prepared for south hunterdon regional school d mt -h-+02-25-2014+-+south... · this report presents...

118
LOCAL GOVERNMENT ENERGY AUDIT PROGRAM: ENERGY AUDIT REPORT PREPARED FOR: SOUTH HUNTERDON REGIONAL SCHOOL DISTRICT 201 MT. AIRY-HARBOURTON RD. LAMBERTVILLE, NJ 08530 ATTN: KERRY SEVILIS BUSINESS ADMINISTRATOR PREPARED BY: CONCORD ENGINEERING GROUP 520 S. BURNT MILL ROAD VOORHEES, NJ 08043 TELEPHONE: (856) 427-0200 FACSIMILE: (856) 427-6529 WWW.CONCORD-ENGINEERING.COM CEG CONTACT: SAM DORIA MECHANICAL ENGINEER EMAIL: SDORIA@CONCORD- ENGINEERING.COM REPORT ISSUANCE: FINAL, FEBRUARY 25, 2014 PROJECT NO: 1C13406

Upload: others

Post on 18-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

LOCAL GOVERNMENT ENERGY AUDIT PROGRAM: ENERGY AUDIT REPORT

PREPARED FOR: SOUTH HUNTERDON REGIONAL

SCHOOL DISTRICT 201 MT. AIRY-HARBOURTON RD. LAMBERTVILLE, NJ 08530 ATTN: KERRY SEVILIS

BUSINESS ADMINISTRATOR

PREPARED BY: CONCORD ENGINEERING GROUP 520 S. BURNT MILL ROAD

VOORHEES, NJ 08043 TELEPHONE: (856) 427-0200 FACSIMILE: (856) 427-6529 WWW.CONCORD-ENGINEERING.COM

CEG CONTACT: SAM DORIA

MECHANICAL ENGINEER EMAIL: [email protected]

REPORT ISSUANCE: FINAL, FEBRUARY 25, 2014 PROJECT NO: 1C13406

Page 2: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

TABLE OF CONTENTS

I. EXECUTIVE SUMMARY ................................................................................................. 3

II. INTRODUCTION ............................................................................................................. 10

III. METHOD OF ANALYSIS................................................................................................ 11

IV. HISTORIC ENERGY CONSUMPTION/COST ............................................................... 13

A. ENERGY USAGE / TARIFFS .................................................................................................. 13

B. ENERGY USE INDEX (EUI) .................................................................................................. 20

C. EPA ENERGY BENCHMARKING SYSTEM ............................................................................. 22

V. FACILITY DESCRIPTION .............................................................................................. 23

VI. MAJOR EQUIPMENT LIST ............................................................................................ 27

VII. ENERGY CONSERVATION MEASURES ..................................................................... 28

VIII. RENEWABLE/DISTRIBUTED ENERGY MEASURES ................................................ 55

IX. ENERGY PURCHASING AND PROCUREMENT STRATEGY .................................. 57

X. INSTALLATION FUNDING OPTIONS.......................................................................... 61

XI. ADDITIONAL RECOMMENDATIONS ......................................................................... 61

Appendix A – ECM Cost & Savings Breakdown

Appendix B – New Jersey Smart Start® Program Incentives

Appendix C – Portfolio Manager “Statement of Energy Performance”

Appendix D – Major Equipment List

Appendix E – Investment Grade Lighting Audit

Appendix F - Renewable / Distributed Energy Measures Calculations

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 1 of 65

Page 3: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

REPORT DISCLAIMER

The information contained within this report, including any attachment(s), is intended solely for use by the named addressee(s). If you are not the intended recipient, or a person designated as responsible for delivering such messages to the intended recipient, you are not authorized to disclose, copy, distribute or retain this report, in whole or in part, without written authorization from Concord Engineering Group, Inc., 520 S. Burnt Mill Road, Voorhees, NJ 08043.

This report may contain proprietary, confidential or privileged information. If you have received this report in error, please notify the sender immediately. Thank you for your anticipated cooperation.

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 2 of 65

Page 4: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

I. EXECUTIVE SUMMARY

This report presents the findings of the energy audit conducted for:

South Hunterdon Regional School District 301 Mt. Airy Harbourton Road

Lambertville, New Jersey 08530 District Contact Person: Kerry Sevilis, Business Administrator

This audit is performed in connection with the New Jersey Clean Energy - Local Government Energy Audit Program for the South Hunterdon Regional High School. The purpose of this analysis is to provide the owner insight into the energy savings potential that exists within the facility. Energy Efficiency changes and upgrades requires support from the building occupants, operations personnel and the administrators of the building in order to maximize the savings and overall benefit. The efficiency improvement of public buildings provides a benefit for the environment and the residents of New Jersey. The Energy Conservation Measures (ECMs) identified within the report represent the potential annual savings at the facility. It is recommended to consider all ECMs as part of the BOE’s initiative to save energy, reduce emissions, and lower operating costs. The School District should review and be familiar with all measures presented in the report prior to making a decision on which projects to move forward with. This will enable the BOE to effectively align report recommendations with those outlined in their mid/long range facility plans and financial plans. The BOE should also review all conventional and unconventional funding, along with all NJCEP funding opportunities for these projects and determine which options fit their budget most positively in the short and long term. The combination of this information will enable the BOE to put together an effective Energy Savings Improvement Strategy that maximizes the received benefits of the selected projects. The annual energy costs at this facility are as follows: The potential annual energy cost savings for each energy conservation measure (ECM) and renewable energy measure (REM) are shown below in Table 1. Be aware that all ECM’s and REM’s are not additive because of the interrelation of some of the measures. This audit is consistent with an ASHRAE level 2 audit. The cost and savings for each measure is ± 20%. The evaluations are based on engineering estimations and industry standard calculation methods. More detailed analyses would require engineering simulation models, hard equipment specifications, and contractor bid pricing.

Electricity $ 122,161

#2 Fuel Oil $ 152,462

Propane $ 7,953

Total $ 282,576

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 3 of 65

Page 5: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Table 1 Financial Summary Table

The estimated demand and energy savings for each ECM and REM is shown below in Table 2. The descriptions in this table correspond to the ECM’s and REM’s listed in Table 1.

ECM #1 Lighting Upgrade - General $41,640 $6,289 6.6 126.5%

ECM #2 Lighting Upgrade - Exterior $8,980 $3,223 2.8 438.4%

ECM #3 Lighting Controls Upgrade $8,155 $2,086 3.9 283.7%

ECM #4 Energy Star Refrigerator Replacement

$2,000 $50 40.0 -75.0%

ECM #5 Vending Miser Controls $2,000 $339 5.9 69.4%

ECM #6 Walk-in Evaporator Fan Controls

$7,275 $773 9.4 59.4%

ECM #7 DDC Controls Upgrade $30,000 $2,013 14.9 0.7%

ECM #8 VFD on Chilled Water Pumps

$31,875 $1,308 24.4 -38.4%

ECM #9 Weatherization $10,000 $757 13.2 127.1%

ECM #10 Demand Control Ventilation $40,000 $408 98.0 -84.7%

ECM #11 Domestic Hot Water Reset $8,000 $974 8.2 82.6%

ECM #12 Domestic Water Heater Controller/Timer

$3,000 $251 12.0 25.3%

REM #1 424.32 kW PV System $1,727,388 $154,956 11.1 34.6%

Notes:

ECM NO. DESCRIPTION

SIMPLE PAYBACK

(Yrs)

SIMPLE LIFETIME

ROI

ENERGY CONSERVATION MEASURES (ECM's)

NET INSTALLATION

COSTA

RENEWABLE ENERGY MEASURES (REM's)

ECM NO. DESCRIPTION

NET INSTALLATION

COST

ANNUAL SAVINGSB

ANNUAL SAVINGS

SIMPLE PAYBACK

(Yrs)

SIMPLE LIFETIME

ROI

A. Cost takes into consideration applicable NJ Smart StartTM incentives.B. Savings takes into consideration applicable maintenance savings.

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 4 of 65

Page 6: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Table 2 Energy Savings Summary Table

ECM #1 Lighting Upgrade - General 20.6 57,175 -

ECM #2 Lighting Upgrade - Exterior 6.7 29,300 -

ECM #3 Lighting Controls Upgrade - 18,967 -

ECM #4 Energy Star Refrigerator Replacement

- 456 -

ECM #5 Vending Miser Controls - 3,079 -

ECM #6 Walk-in Evaporator Fan Controls

- 7,027 -

ECM #7 DDC Controls Upgrade - 4,448 433

ECM #8 VFD on Chilled Water Pumps

- 11,894 -

ECM #9 Weatherization - - 299

ECM #10 Demand Control Ventilation - 2,262 45

ECM #11 Domestic Hot Water Reset - - 276

ECM #12 Domestic Water Heater Controller/Timer

- - 71

REM #1 424.32 kW PV System 424.3 514,658 -

Notes:

ECM NO. DESCRIPTION

ANNUAL UTILITY REDUCTION

ECM NO. DESCRIPTION

ANNUAL UTILITY REDUCTIONRENEWABLE ENERGY MEASURES (REM's)

NATURAL GAS (THERMS)

ELECTRIC DEMAND

(KW)

#2 FUEL OIL (GALLONS)

ELECTRIC CONSUMPTION

(KWH)

A. Utility reductions denoted with a "-" means there are no associated savings for that measure.

ENERGY CONSERVATION MEASURES (ECM's)

ELECTRIC DEMAND

(KW)

ELECTRIC CONSUMPTION

(KWH)

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 5 of 65

Page 7: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Table 3 Emissions Summary Table

ECM #1 Lighting Upgrade - General 86,906 160 372

ECM #2 Lighting Upgrade - Exterior 44,536 82 190

ECM #3 Lighting Controls Upgrade 28,830 53 123

ECM #4 Energy Star Refrigerator Replacement

693 1 3

ECM #5 Vending Miser Controls 4,680 9 20

ECM #6 Walk-in Evaporator Fan Controls

10,681 20 46

ECM #7 DDC Controls Upgrade 12,100 12 29

ECM #8 VFD on Chilled Water Pumps

18,079 33 77

ECM #9 Weatherization 3,687 0 0

ECM #10 Demand Control Ventilation 3,993 6 15

ECM #11 Domestic Hot Water Reset 3,403 0 0

ECM #12 Domestic Water Heater Controller/Timer

878 0 0

Notes: A. Emissions Reduction based on NJCEP published factors for electric & oil.

ENERGY CONSERVATION MEASURES (ECM's)

ECM NO. DESCRIPTION

GREENHOUSE GAS EMISSIONS REDUCTION

CO2

EMISSIONS (LBS)

NOX

EMISSIONS (LBS)

SO2

EMISSIONS (LBS)

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 6 of 65

Page 8: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Overall Assessment: Overall, the South Hunterdon Regional High School is operating at a site energy use index (EUI) of 101 kBtu/SF per year which is above the average for high schools in the Northeast (see Figure 4). Concord Engineering recommends that the School District review and be familiar with all measures presented in the report prior to making a decision on which projects to move forward with. This will enable the School District to effectively align report recommendations with those outlined in their mid/long range facility plans and financial plans, of which the combination of this information will enable the School District to put together an effective Energy Savings Improvement Strategy that maximizes the received benefits of the selected projects. Other Considerations: Renewable Energy Conservation Measures: Renewable Energy Measures (REMs) were also reviewed for implementation at South Hunterdon High School. Concord Engineering utilized roof and ground mounted solar arrays to house PV systems at the facility. There is a total estimated solar system potential of 424 kW DC that could generate 514,658 kilowatt-hours annually offsetting 46% of the total energy purchased from the grid. The system’s calculated simple payback of 11.1 years is not within the standard 10 year simple payback threshold; however, with alternative funding this payback could be lessened. Concord Engineering recommends the Owner review all funding options available with the implementation of this renewable energy measure. Energy Procurement Recommendations: The School District is currently contracted with a third party supplier for the South Hunterdon High School for electric. It is recommended the School District continue utilizing a 3rd party purchasing approach to energy. The School District should also considering aggregating all of its properties to achieve greater savings through increases volume. Further recommendations are outlined in the Energy Procurement Section of this report that could assist the School District in finding additional savings through their utility bills. Maintenance and Operational Recommendations: In addition to the ECMs and REMs, there are maintenance and operational measures that can provide significant energy savings and provide immediate benefit. The ECMs listed above represent investments that can be made to the facility which are justified by the savings seen overtime. However, the maintenance items and small operational improvements below are typically achievable with onsite staff or maintenance contractors and in turn have the potential to provide substantial operational savings compared to the costs associated. The following are recommendations which should be considered a priority in achieving an energy efficient building and further recommendations for the building are provided in the building reports:

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 7 of 65

Page 9: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

1. Chemically clean the condenser and evaporator coils periodically to optimize efficiency. Poorly maintained heat transfer surfaces can reduce efficiency 5-10%.

2. Maintain all weather stripping on windows and doors. 3. Clean all light fixtures to maximize light output. 4. Provide more frequent air filter changes to decrease overall system power usage and

maintain better IAQ. 5. Confirm that outside air economizers on the air handling units are functioning properly to

take advantage of free cooling and avoid excess outside air during occupied periods. 6. Verify all HVAC control systems are utilizing setback and scheduling capabilities.

Combined Project Approach: Although individual projects with a simple payback of 10 years and less are considered financially self-sustaining, it is important to consider how multiple projects can be combined together. When ECMs are aggregated into a single project, the lower cost ECMs provides valuable savings to offset the higher cost ECMs. Likewise when multiple facilities are aggregated together into a single entity energy efficiency project, the same benefits are seen on a larger scale. The Energy Savings Improvement Program (ESIP) allows for financing of any combination of energy efficiency projects across multiple facilities into one large project. The term of the financing must be under 15 years and the savings provides the revenue for the financing cost. The combination of all projects into one large energy efficiency project provides the opportunity to implement many of the ECMs identified within this report with an overall simple payback of 10.4 years. The total Entity Project Summary table below shows the savings, costs, incentives and paybacks for all of the ECMs found in Table 1.

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 8 of 65

Page 10: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Table 4 Combined Project Summary Table

Lighting Upgrade - General $6,289 $41,860 $220 $41,640 6.6

Lighting Upgrade - Exterior $3,223 $12,560 $3,580 $8,980 2.8

Lighting Controls Upgrade $2,086 $8,800 $645 $8,155 3.9

Energy Star Refrigerator Replacement

$50 $2,000 $0 $2,000 40.0

Vending Miser Controls $339 $2,000 $0 $2,000 5.9

Walk-in Evaporator Fan Controls

$773 $7,500 $225 $7,275 9.4

DDC Controls Upgrade $2,013 $30,000 $0 $30,000 14.9

VFD on Chilled Water Pumps

$1,308 $31,875 $0 $31,875 24.4

Weatherization $757 $10,000 $0 $10,000 13.2

Demand Control Ventilation

$408 $40,000 $0 $40,000 98.0

Domestic Hot Water Reset $974 $8,000 $0 $8,000 8.2

Domestic Water Heater Controller/Timer

$251 $3,000 $0 $3,000 12.0

Total Project $18,470 $197,595 $4,670 $192,925 10.4

FACILITY PROJECT SUMMARY TABLE

ENERGY CONSERVATION

MEASURES

ANNUAL ENERGY

SAVINGS ($)

PROJECT COST ($)

CUSTOMER COST

SIMPLE PAYBACK

SMART START

INCENTIVES

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 9 of 65

Page 11: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

II. INTRODUCTION This audit is performed in connection with the New Jersey Clean Energy - Local Government Energy Audit Program. The energy audit is conducted to promote the mission of the office of Clean Energy, which is to use innovation and technology to solve energy and environmental problems in a way that improves the State’s economy. This can be achieved through the wiser and more efficient use of energy. Electrical and fuel oil utility information were collected and analyzed for one full year’s energy use of the building. The utility information allows for analysis of the building’s operational characteristics; calculate energy benchmarks for comparison to industry averages, estimated savings potential, and baseline usage/cost to monitor the effectiveness of implemented measures. A computer spreadsheet was used to calculate benchmarks and to graph utility information (see the utility profiles below). The Energy Use Index (EUI) is established for the building. Energy Use Index (EUI) is expressed in British Thermal Units/square foot/year (BTU/ft2/yr), which is used to compare energy consumption to similar building types or to track consumption from year to year in the same building. The EUI is calculated by converting the annual consumption of all energy sources to BTU’s and dividing by the area (gross square footage) of the building. Blueprints (where available) are utilized to verify the gross area of the facility. The EUI is a good indicator of the relative potential for energy savings. A low EUI indicates less potential for energy savings, while a high EUI indicates poor building performance therefore a high potential for energy savings. Existing building architectural and engineering drawings (where available) are utilized for additional background information. The building envelope, lighting systems, HVAC equipment, and controls information gathered from building drawings allow for a more accurate and detailed review of the building. The information is compared to the energy usage profiles developed from utility data. Through the review of the architectural and engineering drawings a building profile can be defined that documents building age, type, usage, major energy consuming equipment or systems, etc. The preliminary audit information is gathered in preparation for the site survey. The site survey provides critical information in deciphering where energy is spent and opportunities exist within a facility. The entire site is surveyed to inventory the following to gain an understanding of how each facility operates:

• Building envelope (roof, windows, etc.) • Heating, ventilation, and air conditioning equipment (HVAC) • Lighting systems and controls • Facility-specific equipment

The building site visit is performed to survey all major building components and systems. The site visit includes detailed inspection of energy consuming components. Summary of building occupancy schedules, operating and maintenance practices, and energy management programs provided by the building manager are collected along with the system and components to determine a more accurate impact on energy consumption. Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 10 of 65

Page 12: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

III. METHOD OF ANALYSIS This audit is consistent with an ASHRAE level 2 audit. The cost and savings for each measure is ± 20%. The evaluations are based on engineering estimations and industry standard calculation methods. More detailed analyses would require engineering simulation models, hard equipment specifications, and contractor bid pricing. Post site visit work includes evaluation of the information gathered, researching possible conservation opportunities, organizing the audit into a comprehensive report, and making recommendations on HVAC, lighting and building envelope improvements. Data collected is processed using energy engineering calculations to anticipate energy usage for each of the proposed energy conservation measures (ECMs). The actual building’s energy usage is entered directly from the utility bills provided by the owner. The anticipated energy usage is compared to the historical data to determine energy savings for the proposed ECMs. It is pertinent to note, that the savings noted in this report are not additive. The savings for each recommendation is calculated as standalone energy conservation measures. Implementation of more than one ECM may in some cases affect the savings of each ECM. The savings may in some cases be relatively higher if an individual ECM is implemented in lieu of multiple recommended ECMs. For example implementing reduced operating schedules for inefficient lighting will result in a greater relative savings. Implementing reduced operating schedules for newly installed efficient lighting will result in a lower relative savings, because there is less energy to be saved. The Combined Project Summary Table is based on the implementation of multiple measures. The analysis is reviewed and determined if the nature of the ECMs will cause a major conflict of the overall savings. When additive measures do not cause a major effect on the overall savings the ECMs are included. Where a major conflict is identified, the combined savings is evaluated appropriately to ensure the overall estimates are ± 20%. ECMs are determined by identifying the building’s unique properties and deciphering the most beneficial energy saving measures available that meet the specific needs of the facility. The building construction type, function, operational schedule, existing conditions, and foreseen future plans are critical in the evaluation and final recommendations. Energy savings are calculated based on industry standard methods and engineering estimations. Energy consumption is calculated based on manufacturer’s cataloged information when new equipment is proposed. Cost savings are calculated based on the actual historical energy costs for the facility. Installation costs include labor and equipment costs to estimate the full up-front investment required to implement a change. Costs are derived from Means Cost Data, industry publications, and local contractors and equipment suppliers. The NJ Smart Start Building® program incentives savings (where applicable) are included for the appropriate ECM’s and subtracted from the installed cost. Maintenance savings are calculated where applicable and added to the energy savings for each ECM. The life-time for each ECM is estimated based on the typical life of the equipment being replaced or altered. The costs and savings are applied and a simple payback, simple lifetime savings, and simple return on investment are calculated. See below for calculation methods:

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 11 of 65

Page 13: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

ECM Calculation Equations:

=

SavingsYearlyCostNet

PaybackSimple

( )LifetimeECMSavingsYearlySavingsLifetimeSimple ×=

CostNetCost)NetSavingsLifetime(Simple

ROILifetimeSimple−

=

( )LifetimeECMSavingseMaintenancYearlySavingseMaintenancLifetime ×=

( )∑=

+=

N

0nnIRR1PeriodofFlowCashReturnofRateInternal

( )∑=

+=

N

0nnDR1PeriodofFlowCash

ValuePresentNet

Net Present Value calculations are based on Discount Rate of 3%.

