preparedness and timelines for integrated hospital disaster management planning dr.p.ravindran...

11
Preparedness and Timelines for Integrated Hospital Disaster Management Planning Dr.P.Ravindran Director (EMR), Dte GHS, MOHFW Conference on Chemical (Industrial) Disaster Management February 11-13, 2009, New Delhi

Upload: melanie-alexander

Post on 03-Jan-2016

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Preparedness and Timelines for Integrated Hospital Disaster Management Planning Dr.P.Ravindran Director (EMR), Dte GHS, MOHFW Conference on Chemical (Industrial)

Preparedness and Timelines for Integrated Hospital Disaster

Management Planning

Dr.P.Ravindran

Director (EMR), Dte GHS, MOHFW

Conference on Chemical (Industrial) Disaster Management

February 11-13, 2009, New Delhi

Page 2: Preparedness and Timelines for Integrated Hospital Disaster Management Planning Dr.P.Ravindran Director (EMR), Dte GHS, MOHFW Conference on Chemical (Industrial)

Integrated Hospital Disaster Planning

• Integrate hospital disaster planning with:– Pre Hospital Services/ EMS– Community Plans (District DM plans)– Other Hospitals (referrals etc)

• With-in hospital– With sub-plans of different Departments

Page 3: Preparedness and Timelines for Integrated Hospital Disaster Management Planning Dr.P.Ravindran Director (EMR), Dte GHS, MOHFW Conference on Chemical (Industrial)

Integrated Hospital Disaster Planning

• Hospital Emergency Response plan

• Hospital Emergency Preparedness Plan

• Hospital Disaster Mitigation Plan (Vulnerability assessment and Risk Management Plan)

Page 4: Preparedness and Timelines for Integrated Hospital Disaster Management Planning Dr.P.Ravindran Director (EMR), Dte GHS, MOHFW Conference on Chemical (Industrial)

Legal Framework

• Disaster Management Act-2005

• State DM Acts

Page 5: Preparedness and Timelines for Integrated Hospital Disaster Management Planning Dr.P.Ravindran Director (EMR), Dte GHS, MOHFW Conference on Chemical (Industrial)

National Policy, plans, guidelines

• Draft National Policy reflects the provisions under the Act.

• In consonance with the DM Act 2005, MOHFW, the nodal ministry is preparing the Health Sector Plan.

Page 6: Preparedness and Timelines for Integrated Hospital Disaster Management Planning Dr.P.Ravindran Director (EMR), Dte GHS, MOHFW Conference on Chemical (Industrial)

NDMA Guidelines

• NDMA guidelines on Mass Casualty Management provides for: – Integrated plan for hospital preparedness and

response. – Capacity development. – hospital buildings to be disaster resilient.– Specialized capabilities for trauma, burns and

NBC disasters.– Capacity development for preservation and

identification of dead bodies.

Page 7: Preparedness and Timelines for Integrated Hospital Disaster Management Planning Dr.P.Ravindran Director (EMR), Dte GHS, MOHFW Conference on Chemical (Industrial)

Situation Analysis

• Gujarat, has initiated actions for integrated hospital disaster management planning.

• PWD constructions- disaster resilient.• Hospitals, barring a few, have not assessed the

vulnerabilities. • Do not have preparedness and response plans.• Even if present , they are not tested and reviewed.• By and large, the culture has not imbibed into the

health care system.

Page 8: Preparedness and Timelines for Integrated Hospital Disaster Management Planning Dr.P.Ravindran Director (EMR), Dte GHS, MOHFW Conference on Chemical (Industrial)

Problem areas

• Incident Command System for Hospitals– Borrowed concept without looking into the

functional/ administrative realities.

• Not in a position as of now to implement as a managerial system

• Financial and decision making autonomy not available.

• Need large scale training and exercises to take in the culture of ICS

• Risk assessment and Risk management

Page 9: Preparedness and Timelines for Integrated Hospital Disaster Management Planning Dr.P.Ravindran Director (EMR), Dte GHS, MOHFW Conference on Chemical (Industrial)

Way ahead• Policy, plans and SOPs to be in place• All hospitals to have integrated hospital

preparedness and response plan • Large scale training of hospital managers on

management perspective : to include-

– Risk Assessment & Management– Operational Management– ICS

• Capacity Development for integrated model of pre hospital and hospital care.

• Hospital Disaster Plan and its testing to be made mandatory.

Page 10: Preparedness and Timelines for Integrated Hospital Disaster Management Planning Dr.P.Ravindran Director (EMR), Dte GHS, MOHFW Conference on Chemical (Industrial)

Timelines for Implementation

Phase Year ending

Action

Phase-I 2010 • Developing plans, guidelines and SOPs • Developing/ strengthening legal instruments to

support, preparedness, response and capacity development for MCM

Phase-II 2012 • Capacity development for prevention, preparedness, mitigation and response including hospital preparedness

Phase III 2015 • Testing, reviewing and further strengthening the above initiatives

• Establishing specialized capabilities for NBC disasters, trauma, containerized mobile hospital systems etc.

Page 11: Preparedness and Timelines for Integrated Hospital Disaster Management Planning Dr.P.Ravindran Director (EMR), Dte GHS, MOHFW Conference on Chemical (Industrial)

Thank you