preevision consistent schematic development for wiring … · 2019. 7. 26. · pv wiring harness...

21
V1 | 2019-07-15 Vector Conference Pune, India – July 2019 PREEvision – Consistent Schematic Development for Wiring Harnesses

Upload: others

Post on 06-Mar-2021

14 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: PREEvision Consistent Schematic Development for Wiring … · 2019. 7. 26. · PV Wiring harness 3D-WH-Design WH-Formboard 2D-WH-Drawing PV Geometry Covered by PREEvision Standard

V1 | 2019-07-15

Vector Conference Pune, India – July 2019

PREEvision –Consistent Schematic Development for Wiring Harnesses

Page 2: PREEvision Consistent Schematic Development for Wiring … · 2019. 7. 26. · PV Wiring harness 3D-WH-Design WH-Formboard 2D-WH-Drawing PV Geometry Covered by PREEvision Standard

2

1. Challenges in Automotive E/E-Development

2. Handling of the complexity

3. Classic wiring harness tool chain

4. Approach to meet the challenges in the E/E Development

5. Summary

Agenda

Page 3: PREEvision Consistent Schematic Development for Wiring … · 2019. 7. 26. · PV Wiring harness 3D-WH-Design WH-Formboard 2D-WH-Drawing PV Geometry Covered by PREEvision Standard

3

Engineers must develop complex control functionality:

Driver assistance, active safety, hybrid drives, connectivity, …

While balancing:

Steady increasing quality requirements

Steady decreasing time to market

A drive to minimize costs

The Situation

Challenges in Automotive E/E-Development

Quality

CostTime

Page 4: PREEvision Consistent Schematic Development for Wiring … · 2019. 7. 26. · PV Wiring harness 3D-WH-Design WH-Formboard 2D-WH-Drawing PV Geometry Covered by PREEvision Standard

4

Complexity versus Capability

Challenges in Automotive E/E-Development

Hybrid powertrainElectronic stability control Active body control Emergency callElectric power steeringFLEXRAYGearbox controlTraction control CAN bus …

Electronic fuel injectionAnti-lock brakes

Gearbox controlTraction control CANAnti lock brakesElectronic fuel injection

Electric powertrainAdaptive cruise controlLane AssistantStop-/Start automaticEmergency Break AssistHead-up DisplayElectronic Brake Control TelediagnosticsOnline Software UpdatesAUTOSARHybrid powertrainElectronic stability control

Active body control …

Car2Car, Car2XCloud Computing5G mobile communicationFuel-cell technologyAutonomous drivingBrake-by-wireSteer-by-wireSecurity & safetyLaser-sourced lighting3D displaysGesture HMIEthernet/IP backbone Electric powertrainAdaptive cruise controlLane AssistantStop-/Start automaticEmergency Break AssistHead-up DisplayElectronic Brake Control TelediagnosticsAUTOSAR …

Enhance Capability

Entire tool support

From local to global optimization

Integrated,model based and comprehensive design approach

1975 1985 1995 2005 2015 2025

Reduce Complexity

Reuse of proven components

More standardized architectures

High Performance ECU

Service Oriented Architectures

Page 5: PREEvision Consistent Schematic Development for Wiring … · 2019. 7. 26. · PV Wiring harness 3D-WH-Design WH-Formboard 2D-WH-Drawing PV Geometry Covered by PREEvision Standard

5

1. Challenges in Automotive E/E-Development

2. Handling of the complexity

3. Classic wiring harness tool chain

4. Approach to meet the challenges in the E/E Development

5. Summary

Agenda

Page 6: PREEvision Consistent Schematic Development for Wiring … · 2019. 7. 26. · PV Wiring harness 3D-WH-Design WH-Formboard 2D-WH-Drawing PV Geometry Covered by PREEvision Standard

6

Process of platform development

Handling of the complexity

Platform IdeaArchitecture Development

Incre

asin

g R

esp

on

sib

ility

of th

e S

up

plie

r

Concept Phase

Increasing number of involved engineers and departments

SeriesDevelopment

Page 7: PREEvision Consistent Schematic Development for Wiring … · 2019. 7. 26. · PV Wiring harness 3D-WH-Design WH-Formboard 2D-WH-Drawing PV Geometry Covered by PREEvision Standard

