preliminary task: filming schedule

1
Date Casting involved Location Props Equipment needed Health and safety considerat ions 9 th of October George and James. In school, food tech room. School uniform. Milk Pencil case 2 back bags noteboo k None PRELIMINARY TASK: FILMING SCHEDULE

Upload: amandaliepina

Post on 15-Apr-2017

366 views

Category:

Education


1 download

TRANSCRIPT

Page 1: Preliminary Task: Filming Schedule

Date Casting involved

Location Props Equipment needed

Health and safety considerations

9th of October

George and James.

In school, food tech room.

School uniform.

• Milk• Pencil case• 2 back bags• notebook

• None

PRELIMINARY TASK: FILMING SCHEDULE