Prefabricated Construction Systems for Building and Civil works
adopted in Hong Kong
Presented by
Raymond W M Wong
Division of Building Science & Technology
City University of Hong Kong
![Page 2: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/2.jpg)
The presentation is based on a paper prepared by Raymond Wong for the
World Congress on Housing Process & Product,
Organized by the International Association for Housing Science
and hosted by the Concordia University,
Montreal, Canada, June 2003
![Page 3: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/3.jpg)
Development and Application of Prefabricated Technology in Building Construction in HK
1. Had been used once in early 1970s in a pilot project to construct a series of 17-storey public houses
2. Used in a broader scale in the mid/late 1980s in the construction of public houses where all the façades of the flats were constructed in precast in a after-fixed manner
3. Improvement to public houses by introducing in-situ joined façade and broader use of other precast elements in early/mid 1990s.
4. A few private developments pioneered in the use of prefabricated system in the construction of buildings of various nature since early 1990s
![Page 4: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/4.jpg)
Development and Application (continue) 5. Packaged projects introduced from late 1990 onward by the
Hong Kong government for the construction of a series of schools using semi-prefabricated method
6. A series of government quarter buildings using similar construction techniques were introduced in 2000
7. A few special buildings such as bus depot or train station podium employed large amount of prefabricated elements of which some were primary structural members (1997 onward)
8. Popular use of prefabricated external wall from 2002 onward in residential buildings due to the introduction of a new guideline encouraging the use of precast façades as a form of green elements in construction (exemption of Gross Floor Area)
![Page 5: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/5.jpg)
Generations of Public Houses (Harmony Block) constructed
using semi-prefabricated concept
![Page 6: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/6.jpg)
First generation of Harmony Block using after-fix façade
Later version of Harmony Block using inisitufaçade cast at the same time with structural walls
![Page 7: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/7.jpg)
Precasting yard was set up to produce precast elements for public housing projects in early to mid 1990
![Page 8: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/8.jpg)
After-fix façade system required the formation of small amount of in-situ joint and grouting that easily caused leaking problem
![Page 9: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/9.jpg)
Detail of façade installation using in-situ jointing arrangement in the later version of Harmony Block Construction
![Page 10: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/10.jpg)
Forming the floor slab in the Harmony Block construction using semi-slab (right) and aluminium formwork (above)
![Page 11: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/11.jpg)
Introduction of mechanical formwork systems incorporating the standard precast elements in the construction of latest version of public houses in the late 1990
![Page 12: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/12.jpg)
Public houses using Concord design with special emphasis on the use of mechanicalisedconstruction system
![Page 13: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/13.jpg)
Layout of the Concord Block showing the position of the cast-in-situ core wall, shear walls and precast façade
![Page 14: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/14.jpg)
Other pioneered projects in the early 1990 constructed using semi-prefabricated concept
![Page 15: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/15.jpg)
The construction of the Headquarter and Members Facilities Complex for the Hong Kong Jockey Club
![Page 16: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/16.jpg)
Forming the floor slab using precastsecondary beams and semi-slab for the main building (above) and members’ complex (right)
![Page 17: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/17.jpg)
Detail of the floor system with the cast in-situ main beams and the place-in precast secondary beams
![Page 18: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/18.jpg)
Introduction of prefabricated concept to construct government
quarters in 2000
![Page 19: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/19.jpg)
Government quarters in West Kowloon
![Page 20: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/20.jpg)
Layout of the quarter building showing typcial phasing arrangement of work
![Page 21: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/21.jpg)
Features in the construction –extensive use of precastfaçade and lintel beams, precast cast-in-situ internal partitions are also introduced
![Page 22: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/22.jpg)
Detail of the façade and the lintel beam installation
![Page 23: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/23.jpg)
Installation of the cast-in-situ precast internal partition
![Page 24: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/24.jpg)
Construction of special buildings using high proportion of precast
since 1998
![Page 25: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/25.jpg)
Kowloon Canton Railway Station podium/deck
Construction of the KowloonCanton Rail podium deck –cargo handling bay on the ground level and on top for a large-scale residential development afterward
![Page 26: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/26.jpg)
Forming of the cast-in-situ main beams
![Page 27: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/27.jpg)
Jointing detail of the main beam and precastsecondary beams
![Page 28: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/28.jpg)
Semi-slab with RC topping to form the composite podium deck
![Page 29: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/29.jpg)
Kowloon Motor Bus Maintenance Depot
- 3-level depot building with columns, main and secondary beams all in precast
![Page 30: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/30.jpg)
Erecting of the building frame using precast columns and beams
![Page 31: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/31.jpg)
Connecting the precast column to the foundation cap with a base plate
![Page 32: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/32.jpg)
Placing the secondary beams onto the main beam
![Page 33: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/33.jpg)
Connecting beams to columns by stitching, a means to provide an in-situ joints with rigid RC links
![Page 34: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/34.jpg)
Detail of the beam/column and beam/beam joints
![Page 35: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/35.jpg)
Recent Residential/Commercial Developments using prefabricated
concept to construct
![Page 36: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/36.jpg)
Residential development at Cyber Port
![Page 37: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/37.jpg)
Façade and general installation details
![Page 38: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/38.jpg)
Features in the construction –large amount of external walls are constructed in precastfaçade untis, with major structural links tie back to the inner shear walls and floor slab
![Page 39: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/39.jpg)
Incorporation of other sophisticated formwork in construction –steel gang form for walls and table form for floor
![Page 40: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/40.jpg)
Residential Development at Taikoo Valley
Construction features –the use of large amount of precast units both of structural or architectural nature. This includes the balcony, façade units, loss-form for external walls and some shading fins.
