Pre-Mining Survey Map (PMSM) and Form Presentation At: Training for the Kentucky General Coal Permits Training for the Kentucky General Coal Permits Chris Hart, Permit Writer Chris Hart, Permit Writer Division of Water Division of Water

Upload: dinhdieu

Post on 09-Jun-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Pre-Mining Survey Map (PMSM) and Formwater.ky.gov/permitting/KPDES Documents/CoalGP/PMSM.pdfPre-Mining Survey Map (PMSM) and Form Presentation At: Training for the Kentucky General

Pre-Mining Survey Map (PMSM) and Form

Presentation At:

Training for the Kentucky General Coal PermitsTraining for the Kentucky General Coal Permits

Chris Hart, Permit WriterChris Hart, Permit Writer

Division of Water Division of Water

Page 2: Pre-Mining Survey Map (PMSM) and Formwater.ky.gov/permitting/KPDES Documents/CoalGP/PMSM.pdfPre-Mining Survey Map (PMSM) and Form Presentation At: Training for the Kentucky General

Who Must Submit

• KYGE4 – Eastern Kentucky

– New and expanded active surface mining areas

draining to an in-stream sediment control

structure (for the purposes of this permit in-

stream sediment control structures are those

sediment control structures that are constructed sediment control structures that are constructed

within the natural drainage way of a water body

or have a continuous discharge or have an

average discharge duration of 96 hours or more)

– New and expanded coal preparation plant

– New and expanded underground mine

Page 3: Pre-Mining Survey Map (PMSM) and Formwater.ky.gov/permitting/KPDES Documents/CoalGP/PMSM.pdfPre-Mining Survey Map (PMSM) and Form Presentation At: Training for the Kentucky General

PMSM Form

Page 4: Pre-Mining Survey Map (PMSM) and Formwater.ky.gov/permitting/KPDES Documents/CoalGP/PMSM.pdfPre-Mining Survey Map (PMSM) and Form Presentation At: Training for the Kentucky General

PMSM Form

Page 5: Pre-Mining Survey Map (PMSM) and Formwater.ky.gov/permitting/KPDES Documents/CoalGP/PMSM.pdfPre-Mining Survey Map (PMSM) and Form Presentation At: Training for the Kentucky General

In-stream Monitoring Points (IMP)

• Requirement

– At a minimum, one in-stream monitoring point

directly below the outfall along with one

downstream monitoring point of the receiving

stream located after the confluence but above

any tributaries.any tributaries.

– In-stream identification number: start with I01,

I02, I03, etc.

– Coordinates must be in decimal degrees

Page 6: Pre-Mining Survey Map (PMSM) and Formwater.ky.gov/permitting/KPDES Documents/CoalGP/PMSM.pdfPre-Mining Survey Map (PMSM) and Form Presentation At: Training for the Kentucky General

IMP Sample #1

Page 7: Pre-Mining Survey Map (PMSM) and Formwater.ky.gov/permitting/KPDES Documents/CoalGP/PMSM.pdfPre-Mining Survey Map (PMSM) and Form Presentation At: Training for the Kentucky General

IMP Sample #2

Page 8: Pre-Mining Survey Map (PMSM) and Formwater.ky.gov/permitting/KPDES Documents/CoalGP/PMSM.pdfPre-Mining Survey Map (PMSM) and Form Presentation At: Training for the Kentucky General

IMP Sample #3

Page 9: Pre-Mining Survey Map (PMSM) and Formwater.ky.gov/permitting/KPDES Documents/CoalGP/PMSM.pdfPre-Mining Survey Map (PMSM) and Form Presentation At: Training for the Kentucky General