prefeasibility report -...
TRANSCRIPT
For Environment Clearance from MOEF under EIA
Notification Dated 14th September, 2006 as Amended
Prefeasibility Report
1. SUMMARY
-
-Location: Village - Pampapur
---
1. -
2. Geographical Co-ordinates LATITUDE
23°11'20.97"N 23°11'20.14"N 23°11'17.59"N 23°11'17.86"N 23°11'21.05"N 23°11'22.13"N 23°11'22.95"N 23°11'22.92"N
River -
Nalla - 1.00 km
Pond - 325 m
Canal - 10.00km
4. -
-
6. -
7. -
8. -
9. -
10. -
Hilly Land devoid of vegitation
Ordinary stone
Ketka Reserve Forest around 1.00 km (South) from the lease
area
Name of Reserve Forest(s), Wild Life
Sanctuary/National Park
Altitude - Max. 579 aMSL and Min. 567 aMSL
Surface slope - Towards West
Toposheet No.- 64I/16
Topography of the area
82°50'50.97"E 82°50'51.30"E
82°50'44.08"E
Canal towards south-west near
Jagarnathpur village area
Reservoir - 40.00
km
Hasdeo Bango Reservoir Towards south
- West.
-Name of River/ Nallahs /Tanks /Spring
/ Lakes etc. Sutiya Nalla towards west near
Pampapur village area
Life of Mine
Mining Lease Area & Type of Land
Pond towards north-east
82°50'49.63"E
82°50'47.55"E 82°50'44.47"E
StateSurajpur
Project
Tehsil/Taluka Surajpur
Name of Company/Mine
Chhattisgarh
1.922 / Government Land
LONGITUDE
82°50'43.63"E 82°50'45.41"E
6.00 km (Rehar river at north-east)
BL7BL8
Mineral Reserve (in tons) Geological Reserve - 1020434.75 tons.
Recoverable Reserve - 472641.52 tons.
-
District
BOUNDARY POINT
BL1BL2BL3BL4BL5BL6
Pre - Feasibility ReportFor Pampapur Ordinary Stone Mine at Village - Pampapur
Tehsil- Surajpur & District- Surajpur, State- Chhattisgarh.
Pampapur Ordinary Stone Mine
Anand Kumar Singhal
3.
5.
Scientific mining of Ordinary stone for proposed capacity of
maximum 47635.42 MT per year.
Project Proposal
Name of Mineral Mined
Maximum 47635.42 MT/year
10 years for the excavation of recoverable reserve of
472641.52 MT
Rate of Production (in tons)
Signature of Project Proponent
________________________________________________________________________________________________
_
2
Pre - Feasibility ReportFor Pampapur Ordinary Stone Mine at Village - Pampapur
Tehsil- Surajpur & District- Surajpur, State- Chhattisgarh.
11. -
12. -
13. -
14. -
15. 1. 1.922 Hect.
2. 1.467 Hect.
3. 0.455 Hect.
4. 0 Hect.5. 0 Hect.
6. 0 Hect.
1.922 Hect.7. 0.273 Hect.
8. 0.273 Hect.
9. 0.182 Hect.
16. -
17. -
18. -
19. -
20. -
Anand Kumar Singhal
Registered office
S/o. Shri Ratan Lal Agrawal
Ward no. 15, Hospital Colony
Village/Post - Surajpur
Tehsil - Surajpur
District - Surajpur
State - Chhattisgarh
Mine Office Village - PampapurE-MailProspecting Agency
Type of Activity
Mining Method
Unused Area within Lease area
Dumping Area proposed within
proposed Statutory/mine Boundary
Plantation Area proposed over the
dump on dumping area
Break-up of Land Utilization Pattern
Total Area (2+3+4+5+6) =
Any Other (Specify)
Not Applicable
Solid waste/Tailings
Cost of Project (Rs. Lacs) Rs. 4 lacs
NIL
Water Requirement & Source Requirement - 6 kilo litre per day, Source - Mine pit/Setting
tank, dug well and tube well of nearby village within
permited limits.
Top Soil & OB - total 3216.54 cum (Maximum yearly
generation @ 1267.88 cum). IBM approval: Date
Total Lease Area
Area proposed under mining pits
Area covered by statuary/mine
Area covered by crusherArea Kept for storage of stone
Natural drainage towards West
No Activity Zone on Mine Boundary as
per MMR 1961
Name and Address of the company /
Proponent
Ground Water table Intersection
Drilling/Blasting
Drainage Pattern/ Water Courses
Yes - Jack hammer drill / low capacity scientific controlled
blast is proposed to be conducted.Open Cast Semi Mechanized
Below 40 meter from surface level
-
Anand Kumar Singhal
Open Cast Semi Mechanized Ordinary stone Quarry Mining
Not ApplicableNil
Signature of Project Proponent
________________________________________________________________________________________________
_
3
Pre - Feasibility ReportFor Pampapur Ordinary Stone Mine at Village - Pampapur
Tehsil- Surajpur & District- Surajpur, State- Chhattisgarh.