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 12 of 65

Page 14: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

IV. HISTORIC ENERGY CONSUMPTION/COST

A. Energy Usage / Tariffs The energy usage for the facility has been tabulated and plotted in graph form as depicted within this section. Each energy source has been identified and monthly consumption and cost noted per the information provided by the Owner. The electric usage profile represents the actual electrical usage for the facility. The facility receives electric distribution service through Jersey Central Power and Electric (JCPL) under their General Service Secondary 3 Phase (JC_GS3_01D) rate structure. The School District has contracted Hess, a Third Party Supplier (TPS), to provide electric commodity supply (generation) service. The electric utility measures consumption in kilowatt-hours (KWH) and maximum demand in kilowatts (KW). One KWH usage is equivalent to 1000 watts running for one hour. One KW of electric demand is equivalent to 1000 watts running at any given time. The basic usage charges are shown as generation service and delivery charges along with several non-utility generation charges. Rates used in this report reflect the historical data received for the facility. The propane usage profile shows the actual propane consumption for the facility. Propane is provided by Amerigas to the facility. The propane provider measures consumption in gallons. One Gallon of propane is equivalent to 91,600 BTUs of energy. The oil usage profile shows the actual oil consumption for the facility. Oil is provided by Allied Oil LLC to the facility. The oil provider measures consumption in gallons. One Gallon of #2 oil is equivalent to 139,000 BTUs of energy. The overall cost for utilities is calculated by dividing the total cost by the total usage. Based on the utility history provided, the average cost for utilities at this facility is as follows: Description Average

Electricity 11.0¢ / kWh Propane $4.18/ Gallon

#2 Fuel Oil $3.52 / Gallon

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 13 of 65

Page 15: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Table 5 Electricity Billing Data

Utility Provider: JCP&LRate: General Service Secondary 3 Phase (JC_GS3_01D)

Meter No: L86727557Account # 100 003 653 068

Third Party Utility Provider: Hess CorporationTPS Meter / Acct No:

MONTH OF USE CONSUMPTION KWH TOTAL BILL

Jul-12 105,600 $11,381 Aug-12 105,900 $11,315 Sep-12 106,200 $12,845 Oct-12 75,600 $8,998 Nov-12 56,700 $6,416 Dec-12 85,200 $8,930 Jan-13 91,200 $9,390 Feb-13 91,500 $9,363 Mar-13 104,700 $10,498 Apr-13 72,300 $7,657 May-13 95,400 $10,565 Jun-13 124,500 $14,804 Totals 1,114,800 404 Max $122,161

AVERAGE DEMAND 313.3 KW averageAVERAGE RATE $0.110 $/kWh

392404

262263257260243

358398248

ELECTRIC USAGE SUMMARY

DEMAND KW

345332

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 14 of 65

Page 16: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Figure 1 Electricity Usage Profile

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 15 of 65

Page 17: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Table 6 Propane Billing Data

Utility Provider: AmeriGasAccount Number 200475857

Rate: Based on Time of Delivery Price

MONTH OF USECONSUMPTION

(GALLONS) TOTAL BILL

Jul-12 123.50 $524.49Aug-12 62.80 $267.73Sep-12 62.80 $267.73Oct-12 62.80 $267.73Nov-12 287.30 $1,281.58Dec-12 334.90 $1,605.89Jan-13 406.00 $1,856.14Feb-13 245.70 $1,123.92Mar-13 164.20 $758.06Apr-13 75.30 $0.00May-13 75.30 $0.00Jun-13 0.00 $0.00

TOTALS 1,900.60 $7,953.27

AVERAGE RATE: $4.18 $/Gallon

PROPANE USAGE SUMMARY

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 16 of 65

Page 18: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Figure 2 Propane Usage Profile

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 17 of 65

Page 19: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Table 7 #2 Fuel Oil Billing Data

Utility Provider: Allied Oil LLCAccount Number 433184

Rate: Based on Time of Delivery Price

MONTH OF USECONSUMPTION

(GALLONS) TOTAL BILL

Jul-12 0.00 $0.00Aug-12 0.00 $0.00Sep-12 5,002.40 $17,362.83Oct-12 5,001.60 $17,385.06Nov-12 4,400.00 $14,611.96Dec-12 9,012.20 $31,912.05Jan-13 9,898.40 $36,636.10Feb-13 4,997.40 $17,169.57Mar-13 5,016.30 $17,384.99Apr-13 0.00 $0.00May-13 0.00 $0.00Jun-13 0.00 $0.00

TOTALS 43,328.30 $152,462.56

AVERAGE RATE: $3.52 $/Gallon

FUEL OIL USAGE SUMMARY

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 18 of 65

Page 20: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Figure 3 #2 Fuel Oil Usage Profile

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 19 of 65

Page 21: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

B. Energy Use Index (EUI) Energy Use Index (EUI) is a measure of a building’s annual energy utilization per square foot of building. This calculation is completed by converting all utility usage consumed by a building for one year, to British Thermal Units (BTU) and dividing this number by the building square footage. EUI is a good measure of a building’s energy use and is utilized regularly for comparison of energy performance for similar building types. The Oak Ridge National Laboratory (ORNL) Buildings Technology Center under a contract with the U.S. Department of Energy maintains a Benchmarking Building Energy Performance Program. The ORNL website determines how a building’s energy use compares with similar facilities throughout the U.S. and in a specific region or state. Source use differs from site usage when comparing a building’s energy consumption with the national average. Site energy use is the energy consumed by the building at the building site only. Source energy use includes the site energy use as well as all of the losses to create and distribute the energy to the building. Source energy represents the total amount of raw fuel that is required to operate the building. It incorporates all transmission, delivery, and production losses, which allows for a complete assessment of energy efficiency in a building. The type of utility purchased has a substantial impact on the source energy use of a building. The EPA has determined that source energy is the most comparable unit for evaluation purposes and overall global impact. Both the site and source EUI ratings for the building are provided to understand and compare the differences in energy use. The site and source EUI for this facility is calculated as follows:

FootageSquareBuildingkBtuinUsageGaskBtuinUsageElectricEUISiteBuilding )( +

=

FootageSquareBuildingRatioSSXkBtuinUsageGasRatioSSXkBtuinUsageElectricEUISourceBuilding )( +

=

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 20 of 65

Page 22: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Table 8 Facility Energy Use Index (EUI) Calculation

Figure 4 below depicts the Northeast Region EUI grading for the source use of High Schools.

Figure 4

Source Energy Use Intensity Distributions: High Schools

Based on the above source energy comparison the South Hunterdon Regional High School is operating inefficiently, compared to buildings of similar type.

kWh Therms Gallons kBtu kBtu

ELECTRIC 1,114,800 3,805,927 3.140 11,950,611

FUEL OIL 43,328.3 6,022,634 1.010 6,082,860

PROPANE 1,900.6 173,582 1.010 175,318

TOTAL 1,114,800.0 0.0 45,228.9 10,002,143 18,208,789

BUILDING AREA 99,000 SQUARE FEETBUILDING SITE EUI 101 kBtu/SF/YRBUILDING SOURCE EUI 184 kBtu/SF/YR

ENERGY USE INTENSITY CALCULATION

ENERGY TYPESITE-

SOURCE RATIO

BUILDING USESITE

ENERGYSOURCE ENERGY

*Site - Source Ratio data is provided by the Energy Star Performance Rating Methodology for Incorporating Source Energy Use document issued Dec 2007.

SOURCE EUI = 184

NAT’L MEDIAN SOURCE EUI = 141.4

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 21 of 65

Page 23: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

C. EPA Energy Benchmarking System The United States Environmental Protection Agency (EPA) in an effort to promote energy management has created a system for benchmarking energy use amongst various end users. The benchmarking tool utilized for this analysis is entitled Portfolio Manager. The Portfolio Manager tool allows tracking and assessment of energy consumption via the template forms located on the ENERGY STAR website (www.energystar.gov). The importance of benchmarking for local government municipalities is becoming more important as utility costs continue to increase and emphasis is being placed on carbon reduction, greenhouse gas emissions and other environmental impacts. Based on information gathered from the ENERGY STAR website, Government agencies spend more than $10 billion a year on energy to provide public services and meet constituent needs. Furthermore, energy use in commercial buildings and industrial facilities is responsible for more than 50 percent of U.S. carbon dioxide emissions. It is vital that local government municipalities assess facility energy usage, benchmark energy usage utilizing Portfolio Manager, set priorities and goals to lessen energy usage and move forward with priorities and goals. In accordance with the Local Government Energy Audit Program, Concord has created an ENERGY STAR account for the municipality to access and monitoring the facility’s yearly energy usage as it compares to facilities of similar type. The login page for the account can be accessed at the following web address; the username and password are also listed below:

https://www.energystar.gov/istar/pmpam/index.cfm?fuseaction=login.login

The utility bills and other information gathered during the energy audit process are entered into the Portfolio Manager. The following is a summary of the results for the facility:

Table 8 ENERGY STAR Performance Rating

ENERGY STAR PERFORMANCE RATING

FACILITY DESCRIPTION

ENERGY PERFORMANCE

RATING

NATIONAL AVERAGE

Hunterdon Regional HS 23 50

Refer to Statement of Energy Performance Appendix for the detailed energy summary.

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 22 of 65

Page 24: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

V. FACILITY DESCRIPTION

The South Hunterdon Regional High School is located at 301 Mount Airy-Harbourton Road in Lambertville, New Jersey. This 99,000 SF facility was originally built in 1959 with major additions/renovations in 2008. The building is a single-story facility that is comprised of five (5) major areas as follows:

Area A Auditorium, Art/Music, Administration Offices Area B High School Commons, Kitchen, Classrooms Area C Media Center, Classrooms Area D High School Gym, Weight Room, Lockers, Boiler Room, Classrooms Area E Middle School Gym, Lockers, Middle School Commons

Occupancy Profile

The typical hours of operation for the high school are Monday through Friday between 7:00 am and 4:00 pm. Maintenance staff is present in the building as early as 6:00 am, and nighttime cleaning staff present until 10:00 pm. The entire School District Regional High School’s enrollment is approximately 360 students and has approximately 100 teachers, support staff, and administrative personnel.

Building Envelope

Exterior walls for this school are brick faced with a concrete block and structural steel construction. The new exterior walls have R-15 and R-19 batt insulation. The windows throughout the facility are double-pane, insulated ¼-inch interior/exterior pane with ¼-inch spacing, aluminum frames and are in good condition. Double-pane windows contain two glasses with a spacer bar in between which helps cut energy costs because indoor and outdoor air cannot easily travel through the doubled windows. New entrance doors and curtain walls have 1-inch insulated glass and aluminum frames. Various elevations of roofing include reinforced EPDM membrane roof with flashing, seal tape, a water shield over 1 ½ inch metal deck.

HVAC Systems

In general, the high school HVAC systems consists of two (2) cast iron commercial boilers, an air-cooled rotary chiller, twelve (12) packaged rooftop air handling units, eight (8) interior central air handling units, split condensing units, unit ventilators/fan coil/VAV terminal units, and rooftop exhaust fans.

The heating hot water system located in the boiler mechanical room consists of two (2) Buderus Model GE615/14 forced draft firing with No. 2 fuel oil boilers rated at 3,402 MBH total gross output each and having a thermal efficiency of 86.5% (new). These units have lead/lag control and an outside temperature reset via a Siemens controller. A three-way valve maintains the boiler return temperature at a minimum of 140°F. The 3-way valve also modulates to maintain a reset water schedule. Each of these units has a Bell & Gossett Series 5-HP in-line centrifugal primary hot water pump that circulates the water through the boilers. The heating hot water is pumped to the various hot water coils throughout the entire facility by two (2) Bell & Gossett

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 23 of 65

Page 25: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Model 1510 Series base-mounted, double-suction, centrifugal pumps. These pumps have a flow of 825 GPM at 86 feet of TDH and a 30-HP motor with a NEMA efficiency of 94.1% manufactured by Baldor Motor Company. In addition, each motor is controlled by a Mitsubishi Electric 700 series variable speed drive.

The chilled water system consists of a McQuay Model AGS195CH12 air-cooled, rotary chiller rated at 186.3 tons with 30% ethylene glycol. The unit is rated at 450 GPM @ a 10°F delta T and has an efficiency of 10.5 EER. The chilled water is pumped to various chilled water coils by two (2) Bell & Gossett Model 1510 Series base-mounted, double-suction, centrifugal pumps. These pumps have a flow of 450 GPM at 87 feet of TDH and a 20-HP motor with a NEMA efficiency of 93% manufactured by Baldor Motor Company.

Twelve (12) rooftop air handling units with hot water and chilled water coils provide conditioned air for most of the facility. These units are as follows:

Unit Tag Area Served Mfg. Type Size (CFM)

RTU-1 High School Gym McQuay Constant Volume 8,610

RTU-2 Middle School Commons McQuay Constant Volume 4,000 RTU-3 Media Center McQuay Variable Volume 5,200 RTU-4 Area B Offices McQuay Variable Volume 4,000 RTU-5 Auditorium McQuay Constant Volume 11,400 RTU-6 Lobby McQuay Variable Volume 3,000

RTU-7 High School Commons McQuay Variable Volume 5,500

RTU-8 Music Room McQuay Constant Volume 2,500

RTU-9 Area A Nurse’s Office McQuay Constant Volume 825

RTU-10 Wood Shop McQuay Constant Volume 4,500

RTU-11 Bldg. Constr/AGR Science McQuay Constant Volume 4,000

RTU-12 Kitchen McQuay Constant Volume 2,800 There are four (4) split condensing units on the roof that range in size from 1.5-Tons to 5-Tons which service sound equipment room, TV production, Computer Lab, etc.

There are eight (8) interior central air handler units that were manufactured by McQuay with hot water and chilled water coils that provide conditioned air for smaller interior spaces. These units are as follows:

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 24 of 65

Page 26: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Unit Tag Area Served Mfg. Type Size (CFM)

AHU-1 Back Stage McQuay Outside & Return Air 1,100

AHU-2 Area A Offices McQuay Outside & Return Air 1,400 AHU-3 Area A Offices McQuay Outside & Return Air 875 AHU-4 Boys Locker Rm McQuay Return Air Only 850 AHU-5 Girls Locker Rm McQuay Return Air Only 850 AHU-6 Old Gym McQuay Outside & Return Air 9,000

AHU-7 M. S. Science McQuay Outside & Return Air 1,500

AHU-8 Computer Lab McQuay Outside & Return Air 1,500 With separate DX Cooling Coil The classroom wings are heated and cooled by McQuay Model UAVV vertical unit ventilators with a hot water/chilled water coil; 3-speed fan; and a unitary controller that can communicate with the Siemens APOGEE Building Management System. Various vestibules, entrance ways and small corridors are heated and cooled by fan coil units manufactured by McQuay with a hot water/chilled water coil; 3-speed fan; and a unitary controller that can communicate with the Siemens APOGEE Building Management System.

Unit heaters with hot water coils and three-speed fans are located in the boiler room and fire pump room.

Fresh air is supplied to most of the spaces via the rooftop units, roof-mounted air intake housings, etc. Outside air intake louvers provide fresh air for the boiler room, mechanical rooms, and other smaller spaces. The classrooms receive fresh air thru the unit ventilators equipped with outside air dampers and controls. Exhaust System

Air is exhausted from the many areas of the school via forty-two (42) mostly Greenheck Domex type centrifugal roof exhausters. HVAC System Controls A Siemens APOGEE Insight 3.8 building management system (BMS) is used to monitor and control the building HVAC equipment through graphics; schedule and modify the HVAC operation; collect, view and analyze trend information for space temperature, equipment operation and other points; and trouble shooting of the various equipment. Additionally, the building has occupancy sensors in most of the rooms and common areas which indicate occupied/unoccupied status for lighting and HVAC.

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 25 of 65

Page 27: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Domestic Hot Water

The domestic hot water system, that is also located in the boiler room, consists of an oil-fired water heater manufactured by A. O. Smith that has an input capacity of 385 MBH, a thermal efficiency of 80%, a recovery of 383 GPH at 80°F rise, and feeds a storage tank with a shell & tube heat exchanger. Three small circulation pumps are included in the domestic hot water system. Lighting

Refer to the Investment Grade Lighting Audit Appendix for a detailed list of the lighting throughout the facility and estimated operating hours per space. Kitchen

The full-cooking, all-electric kitchen consists of an upright refrigerator, Vulcan double stack electric convection oven, Vulcan 4kW electric range, Blodgett Model BX-14 combination oven steamer, Jamison walk-in refrigerator, Jamison walk-in freezer, an outdoor walk-in freezer, a Scotsman CM3 ice maker, Hobart 54kW electric booster water heater, etc.

The walk-in refrigerator and freezer boxes are served by two (2) condenser units located in the storage room closet and the third is located outside on a pad. The units are old and there is an appreciable amount of ice buildup on two condensing unit refrigerant lines and coils.

These condensing units are beyond their equipment life, refrigerant lines have ice buildup and the units should be replaced by new, high-efficiency condensing units. The upright freezer is also beyond its service life and the coils also have ice buildup.

The large kitchen hood is exhausted by a Greenheck exhaust fan located on the kitchen roof. Plumbing Fixtures The various restrooms are equipped with Sloan Optima battery-powered flushometers with a low water consumption of 1.6 gpf for water closets, and 1.0 gpf for urinals. In addition, the sinks are equipped with low-flow Aerada 1100 Series faucets that consume only 0.5 GPM. Conveying System Two (2) National Wheel-O-Vator screw-driven, vertical platform lifts are located at the A and B wing corridor stairs. Refrigerators

Two (2) 18 Cubic Feet and one 17 Cubic Feet Hotpoint refrigerators are newer model units with an energy rating of 464 to 480 kWh per year

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 26 of 65

Page 28: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

VI. MAJOR EQUIPMENT LIST

The equipment list contains major energy consuming equipment that through implementation of energy conservation measures could yield substantial energy savings. The list shows the major equipment in the facility and all pertinent information utilized in energy savings calculations. An approximate age was assigned to the equipment in some cases if a manufactures date was not shown on the equipment’s nameplate. The ASHRAE service life for the equipment along with the remaining useful life is also shown in the Appendix.

Refer to the Major Equipment List Appendix for this facility.

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 27 of 65

Page 29: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

VII. ENERGY CONSERVATION MEASURES ECM #1: Lighting Upgrade – General Description: The majority of the interior lighting throughout the South Hunterdon Regional High School is provided by fluorescent fixtures with the latest T-5 lamps and electronic ballasts. Several of these spaces have higher than average light levels and can be de-lamped to save energy. There are several areas that have the older T-12 lamps and ballasts that can be retrofitted to the T-5 system. In addition to the fluorescent tube lamps, there are additional fixture types consisting of metal halide, compact fluorescent, and incandescent lamps that can be retrofitted to LED style lamps. This ECM includes retrofitting the balance of the T-12 fixtures to the T-5 lighting system. The two gyms would be upgraded to the appropriate LED HiBay lighting fixtures. The incandescent lamps retrofitted to LED types. Energy Savings Calculations: The Investment Grade Lighting Audit Appendix outlines the hours of operation, proposed retrofits, costs, savings, and payback periods for each set of fixtures in the each building. Energy Savings Summary:

Installation Cost ($): $41,860NJ Smart Start Equipment Incentive ($): $220Net Installation Cost ($): $41,640Maintenance Savings ($/Yr): $0Energy Savings ($/Yr): $6,289Total Yearly Savings ($/Yr): $6,289Estimated ECM Lifetime (Yr): 15Simple Payback 6.6Simple Lifetime ROI 126.5%Simple Lifetime Maintenance Savings $0Simple Lifetime Savings $94,335Internal Rate of Return (IRR) 13%Net Present Value (NPV) $33,437.67

ECM #1 - ENERGY SAVINGS SUMMARY

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 28 of 65

Page 30: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

ECM #2: Lighting Upgrade – Exterior Lighting Description: The exterior lighting at South Hunterdon High School is currently lit by high pressure sodium and metal halide fixtures. The exterior would be better served with more efficient LED lighting system. Concord Engineering recommends upgrading the lighting to an energy-efficient LED lighting system that includes LED lamps and fixtures for the existing exterior lighting. This ECM would replace the existing exterior lamps and fixtures with equivalent LED lamps and fixtures. Energy Savings Calculations: A detailed Investment Grade Lighting Audit can be found in Investment Grade Lighting Audit Appendix that outlines the proposed retrofits, costs, savings, and payback periods. Energy Savings Summary:

Installation Cost ($): $12,560NJ Smart Start Equipment Incentive ($): $3,580Net Installation Cost ($): $8,980Maintenance Savings ($/Yr): $0Energy Savings ($/Yr): $3,223Total Yearly Savings ($/Yr): $3,223Estimated ECM Lifetime (Yr): 15Simple Payback 2.8Simple Lifetime ROI 438.4%Simple Lifetime Maintenance Savings $0Simple Lifetime Savings $48,345Internal Rate of Return (IRR) 36%Net Present Value (NPV) $29,495.96

ECM #2 - ENERGY SAVINGS SUMMARY

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 29 of 65

Page 31: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

ECM #3: Lighting Controls Upgrade – Occupancy Sensors Description: Some of the lights in the South Hunterdon High School are left on unnecessarily. In many cases the lights are left on because of the inconvenience to manually switch lights off when a room is left or on when a room is first occupied. This is common in rooms that are occupied for only short periods and only a few times per day. In some instances lights are left on due to the misconception that it is better to keep the lights on rather than to continuously switch lights on and off. Although increased switching reduces lamp life, the energy savings outweigh the lamp replacement costs. The payback timeframe for when to turn the lights off is approximately two minutes. If the lights are expected to be off for at least a two minute interval, then it pays to shut them off.

