preliminary draft not for circulation
DESCRIPTION
PRELIMINARY DRAFT not for circulation. feasibility and review of housing plan for TYOKSVILLE 700. TYOKSVILLE 700. Feasibility and Review of Housing Plan. prepared for. NXUBA LOCAL MUNICIPALITY Private Bag X350, Adelaide, 5760 Tel: (046) 684-0034 Fax: (046) 684-1931. - PowerPoint PPT PresentationTRANSCRIPT
Amathole District MunicipalityNXUBA LOCAL MUNICIPALITY
March 2014
PRELIMINARY DRAFTnot for circulation
feasibility and review of housing plan for TYOKSVILLE 700TYOKSVILLE 700
Feasibility and Review of Housing Plan
TYOKSVILLE 700TYOKSVILLE 700
March 2014
by
prepared for
CNdV africa (Pty) Ltdenvironmental planning, urban design, landscape architecture
17 New Church Street Cape Town 8000Tel: 021 424-5022 Fax: 021 424-6837
Kantey & TemplerPO Box 15087Beacon Bay, 5205Tel: 041 373-0738
IQ Vision110 Sarel Cillier Street Strand 7140Tel: 021 853-3902
EASTERN CAPE DEPARTMENT OF HUMAN SETTLEMENTS 31-33 Phillip Frame Road ChiselhurstTel: +27 (0) 43 711 9735
NXUBA LOCAL MUNICIPALITYPrivate Bag X350, Adelaide, 5760
Tel: (046) 684-0034
Fax: (046) 684-1931
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 5
CONTENTS
2.1 INTRODUCTION
2.1.2 Purpose of the Report
2.1.2 Background of this Report
2.1.3 Terms of Reference
2.1.4 Background to Settlement
2.2 Status of Housing Project and Waiting List
2.3 Land Identification and Ownership
2.4 Engineering
2.5 Environment
2.6 Geo-tech
2.7 Distribution of Social Facilities
2.8 Current Spatial Development Framework
2.9 Future Plans of Other Sector Departments
2.10 Approval by Council
2.11 Summary and Recommendations
LIST OF FIGURES
Figure 2.1 .1 Locality Plan
Figure 2.1.2 Aerial Photograph
Figure 2.1.3 Visual Survey
Figure 2.2.1 Statistical Background
Figure 2.3.1 Cadastral Layout
Figure 2.4.1 Engineering
Figure 2.5 .1 Environment
Figure 2.6.1 Geo-tech
Figure 2.7.1 Distribution of Social Facilities
Figure 2.8.1 Current Spatial Development Framework
LIST OF ANNEXURESAnnexure 1 OwnershipAnnexure 2 Title DeedAnnexure 3 Surveyor General diagram
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 6
CONTENTS
GLOSSARY
Informal Site: A Site occupied by a household or to which a household has customary rights, e.g. Permission to occupy (PTO, no longer formally in use) or community agreement via a meeting of elders including headman or chief.
Formal Site: A site occupied by a household or to which a household is entitled to have a registered right recorded at the Deeds Registry with a title deed and surveyors diagram and/or registered General Plan. However, in many instances title deeds have not been issued nor ownership registered.
In-Situ upgrade project: Formalising of tenure and installation of services and possibly also construction of a subsidised dwelling on land on which people are already living. Generally refers to a project larger than one unit.
Greenfields project: New project site which there has been no formal or informal settlement, industry, infrastructure to date. Project sites are often outside of existing urban development.
Infill Project: New project site within existing urban development usually on under utilised or vacant land and which often can help to promote physical integration between spatially isolated parts of the settlement.
Rectification projects: Repair or rebuilding of defective existing houses built through one or other government housing program.
Erven: The plural of ‘erf’ meaning plots of land each registered as an ‘erf’ in a deeds registry and forming part of a registered General Plan.
Plots: The plural of ‘plot’ meaning unregistered pieces of land informally laid out.
Portion: A plot of land forming part of a proposed or approved (by LM Council) subdivision layout but which has not yet been registered by the Surveyor General as a general plan and for which erf numbers have not yet been registered.