Utilities (Power, Water Requirement)
Manpower requirement
2. INTRODUCTION OF PROJECT/BACK INFORMATION
S/o. Shri Ratan Lal Agrawal
Ward no. 15, Hospital Colony
Village/Post - Surajpur
Tehsil - Surajpur
District - Surajpur
State - Chhattisgarh
(ii) Brief Description of Nature of the Project
For compliance of Rule 24 and 63 to 66 of MMR 2015 proponent was submitted quarry plan before
mining authorities and the plan so submitted has been duly approved by the sanctioning authority
vide letter No. 3457/Khanij/2017 Surajpur, Dated 07/11/2017.
(i) Identification of Project and Project Proponent
18 workers per day
The proposed project is mining activity of Ordinary stone with the name of 'Pampapur Ordinary
Stone Mine' which is situated at Khasra no. 1634 at village Pampapur, tehsil Surajpur and district
Surajpur (C.G.). This site is 3.50 km away from district office Surajpur. The quarry lease of Ordinary
stone mining was sanctioned for Lease period 30 years from the date of first commencement of
lease as per rule 38A of MMR 2015 as ammended to project proponent Anand Kumar Singhal
resident of Surajpur district Surajpur (C.G.). The granted lease area is 1.922 and the proposed
maximum production capacity is 47635.42 t. per annum. The excavation of Ordinary stone will be
done by Open Cast Semi Mechanized method with low level intensity scientific controlled blasting.
Letter of Intent for sanction of quarry lease has been granted by collectorate mining branch vide
Proposed Ordinary stone Deposit is located at village Pampapur, Tehsil Surajpur, District Surajpur and
state Chhattisgarh over an area of 1.922 ha. The proposed capacity of the project is maximum 47635.42
tones/annum. Proposed land is Government non forest revenue land. Open Cast Semi Mechanized with
low level intensity scientific controlled blasting method of mining is the most suitable mining procedure
for this mine. This method of mining is used for highest productivity and the lowest cost of any of the
broadly used mining methods Brief description of the project is described below –
(b) Project Proponent : Anand Kumar Singhal
(c) Postal /Correspondence Address of Project Proponent:
(a) Name of the Project: Pampapur Ordinary Stone Mine
Anand Kumar Singhal
Power- 5 HP
Water – 6 KLD for Domestic, Dust Suppression & Plantation
Purpose
Signature of Project Proponent
________________________________________________________________________________________________
_
4
Pre - Feasibility ReportFor Pampapur Ordinary Stone Mine at Village - Pampapur
Tehsil- Surajpur & District- Surajpur, State- Chhattisgarh.
(iii)
(iv)
(v) Demand - Supply Analysis
Exploiting this Ordinary stone deposit is important for the country’s long term economic growth
and regional growth. By mining the deposit, the lessee acts as bridge and fills the gap between
demand and supply of Ordinary stone in the market surrounding the area.
Therefore, a ready market is available for the proposed unit hence looking to the use and demand
of Ordinary stone boulders which exist a good scope for the proposed project.
Chhattisgarh is a developing state in map of India. Considering the growth, State Government has
divided the state in 27 districts out of which 9 are recently declared districts. State Government, is
carrying on various Infrastructure development projects in all districts, like Pachri Nirman, Dams,
Over bridge on rivers/nalla, approach roads etc. in addition to these various power plants, steel
plant and cement plants in private sectors are under implementations, all above civil works require
stone boulders in different sizes which is in huge in demand. However supply of stone boulder &
chip in the above sectors are in huge shortage.
Need for the Project and its Importance to the Country and/or Region
Mineral resources of any country are the “TREASURE-TROVE” of its national economy;
Chhattisgarh is one of the richest states in the country with its sparkling mineral wealth. The
Chhattisgarh State has enormous reserves of stone & its variety of varies grades spread over
mainly in Raipur, Raigarh, Balodabazar-Bhatapara, Janjgir-Champa, Durg, Rajnandgaon, sarguja,
Koriya, Balrampur and Bilaspur districts. Stone is basic material for civil building & civil construction
works. The project shall also provide additional revenue to State Government and create direct
and indirect employment opportunities, which will catalyze overall growth of the State and
improve the quality of life of the people living in the region and transform the region’s economy
from predominantly agricultural to significantly industrial and accelerate the pace of regional
development of region. There is huge demand of stone chip in the region as well as throughout
country for the use in construction of House, Canal, Dam, Pachri and other infrastructure etc.