Lighting controls come in many forms. Sometimes an additional switch is adequate to provide reduced lighting levels when full light output is not needed. Occupancy sensors detect motion and will switch the lights on when the room is occupied. Occupancy sensors can either be mounted in place of a current wall switch, or on the ceiling to cover large areas. The U.S. Department of Energy sponsored a study to analyze energy savings achieved through various types of building system controls. The referenced savings is based on the “Advanced Sensors and Controls for Building Applications: Market Assessment and Potential R&D Pathways,” document posted for public use April 2005. The study has found that commercial buildings have the potential to achieve significant energy savings through the use of building controls. The average energy savings are as follows based on the report:

• Occupancy Sensors for Lighting Control 20% - 28% energy savings.

Savings resulting from the implementation of this ECM for energy management controls are estimated to be 20% of the total light energy controlled by occupancy sensors. This ECM includes installation of ceiling or switch mount sensors for offices, classrooms, and restrooms. Sensors shall be manufactured by Sensorswitch, Watt Stopper or equivalent. The Investment Grade Lighting Audit Appendix of this report includes the summary of lighting controls implemented in this ECM and outlines the proposed controls, costs, savings, and payback periods. The calculations adjust the lighting power usage by the applicable percent savings for each area that includes lighting controls. Energy Savings Calculations:

( )( )kWh/YrEnergyLightControlledSavings%SavingsEnergy ×=

( )

×=

kWh$CostElecAvekWhSavingsEnergySavings.

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 30 of 65

Page 32: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Rebates and Incentives:

From the NJ Smart Start® Program Incentives Appendix, the installation of a lighting control device warrants the following incentive: Smart Start Incentive

= (# Wall mount sensors × $20 per sensor)+ (# Ceiling mount sensors × $35 per sensor)

Energy Savings Summary:

Installation Cost ($): $8,800NJ Smart Start Equipment Incentive ($): $645Net Installation Cost ($): $8,155Maintenance Savings ($/Yr): $0Energy Savings ($/Yr): $2,086Total Yearly Savings ($/Yr): $2,086Estimated ECM Lifetime (Yr): 15Simple Payback 3.9Simple Lifetime ROI 283.7%Simple Lifetime Maintenance Savings $0Simple Lifetime Savings $31,290Internal Rate of Return (IRR) 25%Net Present Value (NPV) $16,747.53

ECM #3 - ENERGY SAVINGS SUMMARY

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 31 of 65

Page 33: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

ECM #4: Refrigerator Replacement

Description: The South Hunterdon Regional High School has several residential style refrigerators in the lounges. These units are older models that are not nearly as energy efficient as those manufactured today. The proposed replacements are one-for-one with units of similar size and dimensions that have the most up-to-date Energy Star Ratings. The models selected are 2013 models manufactured by Frigidaire models FFHT1814LW and FFHT1713LW. (Note: There are currently no NJ OCE incentives for commercial property refrigerator replacement.) Energy Savings Calculations:

ECM INPUTS EXISTING EXISTING PROPOSED PROPOSED SAVINGS

Quantity 2 1 2 1

Manufacturer Hotpoint Hotpoint Hotpoint Frigidaire

Type Top Freezer Top Freezer Top Freezer Top Freezer

Model HTS18GBSARWW HTS17GBSARWW FFHT1814LW FFHT1713LW

Size (Cu-Ft) 18.2 16.6 18 17

Per Unit Electric Usage (kWh) 539 521 387 369

Electric Rate ($/kWh) $0.110 $0.110 $0.110 $0.110

Electric Usage (kWh) 1,078 521 774 369 456

Energy Cost ($) $119 $57 $85 $41 $50COMMENTS:

ENERGY STAR REFRIGERATOR CALCULATION

ENERGY SAVINGS CALCULATIONS

Calculations based Energy Star Website http://www.energystar.gov/index.cfm?fuseaction=refrig.calculator

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 32 of 65

Page 34: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Energy Savings Summary:

Installation Cost ($): $2,000NJ Smart Start Equipment Incentive ($): $0Net Installation Cost ($): $2,000Maintenance Savings ($/Yr): $0Energy Savings ($/Yr): $50Total Yearly Savings ($/Yr): $50Estimated ECM Lifetime (Yr): 10Simple Payback 40.0Simple Lifetime ROI -75.0%Simple Lifetime Maintenance Savings $0Simple Lifetime Savings $500Internal Rate of Return (IRR) -20%Net Present Value (NPV) ($1,573.49)

ECM #4 - ENERGY SAVINGS SUMMARY

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 33 of 65

Page 35: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

ECM #5: Vending Miser Controls Description: The school currently utilizes cold beverage and snack vending machines. Vending machines are usually used for a limited time during the day. The installation of the Vending Miser system will help reduce the operating hours of the vending machines. Cold beverage machines regularly operate inefficiently trying to maintain a constant cool temperature within the machine and snack machines with no cooling usually have lights that operate 24/7. The VendingMiser® system incorporates innovative energy-saving technology into a small plug-and-play device that in conjunction with a passive infrared sensor regulate the operation of the cold beverage and snack machines based on occupancy. The device also monitors the room’s temperature and automatically re-powers the cooling system in the beverage machine to ensure that the product stays cold. For the cold beverage machines, the controllers will never power down the machine while the compressor is running so as to prevent compressor short-cycling. The cooling cycle is allowed to finish before powering down the compressor. This ECM would install four (4) of these control systems, two (2) for the snack machines and two (2) for the cold beverage machines. Energy Savings Calculations:

Energy Analysis Prepared For: Ene rg y Co sts ($0.000 p e r kwh) $0.110Fa c ility Occup ie d Ho urs p e r We e k 60

So uth Hunte rd o n H ig h Scho o l Numb e r o f Co ld Drink Ve nd ing Ma chine s 2Numb e r o f Unco o le d Sna ck Ma chine s 2

www.VendingMiserStore.com Po we r Re q uire me nts o f Co ld Drink Ma chine (a vg wa tts ) 233Po we r Re q uire me nts o f Sna ck Ma chine (a vg wa tts ) 80Ve nd ing Mise r Sa le Price (fo r co ld d rink ma chine s) $500.00Office Mise r Sa le Price (fo r sna ck ma chine s) $250.00

Savings AnalysisBe fo re Afte r

Co ld Drink Ma chine s $449.35 $209.45 Co st o f Op e ra tio n4,085 1,904 kWh

53% % Ene rg y Sa v ing s

Sna ck Ma chine s $153.75 $54.91 Co st o f Op e ra tio n1,398 499 kWh

64% % Ene rg y Sa v ing s

Project Summary

Pre se nt kWh Pro je c te d kWhkWh Sa v ing s

p e r Ye a r5,483 2,403 3,079

Pre se nt Co stPro je c te d

Co stsAnnua l

Sa v ing sPe r Ce nt Sa v ing s T o ta l Pro je c t Co st

Bre a k Eve n (Mo nths)

$603.10 $264.36 $338.74 56% $1,500.00 53.1

Inp ut Va ria b le s

Cold Drink and Snack Vending Machine Energy Conservation Project

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 34 of 65

Page 36: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Energy Savings Summary:

Installation Cost ($): $2,000NJ Smart Start Equipment Incentive ($): $0Net Installation Cost ($): $2,000Maintenance Savings ($/Yr): $0Energy Savings ($/Yr): $339Total Yearly Savings ($/Yr): $339Estimated ECM Lifetime (Yr): 10Simple Payback 5.9Simple Lifetime ROI 69.4%Simple Lifetime Maintenance Savings $0Simple Lifetime Savings $3,387Internal Rate of Return (IRR) 11%Net Present Value (NPV) $889.52

ECM #5 - ENERGY SAVINGS SUMMARY

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 35 of 65

Page 37: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

ECM #6: Walk-In Cooler/Freezer Controls The High School has three walk-in coolers/freezers that store food for the kitchen. Each box has an evaporator with fans to circulate cold air, three in the refrigerators, and two in the freezer. These fans operate continuously whether the compressor is on or off resulting in unnecessary heat buildup in the box due to the fan motors. This measure would install an evaporator fan controller that features two-speed operation of the evaporator fans – high speed during cooling, and low speed or off when not cooling manufactured by Frigitek or equivalent. Energy Savings Calculations: Energy savings calculations are based on New Jersey Board of Public Utilities Protocols to Measure Resource Savings. The energy savings are calculated using existing equipment characteristics.

kWh Savings Evap Fans =�Amps × Volts × Phase

12�

1000 × 0.55 × 8760 × 35.52%

kWh Savings Evap Reduced Heat = kWh Savings Evap Fans × 0.28 × 1.6 kWh Savings Controls

=AmpsCP × VoltsCP × PhaseCP

12

1000 × 0.85 × (35% × 2,195 Hrs + 55% × 6,565 Hrs)

+ AmpsEF × VoltsEF × PhaseEF

12

1000 × 0.55 × 8760 × 35.52% × 5%

Evaporator Fan Motor Power Factor 0.55ConversIon kW to ton (Refrigeration) 0.28Efficiency of Typical System (kW/ton) 1.6Compressor Power Factor 0.85Compressor Winter Runtime 2195Compressor Winter Duty Cycle 35%Compressor Non-Winter Runtime 6565Compressor Non-Winter Duty Cycle 55%Reduced Runtime due to Controls 5%Percent Time Evaporator is Turned Off 35.52%

CALCULATION CONSTANTS

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 36 of 65

Page 38: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

ECM INPUTS EXISTING PROPOSED SAVINGSECM INPUTS No Controller Frigitek Controller

Qty of Evaporator Fans 2 2

Nameplate Amps of Evap Fan 1.4 1.4

Nameplate Volts of Evap Fan 208 208

Phase of Evap Fan 1 1

Nameplate Amps of Compressor

11.1 11.1

Nameplate Volts of Compressor

230 230

Phase of Compressor 3 3

Elec Cost ($/kWh) $0.110 $0.110

ECM RESULTS EXISTING PROPOSED SAVINGS

Evaporator Fan Usage (KWH) 2,806 1,809 997

Evap Fan Heat Usage (KWH) 629 405 223

Compressor Usage (KWH) 16,459 15,636 823

Total Electric Usage (KWH) 19,894 17,851 2,043

Electric Cost ($) $2,188 $1,964 $225

COMMENTS:

WALK-IN COOLER/FREEZER EVAPORATOR FAN CONTROL

ENERGY SAVINGS CALCULATIONS

Walk-In #1

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 37 of 65

Page 39: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

ECM INPUTS EXISTING PROPOSED SAVINGSECM INPUTS No Controller Frigitek Controller

Qty of Evaporator Fans 3 3

Nameplate Amps of Evap Fan 2.7 2.7

Nameplate Volts of Evap Fan 115 115

Phase of Evap Fan 1 1

Nameplate Amps of Compressor

8.9 8.9

Nameplate Volts of Compressor

230 230

Phase of Compressor 3 3

Elec Cost ($/kWh) $0.110 $0.110

ECM RESULTS EXISTING PROPOSED SAVINGS

Evaporator Fan Usage (KWH) 4,488 2,894 1,594

Evap Fan Heat Usage (KWH) 670 432 238

Compressor Usage (KWH) 13,197 12,537 660

Total Electric Usage (KWH) 18,355 15,863 2,492

Electric Cost ($) $2,019 $1,745 $274

COMMENTS:

WALK-IN COOLER/FREEZER EVAPORATOR FAN CONTROL

ENERGY SAVINGS CALCULATIONS

Walk-In #2

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 38 of 65

Page 40: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

ECM INPUTS EXISTING PROPOSED SAVINGSECM INPUTS No Controller Frigitek Controller

Qty of Evaporator Fans 3 3

Nameplate Amps of Evap Fan 2.7 2.7

Nameplate Volts of Evap Fan 115 115

Phase of Evap Fan 1 1

Nameplate Amps of Compressor

8.9 8.9

Nameplate Volts of Compressor

230 230

Phase of Compressor 3 3

Elec Cost ($/kWh) $0.110 $0.110

ECM RESULTS EXISTING PROPOSED SAVINGS

Evaporator Fan Usage (KWH) 4,488 2,894 1,594

Evap Fan Heat Usage (KWH) 670 432 238

Compressor Usage (KWH) 13,197 12,537 660

Total Electric Usage (KWH) 18,355 15,863 2,492

Electric Cost ($) $2,019 $1,745 $274

COMMENTS:

WALK-IN COOLER/FREEZER EVAPORATOR FAN CONTROL

ENERGY SAVINGS CALCULATIONS

Walk-In #3

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 39 of 65

Page 41: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Energy Savings Summary:

Installation Cost ($): $7,500NJ Smart Start Equipment Incentive ($): $225Net Installation Cost ($): $7,275Maintenance Savings ($/Yr): $0Energy Savings ($/Yr): $773Total Yearly Savings ($/Yr): $773Estimated ECM Lifetime (Yr): 15Simple Payback 9.4Simple Lifetime ROI 59.4%Simple Lifetime Maintenance Savings 0Simple Lifetime Savings $11,595Internal Rate of Return (IRR) 6%Net Present Value (NPV) $1,953.02

ECM #6 - ENERGY SAVINGS SUMMARY

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 40 of 65

Page 42: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

ECM #7: Digital Energy Management System (BMS) Upgrades

Description:

Currently a Siemens APOGEE Insight building management system (BMS) monitors and controls the HVAC equipment based on a detailed equipment operating schedule. There are additional opportunities to further optimize this BMS. As part of the system upgrade, this ECM will require the controls contractor to check the calibration of the space temperature sensors in several areas of the building. It is also recommended that the staff review current temperature set-points and set-backs for compliance with ASHRAE indoor environment standards.

This ECM would include the following additional features for the existing BMS:

• Reset the cooling and heating discharge air temperature set points • Reset the duct static pressure set points (VAV Rooftop units) • Set the heat/cool changeover temperature (VAV units) • Set the representative zone temperature (VAV units) • Optimize the start/stop sequences for heating & cooling • Upgrades to the existing BACnet and IP

(Note: There are currently no NJ OCE incentives for HVAC controls upgrades.) Energy Savings Calculations:

ECM INPUTS EXISTING PROPOSED SAVINGS

HVAC Usage Electric (kBtu) 1,517,782 1,502,604 15,178

HVAC Usage Oil (kBtu) 6,015,598 5,955,442 60,156

Savings Percentage -

1.0%

Electric Site Conversion (kWh/kBtu) 3.412 3.412

Oil Site Conversion (Gallon/kBtu) 139.0 139.0

Electric Cost ($/kWh) $0.110 $0.110 Oil Cost ($/Gallon) $3.520 $3.520

ECM RESULTS EXISTING PROPOSED SAVINGS

Electric Usage (kWh) 444,836 440,388 4,448

Oil Usage (Gallons) 43,278 42,845 433

Energy Cost ($) $201,269 $199,257 $2,013

COMMENTS:

CONTROLS SAVINGS CALCULATIONS

ENERGY SAVINGS CALCULATIONS

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 41 of 65

Page 43: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Savings from the implementation of this ECM will be from the reduced energy consumption currently used by the HVAC system by improved control of temperatures and optimization of the central plant via the upgraded DDC system. Energy Savings Summary:

Installation Cost ($): $30,000NJ Smart Start Equipment Incentive ($): $0Net Installation Cost ($): $30,000Maintenance Savings ($/Yr): $0Energy Savings ($/Yr): $2,013Total Yearly Savings ($/Yr): $2,013Estimated ECM Lifetime (Yr): 15Simple Payback 14.9Simple Lifetime ROI 0.7%Simple Lifetime Maintenance Savings $0Simple Lifetime Savings $30,195Internal Rate of Return (IRR) 0%Net Present Value (NPV) ($5,968.94)

ECM #7 - ENERGY SAVINGS SUMMARY

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 42 of 65

Page 44: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

ECM #8: VFD Chilled Water Pump Description: The Chilled Water System at South Hunterdon Regional High School is currently outfitted with constant volume 20 horsepower pumps. The installation of variable speed drives will not only provide soft start capability on the pump system, but also allow the pumps to vary the flow based on chilled water demand in the system. This ECM includes installation of two variable frequency drives with differential pressure controls. The VFD will be wired to both the primary and backup pump as only one is required to operate at a time. Energy Savings Calculations:

Pump Power HP =FlowGPM × Headft−hd.

3650 × ηPump × ηmotor

Energy Consumption (kWh) = Motor HP × 0.746kWHP

× Hours of operation (Hr) ×1

ηmotor

Total Energy Consumption (kWh) = �Energy Consumption of Each Motor

Energy Cost ($) = Total Comsumption(kWh) × Average Cost of Electric �$

kWh�

Affinity Laws are used in order to calculate energy savings by calculating the reduced power consumption requirement based a reduction in flow. Affinity laws, are as following: Q = Flow, n = RPM, p = total pressure Q2

Q1=

n2n1

p2p1

= �n2n1�2

HP2HP1

= �n2n1�3

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 43 of 65

Page 45: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Estimated Operating Profile with VFD

0%

5%

10%

15%

20%

25%

100% 90% 80% 70% 60% 50% 40% 30% 20%

PERC

ENT

HOU

RS

PERCENT FLOW

OPERATING PROFILE

ECM INPUTS EXISTING PROPOSED SAVINGSECM INPUTS CV Pumps VFD Pumps

Flow Control Throttle VFD -

Motor Nameplate HP 20.0 20.0

Flow (GPM) 450 450 -

Head (Ft) 87 87 -

Pump Efficiency (%) 75.0% 75.0% -

Motor Efficiency (%) 93.0% 93.0% 0.0%

Operating Hrs 2000 2000 -

Estimated Power (HP) 14.2 14.2 0.00

Elec Cost ($/kWh) 0.110 0.110 -

ECM RESULTS EXISTING PROPOSED SAVINGS

Electric Energy (kWh) 22,739 10,845 11,894

Electric Energy Cost ($) $2,501 $1,193 $1,308

CHILLER WATER PUMPS VFD CALULATION

ENERGY SAVINGS CALCULATIONS

COMMENTS:

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 44 of 65

Page 46: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Energy Savings Summary:

Installation Cost ($): $31,875NJ Smart Start Equipment Incentive ($): $0Net Installation Cost ($): $31,875Maintenance Savings ($/Yr): $0Energy Savings ($/Yr): $1,308Total Yearly Savings ($/Yr): $1,308Estimated ECM Lifetime (Yr): 15Simple Payback 24.4Simple Lifetime ROI -38.4%Simple Lifetime Maintenance Savings $0Simple Lifetime Savings $19,620Internal Rate of Return (IRR) -6%Net Present Value (NPV) ($16,260.18)

ECM #8 - ENERGY SAVINGS SUMMARY

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 45 of 65

Page 47: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

ECM #9: Building Weatherization A detailed survey was conducted to review potential building envelope upgrades around the entire facility. Leaky doors and windows, poorly sealed window air conditioner openings, lack of weather stripping, un-insulated loading dock doors, improperly adjusted door closers, weather stripping missing on overhead doors, etc. can all contribute to infiltration of cold or hot/humid air. For some of the perimeter doors, the weather stripping is worn and/or the door is the square in the frame allowing infiltration to enter conditioned spaces. Concord Engineering recommends replacing all old weather stripping on perimeter doors and re-caulking of various roof penetrations. This ECM involves sealing leaks in the building envelope with various weatherproofing measures such as caulking, weather stripping exterior doors, spray foam insulation and other techniques. The following measures are recommended:

1. Weather strip and adjust closers and latches on 10 single doors 2. Weather strip and adjust closers and latches on 20 double doors 3. Several entrances need to be air sealed above the doorways 4. Seal 16 roof penetrations

Savings for the building envelope upgrade are based on reducing air infiltration. The standard crack method was used for calculations and is outlined below: Standard Method Calculation Infiltration Rates: Q = k x (dP)^n x A k = 22 Average Daily Temperature Differential (dP) )^n = 6 Average Pressure Difference Across Envelope Boundary A = 1.00 Area of Infiltration Reduction Savings $ = Q x DD x Price per mmBTU / 28,900 Construction costs for the above air sealing services were obtained from ZeroDraft Company of New York and include a turnkey project for $10,000. See Appendix G for a detailed energy savings breakdown

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 46 of 65

Page 48: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Energy Savings Summary:

Installation Cost ($): $10,000NJ Smart Start Equipment Incentive ($): $0Net Installation Cost ($): $10,000Maintenance Savings ($/Yr): $0Energy Savings ($/Yr): $757Total Yearly Savings ($/Yr): $757Estimated ECM Lifetime (Yr): 30Simple Payback 13.2Simple Lifetime ROI 127.1%Simple Lifetime Maintenance Savings $0Simple Lifetime Savings $22,710Internal Rate of Return (IRR) 6%Net Present Value (NPV) $4,837.53

ECM #9 - ENERGY SAVINGS SUMMARY

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 47 of 65

Page 49: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

ECM #10: Demand Controlled Ventilation Description: The High School and Middle School Commons were identified as good candidates for the installation of Demand Controlled Ventilation (DCV) given their varied occupancy levels throughout the day. CO2 – based DCV when properly applied in spaces where occupancies vary below design occupancy, can reduce unnecessary over-ventilation while implementing the minimum air requirements of ASHRAE Standard 62. This ECM includes the installation of the additional Siemens APOGEE standalone controls, CO2 sensors, and programming needed in order to operate the active CO2 ventilation. There is currently one rooftop unit that serves the High School Commons (RTU-7, 5,500 CFM) and one rooftop unit that serves the Middle School Commons (RTU-2, 4,000 CFM) with hot water and chilled water coils. Energy Savings Calculations: Energy savings calculations are based on New Jersey Board of Public Utilities Protocols to Measure Resource Savings. The energy savings are calculated by using the existing efficiency rating and stipulated values in the protocols for operating hours and Heating Degree Days. The protocol stipulates that savings is equal to 5% of the total HVAC Energy for heating and cooling of the affected units.

