    PRE-REQUISITES FOR SUCCESSFUL IMPLEMENTATION OF PROJECT

    Successful Project Implementation

    Successful implementation of theproject lies on effective project plan.

    Based on the anticipated goals and objectives the project planning to be made

    Problem formulation and Statement of the problem

    The crux of the project lies in the problem formulation process. the project

    team should have detailed understanding of the problem, scope intervention areas and

    the out come of the project to be hypothesized

    Project planning

    Project planning: can be defined as

    a scientific and systematic process, in which

    logical linkages are clearly established, among

    various element of projects

    Project Budget

    The project budgeting phase is in the project formulation phase. Two types of

    budgets are to be made. The prior one is the cost category budget (materials,

    administration, capital; expenditures etc) and the later is the activity budget. This

    project budget is to calculate the cost of each project output.

    Feasibility of the project

    management appraisal

    technical feasibility

    financial feasibility

    commercial appraisal environmental analysis

    economic appraisal

    Pre-requisites for successful implementation of

    Adequate formulation

    Cursory assessment of input requirement

    Superficial field investigation

    Slip shod method used for estimating cost and benefits

    Omission of project linkages

    Flawed judgment because of lack of experience and expertise

    Deliberate over estimation of benefits and underestimation of benefits.Sound project organization

    it is led by a competent leader who is accountable for project performance

    the authority of the project leader and his team is commensurate with their

    responsibility.

    Adequate attention is given to the human side of the project system and

    method is clearly defined

    Proper implementation planning

    develop a comprehensive plan for various activities like land acquisition,

    tender evaluation, recruitment of personnel. Construction of building etc.

    estimate meticulously the resource requirement (manpower, materials, moneyect) for each period to realize the time plan.

  • 7/29/2019 Pre Requisites for Project Implementation

    2/3

    Define properly the inter linkages between activities of the project.

    Specify cost standards.

    Advance action

    When the project appears prima facie to be viable and desirable, advance

    action on the following activities may be initiated:

    acquisition of land

    securing essential clearances

    identifying technical collaborators/consultants,

    arranging for infrastructure facilities

    preliminary design and engineering and

    calling of tenders

    Timely availability of funds

    Once a project is approved, adequate funds must be made available to meet its

    requirements as per the plan of implementation, it would be highly desirable if funds

    are provided even before the final approval to initiate advance action. Piecemeal, ad-

    hoc and niggardly allocation, with undue rigidities, can impair the maneuverability ofthe project team.

    Judicious equipment tendering and procurement

    to minimize time over- runs, it may appear that a turnkey contract has obvious

    advantages. Since these contracts are likely to be bagged by the foreign

    suppliers, when global tenders are floated, a very important question arises.

    A judicious balance must be sought which Moderates the outflow of foreign

    exchange and provides reasonable fillip to the development of indigenous

    technology.

    Better contract Management

    The Competence and capability of all contractors must be ensured one weak

    link can jeopardize timely performance of contract.

    Proper discipline must be inculcated among contractors and suppliers by

    insisting that they should develop realistic and detailed resource and time

    plans which are congruent with the project plan.

    Penalties which may be graduated must be imposed for failure to meet

    contractual; obligations. Likewise incentives may be offered for good

    performance. Help should be extended to contractors and suppliers when they

    have genuine problems they should be regarded as partners in common

    pursuit.

    Project authorities must retain latitude on offload contracts ( Partially of

    wholly) to other parties well in time where delays are anticipated.Effective Monitoring:

    In order to keep a tab on the progress of the project, a system of monitoring

    must be established. This helps in:

    Anticipating deviation from implementation plan.

    Analyzing immerging problem

    Taking corrective action

    It should focus sharply on the critical aspect of project implementation

    It must lay more emphasis on physical milestones and not on financial targets.

    It must be kept relatively simple. If made over complicated, it may lead to

    redundant paper work and diversion of resources. Even worse, monitoring

  • 7/29/2019 Pre Requisites for Project Implementation

    3/3

    may be viewed as an end in itself rather than as a means to implement the

    project successfully.