![Page 41: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/41.jpg)
Detail of the precast balcony unit
![Page 42: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/42.jpg)
Detail of the loss-form
![Page 43: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/43.jpg)
Residential development at Ma Tau Wai
![Page 44: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/44.jpg)
Overview of the precastinstallation arrangement
![Page 45: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/45.jpg)
Façade installation detail as seen on the floor deck
![Page 46: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/46.jpg)
Cambridge House – a 42-storey Office Building at Quarry Bay
![Page 47: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/47.jpg)
Features in construction –precast beam trough and precast sub-slab with RC topping forming the floor system
![Page 48: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/48.jpg)
Placing of the precast beam trough to form the floor layout
![Page 49: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/49.jpg)
Recent Achievements of Hong Kong’s Prefabricated Technology
• Previous defects such as leakage problems have been improved
• Application diversified to other forms of construction
• Capable to apply to rather complicate-shaped buildings
• Incorporation of other advanced technology in the construction (such as use with mechanical form/ tensioned elements)
• Generally mastering of skill and growing popular
![Page 50: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/50.jpg)
Future Trend in the application of Prefabricated Technology in Hong Kong
1. To increase the use of prefabrication for more structural elements such as for beam, column or load bearing wall
2. Use more modulated elements or plug-in units
3. Use more for architectural or decorative elements
4. Incorporation of other composite elements in the design such as using at the same time with structural steel
5. Apply prefabrication more to medium-rise buildings with more standardized structural items
6. Improve the supply chain management to make production more efficient and economical
![Page 51: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/51.jpg)
Practical Constraints1. Tighter coordination to allow for structural design,
construction planning, procurement & approval procedure
2. Required a critical amount of precast items before work can be economically used
3. Huge work space for handling precast elements especially in congested urban environment in Hong Kong
4. Congested site environment makes access and delivery of heavy precast units to the work spot becomes difficult
5. Quality assurance become critical especially where large amount of precast components are used as structural nature
![Page 52: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/52.jpg)
Examples of very congested construction environment where prefabrication approach is adopted
![Page 53: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/53.jpg)
Example of Innovative Project (Local)
The Integer
![Page 54: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/54.jpg)
The Integer House at Admiralty
![Page 55: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/55.jpg)
Floor plan of the experimental house
![Page 56: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/56.jpg)
The working concept
![Page 57: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/57.jpg)
Typical connection details
![Page 58: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/58.jpg)
Assembly of the 3-D modules
![Page 59: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/59.jpg)
Possible future development for high-rise structures using similar concept
![Page 60: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/60.jpg)
Example of Innovative Project (overseas)
The Habitat 67 in Montreal, Canada
![Page 61: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/61.jpg)
Building Section
Habitat 67 as seen along the bank of St Lawrence River
![Page 62: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/62.jpg)
Habitat 67 as seen along the bank of St Lawrence River
![Page 63: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/63.jpg)
Close up look of the modulated dwelling units
![Page 64: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/64.jpg)
Close up look of the modulated dwelling units and the linking structure in the form of a access corridor
![Page 65: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/65.jpg)
![Page 66: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/66.jpg)
View as seen on the deck level
![Page 67: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/67.jpg)
Forming and Installation of the modulated units
![Page 68: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/68.jpg)
Installation of the modulated units and the associated structure
![Page 69: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/69.jpg)
Building Section
![Page 70: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/70.jpg)
Floor plan
![Page 71: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/71.jpg)
Connecting the modules
![Page 72: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/72.jpg)
Prefabricated Construction
Application in Civil Works
![Page 73: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/73.jpg)
Examples of application of prefabricated techniques in civil construction works
1. Used in highway projects such as cantilevered deck of elevated bridge, parapets of expressway and road curb
2. Precast girder units or beams for elevated roadway (viaduct)
3. Precast beams or decks for elevated pedestrian footbridges
4. Tunnel lining especially for tunnel formed by tunnel boring machine
5. Decks for long span bridges
![Page 74: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/74.jpg)
Examples of application (continue)6. Marine work such as seawall and deck of terminal
berth
7. Soil retaining element such as for earth-balanced type retaining structure
8. Platform for railway station
9. Parapets and noise barrier panels
10. Overhanging ducts or services channels for underground facilities
11. Nullah section for storm water discharge
![Page 75: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/75.jpg)
Elevated pedestrian footbridge in Mong Kok
![Page 76: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/76.jpg)
Piers formed using precast column
![Page 77: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/77.jpg)
Precast girder erected on top of the piers to form the main span of the footbridge