ECM INPUTS DCV-1 & DCV-2Equipment RTU-7 & RTU-2Total Cooling Capacity, Tons 35Efficiency (EER) 11Annual Full Load Cooling Hours 1131Total Heating Capacity, MBh 103Heating Efficiency (Oil) 85%Heating Degree Days (65°F) 5052Energy Savings 5.0%Elec Cost ($/kWh) $0.110#2 Fuel Oil($/Gallon) $3.52

ECM RESULTS DCV-1 & DCV-2Cooling Energy Consumption, kWh 45,240 Heating Energy (Gallons) 902Cooling Energy Savings kWh 2,262 Heating Energy Savings (Gallons) 45Electric Energy Cost Savings ($) $249Total Fuel Oil Cost Savings ($) $159Total Cost Savings ($) $408COMMENTS: HDD based on Philadelphia,PA. Modification of 0.55

for Building Type.

DEMAND CONTROLLED VENTILATION

ENERGY SAVINGS

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 48 of 65

Page 50: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Energy Savings Summary:

Installation Cost ($): $40,000NJ Smart Start Equipment Incentive ($): $0Net Installation Cost ($): $40,000Maintenance Savings ($/Yr): $0Energy Savings ($/Yr): $408Total Yearly Savings ($/Yr): $408Estimated ECM Lifetime (Yr): 15Simple Payback 98.0Simple Lifetime ROI -84.7%Simple Lifetime Maintenance Savings $0Simple Lifetime Savings $6,120Internal Rate of Return (IRR) -18%Net Present Value (NPV) ($35,129.32)

ECM #10 - ENERGY SAVINGS SUMMARY

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 49 of 65

Page 51: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

ECM # 11: Domestic Hot Water Reset Description: The domestic hot water for this facility is supplied by an indirect water heater (a tank with a coil) that is heated using an oil-fired water heater by A. O. Smith. During the energy audit site inspections, it was observed that the domestic hot water supply was at 160°F and the return temperature was 120°F. During most of the year, 160°F supply water is not required for domestic hot water needs. The domestic hot water supply can be lowered to 150°F and save appreciable fuel oil costs. In addition, short cycling of the water heater (water heater turns on for a very short period of time) was observed. Reduction in water heater efficiency and longevity has been attributed to water heater cycling. This ECM would install outdoor temperature reset by installation of upgraded temperature sensors, and a reset controller. The basis of design for the controller is the Honeywell Model W8735S AquaReset®. Energy Savings Calculations: The energy savings are calculated for reducing the domestic hot water supply temperature by 10°F most of the year based on outdoor temperature reset. For each degree of hot water supply reduction, a 1% reduction in energy costs can be obtained. The oil-fired water heater has a rated input of 385 MBH and a 10% savings would equal 38.5 MBH. It is assumed that the Equivalent Full Load Hours (EFLH) is 1,000 so that the energy savings is 38,500 MBTU. Dividing this number by 139 MBTU (for #2 fuel oil) equals 276 gallons saved x $3.52 per gallon = $974 in energy cost savings. The cost of the Honeywell Model W8735S AquaReset® along with upgraded temperature sensors, installation and programming is estimated to be $8,000. Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 50 of 65

Page 52: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Energy Savings Summary:

Installation Cost ($): $8,000NJ Smart Start Equipment Incentive ($): $0Net Installation Cost ($): $8,000Maintenance Savings ($/Yr): $0Energy Savings ($/Yr): $974Total Yearly Savings ($/Yr): $974Estimated ECM Lifetime (Yr): 15Simple Payback 8.2Simple Lifetime ROI 82.6%Simple Lifetime Maintenance Savings $0Simple Lifetime Savings $14,610Internal Rate of Return (IRR) 9%Net Present Value (NPV) $3,627.55

ECM #11 - ENERGY SAVINGS SUMMARY

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 51 of 65

Page 53: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

ECM #12: Domestic Water Heater Controller/Timer Description: The domestic hot water system at the high school consists of an oil-fired water heater rated for 385 MBH input capacity which feeds a coil inside a storage tank with a capacity of 700 gallons. Although the storage tank is insulated, there are significant standby losses during unoccupied hours. The oil-fired water heater turns on throughout unoccupied hours to maintain the desired set point temperature. Concord Engineering recommends installing a controller/timer on the system to turn off the system during unoccupied hours and turn the domestic hot water system back on two hours before the building becomes occupied. Energy Savings Calculations: Assume that the water heater is turned off for 8 hours per day, 7 days per week = 2,920 hours/yr. The thermal efficiency (TE) of the oil-fired water heater is 78%. From ASHRAE 90.1-2007 Table 7.8, the standby losses (SL) are _ ___ SL = 78% Et (Q/800 + 110 √V) = 0.78(385,000 BTUH/800 + 110 √700 gallons) = 3,390 BTUH (3,390 BTUH x 2,920 hours/yr.) / 139,000 BTU/Gal #2 Fuel Oil = 71.2 gallons/yr. #2 Fuel Oil Savings = 71.2 gallons x $3.52/gallon = $250.60

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 52 of 65

Page 54: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Energy Savings Summary:

Installation Cost ($): $3,000NJ Smart Start Equipment Incentive ($): $0Net Installation Cost ($): $3,000Maintenance Savings ($/Yr): $0Energy Savings ($/Yr): $251Total Yearly Savings ($/Yr): $251Estimated ECM Lifetime (Yr): 15Simple Payback 12.0Simple Lifetime ROI 25.3%Simple Lifetime Maintenance Savings $0Simple Lifetime Savings $3,759Internal Rate of Return (IRR) 3%Net Present Value (NPV) ($8.35)

ECM #12 - ENERGY SAVINGS SUMMARY

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 53 of 65

Page 55: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

REM #1: 424.32 kW Solar System Description: The South Hunterdon Regional High School has available roof and ground space that could accommodate solar arrays. Based on the available area a 424.32 kilowatt solar array could be installed. The array will produce approximately 514,658 kilowatt-hours annually that will reduce the overall electric usage of the facility by 46%. The owner should consult a structural engineer prior to installing any solar array to insure the roof can accommodate the additional weight. Energy Savings Calculations: See Renewable / Distributed Energy Measures Calculations Appendix for detailed financial summary and proposed solar layout areas. Financial results in table below are based on 100% financing of the system over a fifteen year period. Energy Savings Summary:

System Size (KWDC): 424.32Electric Generation (KWH/Yr): 514,658Installation Cost ($): $1,727,388SREC Revenue ($/Yr): $98,343Energy Savings ($/Yr): $56,612Total Yearly Savings ($/Yr): $154,956ECM Analysis Period (Yr): 15Simple Payback (Yrs): 11.1

Analysis Period Electric Savings ($): $1,052,929

Analysis Period SREC Revenue ($): $1,424,620Net Present Value (NPV) ($123,474.31)

REM #1 - ENERGY SAVINGS SUMMARY

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 54 of 65

Page 56: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

VIII. RENEWABLE/DISTRIBUTED ENERGY MEASURES Globally, renewable energy has become a priority affecting international and domestic energy policy. The State of New Jersey has taken a proactive approach, and has recently adopted in its Energy Master Plan a goal of 30% renewable energy by 2020. To help reach this goal New Jersey created the Office of Clean Energy under the direction of the Board of Public Utilities and instituted a Renewable Energy Incentive Program to provide additional funding to private and public entities for installing qualified renewable technologies. A renewable energy source can greatly reduce a building’s operating expenses while producing clean environmentally friendly energy. Concord Engineering has assessed the feasibility of installing renewable energy measures (REM) for the municipality utilizing renewable technologies and concluded that there is potential for solar energy generation. Solar Generation Solar energy produces clean energy and reduces a building’s carbon footprint. This is accomplished via photovoltaic panels which are mounted on all south and southwestern facades of the building. Flat roof, as well as sloped areas can be utilized; flat areas will have the panels turned to an optimum solar absorbing angle. (A structural survey of the roof would be necessary before the installation of PV panels is considered). The state of NJ has instituted a program in which one Solar Renewable Energy Certificate (SREC) is given to the Owner for every 1000 kWh of generation. SREC’s can be sold anytime on the market at their current market value. The value of the credit varies upon the current need of the power companies. The average value per credit is around $191, this value was used in our financial calculations. This equates to $0.191 per kWh generated. Wind Generation In addition to evaluating solar, Concord also conducted a review of the applicability of wind energy for the South Hunterdon Regional School District. Wind energy production is another option available as a clean renewable energy generating source. Wind turbines of various types can be utilized to produce clean energy on a per building basis. Cash incentives are available per kWh of electric generated. Concord investigated the potential for smaller building mountable wind turbines, and horizontal turbines to maximize the available free space. In order to be economically viable a site requires a minimum average wind speed of 6 meters per second (13.5 mph). Based on the obtained wind data shown in Figure 4 for Trenton (closest location with data available) the annual average wind speed is 9.8 mph with a peak of 11.2 mph, making this area unattractive for wind development. Therefore, wind energy is not a viable option to implement.

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 55 of 65

Page 57: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Figure 4: Monthly Wind Speed (Trenton, New Jersey)

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 56 of 65

Page 58: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

IX. ENERGY PURCHASING AND PROCUREMENT STRATEGY Load Profile: Load Profile analysis was performed to determine the seasonal energy usage of the facilities. Irregularities in the load profile will indicate potential problems within the facilities. Consequently based on the profile a recommendation will be made to remedy the irregularity in energy usage. For this report, the facilities energy consumption data was gathered in table format and plotted in graph form to create the load profile. Refer to The Electric and #2 Fuel Oil Usage Profiles included within this report to reference the respective electricity and #2 Fuel Oil usage load profiles. Electricity: The electricity usage profile demonstrates a relatively steep load profile from winter to summer. The average summer (May-September) consumption is 30% more than the average winter (October-April) consumption. The following table outlines the seasonal average monthly consumption and demand for the facility.

Tariff Analysis: Electricity: The facility receives electrical service from Jersey Central Power and Light (JCPL) on rate schedules GS3 (General Service Secondary 3 phase). The facility has contracted a Third Party Supplier (TPS) to provide electric commodity service. Hess Corporation has been contracted however; the contract particulars such as product structure, price, term and conditions were not available for review or comments. Each year since 2002, the four New Jersey Electric Distribution Companies (EDCs) - Public Service Gas & Electric Company (PSE&G), Atlantic City Electric Company (ACE), Jersey Central Power & Light Company (JCP&L), and Rockland Electric Company (RECO) - have procured several billion dollars of electric supply to serve their Basic Generation Service (BGS) customers through a statewide auction process held in February.

DESCRIPTION KWH PER MONTH

KW PER MONTH

KWH PER MONTH

KW PER MONTH

South Hunterdon HS 82,457 275.66 107,520 365.96

ELECTRIC UTILITY SEASONAL LOAD PROFILE

FACILITYSEASONAL AVERAGES

WINTER (OCT - APR) SUMMER (MAY - SEP)

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 57 of 65

Page 59: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

BGS refers to the service of customers who are not served by a third party supplier or competitive retailer. This service is sometimes known as Standard Offer Service, Default Service, or Provider of Last Resort Service. The Auction Process has consisted of two auctions that are held concurrently, one for larger customers on an hourly price plan (BGS-CIEP) and one for smaller commercial and residential customers on a fixed-price plan (BGS-FP). This facility’s rate structure is based on the fixed-price plan (BGS-FP). The utility will continue to be responsible for maintaining the existing network of wires, pipes and poles that make up the delivery system, which will serve all consumers, regardless of whom they choose to purchase their electricity or natural gas from. PSEG’s and ACE’s delivery service rate includes the following charges: Customer Service Charge, Distribution Charge (kWh and Demand), Societal Benefits Charge (SBC), and Securitization Transition Charge.

Commodities Market Overview:

Current electricity and natural gas market pricing has remained relatively stable over the last couple of years. Commodity pricing in 2008 marked historical highs in both natural gas and electricity commodity. Commodity pricing commencing spring of 2009 continuing through 2013, has decreased dramatically over 2008 historic highs and continues to be favorable for locking in long term (2-5 year) contracts with 3rd Party Supplier’s for both natural gas and electricity supply requirements.

It is important to note that both natural gas and electric commodity market prices are moved by supply and demand, political conditions, market technicals and trader sentiment. This market is continuously changing. Energy commodity pricing is also correlated to weather forecasts. Because weather forecasts are dependable only in the short-term, prolonged temperature extremes can really cause extreme price swings.

Short Term Energy Outlook - US Energy Information Administration:

Electricity

The Northeastern United States experienced a strong heat wave during mid-July of 2013. In response, many customers ran their air conditioners more than usual. EIA estimated that the average commercial customer in New England used about 1.0 percent more electricity during the summer of 2013 (June-August) compared with the previous summer, while commercial customers in the Middle Atlantic states used about 0.5 percent more electricity. In addition to increased electricity demand, the heat wave also caused temporary spikes in wholesale power prices. State retail rate regulations shield many commercial customers from price swings in the wholesale power market, but EIA expects summer electricity prices in the Northeast to average about 2.7 percent higher than summer 2013, primarily as a result of higher fuel costs paid by generators.

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 58 of 65

Page 60: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Generation fuel costs and wholesale electricity prices have increased in 2013 after a considerable decline in 2012. During the first half of 2014, EIA estimates the price of natural gas delivered to electric generators will average $4.46 per MMBtu, 44 percent higher than the same period last year. Changes in the costs of providing electricity are not immediately reflected on retail customer bills because state regulatory commissions must approve rate changes in many areas of the country. EIA expects the retail price of electricity in 2014 will average 12.1 cents per kilowatt-hour, about 1.9 percent higher than the price the previous year.

The below recommendations presented by Concord Engineering are based on current information provided by the District for their high school historical energy usage. Any savings presented with these recommendations are estimates only based on that information. It is recommended that further analysis and review of more recent utility data and actual TPS electricity supply contracts and historical billings be performed prior to performing any of the presented recommendations. Recommendations:

1. Concord recommends the district continue its aggregation approach for 3rd party commodity supply procurement strategies for the purchase of electricity. Aggregating the usage of all School District facilities for electricity supply service, allows the District to continue to achieve lower prices in commodity supply costs over the utility default service programs.

2. After review of the utility consumption report and current commodity pricing outlook, Concord recommends that the District utilize the advisement of a 3rd party unbiased Energy Consulting Firm licensed by the State of New Jersey Board of Public Utilities that is experienced in the procurement of commodities, New Jersey procurement laws, aggregation of facilities and energy supply risk and commodity management. This firm should be able to provide full service advisement over the term of the contract, provide market watch opportunities and identify any additional opportunities that may further reduce costs. Many of these opportunities may include: energy rates; utility bill auditing; energy data analytics; and efficiency improvements. It is important that a rational, defensible strategy for purchasing commodity in volatile markets is incorporated. Examples include:

• Budgets that reflect sound market intelligence • An understanding of utility and market historical prices and trends • Awareness of seasonal opportunities (e.g. shoulder months) • Negotiation of fair contractual terms • An aggressive, market based price

3. Concord recommends that the District review their current situation regarding third party

purchasing for electricity. The District should review their current contract particulars and future pricing to formulate a strategy to optimize cost savings.

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 59 of 65

Page 61: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Concord also recommends that the District consider utilizing a third party utility billing-auditing service to further analyze historical utility invoices such as water, sewer, electricity and solar for incorrect billings and rate tariff optimization services. This service can be based on a shared savings model with no direct cost. The service could provide refunds on potential incorrect billings that may have been passed through by the utilities and paid by the School District.

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 60 of 65

Page 62: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

X. INSTALLATION FUNDING OPTIONS CEG has reviewed various funding options for the facility owner to utilize in subsidizing the costs for installing the energy conservation measures noted within this report. Below are a few alternative funding methods:

A. Incentive Programs: Pay For Performance The New Jersey Smart Start Pay for Performance program includes incentives based on savings resulted from implemented ECMs. The program is available for all buildings that were audited as part of the NJ Clean Energy’s Local Government Energy Audit Program. The facility’s participation in the program is assisted by an approved program partner. An “Energy Reduction Plan” is created with the facility and approved partner to shown at least 15% reduction in the building’s current energy use. Multiple energy conservation measures implemented together are applicable toward the total savings of at least 15%. No more than 50% of the total energy savings can result from lighting upgrades / changes.

Total incentive is capped at 50% of the project cost. The program savings is broken down into three benchmarks; Energy Reduction Plan, Project Implementation, and Measurement and Verification. Each step provides additional incentives as the energy reduction project continues. The benchmark incentives are as follows:

1. Energy Reduction Plan – Upon completion of an energy reduction plan by an approved program partner, the incentive will grant $0.10 per square foot between $5,000 and $50,000, and not to exceed 50% of the facility’s annual energy expense. (Benchmark #1 is not provided in addition to the local government energy audit program incentive.)

2. Project Implementation – Upon installation of the recommended measures along with the “Substantial Completion Construction Report,” the incentive will grant savings per KWH or Therm based on the program’s rates. Minimum saving must be 15%. (Example $0.11 / kWh for 15% savings, $0.12/ kWh for 17% savings, … and $1.10 / Therm for 15% savings, $1.20 / Therm for 17% saving, …) Increased incentives result from projected savings above 15%.

3. Measurement and Verification – Upon verification 12 months after implementation of all recommended measures, that actual savings have been achieved, based on a completed verification report, the incentive will grant additional savings per kWh or Therm based on the program’s rates. Minimum savings must be 15%. (Example $0.07 / kWh for 15% savings, $0.08/ kWh for 17% savings, … and $0.70 / Therm for 15% savings, $0.80 / Therm for 17% saving, …) Increased incentives result from verified savings above 15%.

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 61 of 65

Page 63: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

Smart Start Program

Prescriptive Measures - The New Jersey Clean Energy’s Smart Start prescriptive measures incentives include unit pricing incentives for installation of energy efficient equipment and controls. Proposed equipment and controls must meet the minimum efficiency requirements as well as other application requirements. The Smart Start prescriptive incentives applicable for new construction, renovations, remodeling and equipment replacements, for a wide range of equipment including:

• Electric Chillers • Gas Cooling • Electric Unitary HVAC • Ground Source Heat Pumps • Gas Heating • Variable Frequency Drives • Gas Water Heating • Premium Motors • Prescriptive Lighting • Lighting Controls • Technical Studies

Custom Measures - The New Jersey Clean Energy’s Smart Start prescriptive measures incentives include all measures not identified in the prescriptive measures category or measures that must have savings verified through additional analysis such as energy model simulations. Custom measures are intended to include savings as a result of unique energy efficiency measures, which are typically facility specific such as waste heat recovery. Custom incentives are provided based on the amount of energy saved and minimum internal rate of return in order to be eligible.

CEG recommends the Owner review the use of the above-listed funding options in addition to utilizing their standard method of financing for facilities upgrades in order to fund the proposed energy conservation measures.