Therefore application is being filed before jurisdictional DEIAA of district Surajpur for getting
permanent environmental clearance before starting of mining activity on granted lease area.
The proposed project is < 5 hect. Minor mineral and non-coal mining project thus it is classified as
“CATEGORY – B2” project under activity 1(a) of the schedule of EIA notification dated 14th
September 2006 as amended by Ministry of Environment, Forests and Climate Change, New Delhi
by S.O. 141(E) dated 15 January 2016, hence it comes under jurisdiction of DEIAA.
Stone Chip is basic raw material of civil construction works likes building, dams, roads, etc. for
construction of walls/base.
Demand - Supply Gap
All the other necessary permission and noc’s has been taken by the proponent. Consent to
establish & operate/Air/Water clearances from CGCECB will also be taken if instructed by
jurisdictional DEIAA.
Signature of Project Proponent
________________________________________________________________________________________________
_
5
Pre - Feasibility ReportFor Pampapur Ordinary Stone Mine at Village - Pampapur
Tehsil- Surajpur & District- Surajpur, State- Chhattisgarh.
(vi)
a) Direct Employment
S.N.1
2
3
b)
3. PROJECT DESCRIPTION
(i)
(ii)
The details of the lease area are as under:
The Coordinates of the area are:
BOUNDAR
Y POINT
LATITUDE
BL5 23°11'21.05"NBL6 23°11'22.13"NBL7 23°11'22.95"NBL8 23°11'22.92"N
LONGITUDE LONGITUDE
Labors will be required for various purposes like excavation of stone and loading of stone in
various vehicle, management, maintenance & development of mine, making & maintenance of
ramp, transportation of material and book keeping. Experienced personals will be employed as per
the requirement.
Type of Project (Including interlinked and interdependent projects, if any):
16
The mining establishment presents opportunities of employment to various posts under various
cedars viz. supervisory, skilled workmen, semiskilled workmen and unskilled workmen beside
casual workmen. However the maximum required labours at the site to justify the production of
stone at applied land are detailed below-
Taking standard O.M.S. to be one the strength of labour, a labour can work for 4 tons of mineral in
one sift of 8 hours a day. Considering this parameter the manpower need for project is –
Particulars
Chowkidars (Experienced)Total
Indirect employment - Driver, cleaner for loader & dumper are the points were labors are
required. Moreover, manager, accountants will also be appointed as per need.
Employment Generation (direct and indirect) due to the Project
District / State
82°50'44.08"E
1
118
Pampapur
82°50'51.30"E
VillageArea(ha)
Mining mate (Qualified)
BL2 82°50'43.63"E
Surajpur / ChhattisgarhSurajpur
BOUNDARY
POINT
82°50'47.55"E
23°11'17.86"N
No of Workers
1.922
Tehsil
BL4
BL1
23°11'17.59"N 82°50'44.47"E
The proposed project is < 5 hect. Minor mineral and non-coal mining project thus it is classified as
“CATEGORY – B2” project under activity 1(a) of the schedule of EIA notification dated 14th
September 2006 as amended by Ministry of Environment, Forests and Climate Change, New Delhi
by S.O. 141(E) dated 15 January 2016, hence it comes under jurisdiction of DEIAA.
Location (map showing general location, specific location, and project boundary & project site
layout) with coordinates.
82°50'49.63"E82°50'50.97"E
82°50'45.41"E
LATITUDE
BL3
Skilled labours
23°11'20.97"N 23°11'20.14"N
Signature of Project Proponent
________________________________________________________________________________________________
_
6
Pre - Feasibility ReportFor Pampapur Ordinary Stone Mine at Village - Pampapur
Tehsil- Surajpur & District- Surajpur, State- Chhattisgarh.
(iii)
(iv)
Waste in Stone
in cum 1945.11
1947.32
1945.14
1390.29
1944.98
1947.96
1944.97
1939.55
1929.961,960.31
18895.59 cum
(v)
-
-
-
- The proposed heights of working bench will be as tabled below. No Separate bench for soil is
proposed. Bench details and specifications are as under -
The excavation activity will be carried out till the depth of 12 m below general ground level or
occurrence of ground water table at the site which ever encountered earlier.
