précis of p802.11n report to ec on conditional approval to go to sponsor ballot

10
Nov 200 8 Bruce Krae mer ( Slide 1 doc.: IEEE 802.11-08/1437r1 Submission Précis of P802.11n Report to EC on Conditional Approval to go to Sponsor Ballot Date: 2008-11-14 N am e C om pany A ddress Phone em ail A drian Stephens IntelCorporation 15 JJThom pson A venue, Cam bridge CB3 0FD UK +1 (503) 616-3800 [email protected] om Sheung Li SiBEA M 555 M athildaA venue, Sunnyvale, CA 94085 +1 (408) 245-3120 sli@ sibeam.com Bruce K raem er M arvell 5488 M arvellLane, Santa Clara, CA 95054 +1 (321) 427-4098 bkraemer@ marvell.com Authors:

Upload: uriah-wright

Post on 31-Dec-2015

28 views

Category:

Documents


0 download

DESCRIPTION

Précis of P802.11n Report to EC on Conditional Approval to go to Sponsor Ballot. Authors:. Date: 2008-11-14. Introduction. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Précis of P802.11n Report to EC on Conditional Approval to go to Sponsor Ballot

Nov 2008

Bruce Kraemer (Marvell), Adrian Stephens (Intel), Sheung Li (SiBeam)

Slide 1

doc.: IEEE 802.11-08/1437r1

Submission

Précis of P802.11n Report to EC on Conditional Approval to go to Sponsor Ballot

Date: 2008-11-14

Name Company Address Phone email

Adrian Stephens Intel Corporation

15 JJ Thompson Avenue,

Cambridge CB3 0FD UK

+1 (503) 616-3800

[email protected]

Sheung Li SiBEAM 555 Mathilda Avenue, Sunnyvale, CA 94085

+1 (408) 245-3120

[email protected]

Bruce Kraemer Marvell 5488 Marvell Lane,

Santa Clara, CA 95054 +1 (321) 427-4098

[email protected]

Authors:

Page 2: Précis of P802.11n Report to EC on Conditional Approval to go to Sponsor Ballot

Nov 2008

Bruce Kraemer (Marvell), Adrian Stephens (Intel), Sheung Li (SiBeam)

Slide 2

doc.: IEEE 802.11-08/1437r1

Submission

Introduction

• This document is a précis of document 11-08/1217r2, which is the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11n to Sponsor Ballot.

• Document 11-08/1217r2 was approved during the closing plenary session of the 802.11 working group on 2008-11-14.– Passed in the Task Group 53,3,6

• Please refer to 11-08/1217r2 for narrative and explanation of the terms used below.

Page 3: Précis of P802.11n Report to EC on Conditional Approval to go to Sponsor Ballot

Nov 2008

Bruce Kraemer (Marvell), Adrian Stephens (Intel), Sheung Li (SiBeam)

Slide 3

doc.: IEEE 802.11-08/1437r1

Submission

802.11 WG Letter Ballot Results – P802.11n

BallotID

Ballot Close Date

Title BallotType PoolRetu

rn%Return

Abstain

%Abstain

Approve

Disapprove

%Approve

97 09 March 2007

Technical Letter Ballot for Task Group-n Draft 2.0

Technical 325 306 94.15

28 9.15 232 46 83.45

115 27 October 2007

Recirculation Letter Ballot for Task Group-n Draft 3.0

Recirculation 325 310 95.38

27 8.7 240 43 84.8

124 12 April 2008

Second Recirculation Ballot for Task Group-n Draft 4.0

Recirculation 325 312 96 25 8.01 253 34 88.15

129 12 June 2008

IEEE 802.11n_D5.00 Third Recirculation Ballot

Recirculation 325 313 96.3 23 7.34 260 30 89.65

134 05 August 2008

IEEE 802.11n Draft 6.0 Fourth Recirculation Letter Ballot

Technical 325 314 96.61

21 6.68 266 27 90.78

136 30 September

2008

IEEE 802.11n Draft 7.0 Fifth Recirculation Letter Ballot

Recirculation 325 314 96.61

21 6.68 276 17 94.19

136.1 LB136 Post Ballot vote changes

325 314 96.61

21 6.68 277 16 94.53

Page 4: Précis of P802.11n Report to EC on Conditional Approval to go to Sponsor Ballot

Nov 2008

Bruce Kraemer (Marvell), Adrian Stephens (Intel), Sheung Li (SiBeam)

Slide 4

doc.: IEEE 802.11-08/1437r1

Submission

Draft Text Stability

Draft Page Count

300

350

400

450

500

550

600

Sep-05 Mar-06 Oct-06 Apr-07 Nov-07 Jun-08 Dec-08

1.0

2.0 3.0 4.0

5.0

6.0

7.0

Page 5: Précis of P802.11n Report to EC on Conditional Approval to go to Sponsor Ballot

Nov 2008

Bruce Kraemer (Marvell), Adrian Stephens (Intel), Sheung Li (SiBeam)