7

Process of platform development

Handling of the complexity

3D Package & Routing

Schematics3D Package &

RoutingSchematics

3D Package & Routing

Schematics

2D Wiring Harness Drawing

2D Wiring Harness Drawing

2D Wiring Harness Drawing

Page 8: PREEvision Consistent Schematic Development for Wiring … · 2019. 7. 26. · PV Wiring harness 3D-WH-Design WH-Formboard 2D-WH-Drawing PV Geometry Covered by PREEvision Standard

8

Different Wiring Harness Suppliers on a separate derivate of the platform

They are working independently and decisions are made multiple times

Improvable communication in between

Process of platform development

Handling of the complexity

3D Package & Routing

Schematics3D Package &

RoutingSchematics

3D Package & Routing

Schematics

2D Wiring Harness Drawing

2D Wiring Harness Drawing

2D Wiring Harness Drawing

Page 9: PREEvision Consistent Schematic Development for Wiring … · 2019. 7. 26. · PV Wiring harness 3D-WH-Design WH-Formboard 2D-WH-Drawing PV Geometry Covered by PREEvision Standard

9

Geometrical placement is different on each derivate of the platform

Wire length, routing and number of interconnections may differ

The function is the same

From the schematical point of view the connection is exactly the same

It needs only once a definition for a complete platform

Schematic Similarities – Example: Brake Light

Handling of the complexity

Page 10: PREEvision Consistent Schematic Development for Wiring … · 2019. 7. 26. · PV Wiring harness 3D-WH-Design WH-Formboard 2D-WH-Drawing PV Geometry Covered by PREEvision Standard

10

1. Challenges in Automotive E/E-Development

2. Handling of the complexity

3. Classic wiring harness tool chain

4. Approach to meet the challenges in the E/E Development

5. Summary

Agenda

Page 11: PREEvision Consistent Schematic Development for Wiring … · 2019. 7. 26. · PV Wiring harness 3D-WH-Design WH-Formboard 2D-WH-Drawing PV Geometry Covered by PREEvision Standard

11

Schematics

Simplified tool process

Classic wiring harness tool chain

DMU-Package

Electrical System

Schematics

3D-WH-Design

Merging of 3D-Data and

E-Log

WH-Formboard

2D-WH-Drawing

Responsibility of OEM

Responsibility of harness maker (Supplier)

Separate group of engineers/departments

PDM System

Manual exchange of information

Page 12: PREEvision Consistent Schematic Development for Wiring … · 2019. 7. 26. · PV Wiring harness 3D-WH-Design WH-Formboard 2D-WH-Drawing PV Geometry Covered by PREEvision Standard

12

Electrical System

PV Schematic

Electrical System

Simplified tool process – How can an E/E-collaboration tool provide support?

Classic wiring harness tool chain

DMU-Package

E-LogPV Wiring harness

3D-WH-Design

Merging of 3D and E-Log

PV Geometry

WH-Formboard

2D-WH-Drawing

PV Geometry

Covered by PREEvision

Standard tool process

PDM System

Schematics

Merging of 3D-Data and

E-Log

2D-WH-Drawing

Tool interface / File exchange

Page 13: PREEvision Consistent Schematic Development for Wiring … · 2019. 7. 26. · PV Wiring harness 3D-WH-Design WH-Formboard 2D-WH-Drawing PV Geometry Covered by PREEvision Standard

13

Simplified tool process – How can an E/E-collaboration tool provide support?