7.50 m boundary will be left from the lease boundary around 4 sides (N, E, S, W) as barrier for
safety provisions, dumping of top soil & OB and afforestation.
Year
7th Year
8th Year
46898.0347635.42
-
554.70
-
Project description with process details (a schematic diagram/flow chart showing the project
layout, components of the project etc. should be given)-
Top Soil & OB
in cum
3rd Year
47335.39
Total 472641.48 t
-
--
3216.54 cum
9th Year10th Year
It is proposed to carry out mining operation Open Cast Semi Mechanized method. The
development has been proposed for systematic and scientific mining.
622.66
-
4th Year
5th Year
6th Year
The site can be depicted in the toposheet number 64I/16 of Survey of India. Study area map in
Khasra map, toposheet and site specific surface map is attached as Plate-1, Plate -2 and Plate -4 of
enclosed mine plan respectively.
Details of alternate sites considered and the basis of selecting the proposed site, particularly the
environmental considerations gone into should be highlighted:
Production During Plan Period
771.30
47319.86 1267.88
Stone (ROM)
in tonne
It is naturally occurring rocks which is site specific due to its geological origin. Mining is site specific
project. This lease is being granted by the state govt., hence alternative site is not applicable.
The total applied lease area is 1.922 hectare and total proposed maximum production capacity will
be 47635.42 TPA through Open Cast Semi Mechanized method of mining with low level intensity
scientific controlled blasting. Proposed production details during lease period are shown in below -
Size or Magnitude of Operation:
47262.68
47130.98
2nd Year
1st Year 47266.24
47262.89
47266.90
47263.09
Signature of Project Proponent
________________________________________________________________________________________________
_
7
Pre - Feasibility ReportFor Pampapur Ordinary Stone Mine at Village - Pampapur
Tehsil- Surajpur & District- Surajpur, State- Chhattisgarh.
-
-
-
-
Mineral Bench
Bench Height
3.00 m3.00 m3.00 m
3rd Quarry Bench
4th Quarry Bench
3.00 m
-
Overall bench slope will be less than 450 with the horizontal.
Adequate slope and water sump will be gradually developed at the working pit.
Large size of stone boulders will be manually sized in to 10 to 12 inches as per the demand.
Drilling equipment’s to be deployed is as under-
3.00 m
Flow chart of the Project
Loading will be done manually or with the help of excavator and J.C.B and the transporting will be
done by 4.5 tones tractor or 10 tones tippers.
Drilling
Controlled Blasting
Removal of Overburden & Top Soil
Loading by Excavator or Manually
Transportation by Tractor or Tipper
Low level intensity scientific and controlled blasting is proposed to be carried out for production of
Ordinary stone. No deep hole drilling & blasting will be done.
Drilling will be done initially with hand holes and later with the help of jack hammer and
compressed air. Machines specification is given below-
Resizing of stone manually
Drilling and blasting pattern will be d x b x s = depth 1.5m x Burden 1.1m x Spacing 1.2m.
Drilling & Blasting
Drilling:
1st Quarry Bench
3.00 m
Mineral Bench
Mineral Bench
3.00 m
3.00 m
4th Quarry layer
3.00 m
2nd Quarry Bench
3.00 m
3.00 m
Soil LayerSoil + Mineral LayerSoil + Mineral LayerSoil + Mineral Layer
Soil + Mineral Bench
1st Quarry layer
Bench Width along the
periphery of mine
3.00 m3.00 m2nd Quarry layer
3rd Quarry layer
Bench Number Bench Specification
3.00 m3.00 m
Signature of Project Proponent
________________________________________________________________________________________________
_
8
Pre - Feasibility ReportFor Pampapur Ordinary Stone Mine at Village - Pampapur
Tehsil- Surajpur & District- Surajpur, State- Chhattisgarh.
No Make Motive Power
1 Atlas Copco Diesel
1
(vi)
(vii)
Drill Meterage
Special Gelatin
Type Dia of
hole
4-5 ton per Kg47635.42
Blasting:
Broad Blasting Parameters :
Jack Hammer
Size/capacity
210CFM
45 m
The blasting will be conducted on the contract basis through approved blasting contractor,
therefore no need to install magazine at quarry site.
Total Production
32 mm
Raw material/consumables required along with estimated quantity, likely source, marketing
area of final products/s, Mode of transport of raw Material and Finished Product.
Type of explosive:
The excavated mineral will be transported to the destination by tipper/dumper/trucks and broken
Ordinary stone will be loaded manually or by loaders.