Slide 5

doc.: IEEE 802.11-08/1437r1

Submission

Comments by BallotBalloted

Draft LB Non Voter Withdrawn Not

Required Satisfied Unsatisfied Total 2.0 97 30 1920 1146 67 3163 3.0 115 6 469 417 14 906 4.0 124 1 3 238 103 4 349 5.0 129 68 1035 9 1112 6.0 134 1 74 115 5 195 7.0 136 13 32 3 48

Grand Total 1 53 2801 2816 102 5773

Page 6: Précis of P802.11n Report to EC on Conditional Approval to go to Sponsor Ballot

Nov 2008

Bruce Kraemer (Marvell), Adrian Stephens (Intel), Sheung Li (SiBeam)

Slide 6

doc.: IEEE 802.11-08/1437r1

Submission

Unsatisfied Comments

# Comments Resn Status LB A C R Grand Total 97 3 22 42 67 115 5 9 14 124 4 4 129 1 8 9 134 5 5 136 3 3

Grand Total 3 33 66 102

Page 7: Précis of P802.11n Report to EC on Conditional Approval to go to Sponsor Ballot

Nov 2008

Bruce Kraemer (Marvell), Adrian Stephens (Intel), Sheung Li (SiBeam)

Slide 7

doc.: IEEE 802.11-08/1437r1

Submission

Unsatisfied comments by commenter# Comments Resn Status

Commenter A C R Grand Total

Miller, Robert 1 6 16 23 Ji, Lusheng 1 8 12 21

Lefkowitz, Martin 1 9 6 16 Batra, Anuj 2 9 11

Sherlock, Ian 3 7 10 Waters, Deric 7 7

Loc, Peter 2 2 Bagby, David 2 1 3 Benveniste,

Mathilde 1 2 3 Chaplin, Clint 1 1

Kwak, Joe 1 1 HEILE, ROBERT 1 1 Stevenson, Carl 1 1 Buttar, Alistair 1 1

Gossain, Hrishikesh 1 1

Grand Total 3 33 66 102

Page 8: Précis of P802.11n Report to EC on Conditional Approval to go to Sponsor Ballot

Nov 2008

Bruce Kraemer (Marvell), Adrian Stephens (Intel), Sheung Li (SiBeam)

Slide 8

doc.: IEEE 802.11-08/1437r1

Submission

0

2

4

6

8

10

12

14

16

18

Pro

tect

ion

Mec

hani

sms

Edi

toria

l

40 M

Hz

in 2

.4 G

Hz

Sec

onda

ry C

hann

el A

cces

s

Dec

oupl

e M

AC

and

PH

Y IP

PC

O

Sec

urity

40 M

Hz

mas

k

5 G

Hz

Cha

nnel

izat

ion

Bea

con

Leng

th

ST

BC

Tra

nsm

it E

VM

pro

cedu

re

Blo

ck A

ck

Rx

Div

ersi

ty

Sm

ooth

ing

Adm

issi

on C

ontr

ol

A-M

PD

U

Bea

m F

orm

ing

Cha

nnel

Acc

ess

Ext

ende

d C

hann

el S

witc

h

Fra

me

For

mat

s

Gre

enfie

ld

Lega

cy C

ompa

tibili

ty

MS

DU

life

time

Nei

ghbo

r re

port

Ord

er b

it

RC

PI

RT

S P

roce

dure

Scr

ambl

er

R

C

A

Count of Commenter

Topic

Resn Status

Page 9: Précis of P802.11n Report to EC on Conditional Approval to go to Sponsor Ballot

Nov 2008

Bruce Kraemer (Marvell), Adrian Stephens (Intel), Sheung Li (SiBeam)

Slide 9

doc.: IEEE 802.11-08/1437r1

Submission

Topics – 1

Topic A C R Grand TotalProtection Mechanisms 5 11 16

Editorial 3 6 4 1340 MHz in 2.4 GHz 2 10 12

Secondary Channel Access 1 6 7Decouple MAC and PHY 2 4 6

IP 3 2 5PCO 3 1 4

Security 4 440 MHz mask 3 3

5 GHz Channelization 1 2 3Beacon Length 3 3

STBC 3 3Transmit EVM procedure 3 3

Block Ack 2 2Rx Diversity 2 2Smoothing 2 2

Page 10: Précis of P802.11n Report to EC on Conditional Approval to go to Sponsor Ballot

Nov 2008

Bruce Kraemer (Marvell), Adrian Stephens (Intel), Sheung Li (SiBeam)

Slide 10

doc.: IEEE 802.11-08/1437r1

Submission

Topics – 2

Admission Control 1 1A-MPDU 1 1

Beam Forming 1 1Channel Access 1 1

Extended Channel Switch 1 1Frame Formats 1 1

Greenfield 1 1Legacy Compatibility 1 1

MSDU lifetime 1 1Neighbor report 1 1

Order bit 1 1RCPI 1 1

RTS Procedure 1 1Scrambler 1 1

Topic A C R Grand Total