pre-posting and partial energization -...
TRANSCRIPT
![Page 1: Pre-Posting and Partial Energization - Esriproceedings.esri.com/library/userconf/geoconx16/papers/geoconx_18.pdf · 2016 Esri GeoConX Conference Pre-Posting & Partial Energization](https://reader030.vdocuments.us/reader030/viewer/2022011817/5e7b85e3e9e9d434be11570f/html5/thumbnails/1.jpg)
2016 Esri GeoConX Conference
Pre-Posting & Partial EnergizationImproving GIS Usability and Performance at CoServ
October 19, 2016
![Page 2: Pre-Posting and Partial Energization - Esriproceedings.esri.com/library/userconf/geoconx16/papers/geoconx_18.pdf · 2016 Esri GeoConX Conference Pre-Posting & Partial Energization](https://reader030.vdocuments.us/reader030/viewer/2022011817/5e7b85e3e9e9d434be11570f/html5/thumbnails/2.jpg)
James Stevens| CoServ•GIS Manager
Joaquin Madrid, PhD| SSP Innovations•Senior Consultant•GIS – ESB Integrations•GIS Workflows & Applications
Introductions
![Page 3: Pre-Posting and Partial Energization - Esriproceedings.esri.com/library/userconf/geoconx16/papers/geoconx_18.pdf · 2016 Esri GeoConX Conference Pre-Posting & Partial Energization](https://reader030.vdocuments.us/reader030/viewer/2022011817/5e7b85e3e9e9d434be11570f/html5/thumbnails/3.jpg)
ABOUT CoServ
MAY 1937: Denton County Electric Cooperative is chartered.
JANUARY 1998: Denton County Electric begins doing business
as CoServ, an abbreviation of “Cooperative Services.”
JULY 1998: CoServ Gas established.
APRIL 2004: 100,000th meter installed, making CoServ the
second-largest electric cooperative in Texas.
SEPTEMBER 2015: Official dedication ceremony held for CoServ
Solar Station. CoServ begins offering Members a solar rate option.
In July this year: we set a combined total of 300,000 electric
and gas meters.
• Established in 1937• Headquarters: Corinth, TX• Serve several Counties in
North Central Texas
![Page 4: Pre-Posting and Partial Energization - Esriproceedings.esri.com/library/userconf/geoconx16/papers/geoconx_18.pdf · 2016 Esri GeoConX Conference Pre-Posting & Partial Energization](https://reader030.vdocuments.us/reader030/viewer/2022011817/5e7b85e3e9e9d434be11570f/html5/thumbnails/4.jpg)
ABOUT SSP
• Eleven-year old GIS consulting company
• Work exclusively in the U.S. utility/telecom industries
• Team of ~35 Based in the Denver area
• 100% of our work is performed at utilities & telecoms with Esri-based GIS
• 100% aligned with Esri platform strategy
• 70+ clients; 100+ combined years working with Esri software
• Industry-leading reputation for quality, successful solutions to requirements
![Page 5: Pre-Posting and Partial Energization - Esriproceedings.esri.com/library/userconf/geoconx16/papers/geoconx_18.pdf · 2016 Esri GeoConX Conference Pre-Posting & Partial Energization](https://reader030.vdocuments.us/reader030/viewer/2022011817/5e7b85e3e9e9d434be11570f/html5/thumbnails/5.jpg)
Business Drivers
1. Early Data AvailabilityDesign and Construction Data available in Enterprise GIS
2. Up-To-Date Network Energization StatusFollowing Energization evolution during Construction
3. GDB Performance ImprovementMinimizing concurrent SDE versions
![Page 6: Pre-Posting and Partial Energization - Esriproceedings.esri.com/library/userconf/geoconx16/papers/geoconx_18.pdf · 2016 Esri GeoConX Conference Pre-Posting & Partial Energization](https://reader030.vdocuments.us/reader030/viewer/2022011817/5e7b85e3e9e9d434be11570f/html5/thumbnails/6.jpg)
SOLUTION: Pre-Posting
Esri® Reconcile and Post – Delete Esri Version1. When Design is approved for Construction
Design (not energized) available in Enterprise GIS
2. After Edits of Partial As-BuiltsFollowing Construction evolution in Enterprise GIS
