preparation of indian teams for 16th asian...

23
SPORTS AUTHORITY OF INDIA PREPARATION OF INDIAN TEAMS FOR 16 th ASIAN GAMES 2010

Upload: doankhuong

Post on 10-May-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

SPORTS AUTHORITY OF INDIAPREPARATION OF INDIAN TEAMS

FOR 16th ASIAN GAMES 2010

EVENTS IN 2010 ASIAN GAMES - 42AQUATICS ARCHERY ATHLETICS BADMINTON

BASEBALL BASKETBALL BOXING BOWLINGBILLIARDS CYCLING CANOE/KAYAK CHESSCRICKET DANCESPORT DRAGON BOAT EQUESTRIANFENCING FOOTBALL GOLF GYMNASTICSHANDBALL HOCKEY JUDO KABADDIKARATE MODERN

PENTATHLONROLLER SPORTS ROWING

RUGBY SAILING SEPAKTAKRAW SOFTBALL

SHOOTING SQUASH TABLE TENNIS TAEKWONDO

TENNIS TRITHLON VOLLEYBALL WEIGHTLIFTING

WRESTLING WUSHU

EVENTS IN WHICH INDIA LIKELY TO PARTICIPATE - 35

AQUATICS ARCHERY ATHLETICS BADMINTONBASKETBALL BOXING BILLIARDS CYCLING

CANOE/KAYAK CHESS •CRICKET EQUESTRIANFENCING FOOTBALL GOLF GYMNASTICS

HOCKEY HANDBALL JUDO KABADDI

KARATE ROWING SAILING SEPAKTAKRAW

•SOFT TENNIS SHOOTING SQUASH TABLE TENNIS

TAEKWONDO TENNIS TENPIN BOWLING VOLLEYBALL

WEIGHTLIFTING WRESTLING WUSHU

•Soft Tennis is one of the events under Tennis.•Cricket does not requires any financial support from the Government.

SPORTS OF ASIAN GAMES COVERED UNDER CWG SCHEME - PROVIDED WITH ENHANCED FACILITIES - 14

AQUATICS ARCHERY ATHLETICS BADMINTON BOXING

CYCLING GYMNASTICS HOCKEY SHOOTING SQUASH

TABLE TENNIS TENNIS* - EXCEPT SOFT TENNIS

WEIGHTLIFTING WRESTLING

SPORTS OF ASIAN GAMES OTHERTHAN COVERED UNDER CWG CONSIDERED FOR ENHANCED FACILITIES –19 + 1BASKETBALL CANOE &

KAYAKCHESS BILLIARDS EQUESTRIAN

FENCING FOOTBALL GOLF HANDBALL JUDO

KABADDI KARATE ROWING SAILING TAEKWONDO

TEN PIN BOWLING

VOLLEYBALL WUSHU SEPAKTAKRAW

SOFT TENNIS*

* SOFT TENNIS IS ONE OF THE EVENT UNDER TENNIS

EVENTS IN 2010 YOUTH OLYMPICS GAMES [14TH TO 26TH AUGUST, 10] – 26AQUATICS ARCHERY ATHLETICS BADMINTONBASKETBALL BOXIONG CANOE-KAYAK CYCLINGEQUESTRIAN FENCING FOOTBALL GYMNASTICSHANDBALL HOCKEY JUDO MODERN

PENTATHLONROWING SAILING SHOOTING TABLE TENNISTAEKWONDO TENNIS TRIATHLON VOLLEYBALLWEIGHTLIFTING WRESTLING

BASKETBALLITEM APPROVED INPLACECORE GROUP M-20

W-20M-20W-20

INDIAN COACHES 01+02 01 (National Coach)

FOREIGN COACHES 01 01

SUPPORTING PERSONNELS 04 -

ACTC Yet to be received.CENTRES FOR TRAINING Bangalore and Indore

CAMP STATUS PROPOSED

EQUIPMENT STATUS LIST –YET TO BE RECEIVED

NAME OF PROJECT OFFICER Shri P. K. Sahu

REMARKS The number of Core Probables will be same for the Youth Olympics also. However, participation of the team may be discussed.

BILLIARDSITEM APPROVED INPLACE

CORE GROUP Men – 31Women – 03(PROJECTED)

Men – 31Women – 03

INDIAN COACHES 1 + 4 (PROJECTED)

5

FOREIGN COACHES - -

SUPPORTING PERSONNELS 05 -

ACTC YET TO BE RECEIVED.