It is expected that the total water need is about 6 kilo litre per day in the mine. The details of
water balance of existing / proposed mining project are given below:
Storage of Explosives :
No raw material is required for the mining of Ordinary stone.
Marketing area: Ordinary stone will be used in form of stone chips as building material in civil
constructions activity.
Availability of Water, its source, Energy/power requirement and source should be given -
Ordinary Detonator
Safety Fuse
Water Requirement:
Tonnage per blast hole
Total Blast Hole per day
158.78 t
5.35 MT
Low level intencity, scientific and controlled blasting will be done. The Small blast hole will be
charged with explosives. Details of blasting parameters & blast impact and control measure are
discussed below-
d x b x s = depth 1.5m x Burden 1.1m x Spacing 1.2m.
32 mm
Blast pattern
Dia. of the hole
Powder Factor
30
32 mm
Compressor
Daily Production
Signature of Project Proponent
________________________________________________________________________________________________
_
9
Pre - Feasibility ReportFor Pampapur Ordinary Stone Mine at Village - Pampapur
Tehsil- Surajpur & District- Surajpur, State- Chhattisgarh.
Mine Site
Dust Suppression 3.00 KLDGreen Belt 2.00 KLD
Domestic
Sanitation & Drinking 1.00 KLDTotal 6.00 KLD
I)
II)
A)
B)
S.N. Power requirement
1 5 HP
C)
(viii)
a)
Energy & Power Requirement and Source
Total (KLD- Kilo Litre Per Day)Process
For Green belt and dust suppression: Water will be made available from quarry mine pit which is
accumulated during the rainy season and shall be collected in settling tank for utilization in green
belt and dust suppression. However, if required, water might be supplied from tube wells .
Domestic usage: Water might be supplied from tube wells.
Quantity of wastes to be generated (liquid and solid) and scheme for their management/disposal
–
Fossil Fuels :
Electricity :
Particulars
Solid Waste:
Top Soil & overburden:
Domestic Purpose
Source of Electricity:
The power requirement for the project will be met by electricity lines of Chhattisgarh State Power
Distribution Copany Limited available at village or nearby site area.
Top soil & OB. 3216.54 cum will be generated in total at the rate of maximum 1267.88 cum per
year for period of approved mine plan.
Electricity will be required for Pumping of water and for administrative building & rest shelters.
The requirement of Power is estimated as under-
Water Balance of Project
Sources of water:
Fuel is to be used in form of diesel for mining operations, compressors and running of tractors and
other transportation vehicles.
Quantity for fuel will depend upon the usage of transportation vehicle and other machineries and
level of achievement of estimated production. Diesel will be outsourced from nearby diesel
pumps.
Signature of Project Proponent
________________________________________________________________________________________________
_
10
Pre - Feasibility ReportFor Pampapur Ordinary Stone Mine at Village - Pampapur
Tehsil- Surajpur & District- Surajpur, State- Chhattisgarh.
b)
c)
a)
b)
c)
Whatsoever quantity of top soil and overburden generated during the quarrying operation will be
stacked at the periphery of mine along the statutory/mine boundary in such manner that no
stacking will be done at the area of 3 meter from the edge of quarry pit.
Mine/Statutory boundary is 7.50 m wide in order to comply the rules of MMR1961. Out of this
mine/statutory boundary 3.0 m wide area from the edge of mine pit is proposed to left to comply
the provisions of MMR1961. Dumping area is proposed on balance outer 4.50 m wide area of
mine/statutory boundary i.e. after 3.0 m of no activity zone. Threfore saperate dumping area in
the mine is not proposed. Rather outer 4.50 meter wide area under mine/statutory boundary is
itself considered as dumping area. plantation is also proposed on the same dumping area over the
dump. Roads within mine area is also proposed to be constructed within mine boundary only.
Mining Loss or Unusefull Waste Material:
Liquid Effluent:
Selection of Dumping Site:
No sub-grade mineral will be generated during excavation of stone. All ROM mineral will be used.
Only domestic effluent is expected to be generated which will be treated through septic tank
followed by soak pits.
Sub grade material:
All ROM mineral is useful and saleable. 18895.59 cum material may be generated or could not be
recovered as unusefull waste material or mining loss respectivelly during the plan period.
Further if the area for dumping of OB gets short then the land (adjoining or nearby the mine)
owned or controlled by the lessee will be utilised with due permission of district mining office for
dumping of excess OB. Such excess OB dump will be utilised in priority for reclamation at the time
of reclalation of mine.
