preparing for a water treatment plant · 2020. 1. 28. · design-build process preparing for a...

33
Preparing for a Water Treatment Plant Town of Long Harbour Case Study 2017 Clean and Safe Drinking Water Workshop Keith Bartlett, P.Eng. SNC-Lavalin Inc 709-368-0118 [email protected]

Upload: others

Post on 22-Mar-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

›Preparing for a Water Treatment Plant›Town of Long Harbour Case Study2017 Clean and Safe Drinking Water Workshop

Keith Bartlett, P.Eng. SNC-Lavalin Inc709-368-0118 [email protected]

Page 2: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

AGENDAIntroduction and Presentation Road Map

Page 3: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

Agenda

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 3

› Introduction and summary› Review of Long Harbour WTP Project› Lessons Learned› Preparing for a WTP Project› Questions

Page 4: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

Review of Long HarbourWTP Project

Page 5: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

THE PROBLEM

Page 6: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

The Problem

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 6

Water Quality› DOC› Turbidity› Colour › pH› Langelier Index› DBP

Page 7: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

HAA & Langelier IndexSummary

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 7

Page 8: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

Existing Equipment

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 8

Water System› Two Surface Water Sources

› Trout Pond› Shingle Pond

Treatment System› Screens› Pressure Filters› Cl2 Gas Disinfection (Flow Proportional)

Page 9: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

Town Goals

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 9

› Identified improved drinking water quality as a top priority

› System to produce water that meets Guidelines for Canadian Drinking Water Quality

› In 2009 Town received funding to undertake an EDI & prepare Design-Build TOR for WTP

Page 10: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

DESIGN-BUILD OF WATER TREATMENT PLANTStandardized RFQ-RFP process for proponent selection

