hybrid Light Duty Vehicles 296• Plug-in Hybrid Sedans 18• Electric Sedan 1• Neighborhood Electric Vehicles 9• Hybrid Medium Duty Trucks 5• Hybrid Buses 15
Total Hybrid and Electric Vehicles 344
![Page 25: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/25.jpg)
Currently installed charging stations: 40
To be installed by the end of the year through various grants:
MTC Fleet Grant - 31 for fleet use but public can use
MTC Public Charger Grant - 25 in public locations
ChargePoint America Grant /NSCAPCD Funds - 20-35 in public locations
Facilitate Regional Infrastructure Installations
![Page 26: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/26.jpg)
![Page 27: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/27.jpg)
![Page 28: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/28.jpg)
Three simultaneous tracks:1. Tourism – Sonoma County Electric Trail2. Outreach to local businesses – Why and
how to install charging stations3. Branding and general public awareness –
consistent logo, materials, map, website
![Page 29: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/29.jpg)
Sonoma County Electric Trail
![Page 30: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/30.jpg)
Three simultaneous tracks:1. Tourism – Sonoma County Electric Trail2. Outreach to local businesses – Why and how to
install charging stations3. Branding and general public awareness –
consistent logo, materials, map, website
![Page 31: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/31.jpg)
Amy Bolten, Sonoma County Water Agency (Local outreach)
Dave Head, County of Sonoma (Fleet, technical, regional)
![Page 32: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/32.jpg)
Clean Cities / 1
Community PEV Readiness Tools
Mike SimpsonVehicle Systems EngineerNational Renewable Energy Lab
Alternative Fuels and Advanced Vehicles Data Center
![Page 33: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/33.jpg)
Clean Cities / 2
• AFDC Home• Alternative Fuel Station Locator• Emissions Calculator• Cost Estimations*• State and Federal Incentives• EVSE Permitting Template• Training and Education
– Clean Cities University– Clean Cities TV (Installer Video)
• Publications/Outreach– PEV Primer
• Technical Response Service
Alternative Fuels and Advanced Vehicles Data Center Toolkit
?
*Cost calculator is not yet live, but will be soon
![Page 34: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/34.jpg)
Clean Cities / 3
Alternative Fuel Station Locator
![Page 35: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/35.jpg)
Clean Cities / 4
Government-industry collaboration committed to establishing a repository of public EVSE location data for consumers and industry.
Goals– Avoid duplication of data collection efforts for EVSE
locations– Enhance the EVSE data in the AFDC station locator– Ensuring DOE continues to collect and provide the
most comprehensive collection of EVSE location data
– Strengthen relationships and improve communication with new industry stakeholders
GeoEVSE Forum
![Page 36: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/36.jpg)
Clean Cities / 5
Electricity Sources and Emissions
![Page 37: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/37.jpg)
Clean Cities / 6
Vehicle Cost Calculator
![Page 38: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/38.jpg)
Clean Cities / 7
Cost Calculator Widget
![Page 39: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/39.jpg)
Clean Cities / 8
State and Federal Incentives Database
![Page 40: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/40.jpg)
Clean Cities / 9
Residential EVSE permitting template
– Designed for permitting and inspecting jurisdictions
– Jurisdictions can modify for specific, unique requirements
Code material– NEC Article 625– Sets safety requirements for EVSE
installation
EVSE Permitting
![Page 41: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/41.jpg)
Clean Cities / 10
Permit diagrams provided:(options for installer to use in plans)
![Page 42: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/42.jpg)
Clean Cities / 11
Clean Cities University Courses– Electric Drive Vehicles: Overview and Impacts
Quarterly EV Webinars– Lessons learned– Best practices for deployment– Training opportunities
Training & Education
![Page 43: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/43.jpg)
Clean Cities / 12
Residential Charging Installation Video– Electrical contractors and installers– Permitting officials and inspectors– Collaborative effort between Clean
Cities, OEMs, Utilities, EVSE suppliers
Community Readiness Workshop – Clean Cities Coalitions are developing
community EV readiness plans– Videos of presentations available for
local workshops
Training & Education
![Page 44: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/44.jpg)
Clean Cities / 13
Residential Charging Installation Training
WWW.CLEANCITIES.TV
![Page 45: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/45.jpg)
Clean Cities / 14
Publications & Outreach
Hybrid and Plug-In Electric Vehicles fact sheet
Plug-In Electric Vehicle Handbooks (coming soon)
– Consumers– Fleet Managers– Station Owners– Electrical Contractors
![Page 46: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/46.jpg)
Clean Cities / 15
Thank you!
Mike [email protected]
For more information please visit the AFDC:http://www.afdc.energy.gov/afdc/
NREL’s Advanced Technology Vehicle Fleet at Bandimere Speedway
![Page 47: Preparing Your County for Electric Vehicles EV...Preparing Your County for Electric Vehicles NACo Green Government 2011 Fall Webinar Series September 15th NACo is pleased to present](https://reader034.vdocuments.us/reader034/viewer/2022042116/5e94575904933a5a51541700/html5/thumbnails/47.jpg)
Clean Cities / 2
• AFDC Home• Alternative Fuel Station Locator• Emissions Calculator• Cost Estimations*• State and Federal Incentives• EVSE Permitting Template• Training and Education
– Clean Cities University– Clean Cities TV (Installer Video)
• Publications/Outreach– PEV Primer
• Technical Response Service
Alternative Fuels and Advanced Vehicles Data Center Toolkit
?
*Cost calculator is not yet live, but will be soon