Sub grade material:
Top Soil & overburden:
Waste:
No mining waste except from mining losses & OB will be generated during excavation of Ordinary
stone. All ROM mineral will be used. Ordinary stone is usable as building material hence saleable
therefore no mineral waste will be generated which requires their due management.
No sub-grade mineral will be generated during excavation of Ordinary stone. All ROM mineral will
be used. Ordinary stone is usable as building material hence saleable therefore no mineral reject
will be generated which requires their due management.
Signature of Project Proponent
________________________________________________________________________________________________
_
11
Pre - Feasibility ReportFor Pampapur Ordinary Stone Mine at Village - Pampapur
Tehsil- Surajpur & District- Surajpur, State- Chhattisgarh.
a) Top Soil & Overburden :
b) Waste & Subgrade Material :
4. SITE ANALYSISConnectivity
(i)
Form & Use : Hilly, Non Forest, Revenue land.
Ownership : Government land.
Forest - Nil Area (ha)- Nil 1.922 Area
Nil
Nil
Nil
(ii)
No need of planing for dumping management of waste and subgrade material as all ROM is
saleable except Top Soil and Overburden.
Existing land use pattern: Existing land use pattern of the proposed mining area is given in below
table.
(i) waste land
(ii) grazing land,
Manner of waste disposal & configuration:
The climate of Surajpur district in general and the Surajpur in particular is characterized by a hot
summer and a well-distributed rainfall during the southwestern monsoon season extending from
end of June to October. The area has 4 well-defined seasons in a year. The winter season
commences from early December and continues up to the end of February, summer season
extends from March to early June, rainy season generally from mid-June to September and the
post-monsoon season from October to November.
Climate Data from Secondary Sources:
Top Soil initially removed will be temprerorly stacked on mine boundary or other location within
lease area. Then whatsoever quantity of overburden & unusefull waste generated during the
quarrying operation will be spread at the periphery of mine along the mine boundary on specified
dumping areas. After proper dumping of OB and unusefull waste on mine boundary the preserved
Top Soil will be spreyed over the OB and/or unsuefull waste dump. Stack of dump OB, waste & Top
soil so developed is proposed to be stabilized the by grass plantation or cutting of local bushes and
dence plantation on it as per plantation programme so that spillage of dump does not occur in the
surroundings.
Further if the area for dumping of OB gets short then the land (adjoining or nearby the mine)
owned or controlled by the lessee will be utilised with due permission of district mining office for
dumping of excess OB. Such excess OB dump will be utilised in priority for reclamation at the time
of reclalation of mine.
Land form, Land Use & Land Ownership
(iii) Agriculture land,
(iv) others (specify)
The area is approachable from district office Surajpur by fair weather road. The area is 3.50 km
from Surajpur. The applied area is 3.50km away from Surajpur bus stand. Hospital is available at
Pampapur at 500 m/Surajpur at 3.50 km distance. The nearest railway station is at Surajpur
(11.50km) (S.E.C.RLY) and Nearest active airport is Raipur (250.00 km).
Forest Area Non-forest Area
Signature of Project Proponent
________________________________________________________________________________________________
_
12
Pre - Feasibility ReportFor Pampapur Ordinary Stone Mine at Village - Pampapur
Tehsil- Surajpur & District- Surajpur, State- Chhattisgarh.
(iii)
5. PLANNING BRIEF
(i)
(ii)
Proposed Land Use Pattern of Proposed Quarry Lease Area
1. 1.922 Hect.
2. 1.467 Hect.
3. 0.455 Hect.
4. 0 Hect.
5. 0 Hect.
6. 0 Hect.
1.922 Hect.
7. 0.273 Hect.
8. 0.273 Hect.
9. 0.182 Hect.
(iii) Assessment of infrastructure demand (physical and social)
Total Area (2+3+4+5+6) =
The project is very small in magnitude. The project will employ most of the workers from nearby
villages. There will not be any increase in population of the area due to the establishment of
project. However, few people from other area may migrate in this area for business opportunities.
Planning concept (type of industries, facilities, transportation etc.) Town and country
Planning/Development authority Classification-
Area covered by crusher
No Activity Zone on Mine Boundary as per MMR
1961
Area Kept for storage of stone
The road facility is already available which shall be used and properly maintained. Preference will
be given to local labor from nearby villages. Other requisite infrastructure as transport of mine
labors is available by way of jeep, two-wheeler. Medical facility is available for first aid at project
site.