Page 11: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

LONG HARBOUR PROCESS

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 11

EDI AND TOR FOR RFP

FLOW MONITORING

LEAK DETECTION AND REPAIR

DESIGN FLOW APPROVAL AND COMPLETION OF

RFPRFQ RFP PERFORMANCE

VERIFICATION

Page 12: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

PREPARATION FOR THE RFP PROCESS

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 12

Feb

2009

E

DI A

ppro

ved

Aug

200

9 E

DI a

nd T

OR

Com

plet

ed

Jan-

June

201

0R

FP D

ocum

ent D

evel

oped

Sep

t 201

0 –

Aug

201

1Fl

ow M

onito

ring

Aug

ust 2

011-

Mar

ch 2

012

Loca

te a

nd R

epai

r Lea

ks

June

201

2Fu

ndin

g A

ppro

val t

o R

epla

ce W

M

Apr

201

2-M

ar 2

013

Mon

itor F

low

s &

Rep

ort t

o D

OE

C

Mar

201

3A

ppro

val o

f Des

ign

Flow

s

July

201

3R

FP D

ocum

ent C

ompl

eted

Dec

embe

r 201

3P

roce

ss C

hang

ed to

R

FQ/R

FP

Page 13: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

RFQ/RFP PROCESS

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 13

Dec

201

3P

roce

ss C

hang

ed to

R

FQ/R

FP

Mar

201

4A

ppro

val o

f RFQ

&

RFQ

Clo

sing

May

201

4D

ebrie

fs a

nd n

otifi

catio

n to

pr

opon

ents

June

204

RFP

issu

ed to

Pro

pone

nts

July

–A

ug 2

014

Pilo

t Tes

ting

Oct

ober

201

4R

FP C

losi

ng

Nov

201

4-Fe

b 20

15P

ropo

sal R

evie

w a

nd

Neg

otia

tion

with

Pre

ferr

ed

Pro

pone

nt

Apr

il 20

15A

ppro

val o

f Add

ition

al

Fund

ing

May

, 201

5A

war

d of

Des

ign-

Bui

lt C

ontra

ct

Page 14: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

DESIGN-BUILD PROCESS

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14

May

, 201

5A

war

d of

Des

ign-

Bui

lt C

ontra

ct

Oct

, 201

5 10

0% D

esig

n S

ubm

issi

ons

Apr

il, 2

016

Wat

er T

ower

Inst

alla

tion

and

Del

iver

y of

Mod

ular

B

uild

ing

July

, 201

6C

ompl

etio

n of

Site

Civ

il an

d S

tart

Of C

omm

issi

onin

g

Sep

t, 20

16P

lant

Han

dove

r to

Tow

n

Jan,

201

7C

ompl

etio

n of

90

Day

P

erfo

rman

ce V

erifi

catio

n

Feb

2017

Fina

l Rep

ort S

ubm

issi

on

Page 15: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 15

Page 16: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

DESIGN-BUILD PROCESS

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 16

May

, 201

5A

war

d of

Des

ign-

Bui

lt C

ontra

ct

Oct

, 201

5 10

0% D

esig

n S

ubm

issi

ons

Apr

il, 2

016

Wat

er T

ower

Inst

alla

tion

and

Del

iver

y of

Mod

ular

B

uild

ing

July

, 201

6C

ompl

etio

n of

Site

Civ

il an

d S

tart

Of C

omm

issi

onin

g

Sep

t, 20

16P

lant

Han

dove

r to

Tow

n

Jan,

201

7C

ompl

etio

n of

90

Day

P

erfo

rman

ce V

erifi

catio

n

Feb

2017

Fina

l Rep

ort S

ubm

issi

on

Page 17: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 17

Page 18: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

DESIGN-BUILD PROCESS

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 18

May

, 201

5A

war

d of

Des

ign-

Bui

lt C

ontra

ct

Oct

, 201

5 10

0% D

esig

n S

ubm

issi

ons

Apr

il, 2

016

Wat

er T

ower

Inst

alla

tion

and

Del

iver

y of

Mod

ular

B

uild

ing

July

, 201

6C

ompl

etio

n of

Site

Civ

il an

d S

tart

Of C

omm

issi

onin

g

Sep

t, 20

16P

lant

Han

dove

r to

Tow

n

Jan,

201

7C

ompl

etio

n of

90

Day

P

erfo

rman

ce V

erifi

catio

n

Feb

2017

Fina

l Rep

ort S

ubm

issi

on

Page 19: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 19

Page 20: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

PROJECT OVERVIEW

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 20

Capital Costs: $2.6M

Flow Rate (m3/day & 116 USGPM Capacity)

Town Population (design): 298

Operation cost (1st 90 days): $ 12,094.36

Performance: All Parameters Within Guidelines

Page 21: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

LESSONS LEARNED

Page 22: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

Contributors to Project Success

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 22

› Understanding of Town’s complete water distribution system

› Quality of Information available at RFP Stage

› Communication Plan

› Project Execution Plan Anticipating Unknowns

› Document Management System› Access to the proper Technical resources

as needed

Page 23: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

Proposed Process Improvements

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 23

› Increased focus/detail on sludge management

› Detailed Plan/Procedures for Power Outages

› Detailed Source Water Quality Testing for 1 Year in Advance of RFP

› Engineering Study› Existing system As-Builts› Detailed Operator Training and support

plan

Page 24: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

PREPARING FOR A WATER TREATMENT PLANT

Page 25: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

PROCESS FOR DESIGN-BUILD OF A WATER TREATMENT PLANT

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 25

DESKTOP STUDY RFQ PROCESS RFP PROCESS DESIGN-BUILD PERFORMANCE

VERIFICATION1ST YEAR OF OPERATION

Information Gathering,

Planning and Scoping

Identification of Best Qualified

Design-Builders

Piloting and Selection of

Preferred Proponent

Completion of Design, and Construction

Verify Performance, O&M Costing and RFP Requirements

Training, System Calibration,

Initial Support

Page 26: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

DESKTOP STUDY

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 26

› Water System Model› Review of water supply capacity/quality (As requred)› Preliminary Tank Sizing (As Required)› Budgetary Estimate› Legal Surveys› Topographical Survey› Geotechnical Report› Water Quality Monitoring/Testing› Theoretical Flows Vs Actual› Leak Detection & Repair› Confirmation of Design Flows› Water Conservation

Page 27: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

RFQ PROCESS

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 27

› Confirm General Owner’s Statement of Requirements› Preparation of RFQ Document detailing:

› Design Flows› Water Quality› Design Standard› Selection Procedure

› Identify Proponents Most Qualified for Design Build (limit to 3-4)

Page 28: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

RFP PROCESS

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 28

› Detailed Request for Proposals Document Including› Detailed Owner’s Statement of Requirements› Water Quality Data› Design Standard› Evaluation Criteria/Ranking Formulas

› Piloting› 30% Design Submission (By Proponents)› Proposal Review & Evaluation With Owner’s Advisor› Negotiation with Preferred Proponent› Award of Design-Build Contract

Page 29: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

DESIGN-BUILD PROCESS

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 29

› Design Submissions – Review with Owner’s Advisor› 60%› 90%› 100%

› Shop Drawing Submission for Review by Owner’s Advisor› Construction› Start-up› Commissioning› Hand-over

Page 30: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

PERFORMANCE VERIFICATION

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 30

› Set period for tracking of quality objectives and costing› Ongoing Training for Town Staff› Ongoing support for Town staff during operation› Final Reporting› Performance Verification Holdback› Generation of final deficiency list

Page 31: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

First Year of Operations

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 31

› Continuation of tracking of quality objectives and costing› Pre-defined budget for support for Town staff during operation› Completion of Deficiencies› Project Closeout

Page 32: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

QUESIONS?

Keith Bartlett, P.Eng. SNC-Lavalin Inc709.368.0118 [email protected] Clean and Safe Drinking Water Workshop

Page 33: Preparing for a Water Treatment Plant · 2020. 1. 28. · DESIGN-BUILD PROCESS Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 14 May, 2015 Award of Design-Built

Our values keep us anchored and on track. They speak to how we run our business, how we express ourselves as a group, and how we engage with our stakeholders and inspire their trust.

Values that guide us

Teamwork & excellenceWe’re innovative, collaborative, competent and visionary.

Customer focusOur business exists to serve and add long-termvalue to our customers’ organizations.

Strong investor returnWe seek to reward our investors’ trust by delivering competitive returns.

Health & safety, security and environmentWe have a responsibility to protect everyone who comes into contact with our organization and the environment we work in.

Ethics & complianceWe’re committed to ethical business.

RespectOur actions consistently demonstrate respect toward our stakeholders.

Preparing for a Water Treatment Plant: Town of Long Harbour Case Study 33