ACRONYMS
ECDHS Eastern Cape Department of Human SettlementEIA Environmental Impact AssessmentGP General PlanHSP Human Settlement PlanLM Local Municipality MHSP Municipal Human Settlement PlanSA South AfricaSANBI South African National Biodiversity InstituteSDF Spatial Development Framework
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 8
INTRODUCTION 2.1
2.1.1 PURPOSE OF THE REPORT
The purpose of this report is to describe the key elements to be taken into account when assessing the feasibility of Tyoksville 700 as a Human Settlement Project and to recommend whether it should be approved or not.
2.1.2 BACKGROUND TO THIS REPORT
This report is one of 10 Human Settlement Project feasibility reports for Nxuba Municipality. It is designed so that it can be part of a single document that includes the other 10 projects.
2.1.3 TERMS OF REFERENCE (Part C.3 Scope of work Tender No. SCMU11-12/13-A0240)
The project terms of reference for the feasibility report are summarised as follows:
Ascertain the feasibility of the project within each MHSP. The study shall reveal the developmental opportunities and constraints in relation to:
1. Determination of housing demand and potential beneficiary status
2. Land identification and ownership3. Availability of bulk services and confirmation of capacity4. Environmental conditions;5. Geo-technical conditions6. Alignment with Municipal Spatial Planning7. Visual survey (area visits)8. Future development plans of other sector departments 9. Provision of recommendation and proposals to ECDHS
2.1.4 BACKGROUND TO SETTLEMENT
•Registered Owner: Nxuba Municipality
•Property Description: Erf 1832
•Title Deed Restrictions: None (See Annexure 2)
•Servitudes: None (See Annexure 3)
•Current Zoning: Unknown
•Site Size: 3.88 Ha
•The Tyoksville 700 project site is located in Bedford within Nxuba Municipality.
•Bedford is located near the western boundary of the Municipality on the southern edge of the Winterberg Mountain Range about 22.8km west of Adelaide on the R63.
•Tyoksville is a site and service scheme located on the southern corner of Bedford.
•Some roads, Ntlana and Malime, are paved while others are gravel.
•Dwellings range from substantial brick and mortar buildings to wood and iron shacks.
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 9
Locality Plan Figure 2.1.1
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 10
Aerial Photograph Figure 2.1.2
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 3 April 2014
page 11
VISUAL SURVEY Figure 2.1.3
a. Informal Structure on formal plot b. Unit with local building material c. Eastward from Malime Street and Malihambe Street T-Junction
d. Towards Tyoksville from Nyarha
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 12
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 13
STATUS OF HOUSING PROJECTS AND WAITING LISTS 2.2
• 700 subsidies have been proposed for Tyoksville. These units will be In-Situ upgrades onto existing erven.
• The site has been surveyed and residents reside on a erven demarcated on a registered general plan.
• Housing waiting lists have been requested from the municipality and are still awaited for this project.
• It appears that the there is a waiting list for Bedford town but the list has not been divided into projects.
TYOKSVILLE 700
Population (Nxuba SDF 2011) Does not mention
Population (2011 Census) -
Ex. Units (Nxuba SDF 2011) Does Not Mention
No. Households (at 4/hh)
Proposed Subsidies (EC DHS) 700
Waiting List (Nxuba LM) Awaited
Population (Nxuba SDF 2011) Does not mention
Figure 2.2.1 Statistical Background
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 14
LAND IDENTIFICATION AND OWNERSHIP 2.3
• The land on which Tyoksville is located, Erf 1832 Nyarha, is owned by Nxuba Local Municipality, see Annexure 1 and 2.
• Residents reside on erven demarcated on the following general plans (GP No. 6602/1997), see Annexure 3.
• The General Plan was approved in 1999 comprising 281 erven.
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 15
Extent of General Plan Figure 2.3.1
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 16
ENGINEERING (Kantey and Templer) 2.4
BULK SERVICES Existing Services
....
INTERNAL SERVICES Existing Services
....
GEOTECHNICAL CONDITIONS....
EXISTING INTERNAL SERVICES ARE ADEQUATE AND REQUIRE NO UPGRADING
Await K&T
TOP STRUCTURE....
TRAFFIC IMPACT ASSESSMENT...
ROADS AND ACCESSIBILITY...
THE PROJECT IS FEASIBLE FOR DEVELOPMENT OF HUMAN SETTLEMENTS.