Unused Area within Lease area
Dumping Area proposed within proposed
Statutory/mine BoundaryPlantation Area proposed over the dump on
dumping area
Total Lease Area
Area proposed under mining pits
Area covered by statuary/mine boundary
Proposed Land Use Planning
Planning concept: It is a Ordinary stone mining project, for safe, scientific & systematic working to
follow the principles of safety & conservation of human health & mineral the planning for mining
of stone shall be governed by the approved Quarry Plan under Chhattisgarh Minor Mineral Rules,
2015 vide letter No. 3457/Khanij/2017 Surajpur, Dated 07/11/2017.
Population projection:
The study area consists of essentially Hilly land with a very small pit.The general slope is towards
West. Maximum Altitude of the applied area is 579m AMSL at North-Eastern part while lowest side
is 567m AMSL at Western part of lease area .
Topography:
Social Infrastructure Available
Power line, telephone line, school, bank, govt. office, Hospital, Police station etc. at Surajpur.
Signature of Project Proponent
________________________________________________________________________________________________
_
13
Pre - Feasibility ReportFor Pampapur Ordinary Stone Mine at Village - Pampapur
Tehsil- Surajpur & District- Surajpur, State- Chhattisgarh.
6. PROPOSED INFRASTRUCTURE
(i) Industrial Area (Processing Area)
Not Applicable
(ii)
(iii)
Under the afforestation plan, plantation in nearby villages and connecting roads be undertaken.
The implementation for development of greenbelt will be of paramount importance as it will not
only add up as an aesthetic feature but will also act as a pollution sink. The species to be grown in
the areas should be dust tolerant and fast growing species so that a permanent greenbelt is
created. Plantation in the barrier zone and roads is necessary as these areas will contain fine
particulates resulting from mining operation and vehicle movement Plantation will also be carried
out as social forestry programme in village, school and the areas allocated by the Panchayat/State
authorities. Native plants like Neem, Peepal, Khejri and other local species will be planted. A
suitable combination of trees that can grow fast and also have good leaf cover shall be adopted to
develop the greenbelt.
Site services are required per the statutory provisions i.e rest shelters, toilets, drinking water
facilities, safety appliances, and regular medical checkup facilities are suitably needs to be
provided for labors and their families. The health and safety of the employees is required to be
given first priority during the mining operation. Training program organize for first aid.
Amenities / Facilities:
The road facility is already available around 480 m from the site which shall be used and properly
maintained.
Apart from indirect manpower requirement for Driver, cleaner for loader & dumper, manager,
accountants; approx. 18 labours will be required directly for mining operation.
Other requisite infrastructure: Transport of mine labors is available by way of jeep, two-wheeler.
Medical facility is available for first aid at project site.
Power line, telephone line, school, bank, govt. office, Hospital, Police station etc. are the other
requisites needed for mine operation and social facilitation.
Residential Area (Non Processing Area)
Specified first Aid station is needed to be maintained at the site office and the rest shelter as per
applicable statutory provision.
First aid:
Office and stores:
No residential area is proposed for the project except temporary rest shelters proposed for labors.
Site Services:
Specific amenities / facilities are not required in this mining project. However the same can be
provided as per prescribed instructions.
Road & Connectivity:
Manpower Requirement:
Office and stores is needed to be provided as per applicable statutory provision.
Green belt
Signature of Project Proponent
________________________________________________________________________________________________
_
14
Pre - Feasibility ReportFor Pampapur Ordinary Stone Mine at Village - Pampapur
Tehsil- Surajpur & District- Surajpur, State- Chhattisgarh.
No. OF SAPLING
(iv)
OCCUPATIONAL HEALTH AND SAFETY
Occupational Health and Safety works as follow-
1)
2)
3)
4)
(v)
(vi)
Yearwise plantation will be done on Nearby area of the School, at the govt. waste land provided by
the Govt., at Own Private Land and nearby State Highway road and district or public roads etc.
Drinking water is available in dug well and tube well at nearby village of the applied area which is
portable, pure and clean. It is also proposed to provide hand pump if needed in the lease area for
mitigating of drinking water, such hand pump will be arranged after taking statutory permission.
Sewerage System: No construction or sewage waste is expected from the mining process.
However the domestic waste from the toilets shall be given treatment through septic tank and
soak pit arrangement.
1st Year
PROPOSED SITE
Along boundary of quarry area 160
Develop and implement training sessions for management, supervisors and workers on
health and safety practices and legislation;
Awareness program be conducted about likely occupational health hazards so as to have
preventive action in place.
Occupational Health and Safety are important. Periodic assessment of it will be useful. Identifying
workplace hazards, assessing risks to employee health and safety, are important. Health and Safety
points are also important in many of the environmental aspects of the workplace.