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 62 of 65

Page 64: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

B. Financing Options: Municipal Bonds Municipal bonds are a bond issued by a city or other local government, or their agencies. Potential issuers of municipal bonds include cities, counties, redevelopment agencies, school districts, publicly owned airports and seaports, and any other governmental entity (or group of governments) below the state level. Municipal bonds may be general obligations of the issuer or secured by specified revenues. Interest income received by holders of municipal bonds is often exempt from the federal income tax and from the income tax of the state in which they are issued, although municipal bonds issued for certain purposes may not be tax exempt. Power Purchase Agreement Public Law 2008, Chapter 3 authorizes contracts of up to fifteen (15) years for energy purchase contracts commonly known as “power purchase agreements.” These are programs where the contracting unit (Owner) procures a contract for, in most cases, a third party to install, maintain, and own a renewable energy system. These renewable energy systems are typically solar panels, windmills or other systems that create renewable energy. In exchange for the third party’s work of installing, maintaining and owning the renewable energy system, the contracting unit (Owner) agrees to purchase the power generated by the renewable energy system from the third party at agreed upon energy rates. Energy Savings Improvement Program (ESIP): Public Law 2009, Chapter 4 authorizes government entities to make energy related improvements to their facilities and pay for the costs using the value of energy savings that result from the improvements. The “Energy Savings Improvement Program (ESIP)” law provides a flexible approach that can allow all government agencies in New Jersey to improve and reduce energy usage with minimal expenditure of new financial resources. This program provides public entities to make valuable facility infrastructure improvements that are associated with energy savings. All energy savings projects are eligible as long as the financing period does not extend beyond 15 years. The financing can be utilized for all aspects of energy efficiency project implementation including, energy savings plan development, engineering, construction management, construction management, commissioning, and measurement and verification. This program provides the much needed financing for energy efficiency projects without the burden of increased debt. The program allows for procurement of financing without voter approval or extending existing dept. The program requires evaluation to ensure a positive cash-flow through the entire 15 year financing period. The first phase of implementing an ESIP is the development of an Energy Savings Plan (ESP) to verify the energy savings, construction costs, and overall financial model. The underlining program requirement is the limitation of the project term to 15 years. The ESIP project size is open for multiple buildings to be included within one project. In addition all applicable incentive programs can also be utilized to help reduce the overall construction cost. Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 63 of 65

Page 65: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

XI. ADDITIONAL RECOMMENDATIONS In addition to the ECMs and REMs, there are maintenance and operational measures that can provide significant energy savings and provide immediate benefit, many of which facility’s staff are already performing. Maintenance items and small operational improvements are typically achievable with on-site staff or maintenance contractors and in turn have the potential to provide substantial operational savings compared to the costs associated. The following are recommendations which should be considered a priority in achieving an energy efficient building

A. Chemically clean the condenser and evaporator coils periodically to optimize efficiency. Poorly maintained heat transfer surfaces can reduce efficiency 5-10%.

B. Maintain all weather stripping on windows and doors.

C. Clean all light fixtures to maximize light output.

D. Provide more frequent air filter changes to decrease overall system power usage and maintain better IAQ.

E. Confirm that outside air economizers on the air handling units are functioning properly to take advantage of free cooling and avoid excess outside air during occupied periods.

F. Perform annual steam trap surveys to minimize energy waste caused by failed traps, and to maintain an inventory of system equipment.

G. Verify all HVAC control systems are utilizing setback and scheduling capabilities.

H. Shutdown all non-essential equipment during unoccupied periods.

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 64 of 65

Page 66: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

South Hunterdon Regional School District – High School Energy Audit

XII. ENERGY AUDIT ASSUMPTIONS The assumptions utilized in this energy audit include but are not limited to following:

A. Cost Estimates noted within this report are based on industry accepted costing data such as RS MeansTM Cost Data, contractor pricing and engineering estimates. All cost estimates for this level of auditing are +/- 20%. Prevailing wage rates for the specified region has been utilized to calculate installation costs. The cost estimates indicated within this audit should be utilized by the owner for prioritizing further project development post the energy audit. Project development would include investment grade auditing and detailed engineering.

B. Energy savings noted within this audit are calculated utilizing industry standard procedures and accepted engineering assumptions. For this level of auditing, energy savings are not guaranteed.

C. Information gathering for each facility is strongly based on interviews with operations personnel. Information dependent on verbal feedback is used for calculation assumptions including but not limited to the following:

a. operating hours b. equipment type c. control strategies d. scheduling

D. Information contained within the major equipment list is based on the existing owner documentation where available (drawings, O&M manuals, etc.). If existing owner documentation is not available, catalog information is utilized to populate the required information.

E. Equipment incentives and energy credits are based on current pricing and status of rebate programs. Rebate availability is dependent on the individual program funding and applicability.

F. Equipment (HVAC, Plumbing, Electrical, & Lighting) noted within an ECM recommendation is strictly noted as a basis for calculation of energy savings. The owner should use this equipment information as a benchmark when pursuing further investment grade project development and detailed engineering for specific energy conservation measures.

G. Utility bill annual averages are utilized for calculation of all energy costs unless otherwise noted. Accuracy of the utility energy usage and costs are based on the information provided. Utility information including usage and costs is estimated where incomplete data is provided.

H. Greenhouse Gas Emissions are calculated for each ECM, the basis for these emissions reductions are NJCEP published standard emissions factors, which are the following:.

a. Electric Savings: 1. CO2: 1.52 lbs/kWh 2. NOX: 0.0028 lbs/kWh 3. SO2: 0.0065 lbs/kWh

b. Natural Gas Savings: 1. CO2: 11.7 lbs/therm 2. NOX: 0.0092 lbs/therm

Concord Engineering Group, Inc. 1C13406 February 25, 2014 – FINAL Page 65 of 65

Page 67: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix Energy Audit

Concord Engineering Group, Inc.

APPENDIX A

Page 68: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

APPENDIX A1 of 1

LIFETIME ENERGY SAVINGS

LIFETIME MAINTENANCE

SAVINGSLIFETIME ROI SIMPLE PAYBACK INTERNAL RATE OF

RETURN (IRR)NET PRESENT VALUE

(NPV)

MATERIAL LABOR REBATES, INCENTIVES

NET INSTALLATION

COSTENERGY MAINT. / SREC TOTAL (Yearly Saving * ECM Lifetime) (Yearly Maint Svaing * ECM

Lifetime)(Lifetime Savings - Net Cost) /

(Net Cost) (Net cost / Yearly Savings)

($) ($) ($) ($) ($/Yr) ($/Yr) ($/Yr) (Yr) ($) ($) (%) (Yr) ($) ($)

ECM #1 Lighting Upgrade - General $28,590 $13,270 $220 $41,640 $6,289 $0 $6,289 15 $94,335 $0 126.5% 6.6 12.53% $33,437.67

ECM #2 Lighting Upgrade - Exterior $7,280 $5,280 $3,580 $8,980 $3,223 $0 $3,223 15 $48,345 $0 438.4% 2.8 35.51% $29,495.96

ECM #3 Lighting Controls Upgrade $6,550 $2,250 $645 $8,155 $2,086 $0 $2,086 15 $31,290 $0 283.7% 3.9 24.64% $16,747.53

ECM #4 Energy Star Refrigerator Replacement $2,000 $0 $0 $2,000 $50 $0 $50 10 $500 $0 -75.0% 40.0 -19.57% ($1,573.49)

ECM #5 Vending Miser Controls $1,500 $500 $0 $2,000 $339 $0 $339 10 $3,387 $0 69.4% 5.9 10.94% $889.52

ECM #6 Walk-in Evaporator Fan Controls $6,000 $1,500 $225 $7,275 $773 $0 $773 15 $11,595 $0 59.4% 9.4 6.49% $1,953.02

ECM #7 DDC Controls Upgrade $20,000 $10,000 $0 $30,000 $2,013 $0 $2,013 15 $30,195 $0 0.7% 14.9 0.08% ($5,968.94)

ECM #8 VFD on Chilled Water Pumps $16,500 $15,375 $0 $31,875 $1,308 $0 $1,308 15 $19,620 $0 -38.4% 24.4 -5.53% ($16,260.18)

ECM #9 Weatherization $8,000 $2,000 $0 $10,000 $757 $0 $757 30 $22,710 $0 127.1% 13.2 6.39% $4,837.53

ECM #10 Demand Control Ventilation $24,000 $16,000 $0 $40,000 $408 $0 $408 15 $6,120 $0 -84.7% 98.0 -17.61% ($35,129.32)

ECM #11 Domestic Hot Water Reset $6,000 $2,000 $0 $8,000 $974 $0 $974 15 $14,610 $0 82.6% 8.2 8.68% $3,627.55

ECM #12 Domestic Water Heater Controller/Timer $2,500 $500 $0 $3,000 $251 $0 $251 15 $3,759 $0 25.3% 12.0 2.96% ($8.35)

REM #1 424.32 kW PV System $1,727,388 $0 $0 $1,727,388 $56,612 $98,343 $154,956 15 $2,324,334 $1,475,148 34.6% 11.1 3.96% $122,462.04

Notes: 1) The variable Cn in the formulas for Internal Rate of Return and Net Present Value stands for the cash flow during each period.2) The variable DR in the NPV equation stands for Discount Rate3) For NPV and IRR calculations: From n=0 to N periods where N is the lifetime of ECM and Cn is the cash flow during each period .

REM RENEWABLE ENERGY AND FINANCIAL COSTS AND SAVINGS SUMMARY

ECM COST & SAVINGS BREAKDOWNCONCORD ENGINEERING GROUP

South Hunterdon Regional School District - South Hunterdon Regional High School

INSTALLATION COST YEARLY SAVINGSECM

LIFETIMEDESCRIPTIONECM NO.

ECM ENERGY AND FINANCIAL COSTS AND SAVINGS SUMMARY

Page 69: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix Energy Audit

Concord Engineering Group, Inc.

APPENDIX B

Page 70: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix B Page 1 of 4

Concord Engineering Group, Inc. 520 BURNT MILL ROAD VOORHEES, NEW JERSEY 08043 PHONE: (856) 427-0200 FAX: (856) 427-6508

SmartStart Building Incentives The NJ SmartStart Buildings Program offers financial incentives on a wide variety of building system equipment. The incentives were developed to help offset the initial cost of energy-efficient equipment. The following tables show the current available incentives from July 1, 2013 to June 30, 2014:

Electric Chillers Water-Cooled Chillers $16 - $170 per ton

Air-Cooled Chillers $8 - $52 per ton Energy Efficiency must comply with ASHRAE 90.1-2007

Gas Cooling

Gas Absorption Chillers $185 - $450 per ton

Gas Engine-Driven Chillers Calculated through custom measure path)

Desiccant Systems

$1.00 per cfm – gas or electric

Electric Unitary HVAC Unitary AC and Split Systems $73 - $92 per ton

Air-to-Air Heat Pumps $73 - $92 per ton Water-Source Heat Pumps $81 per ton

Packaged Terminal AC & HP $65 per ton Central DX AC Systems $40- $72 per ton

Dual Enthalpy Economizer Controls $250 Occupancy Controlled Thermostat

(Hospitality & Institutional Facility) $75 per thermostat

A/C Economizing Controls < 5 tons $85/unit; >5 tons $170/unit Energy Efficiency must comply with ASHRAE 90.1-2007

Gas Heating

Gas Fired Boilers < 300 MBH $2.00 per MBH, but not less than $300 per unit

Gas Fired Boilers ≥ 300 - 1500 MBH $1.75 per MBH

Gas Fired Boilers ≥1500 - ≤ 4000 MBH $1.00 per MBH

Gas Fired Boilers > 4000 MBH (Calculated through Custom Measure Path)

Gas Furnaces $400 per unit, AFUE ≥ 95%

Boiler Economizing Controls $1,200 - $2,700

Low Intensity Infrared Heating $300 - $500 per unit

Page 71: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix B Page 2 of 4

Ground Source Heat Pumps

Closed Loop $450 per ton, EER ≥ 16 $600 per ton, EER ≥ 18 $750 per ton, EER ≥ 20

Energy Efficiency must comply with ASHRAE 90.1-2007

Variable Frequency Drives Variable Air Volume $65 - $155 per hp

Chilled-Water Pumps ≥ 20 hp $60 per VFD rated hp Rotary Screw Air Compressors ≥ 25 hp $5,250 to $12,500 per drive

Cooling Towers ≥ 10 hp $60 per VFD rated hp Boiler Fans > 5 HP $65 to $155 per hp

Boiler Feed Water Pumps > 5 HP $60 to $155 per hp

Commercial Kitchen Hood up to 50 HP Retrofit $55 – $300 per hp New Hood $55 - $250 per hp

Natural Gas Water Heating

Gas Water Heaters ≤ 50 gallons, 0.67 energy factor or better $50 per unit

Gas-Fired Water Heaters > 50 gallons $1.00 - $2.00 per MBH Gas-Fired Booster Water Heaters $17 - $35 per MBH Gas Fired Tankless Water Heaters $300 per unit

Prescriptive Lighting T-8 reduced Wattage

(28w/25w 4’, 1-4 lamps) Lamp & ballast replacement

$10 per fixture

For retrofit of T-8 fixtures by permanent de-lamping & new reflectors

(Electronic ballast replacement required)

$15 per fixture

T-5 and T-8 High Bay Fixtures $16 - $200 per fixture

Metal Halide w/Pulse Start Including Parking Lot (For fixtures ≥ 150w)

$25 per fixture

HID ≥ 100w Replace with new induction fixture.

(must be 30% less watts/fixture than HID system)

$70 per fixture

HID ≥ 100w Retrofit with induction lamp, power coupler and generator

(must be 30% less watts/fixture than HID system)

$50 per fixture

Page 72: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix B Page 3 of 4

Prescriptive Lighting - LED

LED Display Case Lighting $30 per display case

LED Shelf-Mtd. Display & Task Lights $15 per linear foot

LED Portable Desk Lamp $20 per fixture

LED Wall-wash Lights $30 per fixture

LED Recessed Down Lights $35 per fixture LED Outdoor Pole/Arm-Mounted Area

and Roadway Luminaries $175 per fixture

LED Outdoor Pole/Arm-Mounted Decorative Luminaries $175 per fixture

LED Outdoor Wall-Mounted Area Luminaries $100 per fixture

LED Parking Garage Luminaries $100 per fixture

LED Track or Mono-Point Directional Lighting Fixtures $50 per fixture

LED High-Bay and Low-Bay Fixtures for Commercial & Industrial Bldgs. $150 per fixture

LED High-Bay-Aisle Lighting $150 per fixture

LED Stairwell and Passageway Luminaires $40 per fixture

LED Bollard Fixtures $50 per fixture

Luminaires for Ambient Lighting of Interior Commercial Spaces

(1x4, 2x2, 2x4) $50 per fixture

LED Fuel Pump Canopy $100 per fixture

LED Screw-based & Pin-based (PAR, MR, BR, R) Standards (A-Style) and

Decorative Lamps

$10 per lamp for R/PAR20,MR/PAR16,Globe,Candelabra

or Misc $20 per lamp for R/BR/PAR 30,

R/BR/PAR 38-40, A-Lamp

LED Refrigerator/Freezer case lighting replacement of fluorescent in medium

and low temperature display case

$30 per 4 foot $42 per 5 foot $65 per 6 foot

LED Retrofit Kits To be evaluated through the customer measure path

Page 73: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix B Page 4 of 4

Lighting Controls – Occupancy Sensors Wall Mounted

(Existing Facilities Only) $20 per control

Remote Mounted (Existing Facilities Only) $35 per control

Daylight Dimming Controls $45 per fixture controlled Occupancy Based hi-low Dimming

Control $35 per fixture controlled

Occupancy Sensor Remote Mounted $35 per control

Refrigeration Doors/Covers

Energy-Efficient Doors/Covers for Installation on Open Refrigerated Cases $100 per door

Aluminum Night Curtains for Installation on Open Refrigerated Cases $3.50 per linear foot

Refrigeration Controls

Door Heater Controls $50 per control Electric Defrost Controls $50 per control Evaporator Fan Controls $75 per control Novelty Cooler Shutoff $50 per control

Other Equipment Incentives

Performance Lighting

$1.00 per watt per SF below program incentive threshold, currently 5% more energy efficient than ASHRAE 90.1-

2007 for New Construction and Complete Renovation

Custom Electric and Gas Equipment Incentives not prescriptive

Custom Measures

$0.16 KWh and $1.60/Therm of 1st year savings, or a buy down to a 1 year

payback on estimated savings. Minimum required savings of 75,000

KWh or 1,500 Therms and an IRR of at least 10%.

Page 74: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix Energy Audit

Concord Engineering Group, Inc.

APPENDIX C

Page 75: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

ENERGY STAR® Statement of EnergyPerformance

23ENERGY STAR®

Score1

South Hunterdon Regional High School

Primary Property Function: K-12 SchoolGross Floor Area (ft²): 99,000Built: 1959

For Year Ending: June 30, 2013Date Generated: January 16, 2014

1. The ENERGY STAR score is a 1-100 assessment of a building’s energy efficiency as compared with similar buildings nationwide, adjusting forclimate and business activity.

Property & Contact Information

Property AddressSouth Hunterdon Regional High School301 Mount Airy-Harbourton RoadLambertville, New Jersey 08530

Property OwnerSouth Hunterdon Regional School District301 Mt. Airy Harbourton RoadLambertville, NJ 08530(____)____-______

Primary ContactKerry Sevilis301 Mt. Airy Harbourton RoadLambertville, NJ [email protected]

Property ID: 3944608

Energy Consumption and Energy Use Intensity (EUI)

Site EUI100.6 kBtu/ft²

Annual Energy by FuelPropane (kBtu) 172,955 (2%)Fuel Oil (No. 2) (kBtu) 5,979,306 (60%)Electric - Grid (kBtu) 3,803,697 (38%)

National Median ComparisonNational Median Site EUI (kBtu/ft²) 78.6National Median Source EUI (kBtu/ft²) 143.4% Diff from National Median Source EUI 28%

Source EUI183.4 kBtu/ft²

Annual EmissionsGreenhouse Gas Emissions (MtCO2e/year) 482

Signature & Stamp of Verifying Professional

I ___________________ (Name) verify that the above information is true and correct to the best of my knowledge.

Signature: _______________________Date: ___________

Licensed Professional

Michael Fischette520 South Burnt Mill RoadVoorhees, NJ [email protected]

Professional Engineer Stamp(if applicable)

Page 76: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix Energy Audit

Concord Engineering Group, Inc.