ArcFM™ GDBM Rec&Post3. As-Builts Edits of completed project
Posted verified features in Enterprise GIS
![Page 7: Pre-Posting and Partial Energization - Esriproceedings.esri.com/library/userconf/geoconx16/papers/geoconx_18.pdf · 2016 Esri GeoConX Conference Pre-Posting & Partial Energization](https://reader030.vdocuments.us/reader030/viewer/2022011817/5e7b85e3e9e9d434be11570f/html5/thumbnails/7.jpg)
SOLUTION: Workflow Overview
In Design
In Construction
As-Built Edits
For Approval
![Page 8: Pre-Posting and Partial Energization - Esriproceedings.esri.com/library/userconf/geoconx16/papers/geoconx_18.pdf · 2016 Esri GeoConX Conference Pre-Posting & Partial Energization](https://reader030.vdocuments.us/reader030/viewer/2022011817/5e7b85e3e9e9d434be11570f/html5/thumbnails/8.jpg)
SOLUTION: Workflow Overview
In Design
In Construction
As-Built Edits
For Approval
Esri PRE-POSTDelete Version
Data CorrectionsPosting Status: In Construction
![Page 9: Pre-Posting and Partial Energization - Esriproceedings.esri.com/library/userconf/geoconx16/papers/geoconx_18.pdf · 2016 Esri GeoConX Conference Pre-Posting & Partial Energization](https://reader030.vdocuments.us/reader030/viewer/2022011817/5e7b85e3e9e9d434be11570f/html5/thumbnails/9.jpg)
SOLUTION: Workflow Overview
In Design
In Construction
As-Built Edits
For Approval
Esri PRE-POSTDelete Version
Data CorrectionsPosting Status: In Construction
Posting Status: Partial Post
Partial As-Built(Proposed)(Energized)
Esri PRE-POSTDelete Version
![Page 10: Pre-Posting and Partial Energization - Esriproceedings.esri.com/library/userconf/geoconx16/papers/geoconx_18.pdf · 2016 Esri GeoConX Conference Pre-Posting & Partial Energization](https://reader030.vdocuments.us/reader030/viewer/2022011817/5e7b85e3e9e9d434be11570f/html5/thumbnails/10.jpg)
SOLUTION: Workflow Overview
In Design
In Construction
As-Built Edits
For Approval
Esri PRE-POSTDelete Version
Data CorrectionsPosting Status: In Construction
Posting Status: Partial Post
Partial As-Built(Proposed)(Energized)
ArcFM GDBM PostDelete Version
Esri PRE-POSTDelete Version
Posting Status: Field Verified
![Page 11: Pre-Posting and Partial Energization - Esriproceedings.esri.com/library/userconf/geoconx16/papers/geoconx_18.pdf · 2016 Esri GeoConX Conference Pre-Posting & Partial Energization](https://reader030.vdocuments.us/reader030/viewer/2022011817/5e7b85e3e9e9d434be11570f/html5/thumbnails/11.jpg)
SOLUTION: Sample
In Design In Construction
![Page 12: Pre-Posting and Partial Energization - Esriproceedings.esri.com/library/userconf/geoconx16/papers/geoconx_18.pdf · 2016 Esri GeoConX Conference Pre-Posting & Partial Energization](https://reader030.vdocuments.us/reader030/viewer/2022011817/5e7b85e3e9e9d434be11570f/html5/thumbnails/12.jpg)
SOLUTION: Sample
In Construction Partial As-Built & Partial Post
![Page 13: Pre-Posting and Partial Energization - Esriproceedings.esri.com/library/userconf/geoconx16/papers/geoconx_18.pdf · 2016 Esri GeoConX Conference Pre-Posting & Partial Energization](https://reader030.vdocuments.us/reader030/viewer/2022011817/5e7b85e3e9e9d434be11570f/html5/thumbnails/13.jpg)
SOLUTION: Sample
Partial As-Built/Energized
![Page 14: Pre-Posting and Partial Energization - Esriproceedings.esri.com/library/userconf/geoconx16/papers/geoconx_18.pdf · 2016 Esri GeoConX Conference Pre-Posting & Partial Energization](https://reader030.vdocuments.us/reader030/viewer/2022011817/5e7b85e3e9e9d434be11570f/html5/thumbnails/14.jpg)
Business Benefits
1. Early Data Availability
2. Up-To-Date Network Energization Status
3. GDB Performance Improvement
NOTE: Switched from Designed Stored Displays to DesignGraphics Feature Annotation Layer