preparing for the new superelevation standards in the ... for the new superelevation standards in...

23
1 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated © 2016 Bentley Systems, Incorporated © 2016 Bentley Systems, Incorporated Preparing for the New Superelevation Standards in the Connect Edition Dan Ahern, Content Development Manager Bentley Systems

Upload: ngohuong

Post on 10-May-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

1 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated © 2016 Bentley Systems, Incorporated

© 2016 Bentley Systems, Incorporated

Preparing for the New Superelevation Standards in the Connect Edition

Dan Ahern, Content Development Manager

Bentley Systems

2 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

A Look Back

GEOPAK - *.sep

InRoads - *.sup

MX - *.srl

50 states in the United States = 51 ways of doing super

196 countries in the world = to many ways to count

3 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Requirements for NEW Superelevation

• Include ALL legacy functionality

• Customizable

– Formulas & Tables

– Key Stations

– User Defined Inputs

• Can be modified by the “Average User”

– Universal Format

– Editing Tool

– Customizable without a Developer

4 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Currently

OpenRoads Designer CONNECT Edition

EAP – December 2016

Commercial Release – 2017

5 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Superelevation Process

1. Create Superelevation Section

2. Create Superelevation Lanes

3. Calculate Superelevation

4. Assign to Corridor

6 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated 6 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

NEW Technology and Tools

7 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

One Step Superelevation

• When creating the Superelevation section(s), pick the Corridor instead of the Alignment

– Creates Superelevation Sections

– Creates Superelevation Lanes

– Calculates Superelevation

• Uses ‘default settings’

– Assigns to Corridor

• Corridor must be in the same file.

8 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Superelevation Lanes by Template

Creates lane configurations based on templates

– Uses Superelevation points in template to identify lanes

9 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Pivot Methods

All Legacy Pivot Methods now supported

10 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Superelevation Calculation Report

11 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Superelevation Model

• Super Diagram in a managed model (e.g. profiles, cross sections)

• Editable

• Rules/Relationships

12 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated 12 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

Superelevation Rules File

13 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Superelevation Rules File

Replaces all former preference files

XML Format

OpenRoads Designer

(XML)

14 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Superelevation Rules File

• Everything is in the XML

– No other files required

• Edit through Interface or any XML editor

15 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

General

• Units

• Rounding Values

• Default Settings

– For “One Step” Superelevation

16 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Rate Calculations

Create Rate Tables

– Create Manually

– Import from SUP or SEP

17 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Rate Calculations

Create Rate Tables

– Create Manually

– Import from SUP or SEP

Create Rate Equations

18 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Transition Calculations

Create Transition Tables

– Create Manually

– Import from SUP or SEP

Create Transition Equations

19 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Transition Options

20 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Custom Key Stations

Default Cross Slopes

– Normal Crown (e.g. 2%)

– Flat (0%)

– Reverse Crown (e.g. 2%)

– Full super (e.g. 6%).

Custom Key Stations

– Any cross slope

– For example, at 1%

** Note: These can also be used in customized formulas

21 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Custom Key Stations

22 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

User Variables

Prompt the User for some value(s) before calculating the Superelevation?

– String

– Integer

– Decimal

– Boolian

23 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated © 2016 Bentley Systems, Incorporated

© 2016 Bentley Systems, Incorporated

Thank You

Have a great conference!