APPENDIX D

Page 77: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix DPage 1 of 34

Rooftop UnitsTag RTU-1 RTU-2 RTU-3

Unit Type Packaged Rooftop Packaged Rooftop Packaged Rooftop

Qty 1 1 1

Location Roof Roof Roof

Area Served Gymnasium Middle School Commons Media Center

Manufacturer McQuay McQuay McQuay

Model # RDS800CYY RDS708BY RDS708BY

Serial # FBOU070900321 FBOU070801409 FBOU070900019

Cooling Type Chilled Water Coil Chilled Water Coil Chilled Water Coil

Cooling (MBH) 326.4 161.4 131.0

Heating Type Hot Water Coil Hot Water Coil Hot Water Coil

Heating (MBH) 532.5 263.9 208.5

Supply Fan (HP) 7.5 5 7.5

Return Fan (HP) 5 1.5 3

Approx Age 5 5 5

ASHRAE Service Life 15 15 15

Remaining Life 10 10 10

Comments

Note:

MAJOR EQUIPMENT LISTConcord Engineering Group

South Hunterdon High School

"N/A" = Not Applicable. "-" = Info Not Available

Page 78: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix DPage 2 of 34

Rooftop UnitsTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Cooling Type

Cooling (MBH)

Heating Type

Heating (MBH)

Supply Fan (HP)

Return Fan (HP)

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

RTU-4 RTU-5 RTU-6

Packaged Rooftop Packaged Rooftop Packaged Rooftop

1 1 1

Roof Roof Roof

Offices - Area B Auditorium Lobby

McQuay McQuay McQuay

RDS708BY RAH047CSY RDS708BY

FBOU070900012 FBOU070900319 FBOU070900011

Chilled Water Coil Chilled Water Coil Chilled Water Coil

119.9 484.7 106.4

Hot Water Coil Hot Water Coil Hot Water Coil

183.2 770.7 170.0

7.5 15 5

1.5 7.5 1

5 5 5

15 15 15

10 10 10

Page 79: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix DPage 3 of 34

Rooftop UnitsTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Cooling Type

Cooling (MBH)

Heating Type

Heating (MBH)

Supply Fan (HP)

Return Fan (HP)

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

RTU-7 RTU-8 RTU-9

Packaged Rooftop Packaged Rooftop Packaged Rooftop

1 1 1

Roof Roof Roof

High School Commons Music Room Nurse Office Area A

McQuay McQuay McQuay

RDS708BY RDS708BY OAH003GDAC

FBOU070900017 FBOU070900015 FBOU070700844

Chilled Water Coil Chilled Water Coil Chilled Water Coil

236.1 83.6 23.6

Hot Water Coil Hot Water Coil Hot Water Coil

404.5 122.4 37.3

7.5 3 1

3 1 1

5 5 5

15 15 15

10 10 10

Page 80: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix DPage 4 of 34

Rooftop UnitsTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Cooling Type

Cooling (MBH)

Heating Type

Heating (MBH)

Supply Fan (HP)

Return Fan (HP)

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

RTU-10 RTU-11 RTU-12

Packaged Rooftop Packaged Rooftop Packaged Rooftop

1 1 1

Roof Roof Roof

Wood Shop Bldg Constr/AGR Science Kitchen

McQuay McQuay McQuay

RDS708BY RDS708BY RDS708BY

FBOU070900335 FBOU070900295 FBOU070900332

Chilled Water Coil Chilled Water Coil Chilled Water Coil

212.2 163.1 198.6

Hot Water Coil Hot Water Coil Hot Water Coil

356.4 224.7 300.6

7.5 5 3

2 1.5 N/A

5 5 5

15 15 15

10 10 10

Page 81: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix DPage 5 of 34

Split AC UnitsTag RCU-1 RCU-2

Unit Type Remote Condensing Unit Remote Condensing Unit

Qty 1 1

Location Roof Roof

Area Served Sound Equipment Closet Production

Manufacturer Mitsubishi (Mr. Slim) Sanyo

Model # PUY-A18NHA2 C3672R

Serial # 8YU00845A 0167674

Cooling Type DX Coil DX Coil

Cooling Capacity (BTUH) 18,000 31,400

Cooling Efficiency 14.1 SEER 13.1 SEER

Condenser Fan (HP) ⅓ ⅓

Electrical (V/H/P) 208/1/60 208/1/60

Approx Age 5 5

ASHRAE Service Life 15 15

Remaining Life 10 10

Comments Indoor Unit Model PKA-A18GA Indoor Unit Model KH3672R

Note:

MAJOR EQUIPMENT LISTConcord Engineering Group

South Hunterdon High School

"N/A" = Not Applicable. "-" = Info Not Available

Page 82: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix DPage 6 of 34

Split AC UnitsTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Cooling Type

Cooling Capacity (BTUH)

Cooling Efficiency

Condenser Fan (HP)

Electrical (V/H/P)

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

RCU-3

Remote Condensing Unit Remote Condensing Unit

1 1

Roof Roof

AHU-8 (Computer Lab)

Lennox Sanyo

SSB060H4S42Y CL1852

5807D10838 0058034

DX Coil DX Coil

60,000 1,800

13.7 SEER 10.6 SEER

- ⅓

208/3/60 208/1/60

5 10

15 15

10 5

Indoor Unit Model KS1852

Page 83: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix DPage 7 of 34

BoilersTag B-1 B-2

Unit Type Cast Iron Commercial Boiler Cast Iron Commercial Boiler

Qty 1 1

Location Main Boiler Room Main Boiler Room

Area Served Entire Facility Entire Facility

Manufacturer Buderus Logano Buderus Logano

Model # GE615/14 GE615/14

Serial # 63130080-00-6293-0057 63130080-00-6293-0053

Max Input 28.5 gallons #2 Oil 28.5 gallons #2 Oil

Output Capacity (MBH) 3,402 3,402

Approx. Efficiency % 85.3% Thermal Efficiency 85.3% Thermal Efficiency

Fuel #2 Fuel Oil #2 Fuel Oil

Approx Age 5 5

ASHRAE Service Life 24 24

Remaining Life 19 19

Comments Power Flame Burner C3-GO-25B Serial # 070726362

Power Flame Burner C3-GO-25B Serial # 070726363

Note:

MAJOR EQUIPMENT LISTConcord Engineering Group

South Hunterdon High School

"N/A" = Not Applicable. "-" = Info Not Available

Page 84: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix DPage 8 of 34

MAJOR EQUIPMENT LISTConcord Engineering Group

South Hunterdon High School

Domestic Water HeatersTag DHW-1

Unit Type High Efficiency Oil-Fired Water Heater Storage Tank w/Heat Exchanger

Qty 1 1

Location Boiler Room Boiler Room

Area Served Entire Facility Entire Facility

Manufacturer A. O. Smith Preferred A. O. Smith Water Products

Model # COF 385A 940 HD700A

Serial # 0903M000021 -

Size (Gallons) 75 700

Input Capacity (MBH) 385 N/A

Recovery (Gal/Hr) 382.7 GPH @ 80°F Rise N/A

Efficiency % 80% N/A

Fuel #2 Fuel Oil N/A

Approx Age 5 5

ASHRAE Service Life 15 15

Remaining Life 10 10

Comments Three (3) Bell & Gossett Model PL-36B Circulation Pumps

Shell & Tube Heat Exchanger in Tank

Note:"N/A" = Not Applicable. "-" = Info Not Available

Page 85: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix DPage 9 of 34

MAJOR EQUIPMENT LIST

PumpsTag P-1 & P-2 P-3 & P-4 P-5 & P-6

Unit TypeBase Mounted End

Suction PumpBase Mounted End

Suction PumpIn-Line Centrifugal

Pump

Qty 2 2 2

Location Boiler Room Boiler Room Back of Boiler

Area Served Hot Water Loop Chilled Water Loop Hot Water Loop

Manufacturer Bell & Gossett Bell & Gossett Bell & Gossett

Model # Model 1510 Model 1510 Series 80

Serial # - - -

Horse Power 30 20 5

Flow 825 GPM @ 86' THD 450 GPM @ 87' THD 250 GPM @ 25' THD

Motor Info Baldor Super E Baldor Super E Baldor Super E

Motor Cat. No. EM2535T EM2515T EJMM3211T

Electrical Power 208/3 208/3 208/3

RPM 1770 1765 1755

Motor Efficiency % 94.1% 93.0% 90.2%

Approx Age 5 5 5

ASHRAE Service Life 20 20 20

Remaining Life 15 15 15

Comments Mitsubishi Electric 700 Series Variable Speed Drives on

Each Pump

Pumps Enclosed with Insulation Board

Note:

Concord Engineering Group

South Hunterdon High School

"N/A" = Not Applicable. "-" = Info Not Available

Page 86: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix DPage 10 of 34

PumpsTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Horse Power

Flow

Motor Info

Motor Cat. No.

Electrical Power

RPM

Motor Efficiency %

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

Booster Pumps CP-1, 2, & 3Cold Domestic Water

Booster Pumps DHW Circulator Pumps

3 3

Boiler Room Boiler Room

Entire Facility Domestic Hot Water Loop

Alyan Pump Co. Bell & Gossett

VSPMT-8570-3-5 PL36B

- -

5 1/6

249 GPM @70 PSIG -

Grundfos Bell & Gossett

CR15-3 -

208/3 115/1

3500 1725

90.2% -

5 5

20 20

15 15

Grundfos CR15-3 Vertical Multi-Stage centrifugal pumps

Page 87: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix DPage 11 of 34

MotorsTag

Unit Type Motor Motor Motor Motor

Qty 2 2 2 2

Location Boiler Room Boiler Room Boiler Room Outside Near Chiller

Area Served Burner Fan Motor Boiler Oil Pump Indoor Oil Pump Skid Outdoor Oil Pump Skid

Manufacturer Marathon Marathon Baldor Leeson Electric

Model # EVH 56T34D5316B EVF 56T34D5312B - C6T17WK18

Catalog # P007 P003 - 112429.00

Horse Power 3 ¾ ½ ½

Enclosure Type DP DP DP TEFC

Electrical Power 208/3 208/3 208/3 208/3

RPM 3450 3450 1725 1725

Efficiency % - - - -

Approx Age 5 5 5 5

ASHRAE Service Life 18 18 18 18

Remaining Life 13 13 13 13

Comments

Note:

MAJOR EQUIPMENT LISTConcord Engineering Group

South Hunterdon High School

"N/A" = Not Applicable. "-" = Info Not Available

Page 88: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix DPage 12 of 34

MAJOR EQUIPMENT LIST

Exhaust FansTag PRE-40 PRE-32

Unit Type Exhaust Fan Exhaust Fan Exhaust Fan

Qty 1 1 1

Location Roof Roof Roof

Area Served Boiler Room

Manufacturer Greenheck Penn Ventilation Greenheck

Model # GB-141-4-X Domex GB-081-6-X

Serial # 10949517-0708 Size BB 45 10949492-0708

Motor (HP) 1/4 1/6

Electrical (V/H/P) 115V/1 115V/1 115V/1

Approx Age 5 5

ASHRAE Service Life 20 20 20

Remaining Life 15 20 15

Comments

Note:

Concord Engineering Group

South Hunterdon High School

"N/A" = Not Applicable. "-" = Info Not Available

Page 89: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix DPage 13 of 34

Exhaust FansTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Motor (HP)

Electrical (V/H/P)

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

PRE-14 PRE-26 PRE-20 PRE-6

Exhaust Fan Exhaust Fan Exhaust Fan Exhaust Fan

1 1 1 1

Roof Roof Roof Roof

Uniform/Shop Storage Kitchen Hood Boys Locker Room Weight Room

Greenheck Greenheck Greenheck Greenheck

GB-081-6-X CUBE-300-5-6 GB-101-4-X GB-091-4-X

10949491-0708 10949509-0708 10949501-0708 10949481-0708

1/6 1/2 1/4 1/4

115V/1 208V/3 115V/1 115V/1

5 5 5 5

20 20 20 20

15 15 15 15

Page 90: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix DPage 14 of 34

Exhaust FansTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Motor (HP)

Electrical (V/H/P)

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

PRE-39 PRE-28 PRE-5 PRE-27

Exhaust Fan Exhaust Fan Exhaust Fan Exhaust Fan

1 1 1 1

Roof Roof Roof Roof

Storage Room Toilet Room World Language Lab Dishwasher Hood

Greenheck Greenheck Greenheck Greenheck

GB-071-4-X GB-081-4-X GB-091-4-X CUBE-101-4-6

10949516-0708 10949495-0708 10949480-0708 10949510-0708

1/4 1/4 1/4 1/4

115V/1 115V/1 115V/1 115V/1

5 5 5 5

20 20 20 20

15 15 15 15

Page 91: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix DPage 15 of 34

Exhaust FansTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Motor (HP)

Electrical (V/H/P)

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

PRE-38 PRE-22 PRE-23 PRE-36

Exhaust Fan Exhaust Fan Exhaust Fan Exhaust Fan

1 1 1 1

Roof Roof Roof Roof

Storage Room Boys Changing Room

Girls Changing Room Toilet Room

Greenheck Greenheck Greenheck Greenheck

GB-081-6-X GB-081-4-X GB-091-4-X GB-071-4-X

10949493-0708 10949503-0708 10949504-0708 10949515-0708

1/6 1/4 1/4 1/4

115V/1 115V/1 115V/1 115V/1

5 5 5 5

20 20 20 20

15 15 15 15

Page 92: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix DPage 16 of 34

Exhaust FansTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Motor (HP)

Electrical (V/H/P)

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

PRE-21 PRE-7 PRE-30

Exhaust Fan Exhaust Fan Exhaust Fan Exhaust Fan

1 1 1 1

Roof Roof Roof Roof

Girls Locker Room Health/Driver Ed Closets

Greenheck Dayton Greenheck Greenheck

GB-101-4-X 4YC64G GB-161-4-X GB-091-4-X

10949502-0708 11610493 0812 10949487-0708 10949506-0708

1/4 1/4 1/4

115V/1 115V/1 115V/1 115V/1

5 15 5 5

20 20 20 20

15 5 15 15

Page 93: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix DPage 17 of 34

Exhaust FansTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Motor (HP)

Electrical (V/H/P)

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

PRE-4 PRE-3 PRE-25 PRE-24

Exhaust Fan Exhaust Fan Exhaust Fan Exhaust Fan

1 1 1 1

Roof Roof Roof Roof

Business Classroom Faculty Room & Breakroom Toilet Room Toilet Room

Greenheck Greenheck Greenheck Greenheck

GB-131-4-X GB-101-4-X GB-071-4-X GB-091-4-X

10949485-0708 10949483-0708 10949508-0708 10949505-0708

1/4 1/4 1/4 1/4

115V/1 115V/1 115V/1 115V/1

5 5 5 5

20 20 20 20

15 15 15 15

Page 94: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix DPage 18 of 34

Exhaust FansTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Motor (HP)

Electrical (V/H/P)

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

PRE-37 PRE-2 PRE-1 PRE-12

Exhaust Fan Exhaust Fan Exhaust Fan Exhaust Fan

1 1 1 1

Roof Roof Roof Roof

Music Storage Art Room Boys & Girls Toilet Rooms Electric Room

Greenheck Greenheck Greenheck Greenheck

GB-081-4-X GB-091-4-X GB-121-4-X GB-081-6-X

10949496-0708 10949479-0708 10949478-0708 10949490-0708

1/4 1/4 1/4 1/6

115V/1 115V/1 115V/1 115V/1

5 5 5 5

20 20 20 20

15 15 15 15

Page 95: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix DPage 19 of 34

Exhaust FansTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Motor (HP)

Electrical (V/H/P)

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

PRE-37 PRE-2 PRE-1 PRE-12

Exhaust Fan Exhaust Fan Exhaust Fan Exhaust Fan

1 1 1 1

Roof Roof Roof Roof

Music Storage Art Room Boys & Girls Toilet Rooms Electric Room

Greenheck Greenheck Greenheck Greenheck

GB-081-4-X GB-091-4-X GB-121-4-X GB-081-6-X

10949496-0708 10949479-0708 10949478-0708 10949490-0708

1/4 1/4 1/4 1/6

115V/1 115V/1 115V/1 115V/1

5 5 5 5

20 20 20 20

15 15 15 15

Page 96: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix DPage 20 of 34

Exhaust FansTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Motor (HP)

Electrical (V/H/P)

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

PRE-31 PRE-8 PRE-9 PRE-10

Exhaust Fan Exhaust Fan Exhaust Fan Exhaust Fan

1 1 1 1

Roof Roof Roof Roof

Toilet Rooms Classrooms Classrooms Chemistry Prep Room

Greenheck Greenheck Greenheck Greenheck

GB-121-4-X GB-131-4-X GB-101-4-X GB-091-4-X

10949512-0708 10949486-0708 10949484-0708 10949488-0708

1/4 1/4 1/4 1/4

115V/1 115V/1 115V/1 115V/1

5 5 5 5

20 20 20 20

15 15 15 15

Page 97: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix DPage 21 of 34

Exhaust FansTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Motor (HP)

Electrical (V/H/P)

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

PRE-34 PRE-11 PRE-13 PRE-15

Exhaust Fan Exhaust Fan Exhaust Fan Exhaust Fan

1 1 1 1

Roof Roof Roof Roof

Acid Cabinet Ventilation Science Room Resource Rooms Toilet Rooms

Greenheck Greenheck Greenheck Greenheck

CUBE-098-4-X GB-131-4-X GB-091-4-X GB-081-4-X

10949513-0708 10949489-0708 10949482-0708 10949494-0708

1/4 1/4 1/4 1/4

115V/1 115V/1 115V/1 115V/1

5 5 5 5

20 20 20 20

15 15 15 15

Page 98: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix DPage 22 of 34

Exhaust FansTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Motor (HP)

Electrical (V/H/P)

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

PRE-18 PRE-17 PRE-19 PRE-16

Exhaust Fan Exhaust Fan Exhaust Fan Exhaust Fan

1 1 1 1

Roof Roof Roof Roof

Resource Rooms Classrooms Art Room Classrooms

Greenheck Greenheck Greenheck Greenheck

GB-121-4-X GB-101-4-X GB-101-4-X GB-180-4-X

10949500-0708 10949498-0708 10949499-0708 10949497-0708

1/4 1/4 1/4 1/4

115V/1 115V/1 115V/1 115V/1

5 5 5 5

20 20 20 20

15 15 15 15

Page 99: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix DPage 23 of 34

Exhaust FansTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Motor (HP)

Electrical (V/H/P)

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

PRE-29

Exhaust Fan

1

Roof

Toilet Rooms & Janitor Closet

Greenheck

GB-121-4-X

10949511-0708

1/4

115V/1

5

20

15

Page 100: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix DPage 24 of 34

Emergency GeneratorTag

Unit Type Diesel Generator Set

Qty 1

Location Outside Near Chiller

Manufacturer Cummins Power Generation

Model # DQDAA

Rating (kVA) 313 Standby 281 Prime

Output (kW) 250 kW Standby 225kW Prime

Electrical Information 120/208

Impedance (%) -

Approx Age 5

ASHRAE Service Life 25

Remaining Life 20

Comments

Note:

MAJOR EQUIPMENT LISTConcord Engineering Group

South Hunterdon High School

"N/A" = Not Applicable. "-" = Info Not Available

Page 101: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Air-Cooled ChillerTag CH-1

Unit Type Air-Cooled Screw Compressor Chiller 30% Ethylene Glycol Digital Glycol Feedwe

Qty 1 1

Location Next to Boiler Room- On Grade Boiler room

Area Served Entire Facility Single Loop

Manufacturer McQuay Pulsafeeder

Model # AGS195CH12-ER10 DGF1BBXACXA

Serial # STNU070800136 -

Refrigerant DX, R134a -

ARI Rated Capacity 186.3 1.5 GPM

Cooling Efficiency 10.5 EER -

Volts / Phase / Hz 208/3/60 115/

Fuel Electric -

Chilled Water GPM / ΔT 450 GPM @ 10°F ∆T -

Condenser Water GPM / ΔT Air-Cooled -

Approx Age 5 5

ASHRAE Service Life 20 20

Remaining Life 15 15

Comments High Ambient Unit Evaporator Model EV50271515 Two (2) Circuits

Compressor Model HS3220 A/C

30% Ethylene Glycol

Note:

MAJOR EQUIPMENT LISTConcord Engineering Group

South Hunterdon High School

"N/A" = Not Applicable. "-" = Info Not Available

Page 102: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Air Handler UnitsTag AHU-1 AHU-2

Unit Type Central Air Handler Central Air Handler

Qty 1 1

Location Back Stage Storage Music Storage

Area Served Back Stage Admin Offices

Manufacturer McQuay McQuay

Model # LAH003ADH LAH003ADH

Serial # TLN07080079 TLNV07080078

Cooling Type Chilled Water Chilled Water

Cooling Capacity (MBH) 31.6 30.4

Heating Type Hot Water Hot Water

Heating Capacity (MBH) 59.5 49.2

Supply Fan (HP) ½ ¾

Electrical (V/H/P) 208/3/60 208/3/60

Approx Age 5 5

ASHRAE Service Life 20 20

Remaining Life 15 15

Comments

Note:

MAJOR EQUIPMENT LISTConcord Engineering Group

South Hunterdon High School

"N/A" = Not Applicable. "-" = Info Not Available

Page 103: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

AHU-3 AHU-4 AHU-5

Central Air Handler Central Air Handler Central Air Handler

1 1 1

Stock Room Boys Locker Room Girls Locker Room

Admin Offices Boys Lockers Girls Lockers

McQuay McQuay McQuay

LAH002ADH LAH002ADH LAH002ADH

TLNV070800073 TLNV070800072 TLNV070800071

Chilled Water Chilled Water Chilled Water

22.4 17.7 17.7

Hot Water Hot Water Hot Water

38.5 23.4 23.4

1 1 1

208/3/60 208/3/60 208/3/60

5 5 5

20 20 20

15 15 15

Page 104: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

AHU-6 AHU-7 AHU-8

Central Air Handler Central Air Handler Central Air Handler

1 1 1

Mechanical Room M. S. Science Computer Lab

Old Gym M. S. Science Computer Lab

McQuay McQuay McQuay

CAH019GDAM LAH003ADH LAH003GDAC

FBC070800474 TLNU FB00070800588

Chilled Water Chilled Water Chilled Water

292.8 39.9 43.8

Hot Water Hot Water Hot Water

465 73.2 78.9

10 1-½ 2

208/3/60 208/3/60 208/3/60

5 5 5

20 20 20

15 15 15

Separate DX Cooling Coil

Page 105: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Unit HeatersTag UH-1 UH-2 UH-3