![Page 78: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/78.jpg)
Extending precast plank to form the deck of the footbridge
![Page 79: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/79.jpg)
Structural arrangement of the footbridge
![Page 80: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/80.jpg)
Precast V-shape beam for the Route 3 elevated expressway at Kwai Chung
Precast V-shape beam being lifted to pier head by launching gantry
![Page 81: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/81.jpg)
Precast box-girder for the Rambler Strait Bridge of Route 3
![Page 82: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/82.jpg)
Forming the elevated bridge of the West Kowloon Expressway
![Page 83: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/83.jpg)
West Kowloon Expressway –installing the precast box girder using balanced cantilever method with the help of track mounted gantry crane
![Page 84: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/84.jpg)
Forming the elevated track of the West Rail using the slung launching girder
![Page 85: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/85.jpg)
Forming the elevated track of the West Rail using the longitudinal steel support beam
![Page 86: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/86.jpg)
Forming the elevated track of the KCR Ma On Shan Line by precast girder and lifted to deck level for erection using mobile crane
![Page 87: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/87.jpg)
Placing the precastgirder in position
![Page 88: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/88.jpg)
Project example – Road T7 in Ma On Shan (TTD project)
Technical Features
1. Total length of viaduct – 2200m (approx.)
2. Span length – Average 40m
3. Total nos. of segment used – 790 nos.
4. No. of segment per span – average 14 nos.
5. Weight of segment – ranging from 50 to 98 tons
6. Weight of the launching machine – 310 tons
7. Max. weight of machine with segments – 1300 tons
8. Length of launching machine – 85m
9. Casting of the box-girder segment – match-cast
![Page 89: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/89.jpg)
Construction of highway bridge using precast box-girder (viaduct) –Road T7 in Ma On Shan
![Page 90: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/90.jpg)
Early stage of the project –formation and forming the piers for the viaduct
![Page 91: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/91.jpg)
Overall layout of the precasting yard
![Page 92: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/92.jpg)
Forming the box-girder units
![Page 93: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/93.jpg)
Formwork to form the inner void of the box-girder units
![Page 94: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/94.jpg)
Overview of the launching machine
![Page 95: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/95.jpg)
Drawing provided by China Harbour Engg. Co. (Group)
Launching sequence of the box-girder units using launching machine
![Page 96: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/96.jpg)
Installation of the box-girders
![Page 97: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/97.jpg)
Installation of the box-girders
![Page 98: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/98.jpg)
Other example of application in civil engineering works
![Page 99: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/99.jpg)
Precast parapet unit for the highway and railway road/track way
![Page 100: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/100.jpg)
Precast floating slab for the laying of railway track
![Page 101: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/101.jpg)
Tunnel lining formed by precast segments
![Page 102: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/102.jpg)
Detail of the lining as seen inside the tunnel tube
![Page 103: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/103.jpg)
Forming the station platform using precast curb and plank (KCR Tsim Sha Tsui Station)
![Page 104: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/104.jpg)
Forming the cable hood
![Page 105: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/105.jpg)
Delivery of the precast units
![Page 106: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/106.jpg)
Forming the deck of the berth for the Container Terminal No. 9
Forming the deck of the Ting KauBridge using precast concrete plank
![Page 107: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/107.jpg)
Precast concrete plank as cover to podium deck
![Page 108: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/108.jpg)
Precast vertical panel forming an earth-reinforced type retaining structure
![Page 109: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/109.jpg)
Forming storm water discharge culvert – Tseung Kwan O Reclamation
![Page 110: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/110.jpg)
Delivery and storage along the temporary seawall
Prepare for the foundation to support the culvert
![Page 111: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/111.jpg)
Precast units to form the 4m high 5-cell culvert system in Tseung Kwan O
![Page 112: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/112.jpg)
Positioning the Precast units onto the culvert alignment
![Page 113: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/113.jpg)
Precast culvert in the form of semi-submerged tube –Tsuen Wan West Reclamation as advanced work for the West Rail Tsuen Wan Station
![Page 114: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/114.jpg)
Sinking of the precastculvert section
![Page 115: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/115.jpg)
Positioning of the culvert section onto to formed bed
![Page 116: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/116.jpg)
Connecting the culvert from the precast section to the in-situ section
![Page 117: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/117.jpg)
Precast box as footing to bridge tower – Tsing Ma Bridge tower on Ma Wan side
![Page 118: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/118.jpg)
Precast box as pump house for water cooling system in the Central Reclamation
![Page 119: Prefabricated](https://reader030.vdocuments.us/reader030/viewer/2022020109/541434168d7f720f6a8b4579/html5/thumbnails/119.jpg)
End of Presentationand
Thank you
If you require more information about the Author’s recent work on various
technology topics, you can enter his homepage at