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 17
Engineering (Kantey and Templer) Figure 2.4.1
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 18
ENVIRONMENT 2.5
• Tyoksville is a site and service scheme located on the on the southern corner of Bedford.
• The Eastern Cape Biodiversity Plan (ECBCP), 2007 has developed four terrestrial Biodiversity Land Management Classes (BLMCs) according to the terrestrial Critical Biodiversity Areas (CBAs). Each BLMC sets out the desired ecological state that the area should be kept in to ensure biodiversity persistence.
• The site falls within CBA 2 as per SANBI data (2007) and therefore is subject to BLMC 2 guidelines according to the ECBCP.
• BLMC 2 permits the land to be used for Conservation, Game Farming and Communal Livestock. Settlements are not recommended for these areas, however this must be ground-truthed by a botanist, prior to undertaking the Human Settlement Project.
• There are no water courses or water bodies flowing near or through the site, see Fig. 2.5.1
• The project will entail the upgrading of existing housing units or construction of new units on already developed erven.
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 19
Environment Figure 2.5.1
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 20
GEO-TECH (Kantey and Templer) 2.6
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 21
Geo-tech (Kantey and Templer) Figure 2.6.1
The Site
Tyokville 700
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 22
DISTRIBUTION OF SOCIAL FACILITIES 2.7
• Tyoksville is within walking distance to social facilities, see Figure 2.7.1.
• There are 2 primary schools, namely Nonyameko and Ntlama Primary schools and a combined school with in less than 500m walking distance from Tyoksville, see Fig. 2.71.
• The clinic is situated in Nyarha next to the combined school, see 2.7.1.
• The police station servicing Tyoksville is approximately 2.2km to the north east in Bedford CBD, see 2.7.1.
• The project is aimed at existing beneficiaries already catered for by the facilities.
• This proposed Human Settlement Project will not require provision of additional facilities.
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 23
Distribution of Social Facilities Figure 2.7.1
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 24
CURRENT SPATIAL DEVELOPMENT FRAMEWORK 2.8
•Nxuba SDF shows the Tyoksville 700 project site as an already developed residential area requiring upgrading, see project 45 on Fig. 2.8.1 .
•The Proposed Human Settlement Project is in line with the SDF.
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 25
Current Spatial Development Framework Figure 2.8.1
The Site
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 26
FUTURE PLANS OF OTHER SECTOR DEPARTMENTS 2.9
• The following table indicates government interventions proposed in the various settlements as contained in the IDP 2013-2014.
• Note: Projects may not be in the settlement itself, however if they were taking place within the same ward, they were noted.
• No budget was reflected in the IDP for some projects.
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 27
APPROVAL BY COUNCIL 2.10
Council resolution awaited.
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 28
SUMMARY AND RECOMMENDATIONS 2.11
2.10.1 SUMMARY
•The site was inspected on 21/10/2013 and the conclusions below ground-truthed.
•There are adequate engineering services. (K&T to confirm)
•There are no environmental concerns affecting the proposed Human Settlement Project. It should not trigger an EIA.
•Using ECBCP guidelines in determining the BLMCs that apply to the CBA that covers the site, settlements are not recommended for the site. It is recommended that the site be assessed by a qualified Botanist to verify and ground-truth the CBA nature of the site prior to the Human Settlement Project implementation.
•A detailed geo-technical on site inspection and, if necessary, survey will be required prior to the project commencing.
•The project comprises 700 subsidy units onto existing erven and plots.
•It should be noted that a number of erven already have substantial dwelling units on them and not all residents will want to apply for subsidies. However, there are also a number of informal dwellings whose owners are likely to require housing subsidies.
•Awaiting beneficiary list from the municipality.
•There are no new social facilities required to support the proposed human settlements project.
•The Human Settlement Project is in line with the SDF.
•Awaiting Council Resolution from the municipality.
2.10.2 RECOMMENDATIONS
•The project is feasible, pending a technical assessment by a Botanist to verify the CBA nature of the site.
•In light of this assessment it is recommended that the award of subsidies can proceed in Tyoksville.
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 29
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 30
ANNEXURE 1: OWNERSHIP PRINTOUT
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 31
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 32
ANNEXURE 2: TITLE DEED
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 33
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 34
ANNEXURE 3: SURVEYOR GENERAL DIAGRAM
TYOKSVILLE 700 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 35