CENTRES FOR TRAINING Delhi, Kolkata, Hyderabad, Bangalore & Mumbai

EQUIPMENT STATUS LIST –YET TO BE RECEIVEDCAMP STATUS Camps will be organized by the

Federation at the above venues

NAME OF PROJECT OFFICER Shri Ram Niwas

REMARKS Coaching Camps dates yet to be finalized

BOXING [YOUTH OLYMPICS]ITEM APPROVED INPLACE

CORE GROUP 44 44

INDIAN COACHES 07 06

FOREIGN COACHES - -

SUPPORTING PERSONNELS 09 (on visit basis.) 02

ACTC RECEIVED

CENTRES FOR TRAINING Mumbai, Aurangabad, Pune, Bangalore

CAMP STATUS Camp is progress at STC-Mumbai from 21st Sept. to 30th Nov.09

EQUIPMENT STATUS LIST – RECEIVED.PAC – UNDER PROCESS

NAME OF PROJECT OFFICER Shri P.C. Makholia

REMARKS IABF has proposed to Ministry for Permanent staff i.e. Doctor, Physio, Masseur etc.

CANOEING & KAYAKING ITEM APPROVED INPLACE

CORE GROUP Men – 80Women – 76

Men – 80Women – 76

INDIAN COACHES 06 06

FOREIGN COACHES 02 02

SUPPORTING PERSONNELS 09 02

ACTC RECEIVED

CENTRES FOR TRAINING Bhopal & Alleppey.

CAMP STATUS In progress at Bhopal.

EQUIPMENT STATUS LIST – RECEIVEDPAC- DONE

NAME OF PROJECT OFFICER Shri M.S. Tyagi

REMARKS

CHESSITEM APPROVED INPLACE

CORE GROUP Men – 20Women – 20

Men – 20Women – 20

INDIAN COACHES 01 01

FOREIGN COACHES 04 -

SUPPORTING PERSONNELS - -

ACTC Yet to be received.

CENTRES FOR TRAINING Chennai

CAMP STATUS Camps will be conducted by the Federation.

EQUIPMENT STATUS LIST –YET TO BE RECEIVED

NAME OF PROJECT OFFICER Shri M.S. Tyagi

REMARKS

EQUESTRIANITEM APPROVED INPLACE

CORE GROUP Men – 18Women – 04

Men – 18 Women – 04

INDIAN COACHES 02 -

FOREIGN COACHES 01 -

SUPPORTING PERSONNELS 02 -

ACTC Yet to be received.

CENTRES FOR TRAINING Meerut, Delhi & Jaipur

CAMP STATUS Camps yet to be decided

EQUIPMENT STATUS LIST –YET TO BE FINALISEDPAC- YET TO BE DONE

NAME OF PROJECT OFFICER Shri Ram Niwas

REMARKS

FENCINGITEM APPROVED INPLACE

CORE GROUP Men – 24Women – 24 JR. MEN – 04JR. WOMEN- 08

Men – 24 Women – 24 JR. MEN – 04JR. WOMEN- 08

INDIAN COACHES 06 + 03 05

FOREIGN COACHES 01 -

SUPPORTING PERSONNELS 07 02

ACTC RECEIVED

CENTRES FOR TRAINING Bhopal, Patiala and Sonepat

CAMP STATUS Camp held from 22nd Oct. to 10th

Nov.’09 at BhopalEQUIPMENT STATUS LIST – RECEIVED

PAC- UNDER PROCESSNAME OF PROJECT OFFICER Shri M.S. Tyagi

FOOTBALLITEM APPROVED INPLACE

CORE GROUP 36 M + 33 W 36 M + 33W

INDIAN COACHES 02 02

FOREIGN COACHES 01 01

SUPPORTING PERSONNELS 04 04

ACTC Received

CENTRES FOR TRAINING Goa and Bangalore in India. Abroad - UK, Dubai, Qatar etc.

CAMP STATUS Camp sanctioned at Goa from 15th to 30th November, 2009 for SAF Games

EQUIPMENT STATUS LIST –YET TO BE FINALISED

NAME OF PROJECT OFFICER Shri P. C. Makholia

REMARKS

GOLFITEM APPROVED INPLACE

CORE GROUP Men – 12Women – 09

INDIAN COACHES 04

FOREIGN COACHES 01

SUPPORTING PERSONNELS 01

ACTC Received

CENTRES FOR TRAINING National Golf Academy of India centre's at Chandigarh, Delhi, Bangalore, Kolkata and PuneAbroad - Italy

CAMP STATUS Camps are organized by Federation

EQUIPMENT STATUS LIST –YET TO BE FINALISED

NAME OF PROJECT OFFICER Shri Ram Niwas

REMARKS

HANDBALL ITEM APPROVED INPLACE

CORE GROUP Men – 41 Women – 40

Men – 41Women – 40

INDIAN COACHES 01 + 02 01 + 02

FOREIGN COACHES 01 -

SUPPORTING PERSONNELS 05 -

ACTC Received

CENTRES FOR TRAINING Chennai, Visakhapatnam, Bhopal, Gandhinagar

CAMP STATUS Proposed at SAI, Gandhinagar w.e.f. 01.12.09 to 21.12.09

EQUIPMENT STATUS LIST – Received PAC - Done

NAME OF PROJECT OFFICER Shri Sudhir Jain

REMARKS Federation will submit detail list of Core Probable for Major Competitions coming up in 2010