Drinking Water Management (source & supply of water):
Afforestation program shall be started with the commencement of mining operation with
simultaneous clearing of land by spreading of clay lumps along barrier of lease boundary. 2.5m X
2.5m spacing with 0.6m depth have been suggested for sapling pits on which local species i.e.
Pipal, Neen, Aam, Arjun, Jamun, Imli, Sirus, Sisu, Karanj will be planted as the following manner-
SPECIES
Except dust generation there is no source which can show a probability for health related
diseases and proper dust suppression will control dust generation and dispersion.
Promote occupational health and safety within workers in mine and develop safer and
healthier ways of working;
Seesam, Bargad, Neem, Aam,
Pipal, etc.
For the social developmental program on the need base assessment some development program
will be undertaken by the project proponent i.e. development of or maintenance of urinals, toilets,
safety appliances & training program, confirming availability of pure and clean drinking water,
periodic health checkup program, transportation facility to labours and their children’s to schools
etc.
Social infrastructure
Year
Signature of Project Proponent
________________________________________________________________________________________________
_
15
Pre - Feasibility ReportFor Pampapur Ordinary Stone Mine at Village - Pampapur
Tehsil- Surajpur & District- Surajpur, State- Chhattisgarh.
(vii)
(viii)
A)
B)
S.N. Power requirement
1 5 HP
C)
7. REHABILITATION AND RESETTLEMENT (R&R) PLAN:
8. PROJECT SCHEDULE AND COST ESTIMATES
A)
The proposed mining project will be started after obtaining Environmental Clearance of quarry
lease and order to enter in lease area by District Collector (Mining Branch). Consent to establish &
operate from CGCECB will also be taken if instructed by DEIAA.
Effect on Flora & Fauna:
Mining is restricted to very small area. No study have been conducted or record found on effect on
Floora & Fauna for mine area. However mining activity causes impact on flora and fauna due to
land degradation/deforestation etc.,
Likely date of start construction and likely date of completion (time schedule for project) –
Fossil Fuels :
Electricity :
Particulars
Domestic Purpose
Source of Electricity:
Fuel is to be used in form of diesel for mining operations and running of ractors and other
transportation vehicles. Quantity for fuel will depend upon the usage of transportation vehicle and
other machineries and level of achievement of estimated production. Diesel will be outsourced
from nearby diesel pumps.
The power requirement for the project will be met by electricity lines of Chhattisgarh State Power
Distribution Copany Limited available at village or nearby site area.
No R&R plan is required as the mine area does not cover any habitation. Hence the mining activity
does not involve any displacement of human settlement. No public buildings, places, monuments
etc. exist within the lease area or in the vicinity of the mine lease area. The mining operation will
not disturb/ relocate any village or need resettlement. Thus no adverse impact is anticipated.
Impact of the stone mining will be positive, as it will upgrade the socio-economic status of local
inhabitants in the nearby areas by giving employments to poor people of nearby villages. Due to
this positive impact the living standard will increase and will lead to educational upliftment.
Power requirement & supply/source:
Electricity will be required for Pumping of water and for administrative building & rest shelters.
The requirement of Power is estimated as under-
Industrial waste management: No industrial waste will be generated.
Signature of Project Proponent
________________________________________________________________________________________________
_
16
Pre - Feasibility ReportFor Pampapur Ordinary Stone Mine at Village - Pampapur
Tehsil- Surajpur & District- Surajpur, State- Chhattisgarh.
B) Estimated project cost of the project -
S.N. Amount in Lacs
1 -
2 1.00
3 1.00
4 1.00
5 1.00
4.00
9. CONCLUSION
(a)
(b)
(c)
(d)
(e)
Date : / /2017
Place : Surajpur
Anand Kumar Singhal
The Project is viable and environmental friendly as it’s a development project for the State &
Country.
Increased financial benefits accruing to state and central agencies by ways of taxes, royalties,
cesses etc.
Signature of the applicant
Mining Machineries & Equipment’s
Land Development & Establishment cost
Others
Total Cost of Project :
The Proposal is for the Environment Clearance of the Proposed Mine.
The quarry project will create local employment to the villagers and they will get employment in
nonagricultural season.
The Proposal does not require further Infrastructure facilities other than few Mining
Machineries.
In any human activity there are always possibilities of finding various options. Project proponent has
decided to examine and adopt one such option that will be both environment friendly and best suited
for Ordinary stone production. Various alternatives in terms of site, technology, and equipment are
considered. A final selection is thus arrived–"
Particulars
Land Cost (Government land)
Administrative Building & Rest Shelters
Signature of Project Proponent
________________________________________________________________________________________________
_
17