Unit Type Hot Water Unit Heater Hot Water Unit Heater Hot Water Unit Heater

Qty 1 1 1

Location Fire Pump Room Boiler Room Boiler Room

Area Served Fire Pump Room Boiler Room Boiler Room

Manufacturer McQuay McQuay McQuay

Model # UH-18 UH-86 UH-86

Serial # - - -

Heating Type Hot Water Coil Hot Water Coil Hot Water Coil

Heating (BTUH) 12,800 63,000 63,000

CFM 340 1,340 1,340

Supply Fan (HP) 0.01667 1/8 1/8

Approx Age 5 5 5

ASHRAE Service Life 20 20 20

Remaining Life 15 15 15

Comments

Note:

MAJOR EQUIPMENT LISTConcord Engineering Group

South Hunterdon High School

"N/A" = Not Applicable. "-" = Info Not Available

Page 106: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Fan Coil UnitsTag FCU-1 to 6 FCU-7 FCU-9 to 12

Unit Type Fan Coil Unit Fan Coil Unit Fan Coil Unit

Qty 6 1 4

Location Various Various Various

Area Served Various Various Various

Manufacturer McQuay McQuay McQuay

Model # TSS Horizontal TSS Horizontal TSC Vertical

Serial # - - -

Heating Type Hot Water Hot Water Hot Water

Heating (BTUH) 34,290 23,760 32,780

Cooling Type N/A Chilled Water N/A

Cooling (BTUH) N/A 12,230 N/A

CFM 430 430 480

Approx Age 5 5 5

ASHRAE Service Life 20 20 20

Remaining Life 15 15 15

Comments

Note:

MAJOR EQUIPMENT LISTConcord Engineering Group

South Hunterdon High School

"N/A" = Not Applicable. "-" = Info Not Available

Page 107: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Air Terminal UnitsTag VAV-1 to 13 VAV-15, 18, 19, & 20 VAV-16 & 17

Unit Type Air Terminal Air Terminal Air Terminal

Qty 13 4 2

LocationCareer/Guidance

OfficesTech Office, Storage,

A/V Storage, Work Rm Media Center

Area ServedCareer/Guidance

OfficesTech Office, Storage,

A/V Storage, Work Rm Media Center

Manufacturer Anemostat Anemostat Anemostat

Model # EZTS Basic Assy EZTS Basic Assy EZTS Basic Assy

Serial # "-" "-" "-"

Heating Type Hot Water Coil Hot Water Coil Hot Water Coil

Heating 9.8 to 13.8 MBH 4.0 to 8.7 MBH 89.7 MBH

CFM 250 to 450 100 to 200 2300

Approx Age 5 5 5

ASHRAE Service Life 20 20 20

Remaining Life 15 15 15

Comments

Note:

MAJOR EQUIPMENT LISTConcord Engineering Group

South Hunterdon High School

"N/A" = Not Applicable. "-" = Info Not Available

Page 108: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Air Terminal UnitsTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Heating Type

Heating

CFM

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

VAV-21 & 22 VAV-23

Air Terminal Air Terminal

2 1

School Store/Yearbook TV Production

School Store/Yearbook TV Production

Anemostat Anemostat

EZTS Basic Assy EZTS Basic Assy

"-" "-"

Hot Water Coil Hot Water Coil

8.7 MBH 13

250 500

5 5

20 20

15 15

Page 109: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Unit VentilatorsTag

Unit Type Unit Ventilator Unit Ventilator Unit Ventilator

Qty 6 7 1

Location Various Various Various

Area Served Various Various Various

Manufacturer McQuay McQuay McQuay

Model # UAVV6S05 UAHV6S07 UAVV6S10

Serial # - - -

Heating Type Hot Water Hot Water Hot Water

Heating (BTUH) 23.3 44.8 46.7

Cooling Type Chilled Water Chilled Water Chilled Water

Cooling (MBH) 11.6 20.8 31.6

CFM 500 750 1000

Approx Age 5 5 5

ASHRAE Service Life 20 20 20

Remaining Life 15 15 15

Comments

Note:

MAJOR EQUIPMENT LISTConcord Engineering Group

South Hunterdon High School

"N/A" = Not Applicable. "-" = Info Not Available

Page 110: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Unit VentilatorsTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Heating Type

Heating (BTUH)

Cooling Type

Cooling (MBH)

CFM

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

Unit Ventilator Unit Ventilator

1 25

Various Various

Various Various

McQuay McQuay

UAVV6S13 UAVV6S15

- -

Hot Water Hot Water

59.7 70.0

Chilled Water Chilled Water

42.4 49.6

1250 1500

5 5

20 20

15 15

Page 111: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix Energy Audit

Concord Engineering Group, Inc.

APPENDIX E

Page 112: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix E - Lighting Audit - South Hunterdon HS.xlsx Page 1 of 4

CEG Project #:Facility Name: Address:City, State, Zip

Fixture Reference # Location

Average Burn Hours

Description Lamps per Fixture

Watts per

Fixture

Qty of Fixtures

Total kW

Usage kWh/Yr Work Description Equipment Description Lamps per

FixtureWatts per

FixtureQty of

FixturesTotal kW

Usage kWh/Yr

Energy Savings,

kW

Energy Savings,

kWh

Energy Savings, $

Control Ref # Controls Description Qty of

Controls

Hour Reduction

%

Energy Savings,

kWh

Energy Savings, $ Material Total Labor Total All Rebate

EstimateSimple

PaybackTotal

Materials Total Labor Total All Simple Payback

221.34 Cust Closet 20001x4, 2 Lamp, 32w T8, Elect. Ballast, Pendant

Mnt., No Lens2 62 1 0.06 124 Existing to Remain Existing to Remain 2 62 0 0.06 124 0.00 0 $0 0 No New Controls 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

322.23 BA Office 30002 Lamp 54w T5, 2x4

Recessed Mnt., Direct/Indirect

2 114 2 0.23 684 Existing to Remain Existing to Remain 2 114 0 0.23 684 0.00 0 $0 6Dual Technology Occupancy Sensor -

Switch Mnt. 1 20.0% 137 $15 $0.00 $0.00 $0.00 $0.00 - $50.00 $50.00 $100.00 $20.00 5.32

322.23 Transportation Sec. Office 30002 Lamp 54w T5, 2x4

Recessed Mnt., Direct/Indirect

2 114 1 0.11 342 Existing to Remain Existing to Remain 2 114 0 0.11 342 0.00 0 $0 0 No New Controls 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

322.23 BA Sec. Office 30002 Lamp 54w T5, 2x4

Recessed Mnt., Direct/Indirect

2 114 1 0.11 342 Existing to Remain Existing to Remain 2 114 0 0.11 342 0.00 0 $0 0 No New Controls 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

322.23 BA Office 30002 Lamp 54w T5, 2x4

Recessed Mnt., Direct/Indirect

2 114 1 0.11 342 Existing to Remain Existing to Remain 2 114 0 0.11 342 0.00 0 $0 0 No New Controls 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

322.23 Main Office Restroom 12002 Lamp 54w T5, 2x4

Recessed Mnt., Direct/Indirect

2 114 1 0.11 137 Existing to Remain Existing to Remain 2 114 0 0.11 137 0.00 0 $0 6Dual Technology Occupancy Sensor -

Switch Mnt. 1 20.0% 27 $3 $0.00 $0.00 $0.00 $0.00 - $50.00 $50.00 $100.00 FALSE 33.23

222.21 Main Office Hall 30002x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

2 62 2 0.12 372 Existing to Remain Existing to Remain 2 62 0 0.12 372 0.00 0 $0 0 No New Controls 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

322.23 Kitchenette 30002 Lamp 54w T5, 2x4

Recessed Mnt., Direct/Indirect

2 114 1 0.11 342 Existing to Remain Existing to Remain 2 114 0 0.11 342 0.00 0 $0 6Dual Technology Occupancy Sensor -

Switch Mnt. 1 20.0% 68 $8 $0.00 $0.00 $0.00 $0.00 - $50.00 $50.00 $100.00 FALSE 13.29

322.23 Principal's Office 30002 Lamp 54w T5, 2x4

Recessed Mnt., Direct/Indirect

2 114 2 0.23 684 Existing to Remain Existing to Remain 2 114 0 0.23 684 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

322.23 Main Office 30002 Lamp 54w T5, 2x4

Recessed Mnt., Direct/Indirect

2 114 7 0.80 2,394 Existing to Remain Existing to Remain 2 114 0 0.80 2,394 0.00 0 $0 6Dual Technology Occupancy Sensor -

Switch Mnt. 1 20.0% 479 $53 $0.00 $0.00 $0.00 $0.00 - $50.00 $50.00 $100.00 $20.00 1.52

322.23 Superintendant Office 30002 Lamp 54w T5, 2x4

Recessed Mnt., Direct/Indirect

2 114 4 0.46 1,368 Existing to Remain Existing to Remain 2 114 0 0.46 1,368 0.00 0 $0 5Dual Technology Occupancy Sensor -

Remote Mnt. 1 20.0% 274 $30 $0.00 $0.00 $0.00 $0.00 - $200.00 $50.00 $250.00 $35.00 7.14

322.23Superintendant Office

Restroom 30002 Lamp 54w T5, 2x4

Recessed Mnt., Direct/Indirect

2 114 1 0.11 342 Existing to Remain Existing to Remain 2 114 0 0.11 342 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

322.23Secretary to

Superintendant 30002 Lamp 54w T5, 2x4

Recessed Mnt., Direct/Indirect

2 114 2 0.23 684 Existing to Remain Existing to Remain 2 114 0 0.23 684 0.00 0 $0 6Dual Technology Occupancy Sensor -

Switch Mnt. 1 20.0% 137 $15 $0.00 $0.00 $0.00 $0.00 - $50.00 $50.00 $100.00 $20.00 5.32

232.11 26002x4, 3 Lamp, 32w T8, Elect. Ballast, Surface Mnt., Prismatic Lens

3 86 2 0.17 447 Existing to Remain Existing to Remain 3 86 0 0.17 447 0.00 0 $0 0 No New Controls 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

222.21 26002x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

2 62 2 0.12 322 Existing to Remain Existing to Remain 2 62 0 0.12 322 0.00 0 $0 0 No New Controls 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

322.23 Music Room 26002 Lamp 54w T5, 2x4

Recessed Mnt., Direct/Indirect

2 114 14 1.60 4,150 Existing to Remain Existing to Remain 2 114 0 1.60 4,150 0.00 0 $0 4Dual Tech. Occupancy Sensor w/2 Pole

Powerpack - Remote Mnt. 1 20.0% 830 $91 $0.00 $0.00 $0.00 $0.00 - $300.00 $50.00 $350.00 FALSE 3.83

322.23 Music Room Office 30002 Lamp 54w T5, 2x4

Recessed Mnt., Direct/Indirect

2 114 1 0.11 342 Existing to Remain Existing to Remain 2 114 0 0.11 342 0.00 0 $0 6Dual Technology Occupancy Sensor -

Switch Mnt. 1 20.0% 68 $8 $0.00 $0.00 $0.00 $0.00 - $50.00 $50.00 $100.00 FALSE 13.29

232.21 Practice Rooms (3) 26002x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

3 86 3 0.26 671 Existing to Remain Existing to Remain 3 86 0 0.26 671 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

710 3000250w T4 Frosted, Recessed

Mount 1 250 36 9.00 27,000 Existing to Remain Existing to Remain 1 250 0 9.00 27,000 0.00 0 $0 0 No New Controls 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

710.5 3000250w T4 Frosted, Pendant

Mount 1 250 8 2.00 6,000 Existing to Remain Existing to Remain 1 250 0 2.00 6,000 0.00 0 $0 0 No New Controls 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

712 3000Visa Wall Sconce, 35w T5

Bi-Pin 1 35 16 0.56 1,680 Existing to Remain Existing to Remain 1 35 0 0.56 1,680 0.00 0 $0 0 No New Controls 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

711 3000 Pendant Mount, 35w T4 1 34 12 0.41 1,224 Existing to Remain Existing to Remain 1 34 0 0.41 1,224 0.00 0 $0 0 No New Controls 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

712 3000Visa Wall Sconce, 35w T5

Bi-Pin 1 35 8 0.28 840 Existing to Remain Existing to Remain 1 35 0 0.28 840 0.00 0 $0 0 No New Controls 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

713 3000Recessed Down Light, 2

Lamp 18w Quad 2 36 24 0.86 2,592 Existing to Remain Existing to Remain 2 36 0 0.86 2,592 0.00 0 $0 0 No New Controls 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 D101 Art Room 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 21 1.20 3,112 Existing to Remain Existing to Remain 1 57 0 1.20 3,112 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

100 Lobby Display Case 55002' Light, 2-Lamp, 20w T12, Mag. Ballast, White Lens 2 44 1 0.04 242 Bypass Ballast, Relamp 2' LED 11w; Retrofit 2 22 1 0.02 121 0.02 121 $13 0 No New Controls 0 0.0% 0 $0 $80.00 $80.00 $160.00 $0.00 12.02 $0.00 $0.00 $0.00 FALSE -

322.23 Health 30002 Lamp 54w T5, 2x4

Recessed Mnt., Direct/Indirect

2 114 5 0.57 1,710 Existing to Remain Existing to Remain 2 114 0 0.57 1,710 0.00 0 $0 0 No New Controls 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

322.23 Screening Room 30002 Lamp 54w T5, 2x4

Recessed Mnt., Direct/Indirect

2 114 1 0.11 342 Existing to Remain Existing to Remain 2 114 0 0.11 342 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

322.23 Faculty Room 30002 Lamp 54w T5, 2x4

Recessed Mnt., Direct/Indirect

2 114 5 0.57 1,710 Existing to Remain Existing to Remain 2 114 0 0.57 1,710 0.00 0 $0 6Dual Technology Occupancy Sensor -

Switch Mnt. 1 20.0% 342 $38 $0.00 $0.00 $0.00 $0.00 - $50.00 $50.00 $100.00 $20.00 2.13

222.21 Faculty Restroom 30002x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

2 62 4 0.25 744 Existing to Remain Existing to Remain 2 62 0 0.25 744 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

Lambertville NJ 08530301 Mt. Airy-Harbourton Rd.

Music Room Hall

Auditorium Lobby

Auditorium

LIGHTING CONTROLS COSTRETROFIT ENERGY SAVINGSEXISTING FIXTURES PROPOSED FIXTURE RETROFIT PROPOSED LIGHTING CONTROLS LIGHTING RETROFIT COSTS

Smart Start Incentive

1C13406South Hunterdon HS

Page 113: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix E - Lighting Audit - South Hunterdon HS.xlsx Page 2 of 4

Fixture Reference # Location

Average Burn Hours

Description Lamps per Fixture

Watts per

Fixture

Qty of Fixtures

Total kW

Usage kWh/Yr Work Description Equipment Description Lamps per

FixtureWatts per

FixtureQty of

FixturesTotal kW

Usage kWh/Yr

Energy Savings,

kW

Energy Savings,

kWh

Energy Savings, $

Control Ref # Controls Description Qty of

Controls

Hour Reduction

%

Energy Savings,

kWh

Energy Savings, $ Material Total Labor Total All Rebate

EstimateSimple

PaybackTotal

Materials Total Labor Total All Simple Payback

LIGHTING CONTROLS COSTRETROFIT ENERGY SAVINGSEXISTING FIXTURES PROPOSED FIXTURE RETROFIT PROPOSED LIGHTING CONTROLS LIGHTING RETROFIT COSTS

Smart Start Incentive

322.23 Faculty Room/Vending 30002 Lamp 54w T5, 2x4

Recessed Mnt., Direct/Indirect

2 114 4 0.46 1,368 Existing to Remain Existing to Remain 2 114 0 0.46 1,368 0.00 0 $0 5Dual Technology Occupancy Sensor -

Remote Mnt. 1 20.0% 274 $30 $0.00 $0.00 $0.00 $0.00 - $200.00 $50.00 $250.00 $35.00 7.14

221.34 Storage 5 35001x4, 2 Lamp, 32w T8, Elect. Ballast, Pendant

Mnt., No Lens2 62 3 0.19 651 Existing to Remain Existing to Remain 2 62 0 0.19 651 0.00 0 $0 0 No New Controls 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 Classroom C 101 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 12 0.68 1,778 Existing to Remain Existing to Remain 1 57 0 0.68 1,778 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 Classroom C 102 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 24 1.37 3,557 Existing to Remain Existing to Remain 1 57 0 1.37 3,557 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

322.23 Guidanace Reception 30002 Lamp 54w T5, 2x4

Recessed Mnt., Direct/Indirect

2 114 2 0.23 684 Existing to Remain Existing to Remain 2 114 0 0.23 684 0.00 0 $0 6Dual Technology Occupancy Sensor -

Switch Mnt. 1 20.0% 137 $15 $0.00 $0.00 $0.00 $0.00 - $50.00 $50.00 $100.00 $20.00 5.32

322.23 Guidance Hall 30002 Lamp 54w T5, 2x4

Recessed Mnt., Direct/Indirect

2 114 4 0.46 1,368 Existing to Remain Existing to Remain 2 114 0 0.46 1,368 0.00 0 $0 0 No New Controls 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

322.23Guidance Side Offices

(13) 30002 Lamp 54w T5, 2x4

Recessed Mnt., Direct/Indirect

2 114 29 3.31 9,918 Existing to Remain Existing to Remain 2 114 0 3.31 9,918 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

211.34 Utility Room C 20001x4, 1 Lamp, 32w T8, Elect. Ballast, Pendant

Mnt., No Lens1 30 2 0.06 120 Existing to Remain Existing to Remain 1 30 0 0.06 120 0.00 0 $0 0 No New Controls 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

222.22 Lift/Hall 55002x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

2 62 2 0.12 682 Existing to Remain Existing to Remain 2 62 0 0.12 682 0.00 0 $0 0 No New Controls 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

121.34 Utility Room A 20001x4, 2-Lamp, 34w T12, Mag. Ballast, Pendant

Mnt., No Lens2 78 1 0.08 156 Reballast & Relamp

Reballast & Relamp; Sylvania Lamp FO28/841/SS/ECO 2 50 1 0.05 100 0.03 56 $6 0 No New Controls 0 0.0% 0 $0 $30.00 $70.00 $100.00 $0.00 16.23 $0.00 $0.00 $0.00 FALSE -

242.21 Boy's Restroom 30002x4, 4 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

4 110 3 0.33 990 Reballast & Relamp - Delamp 22 Lamp , 28w T8, Elect. Ballast,

Specular Reflector; retrofit 2 50 3 0.15 450 0.18 540 $59 6Dual Technology Occupancy Sensor -

Switch Mnt. 1 20.0% 90 $10 $210.00 $270.00 $480.00 $45.00 7.32 $50.00 $50.00 $100.00 FALSE 10.10

242.21 Girl's Restroom 30002x4, 4 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

4 110 3 0.33 990 Reballast & Relamp - Delamp 22 Lamp , 28w T8, Elect. Ballast,

Specular Reflector; retrofit 2 50 3 0.15 450 0.18 540 $59 6Dual Technology Occupancy Sensor -

Switch Mnt. 1 20.0% 90 $10 $210.00 $270.00 $480.00 $45.00 7.32 $50.00 $50.00 $100.00 FALSE 10.10

311.33 Classroom A 101 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 18 1.03 2,668 Existing to Remain Existing to Remain 1 57 0 1.03 2,668 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 Classroom A 102 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 15 0.86 2,223 Existing to Remain Existing to Remain 1 57 0 0.86 2,223 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 Classroom A 103 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 12 0.68 1,778 Existing to Remain Existing to Remain 1 57 0 0.68 1,778 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 Classroom A 104 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 30 1.71 4,446 Existing to Remain Existing to Remain 1 57 0 1.71 4,446 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 Classroom A 105 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 12 0.68 1,778 Existing to Remain Existing to Remain 1 57 0 0.68 1,778 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 Classroom A 106 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 30 1.71 4,446 Existing to Remain Existing to Remain 1 57 0 1.71 4,446 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 Classroom A 107 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 15 0.86 2,223 Existing to Remain Existing to Remain 1 57 0 0.86 2,223 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 Classroom A 109 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 15 0.86 2,223 Existing to Remain Existing to Remain 1 57 0 0.86 2,223 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 Classroom H 101 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 4 0.23 593 Existing to Remain Existing to Remain 1 57 0 0.23 593 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 Classroom H 102 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 4 0.23 593 Existing to Remain Existing to Remain 1 57 0 0.23 593 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 Computer Lab 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 10 0.57 1,482 Existing to Remain Existing to Remain 1 57 0 0.57 1,482 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

222.21 Custodial Closet A 20002x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

2 62 1 0.06 124 Existing to Remain Existing to Remain 2 62 0 0.06 124 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 Classroom H 108 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 18 1.03 2,668 Existing to Remain Existing to Remain 1 57 0 1.03 2,668 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