JUDO ITEM APPROVED INPLACE

CORE GROUP Men – 24Women – 24Jr. Men – 20Jr. Women - 20

Men – 28Women – 24Jr. Men – 26Jr. Women - 30

INDIAN COACHES 07 08

FOREIGN COACHES 02 -

SUPPORTING PERSONNELS 07 04

ACTC RECEIVED

CENTRES FOR TRAINING Girls – Bhopal, Boys – Bangalore/ Shillaroo

CAMP STATUS In progress - SAI, Bhopal w.e.f. 2.11.09 to 5.12.09

EQUIPMENT STATUS LIST – RECIVEDPROCUREMENT – UNDER PROCESS

NAME OF PROJECT OFFICER Shri Satish Rana

KABADDIITEM APPROVED INPLACE

CORE GROUP Men – 36Women – 36

Men – 36Women – 36

INDIAN COACHES 04 04

FOREIGN COACHES - -

SUPPORTING PERSONNELS 04 01

ACTC RECEIVED

CENTRES FOR TRAINING Bhopal, Gandhinagar, Kandivali, Aurangabad and Sonepat

CAMP STATUS Proposed from last week of Nov.’09

EQUIPMENT STATUS LIST – ReceivedPAC - Done

NAME OF PROJECT OFFICER Shri M.S. Tyagi

REMARKS WOMEN EVENT IS INCLUDED FOR THE FIRST TIME

KARATE ITEM APPROVED INPLACE

CORE GROUP MEN – 40WOMEN - 36

MEN – 39WOMEN - 27

INDIAN COACHES 04 04FOREIGN COACHES 01 00SUPPORTING PERSONNELS 06 00

ACTC RECEIVEDCENTRES FOR TRAINING Trivandrum and BangaloreCAMP STATUS Proposal yet to be received.

EQUIPMENT STATUS LIST – RECEIVED, under process.

NAME OF PROJECT OFFICER Mr. Sudhir Jain

REMARKS

ROWINGITEM APPROVED INPLACE

CORE GROUP Men – 45Jr. Boys- 8Women – 20Jr. Girls - 8

Men – 34Jr. Boys- 8Women – 13Jr. Girls - 8

INDIAN COACHES 05 06FOREIGN COACHES - -SUPPORTING PERSONNELS 10 -ACTC RECEIVEDCENTRES FOR TRAINING Hyderabad, Pune, Barapani &

Shillong.CAMP STATUS Proposed from January, 2010

EQUIPMENT STATUS LIST – ReceivedPAC – Under Process

NAME OF PROJECT OFFICER Shri Sudhir Jain

REMARKS The Federation has asked for more Coaches than the approved number of Coaches.

SAILING (YACHTING)ITEM APPROVED INPLACE

CORE GROUP Men – 30Women - 10

Men – 30Women - 10

INDIAN COACHES - -

FOREIGN COACHES 07 -

SUPPORTING PERSONNELS - -

ACTC Received

CENTRES FOR TRAINING Chennai & Mumbai.

CAMP STATUS Proposed from 01st to 31st December, 2009.

EQUIPMENT STATUS LIST – ReceivedPAC - Done

NAME OF PROJECT OFFICER Shri M.S. Tyagi

REMARKS

TAEKWONDO ITEM APPROVED INPLACE

CORE GROUP Men – 24Women – 24

-

INDIAN COACHES 04 + 04 -

FOREIGN COACHES 01 -

SUPPORTING PERSONNELS 03 -

ACTC Received

CENTRES FOR TRAINING Balewadi, Bangalore, Trivandrum and Bhopal

CAMP STATUS Proposed from 10th Dec.’09 to 3rd March, 2010 at Balewadi (Pune)

EQUIPMENT STATUS List Received- under process.

NAME OF PROJECT OFFICER Shri Satish Rana

REMARKS

VOLLEYBALL ITEM APPROVED INPLACE

CORE GROUP Men – 29Jr. boys – 08Jr. Girls - 08

Men – 46 (Identified)Jr. boys – 08Jr. Girls - 08

INDIAN COACHES 13 12

FOREIGN COACHES 01 -

SUPPORTING PERSONNELS 14 03

ACTC Received.

CENTRES FOR TRAINING Bangalore, Vishakapatnam, Tiruchendur and Chennai

CAMP STATUS Camps are proposed from January, 2010 at Bangalore

EQUIPMENT STATUS LIST – YET TO BE RECEIVED

NAME OF PROJECT OFFICER Shri K.P. Sreejit

REMARKS Federation has requested to increase the Core probables to 36 Men from 29 Men.

ITEMS NEEDS CLARIFICATION

• UNIFORM DIET MONEY

• LODGING FACILITIES AT NON SAI CENTRES

• COMPREHENSIVE MEDICAL INSURANCE

• FOREIGN COACHES NORMS

• DISCIPLINES OF 1st YOUTH OLYMPIC GAMES TO BE IDENTIFIED FOR PARTICIPATION.