Classic wiring harness tool chain

DMU-Package

Electrical System

PV Schematic

E-LogPV Wiring harness

3D-WH-Design

WH-Formboard

2D-WH-Drawing

PV Geometry

Covered by PREEvision

Standard tool process

PDM System

Tool interface / File exchange

Merging of 3D and E-Log

PV Geometry

KBL /VEC

KBL /VEC

KBL /VEC

Page 14: PREEvision Consistent Schematic Development for Wiring … · 2019. 7. 26. · PV Wiring harness 3D-WH-Design WH-Formboard 2D-WH-Drawing PV Geometry Covered by PREEvision Standard

14

1. Challenges in Automotive E/E-Development

2. Handling of the complexity

3. Classic wiring harness tool chain

4. Approach to meet the challenges in the E/E Development

5. Summary

Agenda

Page 15: PREEvision Consistent Schematic Development for Wiring … · 2019. 7. 26. · PV Wiring harness 3D-WH-Design WH-Formboard 2D-WH-Drawing PV Geometry Covered by PREEvision Standard

15

Classic vs. Integrated Collaboration Approach

Approach to meet the challenges in the E/E Development

Classic Approach

Integrated Collaboration

Approach

Each development step is separated

Interfaces are necessary

No automatic back annotation of changes

Signals from Electric Circuit are used for synthesis of the wiring harness

Complete traceability during development

Electrical System

Schematics

2D-WH-Drawing

Synthesis

(Automated creation of wires out of signals)

Page 16: PREEvision Consistent Schematic Development for Wiring … · 2019. 7. 26. · PV Wiring harness 3D-WH-Design WH-Formboard 2D-WH-Drawing PV Geometry Covered by PREEvision Standard

16

Summary and Benefits

Hardware Architecture and Wiring Harness Design

Approach to meet the challenges in the E/E Development

Hardware Design

Electric CircuitWiring

HarnessGeometrical

Layer

Wiring Harness Router

KBL & VECExport

Architecture Design to Series Development

Consistency Checks

Variant ManagementLife Cycle Management

Circuit SynthesesReusability Concepts

Page 17: PREEvision Consistent Schematic Development for Wiring … · 2019. 7. 26. · PV Wiring harness 3D-WH-Design WH-Formboard 2D-WH-Drawing PV Geometry Covered by PREEvision Standard

17

From a Fragmented Tool Landscape to an Integrated Solution

Approach to meet the challenges in the E/E Development

Tool Landscape Situation:Multiple Tools and Interfaces

Integrated Tool Approach:PREEvision E/E Engineering Environment

Page 18: PREEvision Consistent Schematic Development for Wiring … · 2019. 7. 26. · PV Wiring harness 3D-WH-Design WH-Formboard 2D-WH-Drawing PV Geometry Covered by PREEvision Standard

18

Well addressed with PREEvision

Approach to meet the challenges in the E/E Development

Page 19: PREEvision Consistent Schematic Development for Wiring … · 2019. 7. 26. · PV Wiring harness 3D-WH-Design WH-Formboard 2D-WH-Drawing PV Geometry Covered by PREEvision Standard

19

1. Challenges in Automotive E/E-Development

2. Handling of the complexity

3. Classic wiring harness tool chain

4. Approach to meet the challenges in the E/E Development

5. Summary

Agenda

Page 20: PREEvision Consistent Schematic Development for Wiring … · 2019. 7. 26. · PV Wiring harness 3D-WH-Design WH-Formboard 2D-WH-Drawing PV Geometry Covered by PREEvision Standard

20

Well addressed with PREEvision

Related needs in WH development

Comprehensive evaluation of alternative designsearly in the development process

Requirements and Variant Management deeply integrated in the entire development process→ Model Based Requirements Engineering

Improve efficiency with systematic re-use and less tool-to-tool interfaces

Seamless tool support in theentire E/E development

Challenges in WH development

Team integration with all the knowledge from all development phases

Control complex functionality and manage variants

High quality and shorter time to market

Cost reductions e.g. by increased efficiency

Challenges and Corresponding Needs

Summary

Quality

CostTime

Page 21: PREEvision Consistent Schematic Development for Wiring … · 2019. 7. 26. · PV Wiring harness 3D-WH-Design WH-Formboard 2D-WH-Drawing PV Geometry Covered by PREEvision Standard

21 © 2019. Vector Informatik GmbH. All rights reserved. Any distribution or copying is subject to prior written approval by Vector. V1 | 2019-07-15

Author:Bunkert, Georg; Hoppe, JohannesVector Germany

For more information about Vectorand our products please visit

www.vector.com