322.23 Classroom H 110 26002 Lamp 54w T5, 2x4

Recessed Mnt., Direct/Indirect

2 114 12 1.37 3,557 Existing to Remain Existing to Remain 2 114 0 1.37 3,557 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 Classroom H 111 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 4 0.23 593 Existing to Remain Existing to Remain 1 57 0 0.23 593 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 Classroom H 112 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 4 0.23 593 Existing to Remain Existing to Remain 1 57 0 0.23 593 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 Classroom H 109 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 21 1.20 3,112 Existing to Remain Existing to Remain 1 57 0 1.20 3,112 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 Classroom B 101 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 15 0.86 2,223 Existing to Remain Existing to Remain 1 57 0 0.86 2,223 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 Classroom B 102 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 15 0.86 2,223 Existing to Remain Existing to Remain 1 57 0 0.86 2,223 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

Page 114: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix E - Lighting Audit - South Hunterdon HS.xlsx Page 3 of 4

Fixture Reference # Location

Average Burn Hours

Description Lamps per Fixture

Watts per

Fixture

Qty of Fixtures

Total kW

Usage kWh/Yr Work Description Equipment Description Lamps per

FixtureWatts per

FixtureQty of

FixturesTotal kW

Usage kWh/Yr

Energy Savings,

kW

Energy Savings,

kWh

Energy Savings, $

Control Ref # Controls Description Qty of

Controls

Hour Reduction

%

Energy Savings,

kWh

Energy Savings, $ Material Total Labor Total All Rebate

EstimateSimple

PaybackTotal

Materials Total Labor Total All Simple Payback

LIGHTING CONTROLS COSTRETROFIT ENERGY SAVINGSEXISTING FIXTURES PROPOSED FIXTURE RETROFIT PROPOSED LIGHTING CONTROLS LIGHTING RETROFIT COSTS

Smart Start Incentive

311.33 Classroom B 103 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 15 0.86 2,223 Existing to Remain Existing to Remain 1 57 0 0.86 2,223 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 Classroom B 104 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 12 0.68 1,778 Existing to Remain Existing to Remain 1 57 0 0.68 1,778 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 Classroom B 105 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 15 0.86 2,223 Existing to Remain Existing to Remain 1 57 0 0.86 2,223 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 Classroom B 106 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 15 0.86 2,223 Existing to Remain Existing to Remain 1 57 0 0.86 2,223 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

222.21 Boy's Restroom 30002x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

2 62 4 0.25 744 Existing to Remain Existing to Remain 2 62 0 0.25 744 0.00 0 $0 6Dual Technology Occupancy Sensor -

Switch Mnt. 1 20.0% 149 $16 $0.00 $0.00 $0.00 $0.00 - $50.00 $50.00 $100.00 FALSE 6.11

222.21 Lift/Hall 55002x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

2 62 2 0.12 682 Existing to Remain Existing to Remain 2 62 0 0.12 682 0.00 0 $0 0 No New Controls 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

707 MS Commons 5500Kronos KR1503 Pendant

Mnt., 70w CFL TT 1 70 19 1.33 7,315 Existing to Remain Existing to Remain 1 70 0 1.33 7,315 0.00 0 $0 5Dual Technology Occupancy Sensor -

Remote Mnt. 2 20.0% 1,463 $161 $0.00 $0.00 $0.00 $0.00 - $400.00 $100.00 $500.00 FALSE 3.11

708 MS Gym 2600Sportlite HiBay, 8 42w

CFL 8 372 48 17.86 46,426 Remove Existing Fixture; Install

New Fixture 138w LED HiBay 1 138 48 6.62 17,222 11.23 29,203 $3,212 5Dual Technology Occupancy Sensor -

Remote Mnt. 4 20.0% 3,444 $379 $16,800.00 $7,200.00 $24,000.00 $0.00 7.47 $800.00 $200.00 $1,000.00 $35.00 2.55

222.21 Changing Room 26002x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

2 62 7 0.43 1,128 Existing to Remain Existing to Remain 2 62 0 0.43 1,128 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

221.34 Custodial Closet C 20001x4, 2 Lamp, 32w T8, Elect. Ballast, Pendant

Mnt., No Lens2 62 1 0.06 124 Existing to Remain Existing to Remain 2 62 0 0.06 124 0.00 0 $0 0 No New Controls 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

242.21 Classroom C 109 26002x4, 4 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

4 110 6 0.66 1,716 Reballast & Relamp - Delamp 22 Lamp , 28w T8, Elect. Ballast,

Specular Reflector; retrofit 2 50 6 0.30 780 0.36 936 $103 6Dual Technology Occupancy Sensor -

Switch Mnt. 1 20.0% 156 $17 $420.00 $540.00 $960.00 $90.00 8.45 $50.00 $50.00 $100.00 $20.00 4.66

311.33 Classroom C 104 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 18 1.03 2,668 Existing to Remain Existing to Remain 1 57 0 1.03 2,668 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 Classroom C 105 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 21 1.20 3,112 Existing to Remain Existing to Remain 1 57 0 1.20 3,112 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 Classroom C 106 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 14 0.80 2,075 Existing to Remain Existing to Remain 1 57 0 0.80 2,075 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

311.33 Classroom C 107 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 18 1.03 2,668 Existing to Remain Existing to Remain 1 57 0 1.03 2,668 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

709 Gym 3000 400w MH HiBay 1 465 24 11.16 33,480 By-Pass Ballast; RelampSolstice GNPSOL5400, 110w

LED Retrofit 1 110 24 2.64 7,920 8.52 25,560 $2,812 5Dual Technology Occupancy Sensor -

Remote Mnt. 3 20.0% 1,584 $174 $10,800.00 $4,800.00 $15,600.00 $0.00 5.55 $600.00 $150.00 $750.00 $35.00 4.10

221.11 Weight Room 30001x4, 1 Lamp, 32w T8,

Elect. Ballast, Wall Mnt., No Lens

1 30 16 0.48 1,440 Existing to Remain Existing to Remain 1 30 0 0.48 1,440 0.00 0 $0 5Dual Technology Occupancy Sensor -

Remote Mnt. 2 20.0% 288 $32 $0.00 $0.00 $0.00 $0.00 - $400.00 $100.00 $500.00 $35.00 14.68

232.21 Boy's Locker Room 30002x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

3 86 8 0.69 2,064 Existing to Remain Existing to Remain 3 86 0 0.69 2,064 0.00 0 $0 5Dual Technology Occupancy Sensor -

Remote Mnt. 1 20.0% 413 $45 $0.00 $0.00 $0.00 $0.00 - $200.00 $50.00 $250.00 $35.00 4.73

232.21 Girl's Locker Room 30002x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

3 86 8 0.69 2,064 Existing to Remain Existing to Remain 3 86 0 0.69 2,064 0.00 0 $0 5Dual Technology Occupancy Sensor -

Remote Mnt. 1 20.0% 413 $45 $0.00 $0.00 $0.00 $0.00 - $200.00 $50.00 $250.00 $35.00 4.73

222.21 PE Office 30002x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

2 62 2 0.12 372 Existing to Remain Existing to Remain 2 62 0 0.12 372 0.00 0 $0 6Dual Technology Occupancy Sensor -

Switch Mnt. 1 20.0% 74 $8 $0.00 $0.00 $0.00 $0.00 - $50.00 $50.00 $100.00 FALSE 12.22

222.21 PE Office 30002x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

2 62 2 0.12 372 Existing to Remain Existing to Remain 2 62 0 0.12 372 0.00 0 $0 6Dual Technology Occupancy Sensor -

Switch Mnt. 1 20.0% 74 $8 $0.00 $0.00 $0.00 $0.00 - $50.00 $50.00 $100.00 FALSE 12.22

311.33 Classroom C 108 26001 Lamp 54w T5, Pendant

Mnt., Direct/Indirect 1 57 21 1.20 3,112 Existing to Remain Existing to Remain 1 57 0 1.20 3,112 0.00 0 $0 0 Existing Occupancy Sensor to Remain 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

232.21 26002x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

3 86 10 0.86 2,236 Existing to Remain Existing to Remain 3 86 0 0.86 2,236 0.00 0 $0 5Dual Technology Occupancy Sensor -

Remote Mnt. 1 20.0% 447 $49 $0.00 $0.00 $0.00 $0.00 - $200.00 $50.00 $250.00 $35.00 4.37

612 2600 60w A Lamp 1 60 1 0.06 156 RelampPHILIPS 120V EnduraLED

12.5W A19 2700K 1 12.5 1 0.01 33 0.05 124 $14 0 No New Controls 0 0.0% 0 $0 $20.00 $20.00 $40.00 $20.00 1.47 $0.00 $0.00 $0.00 FALSE -

222.21 Kit. Restroom 30002x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

2 62 1 0.06 186 Existing to Remain Existing to Remain 2 62 0 0.06 186 0.00 0 $0 6Dual Technology Occupancy Sensor -

Switch Mnt. 1 20.0% 37 $4 $0.00 $0.00 $0.00 $0.00 - $50.00 $50.00 $100.00 FALSE 24.44

221.34 Kit. Storage 20001x4, 2 Lamp, 32w T8, Elect. Ballast, Pendant

Mnt., No Lens2 62 2 0.12 248 Existing to Remain Existing to Remain 2 62 0 0.12 248 0.00 0 $0 6

Dual Technology Occupancy Sensor - Switch Mnt. 1 20.0% 50 $5 $0.00 $0.00 $0.00 $0.00 - $50.00 $50.00 $100.00 FALSE 18.33

222.21 Kit. Serving 26002x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

2 62 7 0.43 1,128 Existing to Remain Existing to Remain 2 62 0 0.43 1,128 0.00 0 $0 5Dual Technology Occupancy Sensor -

Remote Mnt. 1 20.0% 226 $25 $0.00 $0.00 $0.00 $0.00 - $200.00 $50.00 $250.00 $35.00 8.66

707 Cafeteria 2600Kronos KR1503 Pendant

Mnt., 70w CFL TT 1 70 30 2.10 5,460 Existing to Remain Existing to Remain 1 70 0 2.10 5,460 0.00 0 $0 5Dual Technology Occupancy Sensor -

Remote Mnt. 3 20.0% 1,092 $120 $0.00 $0.00 $0.00 $0.00 - $600.00 $150.00 $750.00 $35.00 5.95

221.34 Custodial Workroom 35001x4, 2 Lamp, 32w T8, Elect. Ballast, Pendant

Mnt., No Lens2 62 2 0.12 434 Existing to Remain Existing to Remain 2 62 0 0.12 434 0.00 0 $0 6

Dual Technology Occupancy Sensor - Switch Mnt. 1 20.0% 87 $10 $0.00 $0.00 $0.00 $0.00 - $50.00 $50.00 $100.00 FALSE 10.47

221.34 Boiler Room 35001x4, 2 Lamp, 32w T8, Elect. Ballast, Pendant

Mnt., No Lens2 62 12 0.74 2,604 Existing to Remain Existing to Remain 2 62 0 0.74 2,604 0.00 0 $0 0 No New Controls 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

221.34 AG Shop 26001x4, 2 Lamp, 32w T8, Elect. Ballast, Pendant

Mnt., No Lens2 62 28 1.74 4,514 Existing to Remain Existing to Remain 2 62 0 1.74 4,514 0.00 0 $0 5

Dual Technology Occupancy Sensor - Remote Mnt. 3 20.0% 903 $99 $0.00 $0.00 $0.00 $0.00 - $600.00 $150.00 $750.00 $35.00 7.20

Kitchen

Page 115: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix E - Lighting Audit - South Hunterdon HS.xlsx Page 4 of 4

Fixture Reference # Location

Average Burn Hours

Description Lamps per Fixture

Watts per

Fixture

Qty of Fixtures

Total kW

Usage kWh/Yr Work Description Equipment Description Lamps per

FixtureWatts per

FixtureQty of

FixturesTotal kW

Usage kWh/Yr

Energy Savings,

kW

Energy Savings,

kWh

Energy Savings, $

Control Ref # Controls Description Qty of

Controls

Hour Reduction

%

Energy Savings,

kWh

Energy Savings, $ Material Total Labor Total All Rebate

EstimateSimple

PaybackTotal

Materials Total Labor Total All Simple Payback

LIGHTING CONTROLS COSTRETROFIT ENERGY SAVINGSEXISTING FIXTURES PROPOSED FIXTURE RETROFIT PROPOSED LIGHTING CONTROLS LIGHTING RETROFIT COSTS

Smart Start Incentive

221.34 20001x4, 2 Lamp, 32w T8, Elect. Ballast, Pendant

Mnt., No Lens2 62 2 0.12 248 Existing to Remain Existing to Remain 2 62 0 0.12 248 0.00 0 $0 0 No New Controls 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -

612 2000 60w A Lamp 1 60 1 0.06 120 RelampPHILIPS 120V EnduraLED

12.5W A19 2700K 1 12.5 1 0.01 25 0.05 95 $10 0 No New Controls 0 0.0% 0 $0 $20.00 $20.00 $40.00 $20.00 1.91 $0.00 $0.00 $0.00 FALSE -

221.34 Classroom E 102 26001x4, 2 Lamp, 32w T8, Elect. Ballast, Pendant

Mnt., No Lens2 62 12 0.74 1,934 Existing to Remain Existing to Remain 2 62 0 0.74 1,934 0.00 0 $0 5

Dual Technology Occupancy Sensor - Remote Mnt. 1 20.0% 387 $43 $0.00 $0.00 $0.00 $0.00 - $200.00 $50.00 $250.00 $35.00 5.05

221.34 26001x4, 2 Lamp, 32w T8, Elect. Ballast, Pendant

Mnt., No Lens2 62 18 1.12 2,902 Existing to Remain Existing to Remain 2 62 0 1.12 2,902 0.00 0 $0 5

Dual Technology Occupancy Sensor - Remote Mnt. 1 20.0% 580 $64 $0.00 $0.00 $0.00 $0.00 - $200.00 $50.00 $250.00 $35.00 3.37

232.21 26002x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

3 86 12 1.03 2,683 Existing to Remain Existing to Remain 3 86 0 1.03 2,683 0.00 0 $0 5Dual Technology Occupancy Sensor -

Remote Mnt. 1 20.0% 537 $59 $0.00 $0.00 $0.00 $0.00 - $200.00 $50.00 $250.00 $35.00 3.64

222.21 Corridors 26002x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

2 62 112 6.94 18,054 Existing to Remain Existing to Remain 2 62 0 6.94 18,054 0.00 0 $0 5Dual Technology Occupancy Sensor -

Remote Mnt. 1 20.0% 3,611 $397 $0.00 $0.00 $0.00 $0.00 - $200.00 $50.00 $250.00 $35.00 0.54

705 4400 400w HPS Flood Light 1 465 3 1.40 6,138 Remove Existing Fixture; Install

New Fixture 110w LED Flood 1 110 3 0.33 1,452 1.07 4,686 $515 0 No New Controls 0 0.0% 0 $0 $900.00 $450.00 $1,350.00 $0.00 2.62 $0.00 $0.00 $0.00 FALSE -

702 4400 175w MH Wall Pack 1 195 21 4.10 18,018 Remove Existing Fixture; Install

New Fixture 42w LED Wall Pack 1 42 21 0.88 3,881 3.21 14,137 $1,555 0 No New Controls 0 0.0% 0 $0 $4,200.00 $3,150.00 $7,350.00 $2,100.00 3.38 $0.00 $0.00 $0.00 FALSE -

704 4400 250w HPS Wall Pack 1 295 3 0.89 3,894 Remove Existing Fixture; Install

New Fixture 58w LED Wall Pack 1 58 3 0.17 766 0.71 3,128 $344 0 No New Controls 0 0.0% 0 $0 $600.00 $450.00 $1,050.00 $300.00 2.18 $0.00 $0.00 $0.00 FALSE -

703 4400 175w MV Area Light 1 200 4 0.80 3,520 Remove Existing Fixture; Install

New Fixture 42w LED Area Light 1 42 4 0.17 739 0.63 2,781 $306 0 No New Controls 0 0.0% 0 $0 $800.00 $600.00 $1,400.00 $700.00 2.29 $0.00 $0.00 $0.00 FALSE -

700 4400 100w HPS Wallpack 1 120 3 0.36 1,584 Remove Existing Fixture; Install

New Fixture 26w LED Wall Pack 1 26 3 0.08 343 0.28 1,241 $136 0 No New Controls 0 0.0% 0 $0 $600.00 $450.00 $1,050.00 $300.00 5.49 $0.00 $0.00 $0.00 FALSE -

706 44001x1 Sq. Recessed, 100w

A19 1 100 9 0.90 3,960 RelampPHILIPS 120V EnduraLED

16W A19 2700K 1 16 9 0.14 634 0.76 3,326 $366 0 No New Controls 0 0.0% 0 $0 $180.00 $180.00 $360.00 $180.00 0.49 $0.00 $0.00 $0.00 FALSE -

TOTAL 1,122 111 323,123 131 84 236,649 27 86,474 $9,512 45 7 18,967 $2,086 $35,870 $18,550 $54,420 $3,800 5.3216021 $6,550 $2,250 $8,800 $645.00 $3.91

AG Storage

Classroom E 104

Exterior

Page 116: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix Energy Audit

Concord Engineering Group, Inc.

APPENDIX F

Page 117: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix FPage 1 of 2

Location Description

Area (Sq FT) Panel Qty

Panel Sq Ft

Panel Total Sq

FtTotal KWDC

Total Annual kWh

Total KWAC

Panel Weight

(41.9 lbs) W/SQFTSouth Hunterdon

High School47900 SHARP

ND-240QCJ1768 17.5 31,012 424.32 514,658 343.7 74,079 13.68

= Proposed PV Roof Layout = Proposed Ground Mount PV LayoutNotes:

1. Estimated kWH based on the National Renewable Energy Laboratory PVWatts Version 1 Calculator Program.

Page 118: PREPARED FOR SOUTH HUNTERDON REGIONAL SCHOOL D MT -H-+02-25-2014+-+South... · This report presents the findings of the energy audit conducted for: South Hunterdon Regional School

Appendix FPage 2 of 2

Project Name: LGEA Solar PV Project - South Hunterdon High SchoolLocation: Lambertville, NJ

Description: Photovoltaic System 100% Financing - 15 year

Simple Payback Analysis

Total Construction Cost $1,727,388Annual kWh Production 514,658

Annual Energy Cost Reduction $56,612Average Annual SREC Revenue $98,343

Simple Payback: Years

Life Cycle Cost AnalysisAnalysis Period (years): 15 Financing %: 100%

Discount Rate: 3% Maintenance Escalation Rate: 3.0%Average Energy Cost ($/kWh) $0.110 Energy Cost Escalation Rate: 3.0%

Financing Rate: 6.00% Average SREC Value ($/kWh) $0.191Period Additional Energy kWh Energy Cost Additional SREC Interest Loan Net Cash Cumulative

Cash Outlay Production Savings Maint Costs Revenue Expense Principal Flow Cash Flow0 $0 0 0 0 $0 0 0 0 01 $0 514,658 $56,612 $0 $128,665 $101,650 $73,270 $10,357 $10,3572 $0 512,085 $58,311 $0 $128,021 $97,131 $77,789 $11,412 $21,7693 $0 509,524 $60,060 $0 $127,381 $92,333 $82,587 $12,521 $34,2904 $0 506,977 $61,862 $0 $126,744 $87,239 $87,681 $13,686 $47,9755 $0 504,442 $63,718 $5,196 $126,110 $81,831 $93,089 $9,712 $57,6886 $0 501,920 $65,629 $5,170 $100,384 $76,090 $98,830 ($14,077) $43,6117 $0 499,410 $67,598 $5,144 $99,882 $69,994 $104,926 ($12,584) $31,0278 $0 496,913 $69,626 $5,118 $99,383 $63,523 $111,398 ($11,030) $19,9979 $0 494,428 $71,715 $5,093 $98,886 $56,652 $118,268 ($9,412) $10,585

10 $0 491,956 $73,866 $5,067 $73,793 $49,357 $125,563 ($32,328) ($21,742)11 $0 489,496 $76,082 $5,042 $73,424 $41,613 $133,307 ($30,455) ($52,198)12 $0 487,049 $78,365 $5,017 $73,057 $33,391 $141,529 ($28,515) ($80,712)13 $0 484,614 $80,716 $4,992 $72,692 $24,662 $150,259 ($26,504) ($107,216)14 $0 482,191 $83,137 $4,967 $48,219 $15,394 $159,526 ($48,530) ($155,746)15 $0 479,780 $85,631 $4,942 $47,978 $5,555 $169,365 ($46,253) ($201,999)

Totals: 7,455,442 $1,052,929 $55,746 $1,424,620 $896,414 $1,727,388 ($201,999) ($342,315)Net Present Value (NPV)

Photovoltaic System 100% Financing - 15 year

11.15

($123,474)